fbpx
Wikipedia

Pennsylvania Route 28

Pennsylvania Route 28 (PA 28) is a major state highway which runs for 98 miles (158 km) from Anderson Street in Pittsburgh to U.S. Route 219 (US 219) in Brockway in Pennsylvania. From Pittsburgh to Kittanning it is a 44.5-mile-long (71.6 km) limited access expressway named the Alexander H. Lindsay Memorial Highway or the Allegheny Valley Expressway.

Pennsylvania Route 28

Route information
Maintained by PennDOT
Length98.264 mi[1] (158.141 km)
Existed1927–present
Major junctions
South endAnderson Street in Pittsburgh[2][3]
Major intersections
North end US 219 in Brockway
Location
CountryUnited States
StatePennsylvania
CountiesAllegheny, Butler, Armstrong, Clarion, Jefferson
Highway system
PA 27 PA 29

Route description

 
PA 28 northbound approaching the exit for the 40th Street Bridge in Millvale

PA 28 begins adjacent to Downtown Pittsburgh at Anderson Street near the Interstate 279 (I-279)/I-579 interchange and travels north/northeast along the northern bank of the Allegheny River. Until recently the route was a surface street for the first two miles (3.2 km) until the 40th Street Bridge and then an expressway from 40th Street to Kittanning. Upgrades in 2013 made it a limited-access highway throughout its 44.5 miles (71.6 km) in the Pittsburgh metropolitan area from the route's start at I-279 to Rayburn Township, Armstrong County, with Governor Tom Corbett attending the completion ceremony on November 17, 2014.[4]

In Etna, PA 28 interchanges with Pennsylvania Route 8 at exit 5 before departing the Blue Belt, which PA 28 is part of from I-279/I-579 to this point, at exit 6 near Aspinwall. Near Harmar Township, PA 28 meets Pennsylvania Route 910 at exit 11 which provided access to Interstate 76 (the Pennsylvania Turnpike). From exit 11 to U.S. Route 422 west of Kittanning, PA 28 has eight interchanges, including exits with Pittsburgh Mills Boulevard (exit 12A), Pennsylvania Route 366 (exit 14), and Pennsylvania Route 356 (exit 17), while continuing to parallel the Allegheny to the east. Exit 18 consists of Pennsylvania Route 128 crossing or which used to be old 28 before the expressway. At exit 19, PA 28 merges with the limited-access US 422 and heads east along US 422 as it proceeds south of West Kittanning.[5]

Upon crossing the Allegheny River and entering Kittanning, US 422 and PA 28 interchange with Pennsylvania Route 66. PA 66 then joins the concurrency for two miles (3 km) to an exit with U.S. Route 422 Business southeast of downtown Kittanning. Here, US 422 leaves the freeway and heads east toward Indiana while PA 28 and PA 66 remain concurrent as they progress northward.

The 41-mile-long (66 km) freeway ends with a concurrency with Pennsylvania Route 66. In Rayburn Township, PA 28/PA 66 intersects the western terminus of Pennsylvania Route 85. After PA 85, PA 28/PA 66 head towards the northeast. In South Bethlehem, PA 28/PA 66 become North Street and Broad Street then intersecting the northern terminus of Pennsylvania Route 839.

 
PA 28 northbound past PA 536 in Redbank Township

After crossing Redbank Creek, PA 28/PA 66 enters Clarion County and New Bethlehem. In downtown New Bethlehem, PA 66 splits off from PA 28 and making the PA 28/PA 66 concurrency one of the longest concurrencies in Pennsylvania. After the split, PA 28 heads northeast as Broad Street paralleling Redbank Creek. In Hawthorn, PA 28 is called Brookville Street and meets the western terminus of Pennsylvania Route 536. North of PA 536, PA 28 begins to slide to the north instead of the northeast.

In Summerville, PA 28's course begins to slide towards the northeast again and in Summerville, PA 28 is called Harrison Street. In Clover and Rose townships, PA 28 parallels many railroads tracks that even cross it. In Brookville, PA 28 has a wrong-way concurrency with U.S. Route 322 and Pennsylvania Route 36. The reason of the wrong-way concurrency is that PA 28 is heading north while PA 36 is heading south on the concurrency with US 322. In downtown Brookville, PA 36 splits off from US 322/PA 28. Then after crossing North Fork Creek, US 322/PA 28 meet the southern terminus of the former Pennsylvania Route 968. East of here, US 322 splits off from PA 28 at a "T" interchange. East of Brookville in Pine Creek Township, PA 28 intersects Interstate 80 at exit 81 a diamond interchange. North of I-80, PA 28 continues north as a local road without intersecting another route for more than 14 miles (23 km). PA 28 passes through the many wildlife in Pennsylvania through a forest region. In Brockway, PA 28 is called Main Street before terminating (ending) at a "T" intersection with U.S. Route 219.

