fbpx
Wikipedia

R3 expressway (Slovakia)

R3 is a mostly planned expressway (Slovak: rýchlostná cesta) passing through central Slovakia in a north–south direction along the European route E77.

Expressway R3
Rýchlostná cesta R3
     Completed        Under construction        Planned
Route information
Part of E58 E77 E572
Length19.7 km (12.2 mi)
Planned: 200 km (120 mi)
The lengths are stated without concurrences
Major junctions
From DK7 border with Poland (planned)
Major intersections
To M2 border with Hungary (planned)
Location
CountrySlovakia
RegionsŽilina Region, Trenčín Region, Banská Bystrica Region, Nitra Region
Major citiesDolný Kubín, Martin, Žiar nad Hronom
Highway system
R2 R4

It goes from border with Hungary, moving north around Krupina to Zvolen, from there is currently planned to share an 18 km section with R1 and R2 from Budča to Žiar nad Hronom. There is also planned shared section between Žiar nad Hronom and Ráztočno near Handlová with R2. Then continues north, from Martin sharing a section with the D1, then splitting off in either Hubová, going from Dolný Kubín through the Orava River valley to Trstená and ending at border with Poland.The motorway goes along the route I/59,I/18,I/65 and through I/66

From the total length of cca. 230 km (excluding shared sections), these sections are in operation:

What's in construction of the R3 is:

  • Tvrdošín-Nižná to be completed 2023

The route of the R3 which is designed in three parts, in the north from Trstená to the intersection with the D1 highway in Likavka, in the central part from the intersection with the D1 highway in Martin to the intersection with the expressway along the R2 road in Ráztoč and in the southern part from the intersection with the R1 expressway in Budča to the state border of Slovakia with Hungary near Šahy, where the R3 will connect to the Hungarian highway M2. Even though the connection of the R3 road to the Polish highway network is currently not expected in the north, due to the currently missing highway construction project on the Polish side, this position will probably change in the future. In 2019, the preparation of a technical study was launched in Poland for the continuation of the Polish expressway S7, from the current termination in Rabka-Zdrój to the state border with a prospective connection to the R3 road. The technical study of this road was completed at the end of 2020, Poland envisages the construction of a high-capacity four-lane road. Between Šahy and Dudince, the R3 road will intersect with the R7 road.[2][3]

The total length of the R3, with the exception of toll roads, i.e. sections that the R3 route shares with other highways and expressways, is approximately 200 km. In the case of the route of the southern part of this road, in the section roughly between Zvolen and the state border with Hungary, the technical study also allows the possibility of ending the road R3 in Štúrovo instead of Šahy and at the same time, the technical study also allows the possibility of the route of the road R3 through Hronský Beňadik instead of Budča. The specific route of the R3 road in the southern section has not yet been determined. The southern section of the R3 expressway is at the same time the oldest in terms of plans, as the highway in this corridor is already mentioned in the Resolution of the Government of the Czechoslovak Republic No. 286/1963 from 1963. This resolution envisaged the construction of highway No. 66 in the section from Zvolen directly south to Šahy.

The lengths and routes of individual sections listed below are based on provisional construction plans in 2020, but considering the fact that many sections of the R3 road are only at the beginning, it is almost certain that the lengths and routes of unbuilt sections will still change. In 2020, there was a total change in the routing in the area of Dolný Kubín and in the section from the D1 highway to Dolný Kubín. Road R3 is to be implemented to a considerable extent as a reconstruction or completion of the existing road I/59. The R3 road through the town of Dolný Kubín has been newly extended. The planned intersection of the R3 road with the D1 highway was moved from the Hubová location to the Likavka location.

