Perth Freight Link

The Perth Freight Link was a proposed $1.9 billion project in Perth, Western Australia to improve the road freight link between Kewdale and Fremantle Harbour. The project was announced by the state government in May 2014,[1] but was cancelled following a change of government at the March 2017 state election.[2][3]

Perth Freight Link

General information
TypeFreeway  (Proposed)
Length13.4 km (8.3 mi)
Major junctions
Southeast end
Northwest end
Highway system

The proposal included multiple stages: a five-kilometre (3.1 mi) extension of Roe Highway to Stock Road (Roe 8); a second stage linking Roe 8 to Stirling Highway, bypassing fourteen sets of traffic signals (Roe 9);[4] and a final stage connecting into the Port of Fremantle. The plan included mandatory GPS tracking of all vehicles over an undisclosed size or weight with a charge per kilometre being applied for vehicles travelling along the route between Muchea and North Fremantle.[5] The extension would have taken the highway from its current terminus at Kwinana Freeway approximately five kilometres (3.1 mi) further west through the Beeliar Wetlands to Stock Road, near Forrest Road in Coolbellup. The proposed route was along or within the vicinity of an existing road reserve in the Perth Metropolitan Region Scheme.[6]

The project's environmental assessment by the Environmental Protection Authority (EPA) along with the approval of the development by WA Government Minister Albert Jacob was ruled invalid by the Chief Justice of the Supreme Court on 16 December 2015.[7] On 30 March 2016 Greg McIntyre QC, acting for Corina Abraham, lodged writs in the Supreme Court of Western Australia, alleging that Minister of Aboriginal Affairs Peter Collier and the Department of Aboriginal Affairs cultural committee denied procedural fairness when it failed to consult her.[8][9] On 24 August 2016 the Supreme Court dismissed Abraham's challenge.[10] The Save Beeliar Wetlands group tried to challenge the highway in the High Court, but the court dismissed the challenge on 16 December 2016, saying there wasn't sufficient grounds for a challenge.[11]

Construction began in late 2016, following the signing of the contract to build Roe 8 by the Liberal state government. Opposition to the project continued, with protests and a second senate inquiry. The freight link was an election issue in the 2017 state election. The McGowan Government scrapped the entire project after winning office.[12][13]

History edit

Background edit

Roe Highway was first proposed in 1955 by Gordon Stephenson as part of what was to become the Metropolitan Region Planning Scheme. The highway was intended to form the southern and eastern sections of a ring route around the Perth metropolitan area.[14] In the 1950s, Stephenson planned for Roe Highway to continue westwards towards Fremantle, through South Fremantle along Marine Terrace and then north to connect with Stirling Highway and the Port of Fremantle. As part of the plan, in 1974 Stirling Highway was extended from its then terminus north of the Swan River southwards to Canning Highway. Over a period of approximately 20 years, Main Roads Western Australia procured land, and in 1985, Stirling Highway was extended southwards from Canning Highway to High Street (the western continuation of Leach Highway). The remaining 3 km strip of land south of High Street then became known as the Fremantle Eastern Bypass.

At the southern end of the proposed Fremantle Eastern Bypass, an 8 km east–west road reservation was proclaimed, and became known as Roe Highway stage 8. With a change of state governments in 2001, the planned Fremantle Eastern Bypass / Roe Highway stage 8 was cancelled, and the land reserved for the Fremantle Eastern Bypass portion was sold for housing.[15] As part of the funding arrangement for Roe Highway stages 6 and 7, the federal government stipulated that the reservation for Roe Highway stage 8 itself was to be retained.

Following a change in state governments in September 2008, planning work commenced on an extension of the Roe Highway from Kwinana Freeway to Stock Road.[16] Planning was also under way for an upgrade of High Street to dual carriageway between Stirling Highway and Carrington Street.[17]

Project announced edit

 
Rethink the Link[18] protest signs against the Perth Freight Link, 2015

The Perth Freight Link project was announced in May 2014, with joint funding between the state and federal governments.[1] The announcement included plans for a toll on the route, which would only apply to trucks.[19] In December 2014, the state government revealed that they planned to construct the Freight Link between early 2016 and 2019, and that the toll would apply on the 85-kilometre-long (53 mi) truck route between Muchea (north of Perth) and Fremantle, once the link was completed.[20][21]

Uncertainty over the project's scope and time frame emerged in mid-2015.[22] The intended route for the second stage, which was necessitated by the earlier sale of the Fremantle Eastern Bypass land that was previously planned to be used for the route, faced community opposition as it would require residential properties to be compulsorily acquired and demolished.[23] As such, alternative routes for the second stage were considered by the government.[24] The uncertainty over stage 2 remained for over a year. In September 2016, there still was not a decision on the stage's timing, nor its route, but a tunnel was considered by Barnett as the most likely option.[25] A tunnel under White Gum Valley, Beaconsfield and Hilton was committed to on 15 January 2017.[26]

Controversies edit

The project is controversial,[27] and has been the subject of concern and protest from multiple community groups on various issues.[28] The main areas of contention relate to environmental issues, as well as the cost and justification for the project.[27]