History

The highway was signed in 1927 from Pittsburgh to Kittanning. It is named after Alexander Lindsay, a lawyer who lived in South Buffalo and commuted to work in Pittsburgh: he successfully lobbied for the city to be connected to the proposed Keystone Shortway (I-80). [6]

The highway was extended north to Brockway in 1928. In 1928, the route was under construction from Blawnox to Cheswick, Troy Hill Road to Oakland, and Hazen to Reitz Crossing Road. Those sections were completed the following year. In 1929, the section from Avella to Woodrow and from Hickory to Fort Cherry Road was under construction and finished the following year. In 1930, the section from Skyline Road to PA 18 was paved as well as in Venice. That year the western terminus was moved from Avella to Independence.

In 1958, the highway was widened and a median installed at the interchange with the Turnpike. On July 15, 1960, the highway's southern terminus was moved from Independence to PA 8 in Etna. The former section of PA 28 from South Main Street in the West End Valley to the intersection of Noblestown Road and Crafton Boulevard in Crafton Heights was redesignated as PA 60. The remaining 83-mile stretch from Crafton Heights to Independence was renumbered PA 50. This designation change was made to reduce the number of concurrent routes in Pittsburgh. The changes took effect a few months later and signs were changed by spring 1961.[7]

 
PA 28 southbound from exit 14 (PA 366).

In 1963, this section opened to traffic from PA 8 north to the Highland Park Bridge interchange and the following year to Blawnox. Also that year, the Pittsburgh Area Transportation Plan recommended upgrading PA 28 and then PA 8, to a six-lane, limited-access highway starting 2,200 feet (670 m) west of the 31st Street Bridge and ending at the 40th Street Bridge. Full interchanges would be constructed at both bridges; however, this recommendation was not carried out. It also laid out a plan that would turn PA 28 into an expressway from Pittsburgh to Brookville, this too was not carried out.

In 1964, the highway was widened and a median installed on it between Brackenridge and the Butler County line. In 1968, construction began on the section from Blawnox to PA 910. The expressway was proposed from that point to the Butler County line. Construction also began on the section from Slate Lick to near Center Hill in the same year. In 1965, the route was moved from Courthouse Road into Kittanning to bypass the borough on its current alignment. In 1969, construction commenced on the section from PA 910 to Exit 12 and from Exit 16 to PA 356 and the Armstrong County line.

The start of the 1970s saw the construction extend from Exit 16 all the way to a new expressway alignment for US 422, also under construction, near West Kittanning. In 1971, construction commenced on the section from Exit 15 to Exit 16. In 1972, the expressway opened to traffic from Blawnox to PA 910 and from Exit 15 to US 422. However, PA 28's designation was not placed on the section from Exit 15 to Exit 16. The following year, the expressway opened from PA 910 to Exit 12.

In 1973, the route was extended to end at US 19/PA 65 at Chateau Street via Western Avenue and East Ohio Street.

In 1975, construction commenced on the section from Exit 12 to north of Tarentum; during the following year, the construction was extended to Exit 15. In 1978, the PA 28 designation was routed onto the newly opened highway from Exit 11 to Exit 12 and from Exit 15 to Exit 16. The PA 28 designation still followed Freeport Road to connect between Exit 12 and Exit 15.

In 1980, the expressway opened from Exit 12 to Exit 13 and the PA 28 designation was moved onto this section. In 1984, the route was changed to follow Western Avenue, Allegheny Avenue, North Shore Drive, General Robinson Street, and Madison Avenue for northbound traffic, and Reedsdale Street for southbound traffic in Pittsburgh. The final section of the Allegheny Valley Expressway between Exit 13 and Exit 15 opened in 1985. During the 1980s, through traffic in each direction at the Highland Park Bridge interchange was reduced to one lane due to heavy demand for the bridge itself.[8]

In 2011, the southbound lanes of PA 28 were shifted to bypass the intersection of the 40th Street Bridge, while the northbound lanes remained under the bridge. In 2012, an excavation lowered the roadbed of PA 28 at the 31st Street Bridge.[9]

