East Rhine Railway

The East Rhine Railway (German: Rechte Rheinstrecke, literally 'right (of the) Rhine railway') is a major, double-track, electrified railway line, running along the right bank of the Rhine from Cologne to Wiesbaden. The 179-kilometer (111.2 mi)-long line forms two Deutsche Bahn routes. Route 465 extends from Cologne to Koblenz, via Troisdorf, Bonn-Beuel, Unkel, and Neuwied. From Koblenz, Route 466 extends to Wiesbaden, via Rüdesheim am Rhein. Together with the Taunus railway (Route 645.1), the line is used by Stadt-Express line SE-10 of the Rhine-Main Transport Association, which runs from Frankfurt to Koblenz and Neuwied.

East Rhine Railway
Overview
Native nameRechte Rheinstrecke
Line number
  • 2324 (Köln-Kalk Nord–Koblenz)
  • 507 (Koblenz–Wiesbaden)
LocaleNorth Rhine-Westphalia, Rhineland-Palatinate, Hesse, Germany
Termini
Service
Route number
  • 465 (Köln–Koblenz)
  • 466 (Koblenz–Wiesbaden)
Technical
Line length179 km (111 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification15 kV/16.7 Hz AC
Overhead catenary
Operating speed140 km/h (87 mph) (maximum)
Route map

km
00.0
 
Köln Hauptbahnhof
0.0
1.2
Köln Gummersbacher Straße junction
Köln-Trimbornstraße
freight line
2.2
Köln-Kalk
freight line to Köln-Kalk North
Troisdorf–Mülheim-Speldorf Railway
freight line to Köln-Kalk North
connecting line to Köln-Kalk North
A 4 / B 14
3.9
Vingst junction
4.5
Airport NW junction
Cologne Airport Loop (long distance)
Köln-Airport Business Park
Köln-Steinstraße
68.7   7.8
Köln Steinstraße junction (start of HSL)
70.1        
Gremberg Süd junction
Freight line to Gremberg
9.6
Porz (Rhein)
73.9 12.4
Porz-Wahn
Porz-Wahn south junction
A 59 / B 36
78.4 16.9
Spich
Troisdorf Tunnel (627 m)
79.5  18.0
Troisdorf Vorbf
Troisdorf north junction
81.2 19.7
TroisdorfS13
(planned)
⤹ original route from Siegburg
82.8
Friedrich-Wilhelms-Hütte
85.4
Menden
90.3
Bonn-Beuel
Bonn-Beuel industrial railway
Beuel–Großenbusch light railway
to Hangelar
Siebengebirgs Railway [de]
Ramersdorf
(planned)
93.9
Bonn Oberkassel
end of planned S-Bahn
96.6
Niederdollendorf
Siebengebirgs Railway [de]
98.6
Königswinter
101.3
Rhöndorf
103.4
Bad Honnef
107.6
Unkel
former line through the Erpeler Ley [de]
110.3
Erpel
110.5
Kasbach Valley Railway to Kalenborn
113.3
Linz am Rhein
115.8
Leubsdorf
120.0
Bad Hönningen
123.2
Rheinbrohl
129.5
Leutesdorf
133.4
Fahr-Irlich
135.6
Rasselstein & Co. siding
135.8
Neuwied
136.0
industrial sidings
139.0
141.2
Engers
Bendorf
(planned)
143.8
Bendorf
146.7
Vallendar
151.2
Koblenz-Ehrenbreitstein
153.0
Koblenz Pfaffendorf junction
Horchheim Tunnel (
576 m
630 yd
)
Horchheim Railway Bridge
to West Rhine Ry & Koblenz–Trier Ry
154.7
125.7
line change
2324
3507
Koblenz-Horchheim
(planned)
123.8
Niederlahnstein
Lahn (
former
border
)
122.0
Oberlahnstein
117.9
Braubach
117.0
112.0
Osterspai
109.1
Filsen
106.1
Kamp-Bornhofen
100.8
Kestert
94.2
St. Goarshausen
Loreley Tunnel (
368 m
402 yd
417 m
456 yd
)
89.0
Loreley
Roßstein Tunnel (
378 m
413 yd
457 m
500 yd
)
83.6
Kaub
80.0
Lorchhausen
Waldbahn Wispertal [de] (narrow gauge)
77.2
Lorch
69.5
Assmannshausen
65.3
Rüdesheim am Rhein
Kellergrube crossover
61.3
Geisenheim
57.0
Oestrich-Winkel
53.9
Hattenheim
50.8
Erbach
48.8
Eltville
45.8
Niederwalluf
42.6
Wiesbaden-Schierstein
39.5
Wiesbaden-Biebrich
38.8
44.7
Wiesbaden-Biebrich
kilometrage change
Wiesbaden-Salzbach junction
Taunus Railway to Frankfurt
Wiesbaden-Wäschbach Süd junction
Wiesbaden-Wäschbach Nord junction
41.2
Wiesbaden Hauptbahnhof
Wiesbaden Rheinbahnhof [de]
(1879–1906)
km
[1]

With the Cologne-Frankfurt high-speed railway and the Sieg Railway, the East Rhine Railway forms a six-track line between Cologne-Porz and Troisdorf. It includes two tunnels between Rüdesheim and Niederlahnstein, including the well-known Loreley Tunnel near Sankt Goarshausen.