The international route E77 passes along the route of road R3. R3 will lighten traffic on the Kremnické Bane mountain pass, which is located on I/65. Construction on almost the entire length of R3 will require the relocation of roads, watercourses and engineering networks, as part of environmental protection, sewerage with the separation of oil substances and noise barriers will be built. The construction of two tunnels is tentatively planned for the R3 route; Biela Skala (630m) and Sklené (3450m). Both tunnels are located on the planned Horná Štubňa - Ráztočno section. According to the current plans of the Ministry of Transport, with the exception of the section near Tvrdošín, no sections of the R3 road will be constructed or open until 2028. Sections at a high level of preparation were not included in the plans either. With regard to the current intentions of the Ministry of Transport, the operation of the expressway along the entire length of the route cannot be expected before the year 2050.[4][5][6]

Junctions of the R3 edit

Section order Section designation length of the section in km Start of construction

section

Opening of section Exits and junctions
1.? Border crossing SK/PL - Trstená cca. 3,5 Depends on agreement of SR a PR Depends on agreement of SR a PR Section without exits
1. Trstená bypass, left side 7,2 Not included in the plan before year 2028 ? 901. connection onto the route I/59

1. Trstená,completion

2. Tvrdošín, completion

1. Trstená bypass, right side 7,2 2008 2010 901. temporary connection on I/59

1. Trstená

2. Tvrdošín

2. Tvrdošín - Nižná nad Oravou, Left side 4,4 Not included in the plan before year 2028 ? 3. Nižná, completion
2. Tvrdošín - Nižná nad Oravou, Right side 4,4 2021 2023 3. Nižná
3. Nižná nad Oravou - Dlhá nad Oravou, Left side 8,3 Not included in the plan before year 2028 ? 4. Podbiel, completion
3. Nižná nad Oravou - Dlhá nad Oravou, right side 8,3 Not included in the plan before year 2028 ? 4. Podbiel
4. Dlhá nad Oravou - Sedliacka Dubová, left side 4,9 Not included in the plan before year 2028 ? 5. Dlhá nad Oravou, completion
4. Dlhá nad Oravou - Sedliacka Dubová, right side 4,9 Not included in the plan before year 2028 ? 5. Dlhá nad Oravou
5. Oravský Podzámok-Horná Lehota,left side 6,4 Not included in the plan before year 2028 ? Section without exits
5. Oravský Podzámok-Horná Lehota,Right side 6,4 2004 2007 902.Temporary connection on I/59 - east

903.Temporary connection on I/59 - west

6. Oravský Podzámok - Dolný Kubín,south 10,9 Not included in the plan before year 2028 ? 6. Široká

7. Kocmáľ

8. Dolný Kubín - centre

9. Jasenová

7. Dolný Kubín, south - Likavka, Junction 8,7 Not included in the plan before year 2028 ? 10. Valaská Dubová

11. Likavka, junction R3xD1

8. Martin - Sever,junction R3xD1) - Martin 1,5 2011 2015 12. Martin - Sever, junction R3xD1

13. Martin

9. Martin - Rakovo 14 Not included in the plan before year 2028 ? 13. Martin - completion

14. Rakovo

10. Rakovo - Mošovce 10,3 Not included in the plan before year 2028 ? sections without exits
11. Mošovce - Horná Štubňa 7,9 Not included in the plan before year 2028 ? 15. Mošovce

16. Horná Štubňa

12. Horná Štubňa bypass, right side 4,7 Not included in the plan before year 2028 ? section without exits
12. Horná Štubňa bypass, left side 4,7 2008 2010 904. temporary connection on route I/65 - sever

905. temporary connection on route I/65 - juh

13. Horná Štubňa - Ráztočno, junction R3xR2 14 Not included in the plan before year 2028 ? 17. Sklené

18. Ráztočno - junction R3xR2

14. Budča - Krupina 27 Not included in the plan before year 2028 ? 19. Zvolen - west

20. Dobrá Niva

21. Babiná

15. Krupina, bypass 6,5 Not included in the plan before year 2028 ? 22. Krupina - north

23. Krupina - south

16. Krupina - Šahy 35,5 Not included in the plan before year 2028 ? 24. Hontianske Nemce

25. Dudince

26. Semerovce

17. Šahy - border crossing SK/HU 4,8 Not included in the plan before year 2028 ? 27. Šahy - sever