Though technically limited access for its first two miles near downtown Pittsburgh since the 2012 construction, all lanes were clear of lane closures and construction by November, 2014 when Governor Tom Corbett attended the official groundbreaking ceremony to celebrate all 44.5 miles being expressway-grade. The widening included a small park with a promenade and a retaining wall which features several murals on the city's history, including that of the Saint Nicholas Croatian Catholic Church on the aforementioned structure's site.[10]

On December 12, 2017, PennDOT announced that they planned on widening PA 28 at the Highland Park interchange to have two through lanes on each side while having a designated exit and entrance lanes for the bridge, with work scheduled to start in 2020 with some residual work lasting into 2021. The only other thing keeping PA-28 from having the possibility of receiving an interstate designation are the 45-mph speed limits near the Millvale and Etna Exits, as well as the section of the southbound one-lane expressway between Exit 9 (Blawnox Exit), and Exit 8,(Waterworks Exit). If these are ever to be upgraded to Interstate Highway standards, PA 28 will be up to Interstate Highway standards from its southern terminus all the way to Kittanning, and could potentially receive an Interstate designation in the future.[8]

Major intersections

CountyLocationmi[1]kmExitDestinationsNotes
AlleghenyPittsburgh0.0000.000Anderson StreetSouthern terminus of PA 28
0.073–
0.111
0.117–
0.179
River AvenueNorthbound entrance / exit only
0.3750.604Chestnut StreetNorthbound exit only
0.414–
0.746
0.666–
1.201
1B 
 
 
To I-279 north / East Ohio Street – PNC Park, Heinz Field, Allegheny Center
No southbound entrance; signed as exit 1B southbound only
0.4580.7371A 
 
 
 
 
 
I-579 south (Veterans Bridge) / I-279 south (Fort Pitt Bridge) to I-376 – Monroeville, Airport
Southbound exit and northbound entrance
1.497–
1.750
2.409–
2.816
231st Street BridgeStrip District
Millvale2.319–
2.456
3.732–
3.953
3A40th Street BridgeLawrencevilleInverted SPUI/continuous green T hybrid interchange; no northbound entrance (northbound traffic directed to 3B entrance)
2.647–
2.857
4.260–
4.598
3B  Blue Belt – MillvaleNo southbound entrance (southbound traffic directed to 3A entrance), southern terminus of Blue Belt concurrency
Etna3.9686.3864EtnaNorthbound exit and southbound entrance
4.522–
4.539
7.277–
7.305
5A 
 
PA 8 south (R.D. Fleming Bridge) – Sharpsburg
Northbound exit and southbound entrance
4.567–
4.813
7.350–
7.746
5B 
 
PA 8 north – Butler, Etna
Signed as exit 5 southbound
6.218–
6.418
10.007–
10.329
6 
 
 
 
 
 
 
To PA 8 south / Highland Park Bridge / Blue Belt / Green Belt – Aspinwall
Northern terminus of Blue Belt concurrency, southern terminus of Green Belt concurrency
Aspinwall6.846–
7.123
11.018–
11.463
7Delafield AvenueNo southbound exit
7.618–
7.771
12.260–
12.506
8Freeport Road, Fox Chapel Road (  Green Belt), Waterworks DriveNorthern terminus of Green Belt concurrency
Blawnox8.003–
8.029
12.880–
12.921
9BlawnoxNorthbound exit and southbound entrance
8.922–
9.250
14.359–
14.886
10R.I.D.C. Drive
Harmar Township12.038–
12.493
19.373–
20.106
11   
 
 
 
PA 910 / Yellow Belt to Penna Turnpike / I-76 – Harmarville, Harmar
Cheswick13.715–
14.191
22.072–
22.838
12Cheswick, Springdale
14.990–
15.462
24.124–
24.884
12APittsburgh Mills Boulevard
Creighton16.373–
17.236
26.350–
27.739
13  Orange Belt – Russellton, CreightonNorthbound exit and southbound entrance
Tarentum18.125–
19.382
29.169–
31.192
14   PA 366 / Red Belt – Tarentum, Brackenridge, New Kensington, Arnold, Lower Burrell, Fawn TownshipWestern terminus of PA 366
Harrison Township20.805–
21.226
33.482–
34.160
15Natrona Heights, Natrona, BrackenridgeBrackenridge appears on southbound signs only.
23.717–
24.147
38.169–
38.861
16Freeport, MillerstownFreeport appears on northbound signs only.
ButlerBuffalo Township25.337–
25.816
40.776–
41.547
17  PA 356 – Freeport, Butler
ArmstrongNorth Buffalo Township31.346–
31.842
50.446–
51.245
18  PA 128 – Slate Lick, Northpointe
East Franklin Township37.480–
38.000
60.318–
61.155
19 
 