The state government claims the project is needed to reduce congestion in Perth's south and enhance road safety, and would be required for any future port development in the vicinity. The necessity is disputed by opponents of the Freight Link, including the opposition Labor party and the Greens;[27] McGowan has called it a "road to nowhere" and "waste of money".[29] A 2015 report from Infrastructure Australia concluded that, while there would be economic benefit, the project was hurriedly prepared, and detailed assessments were not completed for alternatives.[30] In 2016, a Senate inquiry unanimously denounced the Freight Link, and suggested the federal government redirect funding to a new outer harbour at Cockburn Sound proposed by the City of Kwinana.[31]

The route of the Roe 8 section takes it through the Beeliar Wetlands, a habitat for the endangered Carnaby's black cockatoo.[28] The Environmental Protection Authority (EPA) approved the Roe Highway extension in 2013, following a review that included over 3,000 public submissions,[20] and Environment Minister Albert Jacob confirmed his approval on 2 July 2015.[32] Preliminary site works began on the project during November 2015, which drew protests with many people being given move-on orders preventing them from being in the area.

As well as environmental issues with the extension of Roe Highway,[20] Stephen Marley, president of the Livestock and Rural Transport Association of Western Australia, expressed concern in December 2014 that the cost of the truck toll will be passed on to farmers,[21] and in May 2015, Palmyra residents protested the proposed compulsory acquisition and demolition of their homes to make way for Stage 2 of the link.[33] Local people are opposed to the proposed route through the Bibra Lake area, including the local indigenous people, who described the area as a birthing place, the "King Edward Memorial Hospital for aboriginal people".[28] The WA Road Transport Association has been critical of the November 2015 decision to postpone stage two of the project, as "Roe 8 alone delivers none of the productivity benefits promised by the full freight link to the port".[34] They would not support a toll if implemented before the link to the port was completed. Such a toll was a prospect put forward by Barnett that month, though this was contradicted by Transport Minister Dean Nalder.[34]

Legal challenges edit

In September 2015 the group Save the Beeliar Wetlands took legal action against the EPA, arguing that the authority did not follow its own policies.[7] The project's environmental assessment by the EPA along with the approval of the development by WA Government Minister Albert Jacob was ruled invalid by the Chief Justice of the Supreme Court on 16 December 2015.[7] The state government appealed, and the ruling was unanimously overturned by the Court of Appeal on 15 July 2016, as the EPA's policies were "not mandatory considerations".[35] The Save Beeliar Wetlands group tried to challenge the highway in the High Court, but the court dismissed the challenge on 16 December 2016, saying there were not sufficient grounds for a challenge.[11]

On 30 March 2016 Greg McIntyre QC, acting for Corina Abraham, lodged writs in the Supreme Court of Western Australia, alleging that Minister of Aboriginal Affairs Peter Collier and the Department of Aboriginal Affairs cultural committee denied procedural fairness when it failed to consult her.[8][9] On 24 August 2016 the Supreme Court dismissed Abraham's challenge.[10]

Commencement of construction works edit

The contract to build Roe 8 was approved and signed by state government in October 2016.[36][37] There had been ongoing protests since construction activities commenced,[38] including on 6 December 2016, the day after temporary fencing was erected.[39]

 
The 23 February 2017 public Senate Committee hearing

A public Senate Committee hearing was held on 23 February 2017, regarding the Roe 8 project's alleged failure to adhere to Federal environmental conditions. State Environment Minister Albert Jacob denied the allegations.[40]

State election and aftermath edit

During the 2017 state election, the incoming McGowan Government stated it intended to scrap the entire project.[12][13] On 12 March, Main Roads and the contractors agreed to suspend work on the project.[41][42]

As part of cancellation negotiations with the federal government, Roe Highway was instead curtailed to curve northwards to connect to Murdoch Drive. This has been criticised as allowing for the future construction of Roe 8.[43] Despite the cancellation, funding provisions for the project remained in the federal budget until a change of government in 2022.[44][45]

Route edit

The Perth Freight Link was proposed to connect the terminus of Roe Highway (at the Kwinana Freeway) with the Port of Fremantle. In conjunction with existing highways and the Gateway WA and NorthLink WA projects, the Freight Link would have formed part of an 85-kilometre (53 mi) free-flowing route between Muchea and the port.[4]

Stage 1 (Roe 8) edit

Section 1, also known as Roe 8, was to be a five-kilometre (3.1 mi) extension to Roe Highway, from the Kwinana Freeway to Stock Road,[4] cutting through a portion of the Beeliar Wetlands.[citation needed]

Stage 2 (Roe 9) edit

External images
Stage 2 options
  Original design: upgrade Stock Road, Leach Highway, High Street (source: ABC News[26])
  May 2015: extend Roe Highway to Hamilton Hill, then tunnel north to High Street (source: Perth Now[46])
  May 2016: tunnel from Stock Road/Winterfield Road intersection to High Street (source: WA Today[47])

Stage 2 (Roe 9[26]) would have linked the Roe 8 extension to East Fremantle. The original route considered was via Stock Road, Leach Highway, and High Street, upgraded with grade-separated interchanges, bypassing fourteen sets of traffic signals.[4][48] Following community opposition to the plan, which would require residential properties to be compulsorily acquired and the demolition of homes, alternative routes were considered by the government.[24] As of November 2015, the second stage had been postponed indefinitely, due to the intricacies and costs involved.[49] In January 2017 Premier Colin Barnett announced a tunnel from Stock Road to High Street in East Fremantle 3 km short of the port, including crossing of the Swan River. The tunnel plan was revealed to cost at least $5.8b by documents that Main Roads had fought to prevent being released under a Freedom of Information request. An additional $2.7b would be needed to cross the Swan River. This option would impact the suburbs of Leighton and Mosman Park and see an increase in truck traffic to the north through Cottesloe.[50]