906. Temporary connection on route I/66 resp. Permanent on Hungarian motorway M2

Future of construction edit

Part Tvrdošín - Nižná nad Oravou, first half, under construction edit

Overview of the section under construction
length of section 4,4 km date of start of construction March 2022 Total construction costs without VAT

(NDS a.s. estimate before concluding the contract)

202 million EUR
Contractor Hochtief SK s.r.o., PORR s.r.o., Hydroekol Dolný Kubín, spol. Ltd. Contractual end of construction March 2025 Total construction costs without VAT

(Amount in terms of the contract)

€132.6 million
Construction supervision NDS a.s. Presumption of passage of the section March 2025 The order of the winning bid in

public procurement

The second cheapest
The cheapest offer in public procurement without VAT €123.6 million
Comment:

The length of this R3 section is 4.4 km, despite the fact that NDS a.s. declares its length as 5.5 km. The reason is that the section was shortened because the end of the section was projected beyond the Nižná exit. Part of the section from the Nižná exit would thus not be open to traffic until the following southern section is open to traffic, which, however, was not included in the construction plan until 2028. From the north side, this section connects to the already traveled R3 Trstená bypass, 7.2 km long. The section, like all existing sections of R3, is currently being implemented only in a half profile from the R24.5/100 category. Part of the 260 m long section from km 3,900 to km 4,160 (to bridge 206) will be built in a full profile due to an easier connection to the Nižná exit. Beyond bridge 206 to the end of the section, only the right (western) half-profile of the expressway will be built, which will be connected by the branch of the Nižná exit to the Nižná feeder. After the crossing, this 4.4 km long section will replace 4.7 km of the I/59 road. The section starts north of the village of Nižná. From there, the Nižná feeder will take the traffic to the R3 road itself, which will be led along the eastern bank of the Orava river until it connects to the previous, already passable section of the Trstená bypass. This section of R3 will effectively form a complete bypass of Tvrdošín.

The construction also includes the Nižná feeder, which will be connected to the I/59 road through the roundabout Nižná - north. The construction will include 6 bridges, including one bridge on the branch of the Nižná exit, two bridges on the feeder Nižná, one bridge on the branch of the Tvrdošín exit, one bridge over R3, the Tvrdošín rest area, noise barriers and frame walls. The construction also includes the reconstruction of one bridge, the modification of one temporary bridge over the Oravica river at the Tvrdošín exit and the construction of one temporary bridge over the Orava river at the Nižná feeder. The competition for the construction of this section was launched in the summer of 2017 and lasted for almost four years, during which three governments took turns. The cause of such large delays was poor-quality preparation of tender materials and disproportionately long decision-making processes in NDS a.s. as well as the Office for Public Procurement. Construction began in March 2021, the construction is expected to be completed in June 2023.

Template:Minivlajka Výstavba tohto úseku diaľnice je financovaná z rozpočtu Európskej Únie. Výstavbu diaľnice projektuje, objednáva a koordinuje NDS a.s. v spolupráci s Ministerstvom dopravy a výstavby SR.

Trstená bypass edit

The Trstená bypass on the R3 was under construction since April 2008 and after 30 months it was completed on 29 October 2010 the section is completely paved and handed over in half profile. The construction was financed from the state budget and was implemented by the companies VÁHOSTAV – SK, a. with. and Inžinierske stavby, a. with. . The length of the section is 7.2 km. There are 14 bridges and 3 intersections on the section, including two level crossings at both ends as a temporary connection to the roadI/59.

Tvrdošín – Nižná edit

Tvrdošín – Nižná is a section of R3 under construction. Due to the lack of funding for the construction of this section in 2018, its construction did not start until 3 years later. Its length is 4.4 km. It is being built for €62 million. The route runs on the left bank of the Oravy. There will be 14 bridge objects, 2 extra-level intersections and a large left-side rest area Tvrdošín. The contract for construction in a half profile was signed 25 February 2021 with a completion date of 2023.

