Rail Vikas Nigam Limited (RVNL) is an Indian central public sector enterprise which works as the construction arm of the Ministry of Railways for project implementation and transportation infrastructure development. It was incorporated in 2003 to meet the country's surging infrastructural requirements and to implement projects on a fast-track basis as well as for creating a Railway equipment construction company. It is a ‘Navratna’ CPSE in India under the administrative control of the Indian Ministry of Railways.

Rail Vikas Nigam Limited
Company typePublic Sector Undertaking
BSE: 542649
NSE: RVNL
IndustryRailway infrastructure
Founded24 January 2003; 21 years ago (2003-01-24) in New Delhi, India
HeadquartersAugust Kranti Bhawan, Bhikaji Cama Place, R. K. Puram,
New Delhi
,
India[1]
Area served
India
Key people
Revenue₹ 19,381.71 Cr (2022)
₹ 1476.14 Cr (2022)
Total assets₹ 19,121.42 Cr (2022)
Total equity₹ 5,631.41 Cr (2022)
OwnerGovernment of India (78.20%)[3]
Number of employees
515 (March 2022)
Subsidiaries
Websitervnl.org/home

The organization undertakes project execution from concept to commissioning and creates project-specific SPVs. RVNL’s mandate includes the mobilization of extra-budgetary resources (EBRs) through a mix of equity and debts via these SPVs.

History edit

Rail Vikas Nigam Limited (RVNL) was established to implement the National Rail Vikas Yojana (NRVY), a project to develop railway infrastructure in India. The NRVY was announced by Prime Minister Atal Bihari Vajpayee from the ramparts of the Red Fort during the Independence Day speech on 15 August 2002. The NRVY was formally launched by Vajpayee on 26 December 2002, and RVNL was incorporated under the Companies Act, 1956 on 24 January 2003. RVNL's two main objectives are to augment the capacity of rail infrastructure and raise extra budgetary resources for special purpose vehicle projects.[4]

RVNL opened its initial public offering (IPO) on 29 March 2019. It was the third railways-related PSU to initiate an IPO, after RITES and IRCON. The company offered a 12% stake at a price range of 17-19 per share.[5][6] The IPO was subscribed 1.78 times by close on 3 April earning 481 crore (US$60 million).[7] RVNL was listed on the Bombay Stock Exchange and the National Stock Exchange on 19 April 2019.[8]

List of Manufacturing Units edit

Project Type Location Status Notes
Rail Coach Naveenikaran Karkhana (RCNK) - RVNL Rail factory Sonipat Completed Rail Vikas Nigam Limited successfully commissioned the Rail Coach Naveenikaran Karkhana at Sonipat, Haryana in October 2021. The Rolling Stock Complex is designed for sustainable development with Industry 4.0 compliant assembly line.Vande Bharat Express production to start in the factory in near future.
Marathwada Rail Coach Factory (MRCF), Latur - RVNL Rail factory Latur, Maharashtra Completed The Marathwada Rail Coach Factory, a project of RVNL in Latur, Maharashtra produced its first coach shell on Good Governance Day i.e. 25.12.2020. This state-of-the-art factory was set up and commissioned in just two years by RVNL to manufacture self-propelled trains for Indian Railways.[9] Vande Bharat Express production to start in the factory in near future.
Railway Manufacturing Unit (RMU) Wagon Factory Kazipet,Telangana Under construction Indian Railways is going to set up a railway wagon manufacturing unit in Telangana. The unit will be constructed on 160 acres of land in Kazipet at an estimated cost of `521 crore and is expected to be completed by February 2025. The Rail Vikas Nigam Limited (RVNL) was entrusted with this project.

Subsidiaries edit

High Speed Rail Corporation of India Limited edit

The High Speed Rail Corporation of India Limited (HSRC) is an SPV which was incorporated in 2012 as a subsidiary of RVNL to implement high-speed rail projects in India.[10]

Kinet Railway Solutions Ltd edit

RVNL has incorporated a private company Kinet Railway Solutions Ltd which will act as the SPV that will sign the manufacturing-cum-maintenance agreement with the Ministry of Railways.[11]

Kyrgyzindustry-RVNL edit

RVNL established a 50:50 joint venture company, named Kyrgyzindustry-RVNL, with Kyrgyz company Kyrgyzindustry.[12] The company will develop rail, road, and other infrastructure in Kyrgyzstan.[13] RVNL informed the Securities and Exchange Board of India (SEBI) of the establishment of the joint venture on 10 December 2022.[14]

Special Purpose Vehicles edit

Kutch Railway Company Ltd[15] edit

RVNL owns 50% equity in this project. The project length is 301 km and is for gauge conversion of Palanpur-Gandhidham section. Currently RVNL is doubling Samakhiali-Palanpur (248 km) anticipating increased traffic flow from Mundra and Deendayal Ports.

Bharuch Dahej Railway Co Ltd[16] edit

RVNL is the largest stakeholder in this SPV with 35.46% equity. The project length is 63 km and is for gauge conversion.

Krishnapatnam Railway Co Ltd[17] edit

RVNL is the largest stakeholder in this SPV with 49.76% equity. The project length is 113.2 km and is for construction of new line from Obulaparivalli to Krishnapatnam port. Complete connectivity was provided in June 2019.

Haridaspur Paradip Railway Co Ltd edit

RVNL is the largest equity shareholder with 30%. This SPV is for a new 82 km line from Haridaspur to Paradip Port. This commercial route became operational on 30.07.2020

Angul Sukinda Railway Ltd[18] edit

RVNL is the largest stakeholder in this SPV with 32.16% equity. This is for a new 102.42 km railway line from Angul-Sukinda. 80% of the project has already been completed and the commercial operation will begin shortly.

New SPVs under formation edit

Indian Port Rail Corporation Limited (IRPCL) edit

RVNL is participating in the formation of IRPCL. This is a SPV under the Ministry of Shipping, with the stakeholders being RVNL and 12 major ports. The initial authorised capital of the SPV is Rs 500 crore with RVNL's equity participation being Rs 10 crore only or 10% of the initial subscribed share capital.

The mandate of the SPV is to enhance rail connectivity to the various Ports in the country. This includes maintenance of Port Railways along with up-gradation, modernisation and capacity augmentation as and when required.

Rail connectivity to Rewas Port in Maharashtara edit

RVNL began as an organisation for executing various projects of railway engineering, to meet the shortfall of rail infrastructure that the existing system of that time could not fulfil. It was important to think out of the box and find a solution as eventually the price would be heavy with respect to the curtailment of opportunities and options available to a developing nation.

From beginning with railway capacity augmentation through track doubling, new railway lines, gauge conversion, railway electrification, RVNL has moved onto working on metro railways, multimodal transport system, port connectivity, turnkey projects i.e. workshops, training institutes, green buildings, high speed rail projects, cable stayed bridges, river and road bridges, vertical lift bridge, mountain Railways and tunnels.

Corporate Social Responsibility edit

Corporate Social Responsibility is a part of the ethos of Rail Vikas Nigam Limited. Aligning its goals to CSR objectives’, RVNL has implemented projects in the thematic areas of Health and Education. The geographic focus of RVNL CSR has been West Bengal, Chhattisgarh, Jharkhand, Uttar Pradesh, Madhya Pradesh, Uttarakhand and Odisha. About 60 per cent of CSR funds are spent in the education & health care sector for the underprivileged, marginalized communities and tribal belts.

Department of Public Enterprises Ratings edit

Rail Vikas Nigam Limited has been rated as "Excellent" by the Department of Public Enterprises (DPE) for 11 consecutive years.  The Company has ranked 1st amongst the Railway PSEs and 3rd amongst PSUs in the country in the latest DPE ratings 2020-2021 with a MoU Score of 99.