Stage 3 (Roe 10) edit

A third stage would have seen the link cross the Swan River and connect into the port. There were no proposals made for the design, cost, or timing of this final section.[26][51]

Roe Highway widening edit

Another section involved upgrading Roe Highway between Tonkin Highway and Orrong Road, adding a third lane in each direction and constructing a new bridge across the freight railway.[4]

See also edit

References edit

  1. ^ a b . Media Statements. Government of Western Australia. 19 May 2014. Archived from the original on 27 January 2016. Retrieved 3 January 2016.
  2. ^ "Work starts now for WA's new McGowan govt". SBS News. Special Broadcasting Service. AAP. 12 March 2017. Retrieved 12 March 2017.
  3. ^ Sprague, Julie-anne; Ingram, Tess (12 March 2017). "WA election: Mark McGowan sets his agenda". AFR Weekend. Fairfax Media. from the original on 12 March 2017. Retrieved 12 March 2017.
  4. ^ a b c d e Main Roads Western Australia (5 January 2015). . Government of Western Australia. Archived from the original on 31 March 2015. Retrieved 8 February 2015.
  5. ^ Parker, Gareth (17 December 2014). "Truck toll to pay for Roe Highway extension". The West Australian. Retrieved 2 January 2016.
  6. ^ Main Roads Western Australia (17 December 2014). . Government of Western Australia. Archived from the original on 26 April 2013. Retrieved 8 February 2015.
  7. ^ a b c Young, Emma (16 December 2015). "Supreme Court rules EPA approval of Roe 8 'invalid'". WA Today. Retrieved 2 January 2016.
  8. ^ a b Grant, Steve (1 April 2016). "ROE 8 The fight of my life". Fremantle Herald. Retrieved 2 April 2016.
  9. ^ a b "Traditional owners continue to challenge the Aboriginal heritage approval for a major highway extension in WA". CAAMA. Central Australian Aboriginal Media Association. Retrieved 2 April 2016.
  10. ^ a b Irena Ceranic (24 August 2016). "Perth Freight Link: Roe 8 Aboriginal heritage appeal thrown out". Australian Broadcasting Corporation. Retrieved 27 August 2016.
  11. ^ a b "Roe 8: Save Beeliar Wetlands group lose fresh legal challenge against highway extension". Australian Broadcasting Corporation. 16 December 2016. Retrieved 4 January 2017.
  12. ^ a b Labor vows to scrap Perth Freight-Link if it wins election The Guardian 4 January 2017
  13. ^ a b WA Labor vows to axe Perth Freight Link The West Australian 4 January 2017
  14. ^ New Roe Highway link to open (April 1998). Western Roads: official journal of Main Roads Western Australia, 21(1), p.4. Perth: Main Roads Western Australia.
  15. ^ Parker, Gareth (17 May 2014). "MacTiernan accused of road block". The West Australian. Retrieved 20 August 2022.
  16. ^ . www.mainroads.wa.gov.au. Archived from the original on 26 May 2009.
  17. ^ Main Roads Western Australia (September 2013). "Fact Sheet: Leach Highway Fremantle Upgrade Project" (PDF). Government of Western Australia. Retrieved 3 January 2016.
  18. ^ "Rethink the Link". Retrieved 6 January 2016.
  19. ^ Borrello, Eliza (2 September 2014). "West Australian politicians warned against chasing larger share of GST revenue". ABC News. Australian Broadcasting Corporation. Retrieved 15 January 2016.
  20. ^ a b c "Perth freight link to begin construction in 2016, trucks to pay toll". ABC News. Australian Broadcasting Corporation. 17 December 2014. Retrieved 15 January 2016.
  21. ^ a b Garnett, Olivia (24 December 2014). "Fury over road charge which transporters claim will be passed onto farmers". WA Country Hour. ABC Rural. Australian Broadcasting Corporation. Retrieved 15 January 2016.
  22. ^ O'Connor, Andrew (2 November 2015). "Uncertainty deepens over Perth Freight Link with no timeframe for second stage". ABC News. Australian Broadcasting Corporation. Retrieved 25 February 2017.
  23. ^ "Homeowners in Freight Link path in the dark until after WA election". WAtoday. AAP. 13 October 2016. Retrieved 20 August 2022.
  24. ^ a b O'Connor, Andrew (3 August 2015). "Perth Freight Link still on track, WA Transport Minister Dean Nalder says". ABC News. Australian Broadcasting Corporation. Retrieved 3 January 2016.
  25. ^ O'Connor, Andrew (20 September 2016). "Perth Freight Link a priority project, Barnett tells Parliament". ABC News. Australian Broadcasting Corporation. Retrieved 25 February 2017.
  26. ^ a b c d Gartry, Laura; Holdaway, Scott (15 January 2017). "WA election: Perth Freight Link tunnel to Fremantle promised but critics slam 'road to nowhere'". ABC News. Australian Broadcasting Corporation. from the original on 3 February 2017. Retrieved 25 February 2017. Additional archives: .
