Project 23900 amphibious assault ship

The Project 23900 Ivan Rogov is the newest class of Russian amphibious assault ships intended as a replacement for the French Mistral class, two of which were ordered by Russia in 2011, but that France refused to deliver in September 2014 due to Russia's military intervention in Ukraine.[5] A contract was signed on 22 May 2020 for the construction of two Project 23900 ships with a displacement of 40,000 tons.[3] The construction is led by JSC Zelenodolsk Design Bureau, which is a part of JSC Ak Bars Shipbuilding Corporation.

Official model of the Project 23900.
Class overview
BuildersZaliv shipyard, Kerch[2]
Operators Russian Navy
Preceded by Khalzan class Project 11780
CostRUB 50 billion ($688 Million)[1]
Built2020–present
Planned2
Building2
General characteristics
TypeAmphibious assault ship
Displacement40,000 tons[3]
Length220 m (721 ft 9 in)[4]
Beam38 m (124 ft 8 in)
Draught7.5 m (24 ft 7 in)
Propulsion2 × 16D49 turbo diesels (5 MW each), 2 × M90FR gas turbines (21 MW each)
Speed22 knots (41 km/h; 25 mph)
Range6,000 mi (5,200 nmi; 9,700 km)
Endurance60 days
Capacity
Troopsup to 900 marines
Complement320 crew
Armament
Aircraft carried
Aviation facilitiesHangar deck

Previously, the Lavina (Russian: Лавина, lit.'Avalanche'), and Priboy (Russian: Прибой, lit.'Surf')[6][7] designs were proposed by the Nevskoe Design Bureau and Krylov State Research Center as the replacement for Mistrals.[8][9]

Project 23900 is also a successor class to the unrealized Soviet Project 11780 program.

History

 
Original "Priboy" design model

Initially, the "Priboy" and "Lavina" helicopter carrier designs were first revealed in June 2015 during the "ARMY-2015" military-technical forum, as a replacement for the two undelivered Mistral-class vessels ordered by Russia in 2011 under a $1.3 billion contract.[citation needed] However, due to the Western sanctions against Russia, the French refused to proceed with the delivery and the deal was suspended in 2015. France subsequently returned to Russia the deposit paid for the construction of the two vessels.[10] Both vessels were later sold to the Egyptian Navy.

On 25 May 2017, Russian Deputy Defence Minister Yury Borisov stated that the construction cycle of new Russian helicopter carrier would last at least four years and the first such ship will be completed by 2022.[11][12]

In June 2017, Vice President of the United Shipbuilding Corporation Igor Ponomarev said the "Priboy" helicopter carriers were implemented in Russia's New State Armament Programme for 2018–2025 and that the construction of the ships could be carried either by Severnaya Verf, Baltic Shipyard or Sevmash.[7]

In July 2017, a member of the Russia's State Duma Dmitry Belik announced, the lead ship of the class will be named Sevastopol, after the city of Sevastopol.[13] The cost for the ship is to be about RUB40 billion ($675 million),[14] and its construction would begin after approval of the New State Armament Programme for 2018-2025.[15]

On 11 September 2019, it was reported that the first and second vessel of the class will be laid down in May 2020 at Zaliv Shipyard, Crimea.[16]

On 22 May 2020, according to a TASS news agency report, the Russian Defence Ministry had signed a RUB100 billion deal for the construction of two universal landing ships, the construction of which will take place at the Zaliv Shipyard in Crimea.[17][18] The two vessels should be delivered to the Russian Navy in 2026 and 2027, respectively.[19]

On 20 July 2020, during the laying down ceremony, the names of the first two ships were officially revealed. The ships were named Ivan Rogov and Mitrofan Moskalenko, the same as two already decommissioned Ivan Rogov-class vessels.[20]

On 28 February 2021, it was reported that the shipbuilders had begun to build the hulls of two future amphibious assault ships. It was also reported that construction was going on schedule, that the displacement of each of them will be 40,000 tons, and that the ships will be able to carry up to four Sukhoi S-70 Okhotnik-B drones, to both perform strike missions and to perform target designation for the hypersonic Zircon missiles launched from other ships.[21]