Assessment Year Rating RVNL’s rank among Railway CPSEs
2007-08 Good 8th
2008-09 Very Good 10th
2009-10 Very Good 7th
2010-11 Excellent 5th
2011-12 Excellent 2nd
2012-13 Excellent 1st
2013-14 Excellent 2nd
2014-15 Excellent 1st
2015-16 Excellent 1st
2016-17 Excellent 1st
2017-18 Excellent 1st
2018-19 Excellent 2nd
2019-20 Excellent 1st
2020-21 Excellent 1st

Recent Accolades edit

Rail Vikas Nigam Limited team bagged two awards for excellence by Skoch group viz. Gold award for Public-Private Partnership and Silver award for response to Covid in 2022.[19]

Rail Vikas Nigam Limited was conferred the Roll of Honour as the fastest-growing Mini-Ratna of the year by Dalal Street Investment Journal.

Completed projects edit

The list of 18 projects completed in 2021-22 is as under:[20]

S.

No.

Railway Name of Project Plan Head Length (km)
1.         East Coast Railway Sambalpur-Titlagarh (182 km) Doubling 182.00
2.         Northern Railway Utraitia-Raebareli (65.6 km) Doubling 68.04
3.         Northern Railway Raebareli-Amethi (60.1 km) Doubling 59.00
4.         South Central Railway Vijaywada-Gudivada- Bhimavaram-Narasapur, Gudivada-Machlipatnam and Bhimavaram-Nidadavolu (221 km) - Doubling with electrification Doubling 221.00
5.         South Central Railway Secunderabad (Falaknuma)-Mehbubnagar doubling Doubling 85.70
6.         West Central Railway Bina-Kota (282.66 km) with RE Doubling 282.66
7.         Western Railway Ahmedabad-Botad (170.48 km) GC 166.09
8.         Western Railway Dhasa-Jetalsar (104.44 km) GC 106.69
9.         Railway Electrification Raninagar Jalpaigudi-New Bongaigaon - Guwahati (Incl) RE (382 km) (Part of Barauni - Katihar - Guwahati Incl. Katihar - Barsoi (836 km) RE RE 374.98
10.     Railway Electrification Chikjajur-Bellary RE (184 km) RE 183.15
11.     Railway Electrification Bengaluru-Omalur Via Hosur RE (196 km) RE 196.00
12.     Railway Electrification Utratia-Raebareli-Amethi 2nd line RE (126 km) RE 126.00
13.     Deposit RE of NTPC siding at Hotgi Station (37 km) RE 34.41
14.     East Central Railway Gaya -Setting up New MEMU car shed for maintaining 30 rakes of 16 coaches WKSP -
15.     Northern Railway Sonipat-Setting up of coach periodical overhauling and refurbishment workshop WKSP -
16.     North Eastern Railway Saidpur Bhitri- Setting up of Electric Loco Shed to home 200 Locos WKSP -
17.     Western Railway Dhasa-Jetalsar-Subways in lieu of Level Crossing-35 Nos. RSW -
18.     South Central Railway Lallaguda (Carriage Workshop)- Replacement of 100-Year-Old Administrative Building OSW -

The list of 102 projects fully completed since inception and up to March 2021 is as under:[20]