Nižná – Dlhá nad Oravou edit

The planned section will extend R3 to the village of Dlhá nad Oravou by a length of 8.6 km. Construction was to begin in 2019 and completion was planned for 2022. The state will finance the section with a budget of €94,602,668.80 (SKK 2,850,000,000) according to plans from 2006. The route runs parallel to II/584. The Podbiel tunnel, 515 meters long, 19 bridges, and a level crossing is planned here.

Dlhá nad Oravou – Sedliacka Dubová edit

The section Dlhá nad Oravou – Sedliacka Dubová will extend the R3 by 4.2 km. The construction was planned for the years 2015–2017, while according to the plans from 2006, the construction should cost €48,131,182.37 (SKK 1,450,000,000). The section includes the Dlha nad Oravou and Sedliacká Dubová bypasses, 11 bridges, and a level crossing. The route will be built on varied geological ground.

Horna lehota - oravsky podzamok[edit] edit

Section R3 between Horná Lehota and Oravský Podzámok is a section of R3 in use since 2007, although only in half profile. The length of the section is 6.442 km, its construction took place in the years 2004 - 2007 by the companies Váhostav - SK, a.s., Max Bogl and Skanska, a.s., the construction was financed by the state budget. The section replaced I/59, which increased the flow and safety of traffic. According to STN 736100, category R11.5/100 was used for the section, as a result of which the maximum permitted speed is limited to 100 km/h. There are 9 bridges on the route, one of which is dominant over the Orava River and the railway, 750 meters long, 2 intersections (at the beginning and at the end).

Oravský Podzámok – Dolný Kubín north edit

Section R3, which will connect to Dolný Kubín to the expressway network, was to be built in the years 2016 - 2018, early use was planned for 2017. Its total length is 3,226 km. According to plans from 2007, the construction should cost the state budget €27,822,644.9 (SKK 838,185,000). The section will include 3 bridges, the "Dolný Kubín-sever" interchange.

Dolný Kubín-north – R3 D1 junction edit

The section Dolný Kubín - intersection D1 is a section connecting the town of Dolný Kubín with the D1 highway. Alternatives for connecting to the highway with connection to MÚK Hubová and MÚK Likavka are currently being assessed. The original variant for Kraľovany was rejected from an environmental point of view. Its length will be 17.8 km. The section is situated at the interface of Oravy and Liptova. The section will have 3 level crossings and 2 tunnels near Dolný Kubín with a length of 1569 m and 3004 m.

Horna Štubna bypass edit

The construction of the 4.321 km long Horne Štubna section began in December 2008. The construction was financed from the state budget and was made by the companies Strabag, a.s. and Skanska, a.s. Ochvat is located near the junction of the mountain passes Kremnické Bane and Šturec. The route is located in the corridor Zvolen – Diviaky railway line. There are 6 bridges and two level crossings at the end and beginning of the route. The building was ceremonially handed over for use on 23 November 2010 .

Zvolen - Šahy edit

The process of assessing the effects of the proposed activity "Expressway R3 Zvolen – Šahy" on the environment was stopped. According to the NDS statement, the preparation of the 6.5 km long Krupina bypass and the 4.8 km long Šahy bypass will continue, for which the NDS will have financial coverage.

See also edit

Resources edit

References edit

  1. ^ a b c http://dialnice.szm.com/highways/opening.html List of motorways and expressways constructions in use