  27. ^ a b c Kagi, Jacob (11 October 2016). "What is Roe 8 and why has it been so contentious?". ABC News. Australian Broadcasting Corporation. from the original on 15 February 2017. Retrieved 25 February 2017. Additional archives: .
  28. ^ a b c Anderson, Alyesha (8 October 2015). "Perth Freight Link: Protesters vow to fight if Roe 8 Hwy extension goes ahead". PerthNow. Retrieved 15 January 2016.
  29. ^ Seeber, Elisia (2 November 2015). "Perth Freight Link: Colin Barnett puts stage two of project on hold". News.com.au. News Limited. from the original on 25 February 2017. Retrieved 25 February 2017. Additional archives: .
  30. ^ O'Connor, Andrew (19 August 2015). "Perth Freight Link report finds alternatives not properly assessed". ABC News. Australian Broadcasting Corporation. Retrieved 25 February 2017.
  31. ^ Shepherd, Briana; Perpitch, Nicolas (3 May 2016). "Scrap Perth Freight Link, Senate inquiry recommends". ABC News. Australian Broadcasting Corporation. Retrieved 25 February 2017.
  32. ^ Kagi, Jacob (2 July 2015). "Controversial Roe Highway extension granted environmental approval in WA". ABC News. Australian Broadcasting Corporation. Retrieved 15 January 2016.
  33. ^ "Perth freight link tunnel option may save homes from bulldozer". ABC News. Australian Broadcasting Corporation. 19 May 2015. Retrieved 15 January 2016.
  34. ^ a b O'Connor, Andrew (11 November 2015). "Perth Freight Link confusion deepens within Liberal Party". ABC News. Australian Broadcasting Corporation. Retrieved 17 January 2016.
  35. ^ "Perth Freight Link win for WA Government as court upholds Roe 8 appeal". ABC News. Australian Broadcasting Corporation. 15 July 2016. Retrieved 25 February 2017.
  36. ^ Seeber, Elisia (11 October 2016). "Work on Roe 8 to start before Christmas". Perth Now. AAP. from the original on 15 December 2016. Retrieved 25 February 2017. 25 February 2017 at the Wayback Machine
  37. ^ O'Connor, Andrew (20 October 2016). "WA Labor yet to decide if it will axe Roe 8 if elected". ABC News. Australian Broadcasting Corporation. from the original on 25 February 2017. Retrieved 25 February 2017. Additional archives: .
  38. ^ Shepherd, Briana (30 January 2017). "Government to foot extra cost of policing Roe 8 protests, Commissioner says". ABC News. Australian Broadcasting Corporation. Retrieved 25 February 2017.
  39. ^ "Move-on notices issued to Roe 8 protesters at Beeliar". ABC News. 6 December 2016. Retrieved 25 February 2017.
  40. ^ "Hearing into Perth Freight Link breaches". WA Today. Fairfax Media. AAP. 23 February 2017. from the original on 26 February 2017. Retrieved 26 February 2017. Additional archives: .
  41. ^ "Perth Freight Link: Main Roads WA agrees to suspend Roe 8 project". PerthNow. Seven West Media. AAP. 13 March 2017. from the original on 13 March 2017. Retrieved 14 March 2017. Additional archives: .
  42. ^ Davey, Melissa (13 March 2017). "Mark McGowan stops Perth Freight Link in first move as WA premier". The Guardian. Australian Associated Press. from the original on 13 March 2017. Retrieved 14 March 2017. Additional archives: .
  43. ^ Young, Emma (14 March 2018). . WAtoday. Archived from the original on 14 March 2018. Retrieved 20 August 2022.
  44. ^ Laschon, Eliza (12 May 2021). "Commonwealth gifts WA $1 billion for unwanted bypass". ABC News. Retrieved 20 August 2022.
  45. ^ Law, Peter (16 June 2022). "Perth Freight Link to be put out of misery". The West Australian. Retrieved 20 August 2022.
  46. ^ Paddenburg, Trevor (30 May 2015). "Perth Freight Link: Tunnel route option revealed". Perth Now. Seven West Media. from the original on 17 January 2016. Retrieved 26 February 2017. Additional archives: .
  47. ^ "Report backs tunnel for Perth Freight Link". WA Today. Fairfax Media. AAP. 24 April 2016. from the original on 17 July 2016. Retrieved 26 February 2017. Additional archives: .
  48. ^ Main Roads Western Australia. "Perth Freight Link: A Free Flowing Freight Connection" (PDF). Government of Western Australia. Retrieved 3 January 2016.
  49. ^ O'Connor, Andrew (26 November 2015). "Colin Barnett holds line on Perth Freight Link as tunnel plan leaked". ABC News. Australian Broadcasting Corporation. Retrieved 3 January 2016.
  50. ^ Wales, Louisa (24 February 2017). (PDF). Subiaco Post. Subiaco Post. pp. 1, 39. Archived from the original (PDF) on 24 February 2017. Retrieved 24 February 2017.
  51. ^ O'Connor, Andrew (3 November 2015). "Analysis: Is the Perth Freight Link project at a crossroads?". ABC News. Australian Broadcasting Corporation. Retrieved 3 January 2016.