S. No. Railway Project Name Type of Project Length (km)
1.                   Central Railway Diva - Kalyan 5th & 6th Line Doubling 11
2.         Central Railway Pakni - Mohol Doubling Doubling 17
3.         Central Railway Panvel - Jasai JNPT Doubling Doubling 28.5
4.         Central Railway Pakni - Solapur Doubling Doubling 16.28
5.         Eastern Railway Gurup - Saktigarh Extn of 3rd Line Doubling 26
6.         East Central Railway Barauni - Tilrath Bypass Doubling Doubling 8.3
7.         East Coast Railway Talcher-Cuttack-Paradeep Doubling with 2nd Bridge on Rivers Birupa & Mahanadi Doubling 3
8.         East Coast Railway Jakhapura- Haridaspur 3rd Line Doubling 23.3
9.         East Coast Railway Cuttack - Barang Doubling Doubling 14.3
10.     East Coast Railway Rajatgarh-Barang Doubling Doubling 31.3
11.     East Coast Railway Khurda-Barang - 3rd line (35 km) Doubling 32.32
12.     Northern Railway New Delhi-Tilak Bridge- 5th & 6th line (2.65 km) Doubling 2.65
13.     North Central Railway Palwal - Bhuteswar 3rd Line Doubling 81
14.     North Central Railway Aligarh - Ghaziabad 3rd Line Doubling 106.1
15.     North Western Railway Bhagat Ki Kothi - Luni Doubling Doubling 30.3
16.     North Western Railway Karjoda - Palanpur Doubling Doubling 5.4
17.     North Western Railway Rewari- Manheru Doubling Doubling 69.02
18.     North Western Railway Rani-Keshav Ganj Doubling Doubling 59.5
19.     North Western Railway Abu Road-Sarotra Road- Patch doubling (23.12 km) Doubling 23.12
20.     North Western Railway Swaruganj-Abu Road - Patch doubling (25.36 km) Doubling 25.36
21.     North Western Railway Sarotra Road-Karjoda - Patch doubling (23.59 km) Doubling 23.59
22.     Southern Railway Attipattu - Korukkupet 3rd Line Doubling 18
23.     Southern Railway Pattabiram - Tiruvallur 4th Line & Tiruvallur - Arakkonam 3rd Line Doubling 41.89
24.     Southern Railway Tiruvallur - Arakkonam 4th Line Doubling 28
25.     Southern Railway Villipuram-Dindigul Doubling Doubling 273
26.     Southern Railway Thanjavur-Ponmalai - Doubling Doubling 46.96
27.     South Central Railway Pullampet - Balapalle Ph I of Gooty - Renigunta Doubling Doubling 41
28.     South Central Railway Krishnapatnam - Venkatachalam Doubling with RE Doubling 16.5
29.     South Central Railway Gooty - Renigunta Patch Doubling Doubling 151
30.     South Central Railway Raichur - Guntakal Doubling Doubling 81.0
31.     South Central Railway Guntur-Tenali - Doubling with electrification (24.38 km) Doubling 25
32.     South Eastern Railway Tikiapara - Santragachi Doubling Doubling 5.6
33.     South Eastern Railway Panskura - Kharagpur 3rd Line Doubling 45
34.     South Eastern Railway Panskura - Haldia Ph 1 Doubling Doubling 14
35.     South Eastern Railway Rajgoda - Tamluk (Jn. Cabin) Doubling Doubling 13.5
36.     South Eastern Railway Tamluk Jn. Cabin – Basulya Sutahata Doubling Doubling 24.23
37.     South Eastern Railway Goelkera-Monoharpur 3rd line (40 km) Doubling 27.5
38.     South East Central Railway Bilaspur - Urkura 3rd Line Doubling Doubling 105
39.     South East Central Railway Salka Road- Khongsara Patch Doubling Doubling 26
40.     South East Central Railway Khodri-Anuppur, with Flyover at Bilaspur (61.6 km) Doubling 61.6
41.     South Western Railway Hospet - Guntakal Doubling Doubling 115
42.     West Central Railway Bhopal-Bina - 3rd line (143 km) Doubling 144.3
43.     West Central Railway Itarsi-Budni - 3rd line (25.090 km) Doubling 25.09
44.     West Central Railway Barkhera-Habibganj - 3rd line (41.420 km) Doubling 41.2
45.     North Western Railway Delhi - Rewari Gauge Conversion GC 94.2
46.     North Western Railway Ajmer - Phulera - Ringus - Rewari Gauge Conversion GC 295
47.     North Western Railway Bhildi - Samdari Gauge Conversion GC 223
48.     Southern Railway Thanjavur - Villupuram Gauge Conversion GC 192
49.     Southern Railway Cuddalore - Salem Gauge Conversion GC 193
50.     South Western Railway Arasikere-Hassan-Mangalore Gauge Conversion GC 230
51.     Western Railway Bharuch - Samni - Dahej Gauge Conversion GC 62
52.     Western Railway Gandhidham - Palanpur Gauge Conversion GC 301
53.     East Coast Railway Daitari - Banspani New Line NL 155
54.     East Coast Railway Haridaspur-Paradeep (82 km) New Line 82
55.     Southern Railway Vallarpadam - Idapally New Line NL 9
56.     South Central Railway Obulavaripalle- Krishnapattnam (113 km) New Line 121
57.     Railway Electrification Tomka -Banspani – RE RE 144
58.     Railway Electrification Kharagpur (Nimpura) - Bhubaneswar Including Branch Line of Talcher - Cuttack - Paradeep RE 581
59.     Railway Electrification Bhubaneswar - Kottavalasa RE 417
60.     Railway Electrification Daund-Manmad Incl. Puntamba- Shirdi - RE RE 255
61.     Railway Electrification Reningunta - Guntakal RE RE 308
62.     Railway Electrification Yelahanka - Dharmavaram - Gooty RE RE 306
63.     Railway Electrification Bharuch - Samni - Dahej RE RE 64
64.     Railway Electrification Manheru- Hissar RE RE 74
65.     Railway Electrification Jakhal - Hisar (79 km) RE 80.0
66.     Railway Electrification Chhapra-Ballia-Ghazipur-Varanasi-Allahabad RE (330 km) RE 330
67.     Railway Electrification Guntakal-Kalluru RE (40 km) RE 40
68.     Railway Electrification Utretia - Rae Bareli - Amethi - Janghai RE (214 km) RE 214
69.     Railway Electrification Daund-Baramati (44 km) RE 44
70.     Railway Electrification Amla-Chhindwara-Kalumna RE 257
71.     Railway Electrification Raipur-Titlagarh (203 km) {Part of Vizianagaram - Rayagada - Titlagarh - Raipur (465 km)} RE 203
72.     Railway Electrification Rajpura - Dhuri - Lehra Mohabat (151 km) RE 151
73.     Railway Electrification Guntakal - Bellary - Hospet incl. Tornagallu - Ranjitpura Branch Line (138 km) RE 138
74.     Railway Electrification Wani- Pimpalkutti RE (66 km) RE 66
75.     Railway Electrification Manoharabad- Medchal (14 km) RE 14
76.     Railway Electrification Yalahanka-Penukonda (120.55 km)-Doubling RE -
77.     Railway Electrification Jakhal - Dhuri - Ludhiana (123 km) RE 123
78.     Railway Electrification Guna-Gwalior (227 km) RE 227
79.     Railway Electrification Rani-Palanpur 166 km RE 166
80.     Railway Electrification Villupuram-Cuddalore Port-Mayiladuturai-Thanjavur & Mayiladuturai-Thiruvarur (228 km) RE 228
81.     Railway Electrification Raebareli-Unchahar incl. Dalmau-Daryapur (63 km) RE 63
82.     Central Railway Latur- Setting up of coach manufacturing factory WKSP -
83.     Eastern Railway Civil Engineering Works in Connection with Diesel Loco Component Factory, Dankuni WKSP -
84.     Eastern Railway Dankuni - Setting Up of Electric Loco Assembly and Ancillary Unit of CLW WKSP -
85.     East Central Railway Barauni - 250 High Horse Power Loco Shed WKSP -
86.     East Coast Railway Vadlapudi- Wagon PoH Workshop of 200 Nos Capacity Near Duvvada Station WKSP -
87.     North Central Railway Kanpur - Construction of MEMU Car shed WKSP -
88.     South Eastern Railway Setting Up of Diesel Multiple Unit (DMU) Manufacturing Factory at Sankrail/ Haldia WKSP -
89.     DLW Varanasi - Augmentation of Production Capacity from 200 To 250 High HP Locos Per Year WKSP -
90.     North Eastern Railway Aunrihar - DEMU Shed WKSP -
91.     South Central Railway Workshop for Manufacture of Flat Bogies for LHB Design Coaches, Yadgir WKSP -
92.     METKOL MM of Existing Corridor Noparanagar-Baranagar- Daksineshwar MTP 4.14
93.     Eastern Railway Barddhaman Yard - 4-lane road over bridge in lieu of 2-lane road over bridge No. 213 ROB -
94.     Southern Railway Srirangam-Tiruchchirapalli Town - 4-lane road over bridge in lieu of 2- lane bridge No.380-A ROB -
95.     North Western Railway IOC Siding at Salawas (Deposit Work) Others 2.82
96.     South Central Railway Secunderabad- Upgradation of facilities at Centralised Training Academy for Railway Accounts TRG -
97.     South Central Railway Moula Ali - Setting Up of Indian Railway Institute of Finance Management TRG -
98.     North Western Railway Madar - Palanpur - Removing of PSR (Kms 589/1 to 590/1) Track Renewal -
99.     North Central Railway Jhansi-Garhmau, Orai-Ata, Ata-Kalpi &Pokhrayan-Lalpur - Splitting of longer block sections TF -
100.           North Central Railway Paman-Bhimsen - New B-class station TF -
101.           Western Railway Sabarmati-Botad-subways in lieu of level crossing-23 Nos. RSW -
102.           Western Railway Sabarmati-Botad-Subways in lieu of LCs-14 Nos. RSW -

Projects Under Implementation edit

There are 72 projects under various stages of implementation by RVNL.

The details of 66 projects assigned to RVNL till March 2021 and which are under implementation are as under:

S. No. Railway Name of Project Plan Head
1 CR & SCR Daund-Gulbarga - Doubling (224.9 km) and Pune-Guntakal -Electrification (641.37 km) Doubling
2 ER Nabadwipghat-Nabadwipdham upto BB loop (9.58 km) {Part of Kalinarayanpur-Krishnanagar with Krishnanagar-Shantipur Nabadwipghat- GC, Krishnanagar-Chartala, MM for Krishnanagar Chapra-NL, Naihati-Ranaghat-3rd line, Nabadwipghat-Nabadwipdham upto BB loop (9.58 km), Ranaghat-Lalgola strengthening (bridge No.2)} Doubling
3 ER Dankuni-Furfura Sharif NL {Part of Liluah-Dankuni - 3rd line (10.13 km) with extension to Furfura Sharif} Doubling
4 ECR Dhanbad-Sonnagar (Patratu-Sonnagar) - 3rd line (291 km) Doubling
5 ECoR Raipur-Titlagarh (203 km), incl new line Mandir Hasaud-Naya Raipur (20 km) and new MM for conversion of Raipur (Kendri)-Dhamtari & Abhanpur-Rajim branch (67.20 km) Doubling
6 ECoR Banspani-Daitari-Tomka-Jakhapura (180 km) Doubling
7 ECoR Vizianagaram-Sambhalpur (Titlagarh) 3rd line Doubling
8.       NR Rajpura-Bhatinda Doubling with Electrification (172.64 km) Doubling
9.       NR Janghai-Phaphamau DL with RE (46.79 km) Doubling
10.   NCR Bhimsen-Jhansi (206 km) with RE Doubling
11.   NCR Mathura-Jhansi 3rd line Doubling
12.   NER Varanasi-Madhosingh-Allahabad Doubling
13.   NER Bhatni - Aunrihar with electrification (125 km) (excl Indara - Mau (116.95 km)) Doubling
14.   NER Phephna-Indara, Mau-Shahganj (excl. Indara-Mau) (150.28 km) DL Doubling
15 SR Madurai-Maniyachi-Tuticorin Doubling with RE (159 km) Doubling
16 SR Maniyachi - Nagarcoil Doubling with RE (102 km) Doubling
17 SCR Vijayawada-Gudur 3rd line Doubling
18 SER Kharagpur (Nimpura)-Adityapur 3rd line (132 km) Doubling
19 SWR Hospet-Hubli-Londa-Tinaighat-Vasco da Gama (352.28 km) Doubling
20 WR Palanpur-Samakhiali (247.73 km) Doubling
21 WCR Budni-Barkhera - 3rd line (33 km) Doubling
22 NER Lucknow-Pilibhit via Sitapur, Lakhimpur (262.76 km) Gauge Conversion
23 CR Dighi Port-Roha (33.76 km) New Line
24 CR Yevatmal- Nanded (206 km) NL New Line
25 ECR Fatuah-Islampur incl. material modification for extension of new line from Neora to Daniawan; Daniawan to Biharsharif; Biharsharif to Barbigha; Barbigha to Sheikhpura New Line
26 ECoR Angul-Sukinda Road (98.7 km) New Line
27 NR Rishikesh-Karnaprayag (125.09 km) New Line
28 NR Bhanupalli-Bilaspur-Beri (63.1 km) New Line
29 NER Mau-Ghazipur-Tarighat New Line New Line
30 SECR Dallirajhara-Rowghat (90 km) {Part of Dallirajhara-Jagdalpur (235 km)} New Line
31 WCR Indore-Jabalpur (342 km) NL sanctioned as Budhni-Indore (205 km) New Line
32 CORE Hospet - Hubli - Vasco da Gama (346 km) RE
33 CORE Kasganj-Bareilly-Bhojipura-Daliganj RE (401 km) RE
34 CORE RE of Sambalpur-Titlagarh Doubling project (96.596 km) RE
35 CORE Palanpur-Samakhiali (247.73 km) RE RE
36 Deposit Electrification of IOCL Siding at Pakni (4 km) RE
37 Deposit Electrification of Ultra Tech Cement Siding at Hotgi (8 km) RE
38 Deposit Electrification of Chettinad Cement  Siding at Tilati (7.1 km) RE
39 ER Ranaghat (EMU Car Shed)-Inspection bay for 15 coach maintenance facilities WKSP
40 ER Jheel Siding Coaching Depot- Infrastructure development WKSP
41 ECoR Khurda Road - Construction of main line electrical multiple unit car shed (Phase-2) WSKP
42 NCR Jhansi-Setting up of coach periodic overhauling and refurbishment workshop WKSP
43 NER Dullahapur Yard - Provision of tower wagon periodic overhauling shed WKSP
44 SCR Kazipet - Workshop for Wagon Periodical Overhauling WKSP
45 WR Vadodara - Setting up of New PoH Shop for Electrical Locos WKSP
46 SR Repair of S&T Workshop at Podanur, Tamil Nadu WKSP
47 ER Samudragarh-Nabadwipdham - Road over bridge in lieu of level crossing No.14 RSW
48 SCR New Crossing Station Between Umdanagar-Timmarpur Stations of Secunderabad-Mahabubnagar Section TFC
49 SR Manamadurai-Rameswaram - Repl of Full Scherzer Lift Span (Bridge No. 346) (Pamban Viaduct) BRGW
50 SR Manamadurai-Rameshwaram - Reconstruction of bridge (Pamban Viaduct) with navigational lift span BRGW
51 NER Daraganj - Rebuilding (Bridge No.111 On Ganga) BRGW
52 NER Setting Up of Centralised Training Institute for IRSME & IRSS Officers at Lucknow TRG
53 WR National Rail & Transportation Institute at Vadodara (NAIR) TRG
54 WR Construction of hostels in centralised training institutes (Umbrella Work 2019-20) TRG
55 SECR Direct Power Supply from Central Generating Agencies OEW
56 WCR Provision of Addl. Traction Substation at Budhni OEW
57 SWR New Station Building at Belguam OSW
58 SWR Second Entry Station Building at Belguam OSW
59 SWR Proposed Coaching Depot at Belgaum OSW
60 SWR Yard Remodelling Works at Belgaum OSW
61 SCR Multi-Modal Transport System (MMTS) - Phase-II in Hyderabad MTP
62 SCR Ghatkesar-Raigir (Yadadri)-Extension of multi modal transportation system Phase-II MTP
63 MET Baranagar-Barrackpore & Dakshineswar - Construction of Metro Railway (14.5 km) MTP
64 MET Dum Dum Airport-New Garia via Rajerhat - Construction of Metro Railway (32 km) including Naupara (Ex.)-Baranagar (2.6 km) {Part of Dumdum-Baranagar Metro Railway sanctioned as MM to Dumdum-New Garia Metro Railway vide letter No. 96/Proj/C/5/1/Pt. Dated 30.10.09} MTP
65 MET Joka-Binoy Badal Dinesh Bagh via Majerhat - Construction of Metro railway (16.72 km) incl material modification for extension from Joka Diamond Park (Phase-I) MTP
66 NR Final Location Survey for New Line Connectivity to Char Dham (327 km) FLS

The list of Railway project assigned to RVNL in 2021-22 and under execution is as under:

S. No. Railway Name of Project Plan Head
1.         WR Infrastructure up-gradation of Training Institutes at NAIR Campus TRG

The list of projects awarded to RVNL through Competitive Bidding in 2021-22 and under execution is as under:

S. No. Agency /Client Name of Project Plan Head
1. MP Metro Design and Construction of Elevated 10 km Viaduct and 09 Elevated Metro Stations including all Civil, Structural, Roof structure, MEP works, Architectural finishes, Façade, etc for Indore Metro Rail Project. Metro Works
2. MP Metro Design and Construction of 07 Elevated Metro Stations including Structures, Architectural Finishes, E&M Works etc. of Indore Metro Rail Project. Metro Works
3. NHIDCL DPR Preparation for Highways in North-East Region in state of Nagaland for length of 200 KM. DDC
4. NHIDCL DPR Preparation for Highways in North-East Region in state of Nagaland for length of 280 KM. DDC
5. NHIDCL DPR Preparation for Highways in North-East Region in state of Mizoram for length of 740 KM. DDC

See also edit

References edit

  1. ^ "RVNL". rvnl.org. Retrieved 20 May 2023.
  2. ^ "RVNL". rvnl.org. Retrieved 20 May 2023.
  3. ^ "RVNL climbs on bagging orders". Business Standard India. 18 January 2023. Retrieved 9 February 2023.
  4. ^ "RVNL". rvnl.org. Retrieved 20 May 2023.
  5. ^ "Rail Vikas Nigam's IPO to start today, price band set at Rs 17-19 per equity share". The Indian Express. 29 March 2019. Retrieved 20 May 2023.
  6. ^ "RVNL public float opens on Friday". www.thehindubusinessline.com. 26 March 2019. Retrieved 20 May 2023.
  7. ^ Staff Writer (29 March 2019). "Rail Vikas Nigam IPO fully subscribed". mint. Retrieved 20 May 2023.
  8. ^ "Hot stock! Whopping 544.81 pc returns since IPO listing - Share price of this Navratna status company hits all-time high intraday!". TimesNow. 3 May 2023. Retrieved 20 May 2023.
  9. ^ "Latur rail coach factory to make 100 Vande Bharat trains". The Times of India. 4 October 2022. ISSN 0971-8257. Retrieved 31 July 2023.
  10. ^ "About HSRC". hsrc.in. Retrieved 20 May 2023.
  11. ^ "Russia to hold majority stake in Vande Bharat joint venture". The New Indian Express. Retrieved 31 July 2023.
  12. ^ Dharma, RanjithKumar (12 December 2022). "RVNL forms new JV in Kyrgyz Republic". Railway Technology. Retrieved 20 May 2023.
  13. ^ "Rail Vikas Nigam shares locked in upper circuit after joint venture in Kyrgyz Republic". cnbctv18.com. 12 December 2022. Retrieved 20 May 2023.
  14. ^ (PDF). Bombay Stock Exchange. Archived from the original (PDF) on 11 December 2022.
  15. ^ "Kutch Railway Company Ltd". www.kutchrail.org. Retrieved 1 December 2022.
  16. ^ "Bharuch Dahej Railway Company Limited". www.bdrail.in. Retrieved 1 December 2022.
  17. ^ "Krishnapatnam Railway Company Limited (KRCL)". KRCL. Retrieved 1 December 2022.
  18. ^ "Angul Sukinda Railway Limited | Angul Sukinda Railway Limited". asrl.in. Retrieved 1 December 2022.
  19. ^ "Rail Vikas Nigam Limited' SPV Kutch Railway Company Limited - Rail Vikas Nigam Limited". SKOCH Award. 14 April 2022. Retrieved 1 December 2022.
  20. ^ a b "RVNL's 19th Annual Report (2021-22)" (PDF). rvnl.org.