History edit

Soon after the opening of the first railways in the region, a line on the right bank of the Rhine began to be discussed. In 1844 the Mayor of Deutz suggested building a line from Deutz via Rüdesheim to Wiesbaden. In 1852, the town of Neuwied also began to press strongly for the building of a railway. However, others, particularly Prussia, had substantial reservations. There were military objections to a railway line along the Rhine (the extension of the West Rhine railway past Rolandseck was similarly delayed). In particular, the Prussian military objected that the suggested route would pass close to the Ehrenbreitstein Fortress, part of the Koblenz Fortress system. Therefore, in 1853 the Prussian War Ministry declared itself against the line.

Building of the southern section edit

For the Duchy of Nassau such considerations had less weight than the economic advantages. Therefore, it gave the Wiesbaden Railway Company (Wiesbadener Eisenbahngesellschaft) a concession to build the East Rhine line on Nassau national territory. On 11 August 1856, the first section of the Nassau Rhine Railway (Nassauische Rheinbahn) was opened from Wiesbaden to Rüdesheim. Because of the difficult nature of the construction, the Nassau government took over construction in 1858, establishing the Nassau State Railway in 1861. As a result, the line was not extended to Oberlahnstein until 22 February 1862 and Niederlahnstein until 3 June 1864. From 1862 to 1900 the Bingerbrück–Rüdesheim train ferry operated between Bingerbrück and Rüdesheim, connecting the East Rhine lines and the Nahe Valley Railway.

The construction of the Sieg Railway from Deutz to Giessen (which started in 1859) enabled Nassau to negotiate with Prussia over the continuation of the line, since the planned Sieg line passed through the Dillenburg district, which was part of Nassau. Finally in 1860 an agreement between both states was concluded, which allowed Prussia to build the Sieg line. In return Prussia agreed to build the Pfaffendorf Bridge, which connected the line near Niederlahnstein with the West Rhine Railway (Linke Rheinstrecke) in Koblenz finished the year before. The bridge was inaugurated on 3 June 1864. A continuation of the East Rhine line through Prussia was not possible for the time being, because the concession that the Rhenish Railway had received for the West Rhine line had specified that no concession would be given for a railway on the right bank of the Rhine before 1876.

Building of the northern section edit

As a result of the Austro-Prussian War of 1866, Nassau became part of Prussia, changing the situation in the Rhine completely. The Rhenish Railway Company (Rheinische Eisenbahn-Gesellschaft) now had an interest in completing the East Rhine line, and soon received a concession for it. On 27 October 1869, the extension of the line was opened from Niederlahnstein to Neuwied.

 
Planning options considered for the East Rhine line between Beuel and Siegburg. The curved route via Friedrich-Wilhelms-Hütte was built.

The route of the northern end was contentious. The concession referred to a line between Siegburg and Niederlahnstein and under the original plans the line should have turned at Beuel on the Rhine to Siegburg. Later the line should have been extended via the Agger River valley to Overath and then via Witten to Bochum, or alternatively Essen. These plans were, however, viewed critically in Cologne, since it would have involved the construction of a major traffic axis through the Bergisches Land near Cologne. Gustav von Mevissen, president of the Rhenish Railway, preferred a route via Troisdorf and Opladen to Essen.

Emil Langen, board member of the Rhenish Railway and director of Friedrich-Wilhelms Ironworks in Troisdorf (now the location of the suburb and station of Troisdorf-Friedrich-Wilhelms-Hütte), finally implemented a change in the planned route north of Beuel. The new route went northeast from Beuel, crossing the Sieg river at Menden (now part of Sankt Augustin). A station would be built at the Friedrich-Wilhelms works and the line would then turn southeast to parallel the Sieg Railway to Siegburg.

On July 11, 1870 the section of line was opened from Neuwied to Oberkassel, where the Bonn–Oberkassel train ferry provided a connection between the West Rhine and East Rhine lines. In addition, the line from Friedrich-Wilhelms-Hütte to Siegburg had already been completed; the complete opening of the line only awaited the completion of the Sieg bridge. During the Franco-Prussian War, the line was of great strategic importance as a supply route. As a result, the building of the Sieg bridge was accelerated with extra workers, starting in the late summer of 1870. The whole route was opened on March 1, 1871. At the same time a branch was opened from Friedrich-Wilhelms-Hütte to Troisdorf and the line to Cologne, which would later become the main line.

Later changes edit

 
Map of railway lines in the Koblenz area

In 1878/79, the Horchheim rail bridge was built south of Koblenz, creating a further connection between the West Rhine and East Rhine lines.