Further reading edit

  • Young, Emma (8 March 2017). "No question too dumb: an idiot's guide to Roe 8 (and the alternative)". WA Today. Fairfax Media. from the original on 8 March 2017. Retrieved 12 March 2017. 10 March 2017 at the Wayback Machine

perth, freight, link, this, article, needs, updated, please, help, update, this, article, reflect, recent, events, newly, available, information, 2018, proposed, billion, project, perth, western, australia, improve, road, freight, link, between, kewdale, frema. This article needs to be updated Please help update this article to reflect recent events or newly available information May 2018 The Perth Freight Link was a proposed 1 9 billion project in Perth Western Australia to improve the road freight link between Kewdale and Fremantle Harbour The project was announced by the state government in May 2014 1 but was cancelled following a change of government at the March 2017 state election 2 3 Perth Freight LinkWestern AustraliaGeneral informationTypeFreeway Proposed Length13 4 km 8 3 mi Major junctionsSoutheast endKwinana Freeway State Route 2 National Route 1 Roe Highway State Route 3 Bibra LakeNorthwest endStirling Highway State Route 5 FremantleHighway systemHighways in Australia National Highway Freeways in Australia Highways in Western Australia The proposal included multiple stages a five kilometre 3 1 mi extension of Roe Highway to Stock Road Roe 8 a second stage linking Roe 8 to Stirling Highway bypassing fourteen sets of traffic signals Roe 9 4 and a final stage connecting into the Port of Fremantle The plan included mandatory GPS tracking of all vehicles over an undisclosed size or weight with a charge per kilometre being applied for vehicles travelling along the route between Muchea and North Fremantle 5 The extension would have taken the highway from its current terminus at Kwinana Freeway approximately five kilometres 3 1 mi further west through the Beeliar Wetlands to Stock Road near Forrest Road in Coolbellup The proposed route was along or within the vicinity of an existing road reserve in the Perth Metropolitan Region Scheme 6 The project s environmental assessment by the Environmental Protection Authority EPA along with the approval of the development by WA Government Minister Albert Jacob was ruled invalid by the Chief Justice of the Supreme Court on 16 December 2015 7 On 30 March 2016 Greg McIntyre QC acting for Corina Abraham lodged writs in the Supreme Court of Western Australia alleging that Minister of Aboriginal Affairs Peter Collier and the Department of Aboriginal Affairs cultural committee denied procedural fairness when it failed to consult her 8 9 On 24 August 2016 the Supreme Court dismissed Abraham s challenge 10 The Save Beeliar Wetlands group tried to challenge the highway in the High Court but the court dismissed the challenge on 16 December 2016 saying there wasn t sufficient grounds for a challenge 11 Construction began in late 2016 following the signing of the contract to build Roe 8 by the Liberal state government Opposition to the project continued with protests and a second senate inquiry The freight link was an election issue in the 2017 state election The McGowan Government scrapped the entire project after winning office 12 13 Contents 1 History 1 1 Background 1 2 Project announced 1 3 Controversies 1 4 Legal challenges 1 5 Commencement of construction works 1 6 State election and aftermath 2 Route 2 1 Stage 1 Roe 8 2 2 Stage 2 Roe 9 2 3 Stage 3 Roe 10 2 4 Roe Highway widening 3 See also 4 References 5 Further readingHistory editBackground edit Further information Fremantle Eastern Bypass Roe Highway was first proposed in 1955 by Gordon Stephenson as part of what was to become the Metropolitan Region Planning Scheme The highway was intended to form the southern and eastern sections of a ring route around the Perth metropolitan area 14 In the 1950s Stephenson planned for Roe Highway to continue westwards towards Fremantle through South Fremantle along Marine Terrace and then north to connect with Stirling Highway and the Port of Fremantle As part of the plan in 1974 Stirling Highway was extended from its then terminus north of the Swan River southwards to Canning Highway Over a period of approximately 20 years Main Roads Western Australia procured land and in 1985 Stirling Highway was extended southwards from Canning Highway to High Street the western continuation of Leach Highway The remaining 3 km strip of land south of High Street then became known as the Fremantle Eastern Bypass At the southern end of the proposed Fremantle Eastern Bypass an 8 km east west road reservation was proclaimed and became known as Roe Highway stage 8 With a change of state governments in 2001 the planned Fremantle Eastern Bypass Roe Highway stage 8 was cancelled and the land reserved for the Fremantle Eastern Bypass portion was sold for housing 15 As part of the funding arrangement for Roe Highway stages 6 and 7 the federal government stipulated that the reservation for Roe Highway stage 8 itself was to be retained Following a change in state governments in September 2008 planning work commenced on an extension of the Roe Highway from Kwinana Freeway to Stock Road 16 Planning was also under way for an upgrade of High Street to dual carriageway between Stirling Highway and Carrington Street 17 Project announced edit nbsp Rethink the Link 18 protest signs against the Perth Freight Link 2015 The Perth Freight Link project was announced in May 2014 with joint funding between the state and federal governments 1 The announcement included plans for a toll on the route which would only apply to trucks 19 In December 2014 the state government revealed that they planned to construct the Freight