External links edit

  • Official Site
  • RVNL anthem

rail, vikas, nigam, this, article, contain, excessive, amount, intricate, detail, that, interest, only, particular, audience, please, help, spinning, relocating, relevant, information, removing, excessive, detail, that, against, wikipedia, inclusion, policy, d. This article may contain an excessive amount of intricate detail that may interest only a particular audience Please help by spinning off or relocating any relevant information and removing excessive detail that may be against Wikipedia s inclusion policy December 2020 Learn how and when to remove this message Rail Vikas Nigam Limited RVNL is an Indian central public sector enterprise which works as the construction arm of the Ministry of Railways for project implementation and transportation infrastructure development It was incorporated in 2003 to meet the country s surging infrastructural requirements and to implement projects on a fast track basis as well as for creating a Railway equipment construction company It is a Navratna CPSE in India under the administrative control of the Indian Ministry of Railways Rail Vikas Nigam LimitedCompany typePublic Sector UndertakingTraded asBSE 542649NSE RVNLIndustryRailway infrastructureFounded24 January 2003 21 years ago 2003 01 24 in New Delhi IndiaHeadquartersAugust Kranti Bhawan Bhikaji Cama Place R K Puram New Delhi India 1 Area servedIndiaKey peoplePradeep Gaur Chairman amp MD 2 Revenue 19 381 71 Cr 2022 Operating income 1476 14 Cr 2022 Total assets 19 121 42 Cr 2022 Total equity 5 631 41 Cr 2022 OwnerGovernment of India 78 20 3 Number of employees515 March 2022 SubsidiariesHigh Speed Rail Corporation of India LimitedKyrgyzindustry RVNL 50 Websitervnl wbr org wbr home The organization undertakes project execution from concept to commissioning and creates project specific SPVs RVNL s mandate includes the mobilization of extra budgetary resources EBRs through a mix of equity and debts via these SPVs Contents 1 History 2 List of Manufacturing Units 3 Subsidiaries 3 1 High Speed Rail Corporation of India Limited 3 2 Kinet Railway Solutions Ltd 3 3 Kyrgyzindustry RVNL 4 Special Purpose Vehicles 4 1 Kutch Railway Company Ltd 15 4 2 Bharuch Dahej Railway Co Ltd 16 4 3 Krishnapatnam Railway Co Ltd 17 4 4 Haridaspur Paradip Railway Co Ltd 4 5 Angul Sukinda Railway Ltd 18 4 6 New SPVs under formation 4 6 1 Indian Port Rail Corporation Limited IRPCL 4 6 2 Rail connectivity to Rewas Port in Maharashtara 5 Corporate Social Responsibility 6 Department of Public Enterprises Ratings 7 Recent Accolades 8 Completed projects 9 Projects Under Implementation 10 See also 11 References 12 External linksHistory editRail Vikas Nigam Limited RVNL was established to implement the National Rail Vikas Yojana NRVY a project to develop railway infrastructure in India The NRVY was announced by Prime Minister Atal Bihari Vajpayee from the ramparts of the Red Fort during the Independence Day speech on 15 August 2002 The NRVY was formally launched by Vajpayee on 26 December 2002 and RVNL was incorporated under the Companies Act 1956 on 24 January 2003 RVNL s two main objectives are to augment the capacity of rail infrastructure and raise extra budgetary resources for special purpose vehicle projects 4 RVNL opened its initial public offering IPO on 29 March 2019 It was the third railways related PSU to initiate an IPO after RITES and IRCON The company offered a 12 stake at a price range of 17 19 per share 5 6 The IPO was subscribed 1 78 times by close on 3 April earning 481 crore US 60 million 7 RVNL was listed on the Bombay Stock Exchange and the National Stock Exchange on 19 April 2019 8 List of Manufacturing Units editProject Type Location Status Notes Rail Coach Naveenikaran Karkhana RCNK RVNL Rail factory Sonipat Completed Rail Vikas Nigam Limited successfully commissioned the Rail Coach Naveenikaran Karkhana at Sonipat Haryana in October 2021 The Rolling Stock Complex is designed for sustainable development with Industry 4 0 compliant assembly line Vande Bharat Express production to start in the factory in near future Marathwada Rail Coach Factory MRCF Latur RVNL Rail factory Latur Maharashtra Completed The Marathwada Rail Coach Factory a project of RVNL in Latur Maharashtra produced its first coach shell on Good Governance Day i e 25 12 2020 This state of the art factory was set up and commissioned in just two years by RVNL to manufacture self propelled trains for Indian Railways 9 Vande Bharat Express production to start in the factory in near future Railway Manufacturing Unit RMU Wagon Factory Kazipet Telangana Under construction Indian Railways is going to set up a railway wagon manufacturing unit in Telangana The unit will be constructed on 160 acres of land in Kazipet at an estimated cost of 521 crore and is expected to be completed by February 2025 The Rail Vikas Nigam Limited RVNL was entrusted with this project Subsidiaries editHigh Speed Rail Corporation of India Limited edit Main article High Speed Rail Corporation of India Limited The High Speed Rail Corporation of India Limited HSRC is an SPV which was incorporated in 2012 as a subsidiary of RVNL to implement high speed rail projects in India 10 Kinet Railway Solutions Ltd edit RVNL has incorporated a private company Kinet Railway Solutions Ltd which will act as the SPV that will sign the manufacturing cum maintenance agreement with the Ministry of Railways 11 Kyrgyzindustry RVNL edit RVNL established a 50 50 joint venture company named Kyrgyzindustry RVNL with Kyrgyz company Kyrgyzindustry 12 The company will develop rail road and other infrastructure in Kyrgyzstan 13 RVNL informed the Securities and Exchange Board of India SEBI of the establishment of the joint venture on 10 December 2022 14 Special Purpose Vehicles editKutch Railway Company Ltd 15 edit RVNL owns 50 equity in this project The project length is 301 km and is for gauge conversion of Palanpur Gandhidham section Currently RVNL is doubling Samakhiali Palanpur 248 km anticipating increased traffic flow from Mundra and Deendayal Ports Bharuch Dahej Railway Co Ltd 16 edit RVNL is the largest stakeholder in this SPV with 35 46 equity The project length is 63 km and is for gauge conversion Krishnapatnam Railway Co Ltd 17 edit RVNL is the largest stakeholder in this SPV with 49 76 equity The project length is 113 2 km and is for construction of new line from Obulaparivalli to Krishnapatnam port Complete connectivity was provided in June 2019 Haridaspur Paradip Railway Co Ltd edit RVNL is the largest equity shareholder with 30 This SPV is for a new 82 km line from Haridaspur to Paradip Port This commercial route became operational on 30 07 2020 Angul Sukinda Railway Ltd 18 edit RVNL is the largest stakeholder in this SPV with 32 16 equity This is for a new 102 42 km railway line from Angul Sukinda 80 of the project has already been completed and the commercial operation will begin shortly New SPVs under