During World War I, three Rhine crossings were built using very similar building methods:

All three bridges were destroyed in World War II. Only the Kronprinz-Wilhelm Bridge was rebuilt, as the Urmitz railway bridge, in 1954.

In 1961, during the electrification of the line, new single-line tunnels were built parallel to the existing double-line Loreley and Rossstein tunnels. The old tunnels were then converted to single-line operations and electrified.

With the opening of the Cologne-Frankfurt high-speed rail line at the end of 2002, Troisdorf station was completely rebuilt and the connections from the East Rhine railway towards Siegburg were removed.

Operations edit

 
Freight train north of Unkel
 
Bonn-Beuel station

The line is heavily congested and gives priority to long-distance freight trains. Long distance passenger trains in the Rhine Valley use the West Rhine line and the Cologne-Frankfurt high-speed line. When there are line closures on the left side, the long-distance trains are diverted to the East Rhine route. In that case the stop for Bonn is replaced with Bonn-Beuel.

Passenger services on the line are provided by RegionalBahn and Regional-Express trains. According to Deutsche Bahn timetables, the East Rhine route is KBS 465 (Cologne-Koblenz) and KBS 466 (Koblenz-Wiesbaden). The KBS 465 added a section from Cologne to Mönchengladbach a few years ago. All passenger trains start or finish at the Koblenz main station. Trains from there in the direction of Wiesbaden cross on the Horchheimer Bridge (south of Koblenz). Trains travelling in the direction of Cologne cross the Urmitz Railway Bridge (north of Koblenz), or travel via Vallendar over the Horchheimer Bridge.

Generally Regional-Express trains operate every two hours between the Frankfurt and Wiesbaden main train stations and Koblenz. RegionalBahn trains operate every two hours between the Wiesbaden main station and Koblenz.

Regional-Express trains operate every hour between Mönchengladbach main station and Koblenz, via Cologne Central Station and Vallendar, using the Horchheim bridge. RegionalBahn trains operate every hour between Mönchengladbach Hbf, Cologne Hbf and Koblenz, via the Urmitz Railway Bridge.

The northern section is also served hourly by the Rhein-Erft-Express (RE 8) and the Rhein-Erft-Bahn (RB 27) lines. The RE-8 serves the Cologne/Bonn Airport station and extends south of Koblenz on the Horchheimer Bridge. It uses Series-425 electric locomotives and a maximum speed of 140 km/h. The RB 27 operates between Porz and Koblenz, crossing from the north via the Urmitz Bridge. It operates non-stop from Koblenz to Cochem twice daily. The RB-27 uses Series-143 electric locomotives and three double-decker carriages with a maximum speed of 120 km/h. From Moenchengladbach to Rommerskirchen, the tariffs of the Verkehrsverbund Rhein-Ruhr (VRR) apply; from Grevenbroich to Neuwied, those of the Verkehrsverbund Rhein-Sieg (VRS); and from Unkel to Koblenz, the tariffs of the Verkehrsverbund Rhein-Mosel (VRM).

Until 2010, the southern section was served by the Loreley-Bahn (RB 10) and the Loreley-Express (RE 10) services, using electric class 143 or 110 locomotives and 4-5 coaches every one or two hours. In 2007, the operation of services on the section from the Koblenz–Frankfurt section was tendered by the Rhein-Main-Verkehrsverbund (Rhine-Main Transport Association, RMV) and the Zweckverband Schienenpersonennahverkehr Rheinland-Pfalz Nord (Association for Passenger Rail Transport of Rhineland-Palatinate North). On 12 December 2010, VIAS GmbH took over operations of the service, now called the RheingauLinie (originally numbered SE 10, but called RB 10 again from December 2016). Between Koblenz, Lahnstein and Wiesbaden trains now stop at every station, but between Wiesbaden and Frankfurt Central Station there now only two stops. Similarly, between Neuwied and Koblenz Central Station there were initially no stations. Since its completion in April 2011, Koblenz Stadtmitte station has also been served. The services run every hour, sometimes even every half-hour. VIAS GmbH uses new Stadler FLIRT sets for the service. Because of the renewal of track on the line in 2010 and the good acceleration of the FLIRT sets, the travel time is only slightly longer than that of the former RE 10 service, which did not stop at each station.

Between Koblenz and Kaub, tariffs of the Verkehrsverbund Rhein-Mosel apply and between Lorchhausen and Wiesbaden/Frankfurt, the tariffs of the Rhein-Main-Verkehrsverbund (RMV).