Link between early 2016 and 2019 and that the toll would apply on the 85 kilometre long 53 mi truck route between Muchea north of Perth and Fremantle once the link was completed 20 21 Uncertainty over the project s scope and time frame emerged in mid 2015 22 The intended route for the second stage which was necessitated by the earlier sale of the Fremantle Eastern Bypass land that was previously planned to be used for the route faced community opposition as it would require residential properties to be compulsorily acquired and demolished 23 As such alternative routes for the second stage were considered by the government 24 The uncertainty over stage 2 remained for over a year In September 2016 there still was not a decision on the stage s timing nor its route but a tunnel was considered by Barnett as the most likely option 25 A tunnel under White Gum Valley Beaconsfield and Hilton was committed to on 15 January 2017 26 Controversies edit The project is controversial 27 and has been the subject of concern and protest from multiple community groups on various issues 28 The main areas of contention relate to environmental issues as well as the cost and justification for the project 27 The state government claims the project is needed to reduce congestion in Perth s south and enhance road safety and would be required for any future port development in the vicinity The necessity is disputed by opponents of the Freight Link including the opposition Labor party and the Greens 27 McGowan has called it a road to nowhere and waste of money 29 A 2015 report from Infrastructure Australia concluded that while there would be economic benefit the project was hurriedly prepared and detailed assessments were not completed for alternatives 30 In 2016 a Senate inquiry unanimously denounced the Freight Link and suggested the federal government redirect funding to a new outer harbour at Cockburn Sound proposed by the City of Kwinana 31 The route of the Roe 8 section takes it through the Beeliar Wetlands a habitat for the endangered Carnaby s black cockatoo 28 The Environmental Protection Authority EPA approved the Roe Highway extension in 2013 following a review that included over 3 000 public submissions 20 and Environment Minister Albert Jacob confirmed his approval on 2 July 2015 32 Preliminary site works began on the project during November 2015 which drew protests with many people being given move on orders preventing them from being in the area As well as environmental issues with the extension of Roe Highway 20 Stephen Marley president of the Livestock and Rural Transport Association of Western Australia expressed concern in December 2014 that the cost of the truck toll will be passed on to farmers 21 and in May 2015 Palmyra residents protested the proposed compulsory acquisition and demolition of their homes to make way for Stage 2 of the link 33 Local people are opposed to the proposed route through the Bibra Lake area including the local indigenous people who described the area as a birthing place the King Edward Memorial Hospital for aboriginal people 28 The WA Road Transport Association has been critical of the November 2015 decision to postpone stage two of the project as Roe 8 alone delivers none of the productivity benefits promised by the full freight link to the port 34 They would not support a toll if implemented before the link to the port was completed Such a toll was a prospect put forward by Barnett that month though this was contradicted by Transport Minister Dean Nalder 34 Legal challenges edit In September 2015 the group Save the Beeliar Wetlands took legal action against the EPA arguing that the authority did not follow its own policies 7 The project s environmental assessment by the EPA along with the approval of the development by WA Government Minister Albert Jacob was ruled invalid by the Chief Justice of the Supreme Court on 16 December 2015 7 The state government appealed and the ruling was unanimously overturned by the Court of Appeal on 15 July 2016 as the EPA s policies were not mandatory considerations 35 The Save Beeliar Wetlands group tried to challenge the highway in the High Court but the court dismissed the challenge on 16 December 2016 saying there were not sufficient grounds for a challenge 11 On 30 March 2016 Greg McIntyre QC acting for Corina Abraham lodged writs in the Supreme Court of Western Australia alleging that Minister of Aboriginal Affairs Peter Collier and the Department of Aboriginal Affairs cultural committee denied procedural fairness when it failed to consult her 8 9 On 24 August 2016 the Supreme Court dismissed Abraham s challenge 10 Commencement of construction works edit The contract to build Roe 8 was approved and signed by state government in October 2016 36 37 There had been ongoing protests since construction activities commenced 38 including on 6 December 2016 the day after temporary fencing was erected 39 nbsp The 23 February 2017 public Senate Committee hearing A public Senate Committee hearing was held on 23 February 2017 regarding the Roe 8 project s alleged failure to adhere to Federal environmental conditions State Environment Minister Albert Jacob denied the allegations 40 State election and aftermath edit During the 2017 state election the incoming McGowan Government stated it intended to scrap the entire project 12 13 On 12 March Main Roads and the contractors agreed to suspend work on the project 41 42 As part of cancellation negotiations with the federal government Roe Highway was instead curtailed to curve northwards to connect to Murdoch Drive This has been criticised as allowing for the future construction of Roe 8 43 Despite the cancellation funding provisions for the project remained in the