External links edit

  • Highways portal by INEKO Institute (slovak)
  • R3 exit list

expressway, slovakia, mostly, planned, expressway, slovak, rýchlostná, cesta, passing, through, central, slovakia, north, south, direction, along, european, route, expressway, r3rýchlostná, cesta, completed, under, construction, plannedroute, informationpart, . R3 is a mostly planned expressway Slovak rychlostna cesta passing through central Slovakia in a north south direction along the European route E77 Expressway R3Rychlostna cesta R3 Completed Under construction PlannedRoute informationPart of E58 E77 E572Length19 7 km 12 2 mi Planned 200 km 120 mi The lengths are stated without concurrencesMajor junctionsFromDK7 border with Poland planned Major intersectionsD1 near Likavka planned D1 near Martin R2 near Raztocno planned R1 near Ziar nad Hronom R1 Budca R7 near Horne Semerovce planned ToM2 border with Hungary planned LocationCountrySlovakiaRegionsZilina Region Trencin Region Banska Bystrica Region Nitra RegionMajor citiesDolny Kubin Martin Ziar nad HronomHighway systemHighways in Slovakia R2 R4 This article may be a rough translation from Slovak It may have been generated in whole or in part by a computer or by a translator without dual proficiency Please help to enhance the translation The original article is under slovencina in the languages list If you have just labeled this article as needing attention please add a href Template Needtrans html class mw redirect title Template Needtrans subst Needtrans a pg R3 expressway Slovakia language Slovak comments to the bottom of the WP PNTCU section on Wikipedia Pages needing translation into English March 2023 It goes from border with Hungary moving north around Krupina to Zvolen from there is currently planned to share an 18 km section with R1 and R2 from Budca to Ziar nad Hronom There is also planned shared section between Ziar nad Hronom and Raztocno near Handlova with R2 Then continues north from Martin sharing a section with the D1 then splitting off in either Hubova going from Dolny Kubin through the Orava River valley to Trstena and ending at border with Poland The motorway goes along the route I 59 I 18 I 65 and through I 66From the total length of cca 230 km excluding shared sections these sections are in operation 7 2 km Trstena bypass two lane 1 5 7 km Oravsky Podzamok Horna Lehota two lane 1 1 7 km Martin Martin North 4 3 km Horna Stubna bypass two lane 1 What s in construction of the R3 is Tvrdosin Nizna to be completed 2023 The route of the R3 which is designed in three parts in the north from Trstena to the intersection with the D1 highway in Likavka in the central part from the intersection with the D1 highway in Martin to the intersection with the expressway along the R2 road in Raztoc and in the southern part from the intersection with the R1 expressway in Budca to the state border of Slovakia with Hungary near Sahy where the R3 will connect to the Hungarian highway M2 Even though the connection of the R3 road to the Polish highway network is currently not expected in the north due to the currently missing highway construction project on the Polish side this position will probably change in the future In 2019 the preparation of a technical study was launched in Poland for the continuation of the Polish expressway S7 from the current termination in Rabka Zdroj to the state border with a prospective connection to the R3 road The technical study of this road was completed at the end of 2020 Poland envisages the construction of a high capacity four lane road Between Sahy and Dudince the R3 road will intersect with the R7 road 2 3 The total length of the R3 with the exception of toll roads i e sections that the R3 route shares with other highways and expressways is approximately 200 km In the case of the route of the southern part of this road in the section roughly between Zvolen and the state border with Hungary the technical study also allows the possibility of ending the road R3 in Sturovo instead of Sahy and at the same time the technical study also allows the possibility of the route of the road R3 through Hronsky Benadik instead of Budca The specific route of the R3 road in the southern section has not yet been determined The southern section of the R3 expressway is at the same time the oldest in terms of plans as the highway in this corridor is already mentioned in the Resolution of the Government of the Czechoslovak Republic No 