On 11 October 2021, it was reported that Mitrofan Moskalenko will become the flagship of the Black Sea Fleet. Infrastructure facilities initially intended for the second Mistral-class vessel are being prepared in Sevastopol, scheduled to be ready by the time the ship is commissioned.[22]

Design

"Lavina" was the first designation for the class, revealed at the «ARMY-2015» military-technical forum, and stands for the heavier variant designed by Krylov with a displacement of about 24,000 tons. "Priboy" used to refer to the lighter variant designed by Nevskoe, and displacing about 14,000 tons.[8][9]

Based on images showed to Vladimir Putin at January 2020 exposition devoted to the future for the Russian Navy, the two Project 23900 ships ordered for the Russian Navy appear to be a design derivative from the French Mistral class, having similar architecture and dimensions.[23] The Project 23900 will be even larger and displace about 40,000 tons.[21]

On 20 July 2020, at the official ceremony for the laying down of the Project 23900, a computer-generated image was showcased to represent the warship. Based on that image, the design of Project 23900 looks like a hybrid between the Lavina and the Mistral.[20]

On 14 December 2021, it was reported that the Project 23900 ships will be able to carry strike and reconnaissance drones, which will greatly enhance the helicopter carriers' combat capabilities.[24]

On 6 January 2022, it was reported that the amphibious assault ships will be armed with mine warfare unmanned surface vessels, which will detect, identify, and destroy sea mines. This will allow the vessels to operate independent from the support of minesweepers, allowing them to independently fulfill missions in blue waters.[25]

Export

Krylov has also proposed an export version of the Priboy design, dubbed "Priboy-E".[26]

Ships

Italics indicate estimates

Name Builder Laid down Launched Commissioned Fleet Status
Ivan Rogov Zaliv Shipyard 20 July 2020[20] 2028[19][27] Pacific Fleet[27] Under construction[28]
Mitrofan Moskalenko Zaliv Shipyard 20 July 2020[20] 2029[19][27] Black Sea[29] Under construction[28]