Current developments edit

Track reconstruction/electronic interlockings edit

Deutsche Bahn AG planned further closures on the line. Unkel, Rheinbrohl, Rüdesheim, Hattenheim and Oestrich-Winkel stations would be largely abandoned in connection with the installation of electronic interlockings on the line. A simulation and an operational test in the course of the Netz 21 (network 21) strategy had shown at the end of 1998 that with new, fast rolling stock for regional services and alternating stops, the top speed on the Wiesbaden–Neuwied section could be raised from 50 to 80 km/h and that several overtaking loops, 67 sets of points and 10 km of track could be dispensed with.[2]

The dismantling was carried out without Federal Railway Authority (Eisenbahn-Bundesamt, EBA) approval. The line is already at 93% capacity, with an extreme mix of different types of trains with considerably differing top speeds, including scheduled passenger services, which is already subject a high level of delays. The EBA has also asked DB Netz to provide more overtaking tracks in the stations of Niederdollendorf, Unkel, Rheinbrohl, Bad Hönningen, Hattenheim and Oestrich-Winkel, some of which were illegally withdrawn from railway operations.[3]

On 3 October 2014, the signal boxes in Schierstein, Niederwalluf, Eltville, Hattenheim and Geisenheim were taken out of service at 5:30 am CET and signalling has since been controlled by the operations centre in Frankfurt and, if necessary, via the under operations centre (Unterzentrale, UZ) in Oberlahnstein. The signal box in Oestrich-Winkel will remain for at least two more years (until ca. 2017), the signal box in Rüdesheim is to be permanently preserved as a so-called Inselstellwerk (island signal box).

S-Bahn line between Troisdorf and Bonn–Oberkassel edit

In order to link Bonn to Cologne and the Cologne Bonn Airport, the S-Bahn line that connects Cologne with Troisdorf is being extended along the East Rhine Railway to Bonn-Oberkassel. The first plans for this line were made in the 1990s as part of the planning approval procedure for the Cologne-Frankfurt high-speed railway. In addition to the existing stations on the Right Rhine line, new stations are planned in Bonn-Ramersdorf and Bonn-Vilich. The latter is to be established as a two-level station with a link with the Siebengebirgsbahn, a section of the Bonn Stadtbahn. The construction costs for the 13 km-long line is (as of December 2014) up to €502 to be mainly borne by the federal Government. The state of NRW is contributing €47.5 million to these costs.

According to Deutsche Bahn’s plans, construction is to begin in early 2017. Since the trains of the East Rhine railway are planned to run on schedule during the construction period, a construction period of twelve years is estimated. The route is due to be finished at the end of 2028. On the section between Troisdorf and Bonn-Beuel, S-Bahn services are planned to commence at the end of 2026.[4]

New stations edit

The construction of new stations is planned in Bendorf (at the Rheinstraße level crossing) and in Koblenz-Horchheim (at the Alte Heerstraße overbridge). The construction costs are estimated at €1.5 million in Bendorf and €1 million in Horchheim.[5]

Notes edit

  1. ^ Eisenbahnatlas Deutschland [German railway atlas] (in German) (Updated ed.). Cologne: Schweers + Wall. 2020. pp. 63, 75–76, 148–149, 151. ISBN 978-3-89494-149-9.
  2. ^ "Fahrwegrationalisierung". Eisenbahn-Revue International (in German) (4): 114. 1999. ISSN 1421-2811.
  3. ^ "unknown". Eisenbahn-Revue International (in German) (5): 210. 2009. {{cite journal}}: Cite uses generic title (help)
  4. ^ "Alle 20 Minuten zum Airport - aber erst ab 2026". General-Anzeiger (in German). 21 March 2013. Retrieved 18 February 2017.
  5. ^ "Horchheim, Goldgrube, Bendorf: Neue Bahnhaltestellen sind geplant". Rhein-Zeitung (in German). 26 July 2016. Retrieved 18 February 2017.

References edit

  • Udo Kandler (1992). "Die rechte Rheinstrecke". Eisenbahn-Journal (in German) (special issue: III/92). Hermann Merker Verlag. ISSN 0720-051X.
  • Joachim Seyferth (1995). Die Rechte Rheinstrecke (in German). Vol. 4. Wiesbaden: self-published, SCHIENE-Photo. ISBN 3-926669-04-7.

External links (in German) edit

NRWbahnarchiv von André Joost:

  • Description of Line 2324: (Cologne-Kalk North ↔) Troisdorf ↔ Koblenz-Ehrenbreitstein
  • Description of the former Line 10: Siegburg/Bonn ↔ Friedrich-Wilhelms-Hütte

www.eisenbahntunnel-portal.de:

  • Line 2324, Photos of Tunnel Portals
  • Line 3507, Photos of Tunnel Portals
  • Former Line 3009, Photos of Tunnel Portals

east, rhine, railway, german, rechte, rheinstrecke, literally, right, rhine, railway, major, double, track, electrified, railway, line, running, along, right, bank, rhine, from, cologne, wiesbaden, kilometer, long, line, forms, deutsche, bahn, routes, route, e. The East Rhine Railway German Rechte Rheinstrecke literally right of the Rhine railway is a major double track electrified railway line running along the right bank of the Rhine from Cologne to Wiesbaden The 179 kilometer 111 2 mi long line forms two Deutsche Bahn routes Route 465 extends from Cologne to Koblenz via Troisdorf Bonn Beuel Unkel and Neuwied From Koblenz Route 466 extends to Wiesbaden via Rudesheim am Rhein Together with the Taunus railway Route 645 1 the line is used by Stadt Express line SE 10 of the Rhine Main Transport Association which runs from Frankfurt to Koblenz and Neuwied East Rhine RailwayOverviewNative nameRechte RheinstreckeLine number2324 Koln Kalk Nord Koblenz 507 Koblenz Wiesbaden LocaleNorth Rhine Westphalia Rhineland Palatinate Hesse GermanyTerminiCologneWiesbadenServiceRoute number465 Koln Koblenz 466 Koblenz Wiesbaden TechnicalLine length179 km 111 mi Number of tracks2Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification15 kV 16 7 Hz ACOverhead catenaryOperating speed140 km h 87 mph maximum Route mapLegendkmWest Lower Rhine Railway to Neuss amp S Bahn S6 S11Cologne Aachen HSR to AachenS Bahn S12 S13 S19West Rhine Railway to Bonn00 0 00 0 Koln HansaringKoln HauptbahnhofHohenzollernbrucke0 0 Koln Messe Deutzto Koln MulheimKoln Posthof junctionto Koln Mulheim Cologne Duisburg RailwayS Bahn S6 S111 2 Koln Gummersbacher Strasse junctionKoln Trimbornstrassefreight lineCologne freight railway bypassto the south bridge2 2 Koln Kalkfreight line to Koln Kalk NorthTroisdorf Mulheim Speldorf Railwayfreight line to Koln Kalk Northconnecting line to Koln Kalk NorthA 4 B 143 9 Vingst junctionAirport NE junction Cologne Kalk Overath Ry amp Cologne Airport Loop S13 S194 5 Airport NW junctionCologne Airport Loop long distance Koln Airport Business ParkA 559 B 2Koln SteinstrasseCologne freight railway bypassto the south bridge68 7 7 8 Koln Steinstrasse junction start of HSL 70 1 Gremberg Sud junctionFreight line to Gremberg9 6 Porz Rhein Cologne Airport Loop long distanceS Bahn S13 S1973 9 12 4 Porz WahnPorz Wahn south junctionA 59 B 3678 4 16 9 SpichTroisdorf Tunnel 627 m 79 5 18 0 Troisdorf VorbfTroisdorf north junction81 2 19 7 Troisdorf S13 planned Sieg Railway amp S12High speed railway to Siegburg Bonn station original route from Siegburg82 8 Friedrich Wilhelms HutteSiegA 56085 4 MendenA 59VilichBonn Stadtbahn90 3 Bonn BeuelBonn Beuel industrial railwayBeuel Grossenbusch light railwayto HangelarSiebengebirgs Railway de Ramersdorf planned Bonn Stadtbahnto Bonn Oberkassel train ferry93 9 Bonn Oberkasselend of planned S Bahn96 6 NiederdollendorfSiebengebirgs Railway de 98 6 Konigswinter101 3 Rhondorf103 4 Bad HonnefNorth Rhine WestphaliaRhineland Palatinate state border107 6 Unkelformer line through the Erpeler Ley de 110 3 Erpel110 5 Ludendorff Bridgeto Ahr Valley RailwayKasbach Valley Railway to Kalenborn113 3 Linz am Rhein115 8 Leubsdorf120 0 Bad Honningen123 2 Rheinbrohl129 5 Leutesdorf133 4 Fahr Irlich135 6 Rasselstein amp Co siding135 8 Neuwied136 0 industrial sidings139 0 Neuwied Koblenz railway to Koblenz amp West Rhine Railway141 2 EngersBrexbach Valley Railway to SiershahnBendorf planned 143 8 Bendorf146 7 Vallendar151 2 Koblenz EhrenbreitsteinPfaffendorf Bridge now road bridge to West Rhine Railway153 0 Koblenz Pfaffendorf junctionHorchheim Tunnel 576 m630 yd Horchheim Railway Bridgeto West Rhine Ry amp Koblenz Trier Ry154 7125 7 line change 23243507Koblenz Horchheim planned 123 8 NiederlahnsteinLahntal railwayto WetzlarLahn PrussiaNassau formerborder Lahntal railway122 0 Oberlahnstein117 9 Braubach117 0 Nassau Light Railway112 0 Osterspai109 1 Filsen106 1 Kamp Bornhofen100 8 Kestert94 2 St GoarshausenNassau Light RailwayLoreley Tunnel 368 m402 yd 417 m456 yd 89 0 LoreleyRossstein Tunnel 378 m413 yd 457 m500 yd 83 6 KaubRhineland PalatinateHesse state border80 0 LorchhausenWaldbahn Wispertal de narrow gauge 77 2 Lorch69 5 Assmannshausen65 3 Rudesheim am RheinFloss BlockstelleHindenburg Bridgeto Nahe Valley RailwayKellergrube crossover61 3 Geisenheim57 0 Oestrich Winkel53 9 Hattenheim50 8 Erbach48 8 Eltville45 8 Niederwalluf42 6 Wiesbaden Schierstein39 5 Wiesbaden Biebrich38 844 7 Wiesbaden Biebrichkilometrage changeto Taunus Railway to Frankfurt Aar Valley RailwayWiesbaden Salzbach junctionTaunus Railway to Frankfurtflying junctionWiesbaden Waschbach Sud junctionto Aar Valley Railway to DiezLandches Railway to Niedernhausen amp Breckenheim Jn Wiesbaden line to HSRWiesbaden Waschbach Nord junction41 2 Wiesbaden HauptbahnhofWiesbaden Rheinbahnhof de 1879 1906 km 1 This diagram viewtalkeditWith the Cologne Frankfurt high speed railway and the Sieg Railway