US 422 west – Butler, West Kittanning
Southern terminus of US 422 concurrency
Manor Township39.915–
40.001
64.237–
64.375
A 
 
PA 66 south – Ford City
Southern terminus of PA 66 (southbound) concurrency; exits to PA 66 southbound only
40.256–
40.590
64.786–
65.323
B 
 
 
To US 422 Bus. – Kittanning
Southern terminus of PA 66 (northbound) concurrency; no access to PA 66 southbound
41.511–
42.302
66.805–
68.078
 
 
 
 
 
US 422 east / US 422 Bus. west – Indiana, Kittanning
Northern terminus of US 422 concurrency; eastern terminus of US 422 Bus.
42.80668.890Northern terminus of freeway
Rayburn Township42.80668.890 
 
PA 85 east – Rural Valley, Plumville
Western terminus of PA 85
South Bethlehem59.87196.353 
 
PA 839 south – Mahoning Dam
Northern terminus of PA 839
ClarionNew Bethlehem60.17696.844 
 
PA 66 north – Clarion
Northern terminus of PA 66 concurrency
Redbank Township65.661105.671 
 
PA 536 east (Mayport Road) / Wallwork Road – Mayport
Western terminus of PA 536
JeffersonClover Township73.103117.648 
 
PA 949 north (Summerville-Corsica Road) / Water Street – Corsica
Southern terminus of PA 949
Brookville79.500127.943 
 
 
 
 
 
 
 
 
US 322 west (28th Division Highway) / PA 36 north (Allegheny Boulevard) / PA 28 Truck north to I-80 – Leeper, Clarion
Southern terminus of US 322/PA 36 concurrency; southern terminus of PA 28 Truck
80.282129.201 
 
PA 36 south (White Street) – Punxsutawney
Northern terminus of PA 36 concurrency
Pine Creek Township81.421131.034 
 
US 322 east – Reynoldsville
Northern terminus of US 322 concurrency
82.580–
82.696
132.900–
133.086
  
 
 
I-80 / PA 28 Truck south – Clarion, DuBois
Exit 81 (I-80); northern terminus of PA 28 Truck
Brockway98.264158.141  US 219 (Main Street / Cherry Street) – Ridgway, DuBoisNorthern terminus of PA 28
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

PA 28 Truck

 

 

Pennsylvania Route 28 Truck

LocationBrookville, Pennsylvania
Length3.3 mi[11] (5.3 km)
Existed1963–present

Pennsylvania Route 28 Truck is a 3-mile-long (4.8 km) truck route in Brookville, Jefferson County, Pennsylvania. As Route 28 travels through the Brookville city center, it becomes a narrow main street and features a relatively sharp turn just west of the bridge over North Fork Creek. As a result, after the completion of Interstate 80, Route 28's truck traffic was shifted onto this freeway bypass from Exit 78 at Pennsylvania Route 36 (which Truck 28 is cosigned for its first 1/2 mile of existence) to Exit 81, where Route 28 meets the highway.

See also

References

  1. ^ a b Bureau of Maintenance and Operations (January 2019). Roadway Management System Straight Line Diagrams (Report) (2019 ed.). Pennsylvania Department of Transportation. Retrieved April 13, 2019.
    • Allegheny County (PDF)
    • Butler County (PDF)
    • Armstrong County (PDF)
    • Clarion County (PDF)
    • Jefferson County (PDF)
  2. ^ Quadrant marker 10 for PA Route 28 marking the beginning of the route (Map). Google Maps. Retrieved 2014-04-28.
  3. ^ End quadrant marker for PA Route 28 marking the end of the route (Map). Google Maps. Retrieved 2014-04-28.
  4. ^ Schmitz, Jon (17 November 2014). "After six years, Route 28 reconstruction project ends". Pittsburgh Post-Gazette. Retrieved 12 July 2020.
  5. ^ Google (August 13, 2014). "Pennsylvania Route 28" (Map). Google Maps. Google. Retrieved August 13, 2014.
  6. ^ "Dream of 'nicer commute' genesis of Route 28". TribLive. Retrieved 13 October 2020.
  7. ^ "Designations Of Highways Are Changed". The Evening Standard. Uniontown, PA. July 16, 1960. p. 7. Retrieved August 28, 2015 – via Newspapers.com.  
  8. ^ a b PennDOT Plans Improvements To Route 28 At Highland Park Bridge KDKA-TV (12/12/2017)
  9. ^ Schmitz, Jon (September 28, 2011). "Whole new Route 28 beginning to emerge through construction". Pittsburgh Post-Gazette. Retrieved October 4, 2011.
  10. ^ Plaza, historic marker to memorialize St. Nicholas Church in Troy Hill Pittsburgh Post-Gazette (06/15/2015)
  11. ^ Google (August 13, 2014). "PA Route 28 Truck" (Map). Google Maps. Google. Retrieved August 13, 2014.