See also

References

  1. ^ "Источник: Россия потратит 100 млрд рублей на постройку первых двух вертолетоносцев" [Source: Russia will spend 100 billion rubles on the construction of the first two helicopter carriers]. TASS (in Russian). 10 April 2020.
  2. ^ Manaranche, Martin (26 May 2020). "Russian MoD Signs Construction Contract for Two Project 23900 LHD for the Russian Navy". NavalNews.com.
  3. ^ a b "Минобороны рассказало о водоизмещении строящихся в Керчи вертолетоносцев" [The Ministry of Defense spoke about the displacement of helicopter carriers under construction in Kerch]. RIA Novosti (in Russian). 30 December 2020. Retrieved 6 June 2021.
  4. ^ "Севастополь и Bладивосток" [Sevastopol and Vladivostok] (jpg). servimg.com (in Russian).
  5. ^ "Ukraine crisis: France halts warship delivery to Russia". BBC News. 3 September 2014. Retrieved 29 September 2019.
  6. ^ "Эксперт рассказал, почему российский корабль "Прибой" лучше французского "Мистраля"" [Expert explains why the Russian ship "Priboy" is better than the French "Mistral"]. Zvezda (in Russian). 27 June 2017. from the original on 5 October 2018. Retrieved 17 March 2019.
  7. ^ a b "В России началась работа над проектом перспективного вертолетоносца "Прибой"" [In Russia, work has begun on a project for a promising helicopter carrier "Priboy"]. TASS (in Russian). 28 June 2017. from the original on 19 July 2018. Retrieved 17 March 2019.
  8. ^ a b "В России разработали второй корабль на замену "Мистралям"" [Russia has developed a second ship to replace the "Mistrals"]. Lenta.ru (in Russian). 15 June 2015. from the original on 29 December 2015. Retrieved 17 March 2019.
  9. ^ a b "ВМФ заявил о подготовке технического задания на разработку аналога "Мистралей"" [The Navy announced the preparation of technical specifications for the development of an analogue of "Mistrals"]. Lenta.ru (in Russian). 29 July 2016. from the original on 30 July 2016. Retrieved 17 March 2019.
  10. ^ "Mistral warships: Russia and France agree compensation deal". BBC News. 5 August 2015. Retrieved 13 September 2019.
  11. ^ "Russia to build first helicopter carrier by 2022". TASS. 25 May 2017. from the original on 23 April 2019. Retrieved 17 March 2019.
  12. ^ "Russian MoD: First LHD Amphibious Assault Ship to be Built in Russia by 2022". Navyrecognition.com. 29 May 2017. from the original on 9 March 2019. Retrieved 17 March 2019.
  13. ^ "Перспективный российский вертолетоносец назовут "Севастополем"" [Promising Russian helicopter carrier to be named "Sevastopol"]. Lenta.ru (in Russian). 27 July 2017. from the original on 18 July 2018. Retrieved 17 March 2019.
  14. ^ "Russia's First Priboy LHD Amphibious Assault Ship to Cost $675 Millions". NavyRecognition.com. 10 July 2017. from the original on 10 October 2018. Retrieved 17 March 2019.
  15. ^ "Строительство российских вертолетоносцев начнут после утверждения госпрограммы вооружений" [The construction of Russian helicopter carriers will begin after the approval of the state armaments program]. TASS (in Russian). 20 September 2017. from the original on 22 July 2018. Retrieved 17 March 2019.
  16. ^ "Источники: первые два российских вертолетоносца заложат на верфи в Крыму весной 2020 года" [Source: The first two Russian helicopter carriers will be laid at a shipyard in Crimea in the spring of 2020]. TASS (in Russian). 11 September 2019. Retrieved 12 September 2019.
  17. ^ "Источник: Минобороны подписало контракт на два вертолетоносца" [Source: the Ministry of Defense signed a contract for two helicopter carriers]. TASS (in Russian). 22 May 2020. Retrieved 9 June 2020.
  18. ^ "Russian MoD Signs Contract for Two Project 23900 Helicopter Carriers LHD". NavyRecognition.com. 27 May 2020. Retrieved 9 June 2020.
  19. ^ a b c "Источник: Россия потратит 100 млрд рублей на постройку первых двух вертолетоносцев" [Source: Russia will spend 100 billion rubles on the construction of the first two helicopter carriers]. TASS (in Russian). 10 April 2020. Retrieved 9 June 2020.
  20. ^ a b c d "В России впервые заложили два универсальных десантных корабля-вертолетоносца" [Two universal amphibious assault helicopter carriers were laid down for the first time in Russia]. TASS (in Russian). 20 July 2020. Retrieved 20 July 2020.
  21. ^ a b "Источник: на заводе "Залив" начали формировать корпуса будущих кораблей-вертолетоносцев" [Source: The Zaliv plant began to form the hulls of future helicopter carriers]. ТАSS (in Russian). 28 February 2021.
  22. ^ "Russian Navy Project 23900 LHD To Become Black Sea Fleet's Flagship". navalnews.com. 11 October 2021. Retrieved 6 January 2022.
  23. ^ "Russian MoD Signs Construction Contract for Two Project 23900 LHD for the Russian Navy". NavalNews.com. 26 May 2020. Retrieved 9 June 2020.
  24. ^ "Russian Navy Project 23900 LHD To Carry Drones". navalnews.com. 14 December 2021. Retrieved 6 January 2022.
  25. ^ "Russian Navy Project 23900 LHD To Carry Mine Warfare USV". navalnews.com. 6 January 2022. Retrieved 6 January 2022.
  26. ^ "Russian Krylov State Research Center Developing Priboy-E / UDK-E LHD for Export". NavyRecognition.com. 10 June 2016. from the original on 29 March 2019. Retrieved 17 March 2019.
  27. ^ a b c "Строительство боевых кораблей основных классов для ВМФ России на 01.01.2022". navy-korabel (in Russian). 1 January 2022.
  28. ^ a b "Zaliv Shipyard Begins Construction of UDC Assault Ships". SeaWaves Magazine. 2 March 2021.
  29. ^ "Mitrofan Moskalenko helicopter carrier to become Russian Black Sea Fleet flagship — source".