the East Rhine Railway forms a six track line between Cologne Porz and Troisdorf It includes two tunnels between Rudesheim and Niederlahnstein including the well known Loreley Tunnel near Sankt Goarshausen Contents 1 History 1 1 Building of the southern section 1 2 Building of the northern section 1 3 Later changes 2 Operations 3 Current developments 3 1 Track reconstruction electronic interlockings 3 2 S Bahn line between Troisdorf and Bonn Oberkassel 3 3 New stations 4 Notes 5 References 6 External links in German History editSoon after the opening of the first railways in the region a line on the right bank of the Rhine began to be discussed In 1844 the Mayor of Deutz suggested building a line from Deutz via Rudesheim to Wiesbaden In 1852 the town of Neuwied also began to press strongly for the building of a railway However others particularly Prussia had substantial reservations There were military objections to a railway line along the Rhine the extension of the West Rhine railway past Rolandseck was similarly delayed In particular the Prussian military objected that the suggested route would pass close to the Ehrenbreitstein Fortress part of the Koblenz Fortress system Therefore in 1853 the Prussian War Ministry declared itself against the line Building of the southern section edit For the Duchy of Nassau such considerations had less weight than the economic advantages Therefore it gave the Wiesbaden Railway Company Wiesbadener Eisenbahngesellschaft a concession to build the East Rhine line on Nassau national territory On 11 August 1856 the first section of the Nassau Rhine Railway Nassauische Rheinbahn was opened from Wiesbaden to Rudesheim Because of the difficult nature of the construction the Nassau government took over construction in 1858 establishing the Nassau State Railway in 1861 As a result the line was not extended to Oberlahnstein until 22 February 1862 and Niederlahnstein until 3 June 1864 From 1862 to 1900 the Bingerbruck Rudesheim train ferry operated between Bingerbruck and Rudesheim connecting the East Rhine lines and the Nahe Valley Railway The construction of the Sieg Railway from Deutz to Giessen which started in 1859 enabled Nassau to negotiate with Prussia over the continuation of the line since the planned Sieg line passed through the Dillenburg district which was part of Nassau Finally in 1860 an agreement between both states was concluded which allowed Prussia to build the Sieg line In return Prussia agreed to build the Pfaffendorf Bridge which connected the line near Niederlahnstein with the West Rhine Railway Linke Rheinstrecke in Koblenz finished the year before The bridge was inaugurated on 3 June 1864 A continuation of the East Rhine line through Prussia was not possible for the time being because the concession that the Rhenish Railway had received for the West Rhine line had specified that no concession would be given for a railway on the right bank of the Rhine before 1876 Building of the northern section edit As a result of the Austro Prussian War of 1866 Nassau became part of Prussia changing the situation in the Rhine completely The Rhenish Railway Company Rheinische Eisenbahn Gesellschaft now had an interest in completing the East Rhine line and soon received a concession for it On 27 October 1869 the extension of the line was opened from Niederlahnstein to Neuwied nbsp Planning options considered for the East Rhine line between Beuel and Siegburg The curved route via Friedrich Wilhelms Hutte was built The route of the northern end was contentious The concession referred to a line between Siegburg and Niederlahnstein and under the original plans the line should have turned at Beuel on the Rhine to Siegburg Later the line should have been extended via the Agger River valley to Overath and then via Witten to Bochum or alternatively Essen These plans were however viewed critically in Cologne since it would have involved the construction of a major traffic axis through the Bergisches Land near Cologne Gustav von Mevissen president of the Rhenish Railway preferred a route via Troisdorf and Opladen to Essen Emil Langen board member of the Rhenish Railway and director of Friedrich Wilhelms Ironworks in Troisdorf now the location of the suburb and station of Troisdorf Friedrich Wilhelms Hutte finally implemented a change in the planned route north of Beuel The new route went northeast from Beuel crossing the Sieg river at Menden now part of Sankt Augustin A station would be built at the Friedrich Wilhelms works and the line would then turn southeast to parallel the Sieg Railway to Siegburg On July 11 1870 the section of line was opened from Neuwied to Oberkassel where the Bonn Oberkassel train ferry provided a connection between the West Rhine and East Rhine lines In addition the line from Friedrich Wilhelms Hutte to Siegburg had already been completed the complete opening of the line only awaited the completion of the Sieg bridge During the Franco Prussian War the line was of great strategic importance as a supply route As a result the