formation edit Indian Port Rail Corporation Limited IRPCL edit RVNL is participating in the formation of IRPCL This is a SPV under the Ministry of Shipping with the stakeholders being RVNL and 12 major ports The initial authorised capital of the SPV is Rs 500 crore with RVNL s equity participation being Rs 10 crore only or 10 of the initial subscribed share capital The mandate of the SPV is to enhance rail connectivity to the various Ports in the country This includes maintenance of Port Railways along with up gradation modernisation and capacity augmentation as and when required Rail connectivity to Rewas Port in Maharashtara edit RVNL began as an organisation for executing various projects of railway engineering to meet the shortfall of rail infrastructure that the existing system of that time could not fulfil It was important to think out of the box and find a solution as eventually the price would be heavy with respect to the curtailment of opportunities and options available to a developing nation From beginning with railway capacity augmentation through track doubling new railway lines gauge conversion railway electrification RVNL has moved onto working on metro railways multimodal transport system port connectivity turnkey projects i e workshops training institutes green buildings high speed rail projects cable stayed bridges river and road bridges vertical lift bridge mountain Railways and tunnels Corporate Social Responsibility editCorporate Social Responsibility is a part of the ethos of Rail Vikas Nigam Limited Aligning its goals to CSR objectives RVNL has implemented projects in the thematic areas of Health and Education The geographic focus of RVNL CSR has been West Bengal Chhattisgarh Jharkhand Uttar Pradesh Madhya Pradesh Uttarakhand and Odisha About 60 per cent of CSR funds are spent in the education amp health care sector for the underprivileged marginalized communities and tribal belts Department of Public Enterprises Ratings editRail Vikas Nigam Limited has been rated as Excellent by the Department of Public Enterprises DPE for 11 consecutive years The Company has ranked 1st amongst the Railway PSEs and 3rd amongst PSUs in the country in the latest DPE ratings 2020 2021 with a MoU Score of 99 Assessment Year Rating RVNL s rank among Railway CPSEs 2007 08 Good 8th 2008 09 Very Good 10th 2009 10 Very Good 7th 2010 11 Excellent 5th 2011 12 Excellent 2nd 2012 13 Excellent 1st 2013 14 Excellent 2nd 2014 15 Excellent 1st 2015 16 Excellent 1st 2016 17 Excellent 1st 2017 18 Excellent 1st 2018 19 Excellent 2nd 2019 20 Excellent 1st 2020 21 Excellent 1stRecent Accolades editRail Vikas Nigam Limited team bagged two awards for excellence by Skoch group viz Gold award for Public Private Partnership and Silver award for response to Covid in 2022 19 Rail Vikas Nigam Limited was conferred the Roll of Honour as the fastest growing Mini Ratna of the year by Dalal Street Investment Journal Completed projects editThe list of 18 projects completed in 2021 22 is as under 20 S No Railway Name of Project Plan Head Length km 1 East Coast Railway Sambalpur Titlagarh 182 km Doubling 182 00 2 Northern Railway Utraitia Raebareli 65 6 km Doubling 68 04 3 Northern Railway Raebareli Amethi 60 1 km Doubling 59 00 4 South Central Railway Vijaywada Gudivada Bhimavaram Narasapur Gudivada Machlipatnam and Bhimavaram Nidadavolu 221 km Doubling with electrification Doubling 221 00 5 South Central Railway Secunderabad Falaknuma Mehbubnagar doubling Doubling 85 70 6 West Central Railway Bina Kota 282 66 km with RE Doubling 282 66 7 Western Railway Ahmedabad Botad 170 48 km GC 166 09 8 Western Railway Dhasa Jetalsar 104 44 km GC 106 69 9 Railway Electrification Raninagar Jalpaigudi New Bongaigaon Guwahati Incl RE 382 km Part of Barauni Katihar Guwahati Incl Katihar Barsoi 836 km RE RE 374 98 10 Railway Electrification Chikjajur Bellary RE 184 km RE 183 15 11 Railway Electrification Bengaluru Omalur Via Hosur RE 196 km RE 196 00 12 Railway Electrification Utratia Raebareli Amethi 2nd line RE 126 km RE 126 00 13 Deposit RE of NTPC siding at Hotgi Station 37 km RE 34 41 14 East Central Railway Gaya Setting up New MEMU car shed for maintaining 30 rakes of 16 coaches WKSP 15 Northern Railway Sonipat Setting up of coach periodical overhauling and refurbishment workshop WKSP 16 North Eastern Railway Saidpur Bhitri Setting up of Electric Loco Shed to home 200 Locos WKSP 17 Western Railway Dhasa Jetalsar Subways in lieu of Level Crossing 35 Nos RSW 18 South Central Railway Lallaguda Carriage Workshop Replacement of 100 Year Old Administrative Building OSW The list of 102 projects fully completed since inception and up to March 2021 is as under 20 S No Railway Project Name Type of Project Length km 1 Central Railway Diva Kalyan 5th amp 6th Line Doubling 11 2 Central Railway Pakni Mohol Doubling Doubling 17 3 Central Railway Panvel Jasai JNPT Doubling Doubling 28 5 4 Central Railway Pakni Solapur Doubling Doubling 16 28 5 Eastern Railway Gurup Saktigarh Extn of 3rd Line Doubling 26 6 East Central Railway Barauni Tilrath Bypass Doubling Doubling 8 3 7 East Coast Railway Talcher Cuttack Paradeep Doubling with 2nd Bridge on Rivers Birupa amp Mahanadi Doubling 3 8 East Coast Railway Jakhapura Haridaspur 3rd Line Doubling 23 3 9 East Coast Railway Cuttack Barang Doubling Doubling 14 3 10 East Coast Railway Rajatgarh Barang Doubling Doubling 31 3 11 East Coast Railway Khurda Barang 3rd line 35 km Doubling 32 32 12 Northern Railway New Delhi Tilak Bridge 5th amp 6th line 2 65 km Doubling 2 65 13 North Central Railway Palwal Bhuteswar 3rd Line Doubling 81 14 North Central Railway Aligarh Ghaziabad 3rd Line Doubling 106 1 15 North Western Railway Bhagat Ki Kothi Luni Doubling Doubling 30 3 16 North Western Railway Karjoda Palanpur Doubling Doubling 5 4 17 North Western Railway Rewari Manheru Doubling Doubling 69 02 18 North Western Railway Rani Keshav Ganj Doubling Doubling 59 5 19 North Western Railway Abu Road Sarotra Road Patch doubling 23 12 km Doubling 23 12 20 North Western Railway Swaruganj Abu Road Patch doubling 25 36 km Doubling 25 36 21 North Western Railway Sarotra Road Karjoda Patch doubling 23 59 km Doubling 23 59 22 Southern Railway Attipattu Korukkupet 3rd Line Doubling 18 23 Southern Railway Pattabiram Tiruvallur 4th Line amp Tiruvallur Arakkonam 3rd Line Doubling 41 89 24 Southern Railway Tiruvallur Arakkonam 4th Line Doubling 28 25 Southern Railway Villipuram Dindigul Doubling Doubling 273 26 Southern Railway Thanjavur Ponmalai Doubling Doubling 46 96 27 South Central Railway Pullampet Balapalle Ph I of Gooty Renigunta Doubling Doubling 41 28 South Central Railway Krishnapatnam Venkatachalam Doubling with RE Doubling 16 5 29 South Central Railway Gooty Renigunta Patch Doubling Doubling 151 30 South Central Railway Raichur Guntakal Doubling Doubling 81 0 31 South Central Railway Guntur Tenali Doubling with electrification 24 38 km Doubling 25 32 South Eastern Railway Tikiapara