federal budget until a change of government in 2022 44 45 Route editThe Perth Freight Link was proposed to connect the terminus of Roe Highway at the Kwinana Freeway with the Port of Fremantle In conjunction with existing highways and the Gateway WA and NorthLink WA projects the Freight Link would have formed part of an 85 kilometre 53 mi free flowing route between Muchea and the port 4 Stage 1 Roe 8 edit Section 1 also known as Roe 8 was to be a five kilometre 3 1 mi extension to Roe Highway from the Kwinana Freeway to Stock Road 4 cutting through a portion of the Beeliar Wetlands citation needed Stage 2 Roe 9 edit External imagesStage 2 options nbsp Original design upgrade Stock Road Leach Highway High Street source ABC News 26 nbsp May 2015 extend Roe Highway to Hamilton Hill then tunnel north to High Street source Perth Now 46 nbsp May 2016 tunnel from Stock Road Winterfield Road intersection to High Street source WA Today 47 Stage 2 Roe 9 26 would have linked the Roe 8 extension to East Fremantle The original route considered was via Stock Road Leach Highway and High Street upgraded with grade separated interchanges bypassing fourteen sets of traffic signals 4 48 Following community opposition to the plan which would require residential properties to be compulsorily acquired and the demolition of homes alternative routes were considered by the government 24 As of November 2015 the second stage had been postponed indefinitely due to the intricacies and costs involved 49 In January 2017 Premier Colin Barnett announced a tunnel from Stock Road to High Street in East Fremantle 3 km short of the port including crossing of the Swan River The tunnel plan was revealed to cost at least 5 8b by documents that Main Roads had fought to prevent being released under a Freedom of Information request An additional 2 7b would be needed to cross the Swan River This option would impact the suburbs of Leighton and Mosman Park and see an increase in truck traffic to the north through Cottesloe 50 Stage 3 Roe 10 edit A third stage would have seen the link cross the Swan River and connect into the port There were no proposals made for the design cost or timing of this final section 26 51 Roe Highway widening edit Another section involved upgrading Roe Highway between Tonkin Highway and Orrong Road adding a third lane in each direction and constructing a new bridge across the freight railway 4 See also edit nbsp Australian Roads portal Freeways in Australia East West Link A similar project proposed in Melbourne which was also cancelled due to a change in government WestConnex A similar project currently under construction in Sydney Bunbury Outer Ring Road A ring road around Bunbury currently under construction also controversial for environmental reasons References edit a b Perth Freight Link a boost for WA industry Media Statements Government of Western Australia 19 May 2014 Archived from the original on 27 January 2016 Retrieved 3 January 2016 Work starts now for WA s new McGowan govt SBS News Special Broadcasting Service AAP 12 March 2017 Retrieved 12 March 2017 Sprague Julie anne Ingram Tess 12 March 2017 WA election Mark McGowan sets his agenda AFR Weekend Fairfax Media Archived from the original on 12 March 2017 Retrieved 12 March 2017 a b c d e Main Roads Western Australia 5 January 2015 Perth Freight Link Government of Western Australia Archived from the original on 31 March 2015 Retrieved 8 February 2015 Parker Gareth 17 December 2014 Truck toll to pay for Roe Highway extension The West Australian Retrieved 2 January 2016 Main Roads Western Australia 17 December 2014 Roe Highway Extension Kwinana Freeway to Stock Road Government of Western Australia Archived from the original on 26 April 2013 Retrieved 8 February 2015 a b c Young Emma 16 December 2015 Supreme Court rules EPA approval of Roe 8 invalid WA Today Retrieved 2 January 2016 a b Grant Steve 1 April 2016 ROE 8 The fight of my life Fremantle Herald Retrieved 2 April 2016 a b Traditional owners continue to challenge the Aboriginal heritage approval for a major highway extension in WA CAAMA Central Australian Aboriginal Media Association Retrieved 2 April 2016 a b Irena Ceranic 24 August 2016 Perth Freight Link Roe 8 Aboriginal heritage appeal thrown out Australian Broadcasting Corporation Retrieved 27 August 2016 a b Roe 8 Save Beeliar Wetlands group lose fresh legal challenge against highway extension Australian Broadcasting Corporation 16 December 2016 Retrieved 4 January 2017 a b Labor vows to scrap Perth Freight Link if it wins election The Guardian 4 January 2017 a b WA Labor vows to axe Perth Freight Link The West Australian 4 January 2017 New Roe Highway link to open April 1998 Western Roads official journal of Main Roads Western Australia 21 1 p 4 Perth Main Roads Western Australia Parker Gareth 17 May 2014 MacTiernan accused of road block The West Australian Retrieved 20 August 2022 Roe Highway Extension Main Roads Western Australia www mainroads wa gov au Archived from the original on 26 May 2009 Main Roads Western Australia September 2013 Fact Sheet Leach Highway Fremantle Upgrade Project PDF Government of Western Australia Retrieved 3 January 2016 Rethink the Link Retrieved 6 January 2016 Borrello Eliza 2 September 2014 West Australian politicians warned against chasing larger share of GST revenue ABC News Australian Broadcasting Corporation Retrieved 15 January 2016 a b c Perth freight link to begin construction in 2016 trucks to pay toll ABC News Australian Broadcasting Corporation 17 December 2014 Retrieved 15 January 2016 a b Garnett Olivia 24 December 2014 Fury over road charge which transporters claim will be passed onto farmers WA Country Hour ABC Rural Australian Broadcasting Corporation