External links

Route map:

KML is from Wikidata
  • Pennsylvania Highways: PA 28

pennsylvania, route, major, state, highway, which, runs, miles, from, anderson, street, pittsburgh, route, brockway, pennsylvania, from, pittsburgh, kittanning, mile, long, limited, access, expressway, named, alexander, lindsay, memorial, highway, allegheny, v. Pennsylvania Route 28 PA 28 is a major state highway which runs for 98 miles 158 km from Anderson Street in Pittsburgh to U S Route 219 US 219 in Brockway in Pennsylvania From Pittsburgh to Kittanning it is a 44 5 mile long 71 6 km limited access expressway named the Alexander H Lindsay Memorial Highway or the Allegheny Valley Expressway Pennsylvania Route 28Route informationMaintained by PennDOTLength98 264 mi 1 158 141 km Existed1927 presentMajor junctionsSouth endAnderson Street in Pittsburgh 2 3 Major intersectionsI 279 I 579 in Pittsburgh PA 8 in Etna I 76 Penna Turnpike near Harmar US 422 in Kittanning PA 66 in New Bethlehem US 322 PA 36 in Brookville I 80 near BrookvilleNorth endUS 219 in BrockwayLocationCountryUnited StatesStatePennsylvaniaCountiesAllegheny Butler Armstrong Clarion JeffersonHighway systemPennsylvania State Route SystemInterstate US State Scenic Byways Legislative PA 27 PA 29 Contents 1 Route description 2 History 3 Major intersections 4 PA 28 Truck 5 See also 6 References 7 External linksRoute description EditThis section needs additional citations for verification Please help improve this article by adding citations to reliable sources in this section Unsourced material may be challenged and removed October 2022 Learn how and when to remove this template message PA 28 northbound approaching the exit for the 40th Street Bridge in Millvale PA 28 begins adjacent to Downtown Pittsburgh at Anderson Street near the Interstate 279 I 279 I 579 interchange and travels north northeast along the northern bank of the Allegheny River Until recently the route was a surface street for the first two miles 3 2 km until the 40th Street Bridge and then an expressway from 40th Street to Kittanning Upgrades in 2013 made it a limited access highway throughout its 44 5 miles 71 6 km in the Pittsburgh metropolitan area from the route s start at I 279 to Rayburn Township Armstrong County with Governor Tom Corbett attending the completion ceremony on November 17 2014 4 In Etna PA 28 interchanges with Pennsylvania Route 8 at exit 5 before departing the Blue Belt which PA 28 is part of from I 279 I 579 to this point at exit 6 near Aspinwall Near Harmar Township PA 28 meets Pennsylvania Route 910 at exit 11 which provided access to Interstate 76 the Pennsylvania Turnpike From exit 11 to U S Route 422 west of Kittanning PA 28 has eight interchanges including exits with Pittsburgh Mills Boulevard exit 12A Pennsylvania Route 366 exit 14 and Pennsylvania Route 356 exit 17 while continuing to parallel the Allegheny to the east Exit 18 consists of Pennsylvania Route 128 crossing or which used to be old 28 before the expressway At exit 19 PA 28 merges with the limited access US 422 and heads east along US 422 as it proceeds south of West Kittanning 5 Upon crossing the Allegheny River and entering Kittanning US 422 and PA 28 interchange with Pennsylvania Route 66 PA 66 then joins the concurrency for two miles 3 km to an exit with U S Route 422 Business southeast of downtown Kittanning Here US 422 leaves the freeway and heads east toward Indiana while PA 28 and PA 66 remain concurrent as they progress northward The 41 mile long 66 km freeway ends with a concurrency with Pennsylvania Route 66 In Rayburn Township PA 28 PA 66 intersects the western terminus of Pennsylvania Route 85 After PA 85 PA 28 PA 66 head towards the northeast In South Bethlehem PA 28 PA 66 become North Street and Broad Street then intersecting the northern terminus of Pennsylvania Route 839 PA 28 northbound past PA 536 in Redbank Township After crossing Redbank Creek PA 28 PA 66 enters Clarion County and New Bethlehem In downtown New Bethlehem PA 66 splits off from PA 28 and making the PA 28 PA 66 concurrency one of the longest concurrencies in Pennsylvania After the split PA 28 heads northeast as Broad Street paralleling Redbank Creek In Hawthorn PA 28 is called Brookville Street and meets the western terminus of Pennsylvania Route 536 North of PA 536 PA 28 begins to slide to the north instead of the