project, 23900, amphibious, assault, ship, landing, ships, named, ivan, rogov, mitrofan, moskalenko, ivan, rogov, class, landing, ship, project, 23900, ivan, rogov, newest, class, russian, amphibious, assault, ships, intended, replacement, french, mistral, cla. For landing ships named Ivan Rogov and Mitrofan Moskalenko see Ivan Rogov class landing ship The Project 23900 Ivan Rogov is the newest class of Russian amphibious assault ships intended as a replacement for the French Mistral class two of which were ordered by Russia in 2011 but that France refused to deliver in September 2014 due to Russia s military intervention in Ukraine 5 A contract was signed on 22 May 2020 for the construction of two Project 23900 ships with a displacement of 40 000 tons 3 The construction is led by JSC Zelenodolsk Design Bureau which is a part of JSC Ak Bars Shipbuilding Corporation Official model of the Project 23900 Class overviewBuildersZaliv shipyard Kerch 2 Operators Russian NavyPreceded byKhalzan class Project 11780CostRUB 50 billion 688 Million 1 Built2020 presentPlanned2Building2General characteristicsTypeAmphibious assault shipDisplacement40 000 tons 3 Length220 m 721 ft 9 in 4 Beam38 m 124 ft 8 in Draught7 5 m 24 ft 7 in Propulsion2 16D49 turbo diesels 5 MW each 2 M90FR gas turbines 21 MW each Speed22 knots 41 km h 25 mph Range6 000 mi 5 200 nmi 9 700 km Endurance60 daysCapacity75 armored fighting vehicles 4 landing or assault boats of the Serna class Dyugon class 2 Tsaplya classTroopsup to 900 marinesComplement320 crewArmament1 x 100 mm A190 naval gun 3 x Kashtan CIWS 2 x Pantsir MAircraft carriedUp to 21 military helicopters and 4 drones mix of Kamov Ka 27 Kamov Ka 29 Kamov Ka 31 Kamov Ka 52K Kamov Ka 65 Sukhoi S 70 Okhotnik BAviation facilitiesHangar deckPreviously the Lavina Russian Lavina lit Avalanche and Priboy Russian Priboj lit Surf 6 7 designs were proposed by the Nevskoe Design Bureau and Krylov State Research Center as the replacement for Mistrals 8 9 Project 23900 is also a successor class to the unrealized Soviet Project 11780 program Contents 1 History 2 Design 3 Export 4 Ships 5 See also 6 ReferencesHistory Edit Original Priboy design model Initially the Priboy and Lavina helicopter carrier designs were first revealed in June 2015 during the ARMY 2015 military technical forum as a replacement for the two undelivered Mistral class vessels ordered by Russia in 2011 under a 1 3 billion contract citation needed However due to the Western sanctions against Russia the French refused to proceed with the delivery and the deal was suspended in 2015 France subsequently returned to Russia the deposit paid for the construction of the two vessels 10 Both vessels were later sold to the Egyptian Navy On 25 May 2017 Russian Deputy Defence Minister Yury Borisov stated that the construction cycle of new Russian helicopter carrier would last at least four years and the first such ship will be completed by 2022 11 12 In June 2017 Vice President of the United Shipbuilding Corporation Igor Ponomarev said the Priboy helicopter carriers were implemented in Russia s New State Armament Programme for 2018 2025 and that the construction of the ships could be carried either by Severnaya Verf Baltic Shipyard or Sevmash 7 In July 2017 a member of the Russia s State Duma Dmitry Belik announced the lead ship of the class will be named Sevastopol after the city of Sevastopol 13 The cost for the ship is to be about RUB40 billion 675 million 14 and its construction would begin after approval of the New State Armament Programme for 2018 2025 15 On 11 September 2019 it was reported that the first and second vessel of the class will be laid down in May 2020 at Zaliv Shipyard Crimea 16 On 22 May 2020 according to a TASS news agency report the Russian Defence Ministry had signed a RUB100 billion deal for the construction of two universal landing ships the construction of which will take place at the Zaliv Shipyard in Crimea 17 18 The two vessels should be delivered to the Russian Navy in 2026 and 2027 respectively 19 On 20 July 2020 