Retrieved 15 January 2016 O Connor Andrew 2 November 2015 Uncertainty deepens over Perth Freight Link with no timeframe for second stage ABC News Australian Broadcasting Corporation Retrieved 25 February 2017 Homeowners in Freight Link path in the dark until after WA election WAtoday AAP 13 October 2016 Retrieved 20 August 2022 a b O Connor Andrew 3 August 2015 Perth Freight Link still on track WA Transport Minister Dean Nalder says ABC News Australian Broadcasting Corporation Retrieved 3 January 2016 O Connor Andrew 20 September 2016 Perth Freight Link a priority project Barnett tells Parliament ABC News Australian Broadcasting Corporation Retrieved 25 February 2017 a b c d Gartry Laura Holdaway Scott 15 January 2017 WA election Perth Freight Link tunnel to Fremantle promised but critics slam road to nowhere ABC News Australian Broadcasting Corporation Archived from the original on 3 February 2017 Retrieved 25 February 2017 Additional archives 25 February 2017 a b c Kagi Jacob 11 October 2016 What is Roe 8 and why has it been so contentious ABC News Australian Broadcasting Corporation Archived from the original on 15 February 2017 Retrieved 25 February 2017 Additional archives 25 February 2017 a b c Anderson Alyesha 8 October 2015 Perth Freight Link Protesters vow to fight if Roe 8 Hwy extension goes ahead PerthNow Retrieved 15 January 2016 Seeber Elisia 2 November 2015 Perth Freight Link Colin Barnett puts stage two of project on hold News com au News Limited Archived from the original on 25 February 2017 Retrieved 25 February 2017 Additional archives 26 February 2017 O Connor Andrew 19 August 2015 Perth Freight Link report finds alternatives not properly assessed ABC News Australian Broadcasting Corporation Retrieved 25 February 2017 Shepherd Briana Perpitch Nicolas 3 May 2016 Scrap Perth Freight Link Senate inquiry recommends ABC News Australian Broadcasting Corporation Retrieved 25 February 2017 Kagi Jacob 2 July 2015 Controversial Roe Highway extension granted environmental approval in WA ABC News Australian Broadcasting Corporation Retrieved 15 January 2016 Perth freight link tunnel option may save homes from bulldozer ABC News Australian Broadcasting Corporation 19 May 2015 Retrieved 15 January 2016 a b O Connor Andrew 11 November 2015 Perth Freight Link confusion deepens within Liberal Party ABC News Australian Broadcasting Corporation Retrieved 17 January 2016 Perth Freight Link win for WA Government as court upholds Roe 8 appeal ABC News Australian Broadcasting Corporation 15 July 2016 Retrieved 25 February 2017 Seeber Elisia 11 October 2016 Work on Roe 8 to start before Christmas Perth Now AAP Archived from the original on 15 December 2016 Retrieved 25 February 2017 Archived 25 February 2017 at the Wayback Machine O Connor Andrew 20 October 2016 WA Labor yet to decide if it will axe Roe 8 if elected ABC News Australian Broadcasting Corporation Archived from the original on 25 February 2017 Retrieved 25 February 2017 Additional archives 25 February 2017 Shepherd Briana 30 January 2017 Government to foot extra cost of policing Roe 8 protests Commissioner says ABC News Australian Broadcasting Corporation Retrieved 25 February 2017 Move on notices issued to Roe 8 protesters at Beeliar ABC News 6 December 2016 Retrieved 25 February 2017 Hearing into Perth Freight Link breaches WA Today Fairfax Media AAP 23 February 2017 Archived from the original on 26 February 2017 Retrieved 26 February 2017 Additional archives 26 February 2017 Perth Freight Link Main Roads WA agrees to suspend Roe 8 project PerthNow Seven West Media AAP 13 March 2017 Archived from the original on 13 March 2017 Retrieved 14 March 2017 Additional archives 14 March 2017 Davey Melissa 13 March 2017 Mark McGowan stops Perth Freight Link in first move as WA premier The Guardian Australian Associated Press Archived from the original on 13 March 2017 Retrieved 14 March 2017 Additional archives 14 March 2017 Young Emma 14 March 2018 Playing the long game Roe 8 proceeding by stealth WAtoday Archived from the original on 14 March 2018 Retrieved 20 August 2022 Laschon Eliza 12 May 2021 Commonwealth gifts WA 1 billion for unwanted bypass ABC News Retrieved 20 August 2022 Law Peter 16 June 2022 Perth Freight Link to be put out of misery The West Australian Retrieved 20 August 2022 Paddenburg Trevor 30 May 2015 Perth Freight Link Tunnel route option revealed Perth Now Seven West Media Archived from the original on 17 January 2016 Retrieved 26 February 2017 Additional archives 26 February 2017 Report backs tunnel for Perth Freight Link WA Today Fairfax Media AAP 24 April 2016 Archived from the original on 17 July 2016 Retrieved 26 February 2017 Additional archives 26 February 2017 Main Roads Western Australia Perth Freight Link A Free Flowing Freight Connection PDF Government of Western Australia Retrieved 3 January 2016 O Connor Andrew 26 November 2015 Colin Barnett holds line on Perth Freight Link as tunnel plan leaked ABC News Australian Broadcasting Corporation Retrieved 3 January 2016 Wales Louisa 24 February 2017 5 8b pricetag for Roe 9 PDF Subiaco Post Subiaco Post pp 1 39 Archived from the original PDF on 24 February 2017 Retrieved 24 February 2017 O Connor Andrew 3 November 2015 Analysis Is the Perth Freight Link project at a crossroads ABC News Australian Broadcasting Corporation Retrieved 3 January 2016 Further reading editYoung Emma 8 March 2017 No question too dumb an idiot s guide to Roe 8 and the alternative WA Today Fairfax Media Archived from the original on 8 March 2017 Retrieved 12 March 2017 Archived 10 March 2017 at the Wayback Machine Retrieved from https en wikipedia org w index php title Perth Freight Link amp oldid 1168114260, wikipedia, wiki, book, books, library,