northeast In Summerville PA 28 s course begins to slide towards the northeast again and in Summerville PA 28 is called Harrison Street In Clover and Rose townships PA 28 parallels many railroads tracks that even cross it In Brookville PA 28 has a wrong way concurrency with U S Route 322 and Pennsylvania Route 36 The reason of the wrong way concurrency is that PA 28 is heading north while PA 36 is heading south on the concurrency with US 322 In downtown Brookville PA 36 splits off from US 322 PA 28 Then after crossing North Fork Creek US 322 PA 28 meet the southern terminus of the former Pennsylvania Route 968 East of here US 322 splits off from PA 28 at a T interchange East of Brookville in Pine Creek Township PA 28 intersects Interstate 80 at exit 81 a diamond interchange North of I 80 PA 28 continues north as a local road without intersecting another route for more than 14 miles 23 km PA 28 passes through the many wildlife in Pennsylvania through a forest region In Brockway PA 28 is called Main Street before terminating ending at a T intersection with U S Route 219 History EditThis section needs additional citations for verification Please help improve this article by adding citations to reliable sources in this section Unsourced material may be challenged and removed October 2022 Learn how and when to remove this template message The highway was signed in 1927 from Pittsburgh to Kittanning It is named after Alexander Lindsay a lawyer who lived in South Buffalo and commuted to work in Pittsburgh he successfully lobbied for the city to be connected to the proposed Keystone Shortway I 80 6 The highway was extended north to Brockway in 1928 In 1928 the route was under construction from Blawnox to Cheswick Troy Hill Road to Oakland and Hazen to Reitz Crossing Road Those sections were completed the following year In 1929 the section from Avella to Woodrow and from Hickory to Fort Cherry Road was under construction and finished the following year In 1930 the section from Skyline Road to PA 18 was paved as well as in Venice That year the western terminus was moved from Avella to Independence In 1958 the highway was widened and a median installed at the interchange with the Turnpike On July 15 1960 the highway s southern terminus was moved from Independence to PA 8 in Etna The former section of PA 28 from South Main Street in the West End Valley to the intersection of Noblestown Road and Crafton Boulevard in Crafton Heights was redesignated as PA 60 The remaining 83 mile stretch from Crafton Heights to Independence was renumbered PA 50 This designation change was made to reduce the number of concurrent routes in Pittsburgh The changes took effect a few months later and signs were changed by spring 1961 7 PA 28 southbound from exit 14 PA 366 In 1963 this section opened to traffic from PA 8 north to the Highland Park Bridge interchange and the following year to Blawnox Also that year the Pittsburgh Area Transportation Plan recommended upgrading PA 28 and then PA 8 to a six lane limited access highway starting 2 200 feet 670 m west of the 31st Street Bridge and ending at the 40th Street Bridge Full interchanges would be constructed at both bridges however this recommendation was not carried out It also laid out a plan that would turn PA 28 into an expressway from Pittsburgh to Brookville this too was not carried out In 1964 the highway was widened and a median installed on it between Brackenridge and the Butler County line In 1968 construction began on the section from Blawnox to PA 910 The expressway was proposed from that point to the Butler County line Construction also began on the section from Slate Lick to near Center Hill in the same year In 1965 the route was moved from Courthouse Road into Kittanning to bypass the borough on its current alignment In 1969 construction commenced on the section from PA 910 to Exit 12 and from Exit 16 to PA 356 and the Armstrong County line The start of the 1970s saw the construction extend from Exit 16 all the way to a new expressway alignment for US 422 also under construction near West Kittanning In 1971 construction commenced on the section from Exit 15 to Exit 16 In 1972 the expressway opened to traffic from Blawnox to PA 910 and from Exit 15 to US 422 However PA 28 s designation was not placed on the section from Exit 15 to Exit 16 The following year the expressway