during the laying down ceremony the names of the first two ships were officially revealed The ships were named Ivan Rogov and Mitrofan Moskalenko the same as two already decommissioned Ivan Rogov class vessels 20 On 28 February 2021 it was reported that the shipbuilders had begun to build the hulls of two future amphibious assault ships It was also reported that construction was going on schedule that the displacement of each of them will be 40 000 tons and that the ships will be able to carry up to four Sukhoi S 70 Okhotnik B drones to both perform strike missions and to perform target designation for the hypersonic Zircon missiles launched from other ships 21 On 11 October 2021 it was reported that Mitrofan Moskalenko will become the flagship of the Black Sea Fleet Infrastructure facilities initially intended for the second Mistral class vessel are being prepared in Sevastopol scheduled to be ready by the time the ship is commissioned 22 Design Edit Lavina was the first designation for the class revealed at the ARMY 2015 military technical forum and stands for the heavier variant designed by Krylov with a displacement of about 24 000 tons Priboy used to refer to the lighter variant designed by Nevskoe and displacing about 14 000 tons 8 9 Based on images showed to Vladimir Putin at January 2020 exposition devoted to the future for the Russian Navy the two Project 23900 ships ordered for the Russian Navy appear to be a design derivative from the French Mistral class having similar architecture and dimensions 23 The Project 23900 will be even larger and displace about 40 000 tons 21 On 20 July 2020 at the official ceremony for the laying down of the Project 23900 a computer generated image was showcased to represent the warship Based on that image the design of Project 23900 looks like a hybrid between the Lavina and the Mistral 20 On 14 December 2021 it was reported that the Project 23900 ships will be able to carry strike and reconnaissance drones which will greatly enhance the helicopter carriers combat capabilities 24 On 6 January 2022 it was reported that the amphibious assault ships will be armed with mine warfare unmanned surface vessels which will detect identify and destroy sea mines This will allow the vessels to operate independent from the support of minesweepers allowing them to independently fulfill missions in blue waters 25 Export EditKrylov has also proposed an export version of the Priboy design dubbed Priboy E 26 Ships EditItalics indicate estimates Name Builder Laid down Launched Commissioned Fleet StatusIvan Rogov Zaliv Shipyard 20 July 2020 20 2028 19 27 Pacific Fleet 27 Under construction 28 Mitrofan Moskalenko Zaliv Shipyard 20 July 2020 20 2029 19 27 Black Sea 29 Under construction 28 See also EditList of active Russian Navy ships Future of the Russian NavyReferences Edit Istochnik Rossiya potratit 100 mlrd rublej na postrojku pervyh dvuh vertoletonoscev Source Russia will spend 100 billion rubles on the construction of the first two helicopter carriers TASS in Russian 10 April 2020 Manaranche Martin 26 May 2020 Russian MoD Signs Construction Contract for Two Project 23900 LHD for the Russian Navy NavalNews com a b Minoborony rasskazalo o vodoizmeshenii stroyashihsya v Kerchi vertoletonoscev The Ministry of Defense spoke about the displacement of helicopter carriers under construction in Kerch RIA Novosti in Russian 30 December 2020 Retrieved 6 June 2021 Sevastopol i Bladivostok Sevastopol and Vladivostok jpg servimg com in Russian Ukraine crisis France halts warship delivery to Russia BBC News 3 September 2014 Retrieved 29 September 2019 Ekspert rasskazal pochemu rossijskij korabl Priboj luchshe francuzskogo Mistralya Expert explains why the Russian ship Priboy is better than the French Mistral Zvezda in Russian 27 June 2017 Archived from the original on 5 October 2018 Retrieved 17 March 2019 a b V Rossii nachalas rabota nad proektom perspektivnogo vertoletonosca Priboj In Russia work has begun on a project for a promising helicopter carrier Priboy TASS in Russian 28 June 2017 