286 1963 from 1963 This resolution envisaged the construction of highway No 66 in the section from Zvolen directly south to Sahy The lengths and routes of individual sections listed below are based on provisional construction plans in 2020 but considering the fact that many sections of the R3 road are only at the beginning it is almost certain that the lengths and routes of unbuilt sections will still change In 2020 there was a total change in the routing in the area of Dolny Kubin and in the section from the D1 highway to Dolny Kubin Road R3 is to be implemented to a considerable extent as a reconstruction or completion of the existing road I 59 The R3 road through the town of Dolny Kubin has been newly extended The planned intersection of the R3 road with the D1 highway was moved from the Hubova location to the Likavka location The international route E77 passes along the route of road R3 R3 will lighten traffic on the Kremnicke Bane mountain pass which is located on I 65 Construction on almost the entire length of R3 will require the relocation of roads watercourses and engineering networks as part of environmental protection sewerage with the separation of oil substances and noise barriers will be built The construction of two tunnels is tentatively planned for the R3 route Biela Skala 630m and Sklene 3450m Both tunnels are located on the planned Horna Stubna Raztocno section According to the current plans of the Ministry of Transport with the exception of the section near Tvrdosin no sections of the R3 road will be constructed or open until 2028 Sections at a high level of preparation were not included in the plans either With regard to the current intentions of the Ministry of Transport the operation of the expressway along the entire length of the route cannot be expected before the year 2050 4 5 6 Contents 1 Junctions of the R3 2 Future of construction 2 1 Part Tvrdosin Nizna nad Oravou first half under construction 2 2 Trstena bypass 2 3 Tvrdosin Nizna 2 4 Nizna Dlha nad Oravou 3 Dlha nad Oravou Sedliacka Dubova 4 Horna lehota oravsky podzamok edit 4 1 Oravsky Podzamok Dolny Kubin north 4 2 Dolny Kubin north R3 D1 junction 4 3 Horna Stubna bypass 4 4 Zvolen Sahy 5 See also 6 Resources 7 References 8 External linksJunctions of the R3 editSection order Section designation length of the section in km Start of construction section Opening of section Exits and junctions 1 Border crossing SK PL Trstena cca 3 5 Depends on agreement of SR a PR Depends on agreement of SR a PR Section without exits 1 Trstena bypass left side 7 2 Not included in the plan before year 2028 901 connection onto the route I 59 1 Trstena completion2 Tvrdosin completion 1 Trstena bypass right side 7 2 2008 2010 901 temporary connection on I 59 1 Trstena2 Tvrdosin 2 Tvrdosin Nizna nad Oravou Left side 4 4 Not included in the plan before year 2028 3 Nizna completion 2 Tvrdosin Nizna nad Oravou Right side 4 4 2021 2023 3 Nizna 3 Nizna nad Oravou Dlha nad Oravou Left side 8 3 Not included in the plan before year 2028 4 Podbiel completion 3 Nizna nad Oravou Dlha nad Oravou right side 8 3 Not included in the plan before year 2028 4 Podbiel 4 Dlha nad Oravou Sedliacka Dubova left side 4 9 Not included in the plan before year 2028 5 Dlha nad Oravou completion 4 Dlha nad Oravou Sedliacka Dubova right side 4 9 Not included in the plan before year 2028 5 Dlha nad Oravou 5 Oravsky Podzamok Horna Lehota left side 6 4 Not included in the plan before year 2028 Section without exits 5 Oravsky Podzamok Horna Lehota Right side 6 4 2004 2007 902 Temporary connection on I 59 east 903 Temporary connection on I 59 west 6 Oravsky Podzamok Dolny Kubin south 10 9 Not included in the plan before year 2028 6 Siroka 7 Kocmaľ8 Dolny Kubin centre9 Jasenova 7 Dolny Kubin south Likavka Junction 8 7 Not included in the plan before year 2028 10 Valaska Dubova 11 Likavka junction R3xD1 8 Martin Sever junction R3xD1 Martin 1 5 2011 2015 12 Martin Sever junction R3xD1 13 Martin 9 Martin Rakovo 14 Not included in the plan before year 2028 13 Martin completion 14 Rakovo 10 Rakovo Mosovce 10 3 Not included in the plan before year 2028 sections without exits 11 Mosovce Horna Stubna 7 9 Not included in the plan before year 2028 15 Mosovce 16 Horna Stubna 12 Horna Stubna bypass right side 4 7 Not included in the plan before year 2028 section without exits 12 Horna Stubna bypass left side 4 7 2008 2010 904 temporary connection on route I 65 sever 905 