opened from PA 910 to Exit 12 In 1973 the route was extended to end at US 19 PA 65 at Chateau Street via Western Avenue and East Ohio Street In 1975 construction commenced on the section from Exit 12 to north of Tarentum during the following year the construction was extended to Exit 15 In 1978 the PA 28 designation was routed onto the newly opened highway from Exit 11 to Exit 12 and from Exit 15 to Exit 16 The PA 28 designation still followed Freeport Road to connect between Exit 12 and Exit 15 In 1980 the expressway opened from Exit 12 to Exit 13 and the PA 28 designation was moved onto this section In 1984 the route was changed to follow Western Avenue Allegheny Avenue North Shore Drive General Robinson Street and Madison Avenue for northbound traffic and Reedsdale Street for southbound traffic in Pittsburgh The final section of the Allegheny Valley Expressway between Exit 13 and Exit 15 opened in 1985 During the 1980s through traffic in each direction at the Highland Park Bridge interchange was reduced to one lane due to heavy demand for the bridge itself 8 In 2011 the southbound lanes of PA 28 were shifted to bypass the intersection of the 40th Street Bridge while the northbound lanes remained under the bridge In 2012 an excavation lowered the roadbed of PA 28 at the 31st Street Bridge 9 Though technically limited access for its first two miles near downtown Pittsburgh since the 2012 construction all lanes were clear of lane closures and construction by November 2014 when Governor Tom Corbett attended the official groundbreaking ceremony to celebrate all 44 5 miles being expressway grade The widening included a small park with a promenade and a retaining wall which features several murals on the city s history including that of the Saint Nicholas Croatian Catholic Church on the aforementioned structure s site 10 On December 12 2017 PennDOT announced that they planned on widening PA 28 at the Highland Park interchange to have two through lanes on each side while having a designated exit and entrance lanes for the bridge with work scheduled to start in 2020 with some residual work lasting into 2021 The only other thing keeping PA 28 from having the possibility of receiving an interstate designation are the 45 mph speed limits near the Millvale and Etna Exits as well as the section of the southbound one lane expressway between Exit 9 Blawnox Exit and Exit 8 Waterworks Exit If these are ever to be upgraded to Interstate Highway standards PA 28 will be up to Interstate Highway standards from its southern terminus all the way to Kittanning and could potentially receive an Interstate designation in the future 8 Major intersections EditCountyLocationmi 1 kmExitDestinationsNotesAlleghenyPittsburgh0 0000 000Anderson StreetSouthern terminus of PA 280 073 0 1110 117 0 179River AvenueNorthbound entrance exit only0 3750 604Chestnut StreetNorthbound exit only0 414 0 7460 666 1 2011B To I 279 north East Ohio Street PNC Park Heinz Field Allegheny CenterNo southbound entrance signed as exit 1B southbound only0 4580 7371A I 579 south Veterans Bridge I 279 south Fort Pitt Bridge to I 376 Monroeville AirportSouthbound exit and northbound entrance1 497 1 7502 409 2 816231st Street Bridge Strip DistrictMillvale2 319 2 4563 732 3 9533A40th Street Bridge LawrencevilleInverted SPUI continuous green T hybrid interchange no northbound entrance northbound traffic directed to 3B entrance 2 647 2 8574 260 4 5983B Blue Belt MillvaleNo southbound entrance southbound traffic directed to 3A entrance southern terminus of Blue Belt concurrencyEtna3 9686 3864EtnaNorthbound exit and southbound entrance4 522 4 5397 277 7 3055A PA 8 south R D Fleming Bridge SharpsburgNorthbound exit and southbound entrance4 567 4 8137 350 7 7465B PA 8 north Butler EtnaSigned as exit 5 southbound6 218 6 41810 007 10 3296 To PA 8 south Highland Park Bridge Blue Belt Green Belt AspinwallNorthern terminus of Blue Belt concurrency southern terminus of Green Belt concurrencyAspinwall6 846 7 12311 018 11 4637Delafield AvenueNo southbound exit7 618 7 77112 260 12 5068Freeport Road Fox Chapel Road Green Belt Waterworks DriveNorthern terminus of Green Belt concurrencyBlawnox8 003 8 02912 880 12 9219BlawnoxNorthbound exit and southbound entrance8 922 9 25014 359 14 88610R I D C DriveHarmar Township12 038 12 49319 373 20 10611 PA 910 Yellow Belt to Penna