Santragachi Doubling Doubling 5 6 33 South Eastern Railway Panskura Kharagpur 3rd Line Doubling 45 34 South Eastern Railway Panskura Haldia Ph 1 Doubling Doubling 14 35 South Eastern Railway Rajgoda Tamluk Jn Cabin Doubling Doubling 13 5 36 South Eastern Railway Tamluk Jn Cabin Basulya Sutahata Doubling Doubling 24 23 37 South Eastern Railway Goelkera Monoharpur 3rd line 40 km Doubling 27 5 38 South East Central Railway Bilaspur Urkura 3rd Line Doubling Doubling 105 39 South East Central Railway Salka Road Khongsara Patch Doubling Doubling 26 40 South East Central Railway Khodri Anuppur with Flyover at Bilaspur 61 6 km Doubling 61 6 41 South Western Railway Hospet Guntakal Doubling Doubling 115 42 West Central Railway Bhopal Bina 3rd line 143 km Doubling 144 3 43 West Central Railway Itarsi Budni 3rd line 25 090 km Doubling 25 09 44 West Central Railway Barkhera Habibganj 3rd line 41 420 km Doubling 41 2 45 North Western Railway Delhi Rewari Gauge Conversion GC 94 2 46 North Western Railway Ajmer Phulera Ringus Rewari Gauge Conversion GC 295 47 North Western Railway Bhildi Samdari Gauge Conversion GC 223 48 Southern Railway Thanjavur Villupuram Gauge Conversion GC 192 49 Southern Railway Cuddalore Salem Gauge Conversion GC 193 50 South Western Railway Arasikere Hassan Mangalore Gauge Conversion GC 230 51 Western Railway Bharuch Samni Dahej Gauge Conversion GC 62 52 Western Railway Gandhidham Palanpur Gauge Conversion GC 301 53 East Coast Railway Daitari Banspani New Line NL 155 54 East Coast Railway Haridaspur Paradeep 82 km New Line 82 55 Southern Railway Vallarpadam Idapally New Line NL 9 56 South Central Railway Obulavaripalle Krishnapattnam 113 km New Line 121 57 Railway Electrification Tomka Banspani RE RE 144 58 Railway Electrification Kharagpur Nimpura Bhubaneswar Including Branch Line of Talcher Cuttack Paradeep RE 581 59 Railway Electrification Bhubaneswar Kottavalasa RE 417 60 Railway Electrification Daund Manmad Incl Puntamba Shirdi RE RE 255 61 Railway Electrification Reningunta Guntakal RE RE 308 62 Railway Electrification Yelahanka Dharmavaram Gooty RE RE 306 63 Railway Electrification Bharuch Samni Dahej RE RE 64 64 Railway Electrification Manheru Hissar RE RE 74 65 Railway Electrification Jakhal Hisar 79 km RE 80 0 66 Railway Electrification Chhapra Ballia Ghazipur Varanasi Allahabad RE 330 km RE 330 67 Railway Electrification Guntakal Kalluru RE 40 km RE 40 68 Railway Electrification Utretia Rae Bareli Amethi Janghai RE 214 km RE 214 69 Railway Electrification Daund Baramati 44 km RE 44 70 Railway Electrification Amla Chhindwara Kalumna RE 257 71 Railway Electrification Raipur Titlagarh 203 km Part of Vizianagaram Rayagada Titlagarh Raipur 465 km RE 203 72 Railway Electrification Rajpura Dhuri Lehra Mohabat 151 km RE 151 73 Railway Electrification Guntakal Bellary Hospet incl Tornagallu Ranjitpura Branch Line 138 km RE 138 74 Railway Electrification Wani Pimpalkutti RE 66 km RE 66 75 Railway Electrification Manoharabad Medchal 14 km RE 14 76 Railway Electrification Yalahanka Penukonda 120 55 km Doubling RE 77 Railway Electrification Jakhal Dhuri Ludhiana 123 km RE 123 78 Railway Electrification Guna Gwalior 227 km RE 227 79 Railway Electrification Rani Palanpur 166 km RE 166 80 Railway Electrification Villupuram Cuddalore Port Mayiladuturai Thanjavur amp Mayiladuturai Thiruvarur 228 km RE 228 81 Railway Electrification Raebareli Unchahar incl Dalmau Daryapur 63 km RE 63 82 Central Railway Latur Setting up of coach manufacturing factory WKSP 83 Eastern Railway Civil Engineering Works in Connection with Diesel Loco Component Factory Dankuni WKSP 84 Eastern Railway Dankuni Setting Up of Electric Loco Assembly and Ancillary Unit of CLW WKSP 85 East Central Railway Barauni 250 High Horse Power Loco Shed WKSP 86 East Coast Railway Vadlapudi Wagon PoH Workshop of 200 Nos Capacity Near Duvvada Station WKSP 87 North Central Railway Kanpur Construction of MEMU Car shed WKSP 88 South Eastern Railway Setting Up of Diesel Multiple Unit DMU Manufacturing Factory at Sankrail Haldia WKSP 89 DLW Varanasi Augmentation of Production Capacity from 200 To 250 High HP Locos Per Year WKSP 90 North Eastern Railway Aunrihar DEMU Shed WKSP 91 South Central Railway Workshop for Manufacture of Flat Bogies for LHB Design Coaches Yadgir WKSP 92 METKOL MM of Existing Corridor Noparanagar Baranagar Daksineshwar MTP 4 14 93 Eastern Railway Barddhaman Yard 4 lane road over bridge in lieu of 2 lane road over bridge No 213 ROB 94 Southern Railway Srirangam Tiruchchirapalli Town 4 lane road over bridge in lieu of 2 lane bridge No 380 A ROB 95 North Western Railway IOC Siding at Salawas Deposit Work Others 2 82 96 South Central Railway Secunderabad Upgradation of facilities at Centralised Training Academy for Railway Accounts TRG 97 South Central Railway Moula Ali Setting Up of Indian Railway Institute of Finance Management TRG 98 North Western Railway Madar Palanpur Removing of PSR Kms 589 1 to 590 1 Track Renewal 99 North Central Railway Jhansi Garhmau Orai Ata Ata Kalpi amp Pokhrayan Lalpur Splitting of longer block sections TF 100 North Central Railway Paman Bhimsen New B class station TF 101 Western Railway Sabarmati Botad subways in lieu of level crossing 23 Nos RSW 102 Western Railway Sabarmati Botad Subways in lieu of LCs 14 Nos RSW Projects Under Implementation editThere are 72 projects under various stages of implementation by RVNL The details of 66 projects assigned to RVNL till March 2021 and which are under implementation are as under S No Railway Name of Project Plan Head 1 CR amp SCR Daund Gulbarga Doubling 224 9 km and Pune Guntakal Electrification 641 37 km Doubling 2 ER Nabadwipghat Nabadwipdham upto BB loop 9 58 km Part of Kalinarayanpur Krishnanagar with Krishnanagar Shantipur Nabadwipghat GC Krishnanagar Chartala MM for Krishnanagar Chapra NL Naihati Ranaghat 3rd line Nabadwipghat Nabadwipdham upto BB loop 9 58 km Ranaghat Lalgola strengthening bridge No 2 Doubling 3 ER Dankuni Furfura Sharif NL Part of Liluah Dankuni 3rd line 10 13 km with extension to Furfura Sharif Doubling 4 ECR Dhanbad Sonnagar Patratu Sonnagar 3rd line 291 km Doubling 5 ECoR Raipur Titlagarh 203 km incl new line Mandir Hasaud Naya Raipur 20 km and new MM for conversion of Raipur Kendri Dhamtari amp Abhanpur Rajim branch 67 20 km Doubling 6 ECoR Banspani Daitari Tomka Jakhapura 180 km Doubling 7 ECoR Vizianagaram Sambhalpur Titlagarh 3rd line Doubling 8 NR Rajpura Bhatinda Doubling with Electrification 172 64 km Doubling 9 NR Janghai Phaphamau DL with RE 46 79 km Doubling 10 NCR Bhimsen Jhansi 206 km with RE Doubling 11 NCR Mathura Jhansi 3rd line Doubling 12 NER Varanasi Madhosingh Allahabad Doubling 13 NER Bhatni Aunrihar with electrification 125 km excl Indara Mau 116 95 km Doubling 14 NER Phephna Indara Mau Shahganj excl Indara Mau 150 28 km DL Doubling 15 SR Madurai Maniyachi Tuticorin Doubling with RE 159 km Doubling 16 SR Maniyachi Nagarcoil Doubling with RE 102 km Doubling 17 