temporary connection on route I 65 juh 13 Horna Stubna Raztocno junction R3xR2 14 Not included in the plan before year 2028 17 Sklene 18 Raztocno junction R3xR2 14 Budca Krupina 27 Not included in the plan before year 2028 19 Zvolen west 20 Dobra Niva21 Babina 15 Krupina bypass 6 5 Not included in the plan before year 2028 22 Krupina north 23 Krupina south 16 Krupina Sahy 35 5 Not included in the plan before year 2028 24 Hontianske Nemce 25 Dudince26 Semerovce 17 Sahy border crossing SK HU 4 8 Not included in the plan before year 2028 27 Sahy sever 906 Temporary connection on route I 66 resp Permanent on Hungarian motorway M2Future of construction editPart Tvrdosin Nizna nad Oravou first half under construction edit Overview of the section under construction length of section 4 4 km date of start of construction March 2022 Total construction costs without VAT NDS a s estimate before concluding the contract 202 million EUR Contractor Hochtief SK s r o PORR s r o Hydroekol Dolny Kubin spol Ltd Contractual end of construction March 2025 Total construction costs without VAT Amount in terms of the contract 132 6 million Construction supervision NDS a s Presumption of passage of the section March 2025 The order of the winning bid in public procurement The second cheapest The cheapest offer in public procurement without VAT 123 6 million Comment The length of this R3 section is 4 4 km despite the fact that NDS a s declares its length as 5 5 km The reason is that the section was shortened because the end of the section was projected beyond the Nizna exit Part of the section from the Nizna exit would thus not be open to traffic until the following southern section is open to traffic which however was not included in the construction plan until 2028 From the north side this section connects to the already traveled R3 Trstena bypass 7 2 km long The section like all existing sections of R3 is currently being implemented only in a half profile from the R24 5 100 category Part of the 260 m long section from km 3 900 to km 4 160 to bridge 206 will be built in a full profile due to an easier connection to the Nizna exit Beyond bridge 206 to the end of the section only the right western half profile of the expressway will be built which will be connected by the branch of the Nizna exit to the Nizna feeder After the crossing this 4 4 km long section will replace 4 7 km of the I 59 road The section starts north of the village of Nizna From there the Nizna feeder will take the traffic to the R3 road itself which will be led along the eastern bank of the Orava river until it connects to the previous already passable section of the Trstena bypass This section of R3 will effectively form a complete bypass of Tvrdosin The construction also includes the Nizna feeder which will be connected to the I 59 road through the roundabout Nizna north The construction will include 6 bridges including one bridge on the branch of the Nizna exit two bridges on the feeder Nizna one bridge on the branch of the Tvrdosin exit one bridge over R3 the Tvrdosin rest area noise barriers and frame walls The construction also includes the reconstruction of one bridge the modification of one temporary bridge over the Oravica river at the Tvrdosin exit and the construction of one temporary bridge over the Orava river at the Nizna feeder The competition for the construction of this section was launched in the summer of 2017 and lasted for almost four years during which three governments took turns The cause of such large delays was poor quality preparation of tender materials and disproportionately long decision making processes in NDS a s as well as the Office for Public Procurement Construction began in March 2021 the construction is expected to be completed in June 2023 Template Minivlajka Vystavba tohto useku diaľnice je financovana z rozpoctu Europskej Unie Vystavbu diaľnice projektuje objednava a koordinuje NDS a s v spolupraci s Ministerstvom dopravy a vystavby SR Trstena bypass edit The Trstena bypass on the R3 was under construction since April 2008 and after 30 months it was completed on 29 October 2010 the section is completely paved and handed over in half profile The construction was financed from the state budget and was implemented by the companies VAHOSTAV SK a with and Inzinierske stavby a with The length of the section is 7 2 km There are 14 bridges and 3 intersections on the section including two level crossings at both