building of the Sieg bridge was accelerated with extra workers starting in the late summer of 1870 The whole route was opened on March 1 1871 At the same time a branch was opened from Friedrich Wilhelms Hutte to Troisdorf and the line to Cologne which would later become the main line Later changes edit nbsp Map of railway lines in the Koblenz area In 1878 79 the Horchheim rail bridge was built south of Koblenz creating a further connection between the West Rhine and East Rhine lines During World War I three Rhine crossings were built using very similar building methods From 1913 to 1915 the Hindenburg Bridge was built between Rudesheim am Rhein and Bingen Kempten connecting to the West Rhine line and the Nahe Valley Railway Nahetalbahn From 1916 to 1918 the Neuwied Koblenz line including the Kronprinz Wilhelm Bridge was built between Urmitz and Neuwied Engers From 1916 to 1919 the Ludendorff Bridge was built between Erpel and Remagen connecting the East Rhine railway with the West Rhine line and the strategically important Ahr Valley Railway Ahrtalbahn It became famous as the Remagen Bridge in the last days of World War II All three bridges were destroyed in World War II Only the Kronprinz Wilhelm Bridge was rebuilt as the Urmitz railway bridge in 1954 In 1961 during the electrification of the line new single line tunnels were built parallel to the existing double line Loreley and Rossstein tunnels The old tunnels were then converted to single line operations and electrified With the opening of the Cologne Frankfurt high speed rail line at the end of 2002 Troisdorf station was completely rebuilt and the connections from the East Rhine railway towards Siegburg were removed Operations edit nbsp Freight train north of Unkel nbsp Bonn Beuel station The line is heavily congested and gives priority to long distance freight trains Long distance passenger trains in the Rhine Valley use the West Rhine line and the Cologne Frankfurt high speed line When there are line closures on the left side the long distance trains are diverted to the East Rhine route In that case the stop for Bonn is replaced with Bonn Beuel Passenger services on the line are provided by RegionalBahn and Regional Express trains According to Deutsche Bahn timetables the East Rhine route is KBS 465 Cologne Koblenz and KBS 466 Koblenz Wiesbaden The KBS 465 added a section from Cologne to Monchengladbach a few years ago All passenger trains start or finish at the Koblenz main station Trains from there in the direction of Wiesbaden cross on the Horchheimer Bridge south of Koblenz Trains travelling in the direction of Cologne cross the Urmitz Railway Bridge north of Koblenz or travel via Vallendar over the Horchheimer Bridge Generally Regional Express trains operate every two hours between the Frankfurt and Wiesbaden main train stations and Koblenz RegionalBahn trains operate every two hours between the Wiesbaden main station and Koblenz Regional Express trains operate every hour between Monchengladbach main station and Koblenz via Cologne Central Station and Vallendar using the Horchheim bridge RegionalBahn trains operate every hour between Monchengladbach Hbf Cologne Hbf and Koblenz via the Urmitz Railway Bridge The northern section is also served hourly by the Rhein Erft Express RE 8 and the Rhein Erft Bahn RB 27 lines The RE 8 serves the Cologne Bonn Airport station and extends south of Koblenz on the Horchheimer Bridge It uses Series 425 electric locomotives and a maximum speed of 140 km h The RB 27 operates between Porz and Koblenz crossing from the north via the Urmitz Bridge It operates non stop from Koblenz to Cochem twice daily The RB 27 uses Series 143 electric locomotives and three double decker carriages with a maximum speed of 120 km h From Moenchengladbach to Rommerskirchen the tariffs of the Verkehrsverbund Rhein Ruhr VRR apply from Grevenbroich to Neuwied those of the Verkehrsverbund Rhein Sieg VRS and from Unkel to Koblenz the tariffs of the Verkehrsverbund Rhein Mosel VRM Until 2010 the southern section was served by the Loreley Bahn RB 10 and the Loreley Express RE 10 services using electric class 143 or 110 locomotives and 4 5 coaches every one or two hours In 2007 the operation of services on the section from the Koblenz Frankfurt section was tendered by the Rhein Main Verkehrsverbund Rhine Main Transport Association RMV and the Zweckverband Schienenpersonennahverkehr Rheinland Pfalz Nord Association for Passenger Rail Transport of Rhineland Palatinate North On 12 December 2010 VIAS GmbH took over operations of the service now called the RheingauLinie originally numbered SE 10 but called RB 10 again from December 2016 Between Koblenz Lahnstein and Wiesbaden trains now stop at every station but between Wiesbaden and Frankfurt Central Station there now only two stops Similarly between Neuwied and Koblenz Central Station there were initially no stations Since its completion in April 2011 Koblenz Stadtmitte station has also been served The services run every hour sometimes even every half hour VIAS GmbH