SCR Vijayawada Gudur 3rd line Doubling 18 SER Kharagpur Nimpura Adityapur 3rd line 132 km Doubling 19 SWR Hospet Hubli Londa Tinaighat Vasco da Gama 352 28 km Doubling 20 WR Palanpur Samakhiali 247 73 km Doubling 21 WCR Budni Barkhera 3rd line 33 km Doubling 22 NER Lucknow Pilibhit via Sitapur Lakhimpur 262 76 km Gauge Conversion 23 CR Dighi Port Roha 33 76 km New Line 24 CR Yevatmal Nanded 206 km NL New Line 25 ECR Fatuah Islampur incl material modification for extension of new line from Neora to Daniawan Daniawan to Biharsharif Biharsharif to Barbigha Barbigha to Sheikhpura New Line 26 ECoR Angul Sukinda Road 98 7 km New Line 27 NR Rishikesh Karnaprayag 125 09 km New Line 28 NR Bhanupalli Bilaspur Beri 63 1 km New Line 29 NER Mau Ghazipur Tarighat New Line New Line 30 SECR Dallirajhara Rowghat 90 km Part of Dallirajhara Jagdalpur 235 km New Line 31 WCR Indore Jabalpur 342 km NL sanctioned as Budhni Indore 205 km New Line 32 CORE Hospet Hubli Vasco da Gama 346 km RE 33 CORE Kasganj Bareilly Bhojipura Daliganj RE 401 km RE 34 CORE RE of Sambalpur Titlagarh Doubling project 96 596 km RE 35 CORE Palanpur Samakhiali 247 73 km RE RE 36 Deposit Electrification of IOCL Siding at Pakni 4 km RE 37 Deposit Electrification of Ultra Tech Cement Siding at Hotgi 8 km RE 38 Deposit Electrification of Chettinad Cement Siding at Tilati 7 1 km RE 39 ER Ranaghat EMU Car Shed Inspection bay for 15 coach maintenance facilities WKSP 40 ER Jheel Siding Coaching Depot Infrastructure development WKSP 41 ECoR Khurda Road Construction of main line electrical multiple unit car shed Phase 2 WSKP 42 NCR Jhansi Setting up of coach periodic overhauling and refurbishment workshop WKSP 43 NER Dullahapur Yard Provision of tower wagon periodic overhauling shed WKSP 44 SCR Kazipet Workshop for Wagon Periodical Overhauling WKSP 45 WR Vadodara Setting up of New PoH Shop for Electrical Locos WKSP 46 SR Repair of S amp T Workshop at Podanur Tamil Nadu WKSP 47 ER Samudragarh Nabadwipdham Road over bridge in lieu of level crossing No 14 RSW 48 SCR New Crossing Station Between Umdanagar Timmarpur Stations of Secunderabad Mahabubnagar Section TFC 49 SR Manamadurai Rameswaram Repl of Full Scherzer Lift Span Bridge No 346 Pamban Viaduct BRGW 50 SR Manamadurai Rameshwaram Reconstruction of bridge Pamban Viaduct with navigational lift span BRGW 51 NER Daraganj Rebuilding Bridge No 111 On Ganga BRGW 52 NER Setting Up of Centralised Training Institute for IRSME amp IRSS Officers at Lucknow TRG 53 WR National Rail amp Transportation Institute at Vadodara NAIR TRG 54 WR Construction of hostels in centralised training institutes Umbrella Work 2019 20 TRG 55 SECR Direct Power Supply from Central Generating Agencies OEW 56 WCR Provision of Addl Traction Substation at Budhni OEW 57 SWR New Station Building at Belguam OSW 58 SWR Second Entry Station Building at Belguam OSW 59 SWR Proposed Coaching Depot at Belgaum OSW 60 SWR Yard Remodelling Works at Belgaum OSW 61 SCR Multi Modal Transport System MMTS Phase II in Hyderabad MTP 62 SCR Ghatkesar Raigir Yadadri Extension of multi modal transportation system Phase II MTP 63 MET Baranagar Barrackpore amp Dakshineswar Construction of Metro Railway 14 5 km MTP 64 MET Dum Dum Airport New Garia via Rajerhat Construction of Metro Railway 32 km including Naupara Ex Baranagar 2 6 km Part of Dumdum Baranagar Metro Railway sanctioned as MM to Dumdum New Garia Metro Railway vide letter No 96 Proj C 5 1 Pt Dated 30 10 09 MTP 65 MET Joka Binoy Badal Dinesh Bagh via Majerhat Construction of Metro railway 16 72 km incl material modification for extension from Joka Diamond Park Phase I MTP 66 NR Final Location Survey for New Line Connectivity to Char Dham 327 km FLS The list of Railway project assigned to RVNL in 2021 22 and under execution is as under S No Railway Name of Project Plan Head 1 WR Infrastructure up gradation of Training Institutes at NAIR Campus TRG The list of projects awarded to RVNL through Competitive Bidding in 2021 22 and under execution is as under S No Agency Client Name of Project Plan Head 1 MP Metro Design and Construction of Elevated 10 km Viaduct and 09 Elevated Metro Stations including all Civil Structural Roof structure MEP works Architectural finishes Facade etc for Indore Metro Rail Project Metro Works 2 MP Metro Design and Construction of 07 Elevated Metro Stations including Structures Architectural Finishes E amp M Works etc of Indore Metro Rail Project Metro Works 3 NHIDCL DPR Preparation for Highways in North East Region in state of Nagaland for length of 200 KM DDC 4 NHIDCL DPR Preparation for Highways in North East Region in state of Nagaland for length of 280 KM DDC 5 NHIDCL DPR Preparation for Highways in North East Region in state of Mizoram for length of 740 KM DDCSee also editIndian Railway Finance Corporation non banking financial corporation financing Indian railwaysReferences edit RVNL rvnl org Retrieved 20 May 2023 RVNL rvnl org Retrieved 20 May 2023 RVNL climbs on bagging orders Business Standard India 18 January 2023 Retrieved 9 February 2023 RVNL rvnl org Retrieved 20 May 2023 Rail Vikas Nigam s IPO to start today price band set at Rs 17 19 per equity share The Indian Express 29 March 2019 Retrieved 20 May 2023 RVNL public float opens on Friday www thehindubusinessline com 26 March 2019 Retrieved 20 May 2023 Staff Writer 29 March 2019 Rail Vikas Nigam IPO fully subscribed mint Retrieved 20 May 2023 Hot stock Whopping 544 81 pc returns since IPO listing Share price of this Navratna status company hits all time high intraday TimesNow 3 May 2023 Retrieved 20 May 2023 Latur rail coach factory to make 100 Vande Bharat trains The Times of India 4 October 2022 ISSN 0971 8257 Retrieved 31 July 2023 About HSRC hsrc in Retrieved 20 May 2023 Russia to hold majority stake in Vande Bharat joint venture The New Indian Express Retrieved 31 July 2023 Dharma RanjithKumar 12 December 2022 RVNL forms new JV in Kyrgyz Republic Railway Technology Retrieved 20 May 2023 Rail Vikas Nigam shares locked in upper circuit after joint venture in Kyrgyz Republic cnbctv18 com 12 December 2022 Retrieved 20 May 2023 Rail Vikas Nigam Limited RVNL has formed a Joint Venture Company with Kyrgyzindustry OJSC PDF Bombay Stock Exchange Archived from the original PDF on 11 December 2022 Kutch Railway Company Ltd www kutchrail org Retrieved 1 December 2022 Bharuch Dahej Railway Company Limited www bdrail in Retrieved 1 December 2022 Krishnapatnam Railway Company Limited KRCL KRCL Retrieved 1 December 2022 Angul Sukinda Railway Limited Angul Sukinda Railway Limited asrl in Retrieved 1 December 2022 Rail Vikas Nigam Limited SPV Kutch Railway Company Limited Rail Vikas Nigam Limited SKOCH Award 14 April 2022 Retrieved 1 December 2022 a b RVNL s 19th Annual Report 2021 22 PDF rvnl org External links editOfficial Site RVNL anthem Retrieved from https en wikipedia org w index php title Rail Vikas Nigam amp oldid 1221056370, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.