ends as a temporary connection to the roadI 59 Tvrdosin Nizna edit Tvrdosin Nizna is a section of R3 under construction Due to the lack of funding for the construction of this section in 2018 its construction did not start until 3 years later Its length is 4 4 km It is being built for 62 million The route runs on the left bank of the Oravy There will be 14 bridge objects 2 extra level intersections and a large left side rest area Tvrdosin The contract for construction in a half profile was signed 25 February 2021 with a completion date of 2023 Nizna Dlha nad Oravou edit The planned section will extend R3 to the village of Dlha nad Oravou by a length of 8 6 km Construction was to begin in 2019 and completion was planned for 2022 The state will finance the section with a budget of 94 602 668 80 SKK 2 850 000 000 according to plans from 2006 The route runs parallel to II 584 The Podbiel tunnel 515 meters long 19 bridges and a level crossing is planned here Dlha nad Oravou Sedliacka Dubova editThe section Dlha nad Oravou Sedliacka Dubova will extend the R3 by 4 2 km The construction was planned for the years 2015 2017 while according to the plans from 2006 the construction should cost 48 131 182 37 SKK 1 450 000 000 The section includes the Dlha nad Oravou and Sedliacka Dubova bypasses 11 bridges and a level crossing The route will be built on varied geological ground Horna lehota oravsky podzamok edit editSection R3 between Horna Lehota and Oravsky Podzamok is a section of R3 in use since 2007 although only in half profile The length of the section is 6 442 km its construction took place in the years 2004 2007 by the companies Vahostav SK a s Max Bogl and Skanska a s the construction was financed by the state budget The section replaced I 59 which increased the flow and safety of traffic According to STN 736100 category R11 5 100 was used for the section as a result of which the maximum permitted speed is limited to 100 km h There are 9 bridges on the route one of which is dominant over the Orava River and the railway 750 meters long 2 intersections at the beginning and at the end Oravsky Podzamok Dolny Kubin north edit Section R3 which will connect to Dolny Kubin to the expressway network was to be built in the years 2016 2018 early use was planned for 2017 Its total length is 3 226 km According to plans from 2007 the construction should cost the state budget 27 822 644 9 SKK 838 185 000 The section will include 3 bridges the Dolny Kubin sever interchange Dolny Kubin north R3 D1 junction edit The section Dolny Kubin intersection D1 is a section connecting the town of Dolny Kubin with the D1 highway Alternatives for connecting to the highway with connection to MUK Hubova and MUK Likavka are currently being assessed The original variant for Kraľovany was rejected from an environmental point of view Its length will be 17 8 km The section is situated at the interface of Oravy and Liptova The section will have 3 level crossings and 2 tunnels near Dolny Kubin with a length of 1569 m and 3004 m Horna Stubna bypass edit The construction of the 4 321 km long Horne Stubna section began in December 2008 The construction was financed from the state budget and was made by the companies Strabag a s and Skanska a s Ochvat is located near the junction of the mountain passes Kremnicke Bane and Sturec The route is located in the corridor Zvolen Diviaky railway line There are 6 bridges and two level crossings at the end and beginning of the route The building was ceremonially handed over for use on 23 November 2010 Zvolen Sahy edit The process of assessing the effects of the proposed activity Expressway R3 Zvolen Sahy on the environment was stopped According to the NDS statement the preparation of the 6 5 km long Krupina bypass and the 4 8 km long Sahy bypass will continue for which the NDS will have financial coverage See also editHighways in Slovakia Transport in Slovakia Controlled access highway Limited access roadResources edithttps ww w ndsas sk narodna dialnicna spolocnost https eznamka sk sk https www emyto sk sk http dialnice szm com highways opening htmlReferences edit a b c http dialnice szm com highways opening html List of motorways and expressways constructions in useExternal links editHighways portal by INEKO Institute slovak R3 exit list Retrieved from https en wikipedia org w index php title R3 expressway Slovakia amp oldid 1223577958, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.