uses new Stadler FLIRT sets for the service Because of the renewal of track on the line in 2010 and the good acceleration of the FLIRT sets the travel time is only slightly longer than that of the former RE 10 service which did not stop at each station Between Koblenz and Kaub tariffs of the Verkehrsverbund Rhein Mosel apply and between Lorchhausen and Wiesbaden Frankfurt the tariffs of the Rhein Main Verkehrsverbund RMV Current developments editTrack reconstruction electronic interlockings edit Deutsche Bahn AG planned further closures on the line Unkel Rheinbrohl Rudesheim Hattenheim and Oestrich Winkel stations would be largely abandoned in connection with the installation of electronic interlockings on the line A simulation and an operational test in the course of the Netz 21 network 21 strategy had shown at the end of 1998 that with new fast rolling stock for regional services and alternating stops the top speed on the Wiesbaden Neuwied section could be raised from 50 to 80 km h and that several overtaking loops 67 sets of points and 10 km of track could be dispensed with 2 The dismantling was carried out without Federal Railway Authority Eisenbahn Bundesamt EBA approval The line is already at 93 capacity with an extreme mix of different types of trains with considerably differing top speeds including scheduled passenger services which is already subject a high level of delays The EBA has also asked DB Netz to provide more overtaking tracks in the stations of Niederdollendorf Unkel Rheinbrohl Bad Honningen Hattenheim and Oestrich Winkel some of which were illegally withdrawn from railway operations 3 On 3 October 2014 the signal boxes in Schierstein Niederwalluf Eltville Hattenheim and Geisenheim were taken out of service at 5 30 am CET and signalling has since been controlled by the operations centre in Frankfurt and if necessary via the under operations centre Unterzentrale UZ in Oberlahnstein The signal box in Oestrich Winkel will remain for at least two more years until ca 2017 the signal box in Rudesheim is to be permanently preserved as a so called Inselstellwerk island signal box S Bahn line between Troisdorf and Bonn Oberkassel edit In order to link Bonn to Cologne and the Cologne Bonn Airport the S Bahn line that connects Cologne with Troisdorf is being extended along the East Rhine Railway to Bonn Oberkassel The first plans for this line were made in the 1990s as part of the planning approval procedure for the Cologne Frankfurt high speed railway In addition to the existing stations on the Right Rhine line new stations are planned in Bonn Ramersdorf and Bonn Vilich The latter is to be established as a two level station with a link with the Siebengebirgsbahn a section of the Bonn Stadtbahn The construction costs for the 13 km long line is as of December 2014 up to 502 to be mainly borne by the federal Government The state of NRW is contributing 47 5 million to these costs According to Deutsche Bahn s plans construction is to begin in early 2017 Since the trains of the East Rhine railway are planned to run on schedule during the construction period a construction period of twelve years is estimated The route is due to be finished at the end of 2028 On the section between Troisdorf and Bonn Beuel S Bahn services are planned to commence at the end of 2026 4 New stations edit The construction of new stations is planned in Bendorf at the Rheinstrasse level crossing and in Koblenz Horchheim at the Alte Heerstrasse overbridge The construction costs are estimated at 1 5 million in Bendorf and 1 million in Horchheim 5 Notes edit Eisenbahnatlas Deutschland German railway atlas in German Updated ed Cologne Schweers Wall 2020 pp 63 75 76 148 149 151 ISBN 978 3 89494 149 9 Fahrwegrationalisierung Eisenbahn Revue International in German 4 114 1999 ISSN 1421 2811 unknown Eisenbahn Revue International in German 5 210 2009 a href Template Cite journal html title Template Cite journal cite journal a Cite uses generic title help Alle 20 Minuten zum Airport aber erst ab 2026 General Anzeiger in German 21 March 2013 Retrieved 18 February 2017 Horchheim Goldgrube Bendorf Neue Bahnhaltestellen sind geplant Rhein Zeitung in German 26 July 2016 Retrieved 18 February 2017 References editUdo Kandler 1992 Die rechte Rheinstrecke Eisenbahn Journal in German special issue III 92 Hermann Merker Verlag ISSN 0720 051X Joachim Seyferth 1995 Die Rechte Rheinstrecke in German Vol 4 Wiesbaden self published SCHIENE Photo ISBN 3 926669 04 7 External links in German edit nbsp Wikimedia Commons has media related to Rechte Rheinstrecke NRWbahnarchiv von Andre Joost Description of Line 2324 Cologne Kalk North Troisdorf Koblenz Ehrenbreitstein Description of the former Line 10 Siegburg Bonn Friedrich Wilhelms Huttewww eisenbahntunnel portal de Line 2324 Photos of Tunnel Portals Line 3507 Photos of Tunnel Portals Former Line 3009 Photos of Tunnel Portals Retrieved from https en wikipedia org w index php title East Rhine Railway amp oldid 1205337095, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.