Archived from the original on 19 July 2018 Retrieved 17 March 2019 a b V Rossii razrabotali vtoroj korabl na zamenu Mistralyam Russia has developed a second ship to replace the Mistrals Lenta ru in Russian 15 June 2015 Archived from the original on 29 December 2015 Retrieved 17 March 2019 a b VMF zayavil o podgotovke tehnicheskogo zadaniya na razrabotku analoga Mistralej The Navy announced the preparation of technical specifications for the development of an analogue of Mistrals Lenta ru in Russian 29 July 2016 Archived from the original on 30 July 2016 Retrieved 17 March 2019 Mistral warships Russia and France agree compensation deal BBC News 5 August 2015 Retrieved 13 September 2019 Russia to build first helicopter carrier by 2022 TASS 25 May 2017 Archived from the original on 23 April 2019 Retrieved 17 March 2019 Russian MoD First LHD Amphibious Assault Ship to be Built in Russia by 2022 Navyrecognition com 29 May 2017 Archived from the original on 9 March 2019 Retrieved 17 March 2019 Perspektivnyj rossijskij vertoletonosec nazovut Sevastopolem Promising Russian helicopter carrier to be named Sevastopol Lenta ru in Russian 27 July 2017 Archived from the original on 18 July 2018 Retrieved 17 March 2019 Russia s First Priboy LHD Amphibious Assault Ship to Cost 675 Millions NavyRecognition com 10 July 2017 Archived from the original on 10 October 2018 Retrieved 17 March 2019 Stroitelstvo rossijskih vertoletonoscev nachnut posle utverzhdeniya gosprogrammy vooruzhenij The construction of Russian helicopter carriers will begin after the approval of the state armaments program TASS in Russian 20 September 2017 Archived from the original on 22 July 2018 Retrieved 17 March 2019 Istochniki pervye dva rossijskih vertoletonosca zalozhat na verfi v Krymu vesnoj 2020 goda Source The first two Russian helicopter carriers will be laid at a shipyard in Crimea in the spring of 2020 TASS in Russian 11 September 2019 Retrieved 12 September 2019 Istochnik Minoborony podpisalo kontrakt na dva vertoletonosca Source the Ministry of Defense signed a contract for two helicopter carriers TASS in Russian 22 May 2020 Retrieved 9 June 2020 Russian MoD Signs Contract for Two Project 23900 Helicopter Carriers LHD NavyRecognition com 27 May 2020 Retrieved 9 June 2020 a b c Istochnik Rossiya potratit 100 mlrd rublej na postrojku pervyh dvuh vertoletonoscev Source Russia will spend 100 billion rubles on the construction of the first two helicopter carriers TASS in Russian 10 April 2020 Retrieved 9 June 2020 a b c d V Rossii vpervye zalozhili dva universalnyh desantnyh korablya vertoletonosca Two universal amphibious assault helicopter carriers were laid down for the first time in Russia TASS in Russian 20 July 2020 Retrieved 20 July 2020 a b Istochnik na zavode Zaliv nachali formirovat korpusa budushih korablej vertoletonoscev Source The Zaliv plant began to form the hulls of future helicopter carriers TASS in Russian 28 February 2021 Russian Navy Project 23900 LHD To Become Black Sea Fleet s Flagship navalnews com 11 October 2021 Retrieved 6 January 2022 Russian MoD Signs Construction Contract for Two Project 23900 LHD for the Russian Navy NavalNews com 26 May 2020 Retrieved 9 June 2020 Russian Navy Project 23900 LHD To Carry Drones navalnews com 14 December 2021 Retrieved 6 January 2022 Russian Navy Project 23900 LHD To Carry Mine Warfare USV navalnews com 6 January 2022 Retrieved 6 January 2022 Russian Krylov State Research Center Developing Priboy E UDK E LHD for Export NavyRecognition com 10 June 2016 Archived from the original on 29 March 2019 Retrieved 17 March 2019 a b c Stroitelstvo boevyh korablej osnovnyh klassov dlya VMF Rossii na 01 01 2022 navy korabel in Russian 1 January 2022 a b Zaliv Shipyard Begins Construction of UDC Assault Ships SeaWaves Magazine 2 March 2021 Mitrofan Moskalenko helicopter carrier to become Russian Black Sea Fleet flagship source Retrieved from https en wikipedia org w index php title Project 23900 amphibious assault ship amp oldid 1131097632, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.