The Portlands Energy Centre is a 550-megawatt natural gas electrical generating station in Toronto, Ontario. It is located in the Port Lands area of the Toronto waterfront at 470 Unwin Avenue, adjacent to the site of the decommissioned Hearn Generating Station.

Portlands Energy Centre
Country
  • Canada
Location470 Unwin Ave
Toronto, Ontario
Coordinates43°38′58″N 79°19′51″W / 43.64944°N 79.33083°W / 43.64944; -79.33083
StatusOperational
Commission date2008
Construction cost$730 million CAD[1]
Owner(s)Atura Power (Ontario Power Generation)
Operator(s)Atura Power
Employees30
Thermal power station
Primary fuelNatural gas
Cooling sourceLake Ontario
Combined cycle?Yes
Power generation
Units operational2 × 181 MW GE 7FA gas turbines
2 × Alstom fired HRSG
1 × 290 MW Alstom steam turbine
Nameplate capacity550 megawatts
External links
Websiteportlandsenergycentre.com
CommonsRelated media on Commons

Ownership edit

The Portlands Energy Centre was originally owned and operated as a 50/50 joint partnership between Ontario Power Generation (OPG) and TransCanada Corporation (now TC Energy).[2] OPG acquired full ownership of the facility in 2020, and it is currently operated by OPG's subsidiary Atura Power.[3]

Technical specifications of the plant edit

The technical specifications of the plant in the original submission of the environmental review report (a less rigorous form of a full environmental assessment) to the Ministry of the Environment in November 2003 have been significantly altered. This was due to the government instructing Ontario Power Generation to stop participating in projects which use more environmentally acceptable generations systems, such as co-generation.[4] Originally, the plant was described as two identical 275 MW power train systems, each comprising a 175 MW GE 7FA gas turbine generator, and other equipment. This proposed configuration was capable of producing over 272,000 per hour of steam for district heating.

Power purchase agreement, timing and capital costs edit

On September 18, 2006, TransCanada issued a press release[5] announcing that Portlands Energy Centre L.P. had signed a 20-year Accelerated Clean Energy Supply (ACES) contract with the Ontario Power Authority for the power output of the PEC.

The plant started delivering 340 MW of power to the City of Toronto in June 2008 in single-cycle operation and was fully operational with an output of 550 MW by the second-quarter 2009.[6] Total capital costs are expected to reach $730MM.

See also edit

References edit

  1. ^ Peltier, Robert (1 September 2009). "Top Plants: Portlands Energy Centre, Ontario, Canada". POWER Magazine. Retrieved 9 August 2017.
  2. ^ Dr. Robert Peltier, PE (September 1, 2009). "Top Plants: Portlands Energy Centre, Ontario, Canada". Tradefair Group. {{cite journal}}: Cite journal requires |journal= (help)
  3. ^ "OPG subsidiary Atura Power finalizes acquisition of natural gas assets". Ontario Power Generation. April 29, 2020.
  4. ^ Memorandum of Agreement between the Crown and Ontario Power Generation, August 17, 2005
  5. ^ TransCanada Corp., Press Release dated September 18, 2007: Portlands Energy Centre Signs Accelerated Clean Energy Supply Contract 2008-05-13 at the Wayback Machine
  6. ^ TransCanada Corp. 2007 Annual Report 2008-04-03 at the Wayback Machine

External links edit

  • Portlands Energy Centre
  • Top Plants: Portlands Energy Centre, Ontario, Canada
  • Portlands Energy Centre Photos - 2007

  Media related to Portlands Energy Centre at Wikimedia Commons

portlands, energy, centre, this, article, needs, updated, please, help, update, this, article, reflect, recent, events, newly, available, information, july, 2010, megawatt, natural, electrical, generating, station, toronto, ontario, located, port, lands, area,. This article needs to be updated Please help update this article to reflect recent events or newly available information July 2010 The Portlands Energy Centre is a 550 megawatt natural gas electrical generating station in Toronto Ontario It is located in the Port Lands area of the Toronto waterfront at 470 Unwin Avenue adjacent to the site of the decommissioned Hearn Generating Station Portlands Energy CentreCountryCanadaLocation470 Unwin AveToronto OntarioCoordinates43 38 58 N 79 19 51 W 43 64944 N 79 33083 W 43 64944 79 33083StatusOperationalCommission date2008Construction cost 730 million CAD 1 Owner s Atura Power Ontario Power Generation Operator s Atura PowerEmployees30Thermal power stationPrimary fuelNatural gasCooling sourceLake OntarioCombined cycle YesPower generationUnits operational2 181 MW GE 7FA gas turbines2 Alstom fired HRSG1 290 MW Alstom steam turbineNameplate capacity550 megawattsExternal linksWebsiteportlandsenergycentre comCommonsRelated media on Commons edit on Wikidata Contents 1 Ownership 2 Technical specifications of the plant 3 Power purchase agreement timing and capital costs 4 See also 5 References 6 External linksOwnership editThe Portlands Energy Centre was originally owned and operated as a 50 50 joint partnership between Ontario Power Generation OPG and TransCanada Corporation now TC Energy 2 OPG acquired full ownership of the facility in 2020 and it is currently operated by OPG s subsidiary Atura Power 3 Technical specifications of the plant editThe technical specifications of the plant in the original submission of the environmental review report a less rigorous form of a full environmental assessment to the Ministry of the Environment in November 2003 have been significantly altered This was due to the government instructing Ontario Power Generation to stop participating in projects which use more environmentally acceptable generations systems such as co generation 4 Originally the plant was described as two identical 275 MW power train systems each comprising a 175 MW GE 7FA gas turbine generator and other equipment This proposed configuration was capable of producing over 272 000 per hour of steam for district heating Power purchase agreement timing and capital costs editOn September 18 2006 TransCanada issued a press release 5 announcing that Portlands Energy Centre L P had signed a 20 year Accelerated Clean Energy Supply ACES contract with the Ontario Power Authority for the power output of the PEC The plant started delivering 340 MW of power to the City of Toronto in June 2008 in single cycle operation and was fully operational with an output of 550 MW by the second quarter 2009 6 Total capital costs are expected to reach 730MM See also edit nbsp Ontario portal nbsp Energy portal Toronto waterfront Port Lands Toronto Hydro City owned electricity distribution corporation Ontario Power Generation Provincially owned electricity generation corporation Hearn Generating Station The original electrical generation facility Toronto Port Authority Federal government agency that controls the portlandsReferences edit Peltier Robert 1 September 2009 Top Plants Portlands Energy Centre Ontario Canada POWER Magazine Retrieved 9 August 2017 Dr Robert Peltier PE September 1 2009 Top Plants Portlands Energy Centre Ontario Canada Tradefair Group a href Template Cite journal html title Template Cite journal cite journal a Cite journal requires journal help OPG subsidiary Atura Power finalizes acquisition of natural gas assets Ontario Power Generation April 29 2020 Memorandum of Agreement between the Crown and Ontario Power Generation August 17 2005 TransCanada Corp Press Release dated September 18 2007 Portlands Energy Centre Signs Accelerated Clean Energy Supply Contract Archived 2008 05 13 at the Wayback Machine TransCanada Corp 2007 Annual Report Archived 2008 04 03 at the Wayback MachineExternal links editPortlands Energy Centre Top Plants Portlands Energy Centre Ontario Canada Portlands Energy Centre Photos 2007 nbsp Media related to Portlands Energy Centre at Wikimedia Commons Retrieved from https en wikipedia org w index php title Portlands Energy Centre amp oldid 1219856276, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.