Turnpike I 76 Harmarville HarmarCheswick13 715 14 19122 072 22 83812Cheswick Springdale14 990 15 46224 124 24 88412APittsburgh Mills BoulevardCreighton16 373 17 23626 350 27 73913 Orange Belt Russellton CreightonNorthbound exit and southbound entranceTarentum18 125 19 38229 169 31 19214 PA 366 Red Belt Tarentum Brackenridge New Kensington Arnold Lower Burrell Fawn TownshipWestern terminus of PA 366Harrison Township20 805 21 22633 482 34 16015Natrona Heights Natrona BrackenridgeBrackenridge appears on southbound signs only 23 717 24 14738 169 38 86116Freeport MillerstownFreeport appears on northbound signs only ButlerBuffalo Township25 337 25 81640 776 41 54717 PA 356 Freeport ButlerArmstrongNorth Buffalo Township31 346 31 84250 446 51 24518 PA 128 Slate Lick NorthpointeEast Franklin Township37 480 38 00060 318 61 15519 US 422 west Butler West KittanningSouthern terminus of US 422 concurrencyManor Township39 915 40 00164 237 64 375A PA 66 south Ford CitySouthern terminus of PA 66 southbound concurrency exits to PA 66 southbound only40 256 40 59064 786 65 323B To US 422 Bus KittanningSouthern terminus of PA 66 northbound concurrency no access to PA 66 southbound41 511 42 30266 805 68 078 US 422 east US 422 Bus west Indiana KittanningNorthern terminus of US 422 concurrency eastern terminus of US 422 Bus 42 80668 890Northern terminus of freewayRayburn Township42 80668 890 PA 85 east Rural Valley PlumvilleWestern terminus of PA 85South Bethlehem59 87196 353 PA 839 south Mahoning DamNorthern terminus of PA 839ClarionNew Bethlehem60 17696 844 PA 66 north ClarionNorthern terminus of PA 66 concurrencyRedbank Township65 661105 671 PA 536 east Mayport Road Wallwork Road MayportWestern terminus of PA 536JeffersonClover Township73 103117 648 PA 949 north Summerville Corsica Road Water Street CorsicaSouthern terminus of PA 949Brookville79 500127 943 US 322 west 28th Division Highway PA 36 north Allegheny Boulevard PA 28 Truck north to I 80 Leeper ClarionSouthern terminus of US 322 PA 36 concurrency southern terminus of PA 28 Truck80 282129 201 PA 36 south White Street PunxsutawneyNorthern terminus of PA 36 concurrencyPine Creek Township81 421131 034 US 322 east ReynoldsvilleNorthern terminus of US 322 concurrency82 580 82 696132 900 133 086 I 80 PA 28 Truck south Clarion DuBoisExit 81 I 80 northern terminus of PA 28 TruckBrockway98 264158 141 US 219 Main Street Cherry Street Ridgway DuBoisNorthern terminus of PA 281 000 mi 1 609 km 1 000 km 0 621 mi Concurrency terminus Incomplete accessPA 28 Truck EditThis section does not cite any sources Please help improve this section by adding citations to reliable sources Unsourced material may be challenged and removed October 2022 Learn how and when to remove this template message Pennsylvania Route 28 TruckLocationBrookville PennsylvaniaLength3 3 mi 11 5 3 km Existed1963 presentPennsylvania Route 28 Truck is a 3 mile long 4 8 km truck route in Brookville Jefferson County Pennsylvania As Route 28 travels through the Brookville city center it becomes a narrow main street and features a relatively sharp turn just west of the bridge over North Fork Creek As a result after the completion of Interstate 80 Route 28 s truck traffic was shifted onto this freeway bypass from Exit 78 at Pennsylvania Route 36 which Truck 28 is cosigned for its first 1 2 mile of existence to Exit 81 where Route 28 meets the highway See also Edit U S Roads portal Pennsylvania portalReferences Edit a b Bureau of Maintenance and Operations January 2019 Roadway Management System Straight Line Diagrams Report 2019 ed Pennsylvania Department of Transportation Retrieved April 13 2019 Allegheny County PDF Butler County PDF Armstrong County PDF Clarion County PDF Jefferson County PDF Quadrant marker 10 for PA Route 28 marking the beginning of the route Map Google Maps Retrieved 2014 04 28 End quadrant marker for PA Route 28 marking the end of the route Map Google Maps Retrieved 2014 04 28 Schmitz Jon 17 November 2014 After six years Route 28 reconstruction project ends Pittsburgh Post Gazette Retrieved 12 July 2020 Google August 13 2014 Pennsylvania Route 28 Map Google Maps Google Retrieved August 13 2014 Dream of nicer commute genesis of Route 28 TribLive Retrieved 13 October 2020 Designations Of Highways Are Changed The Evening Standard Uniontown PA July 16 1960 p 7 Retrieved August 28 2015 via Newspapers com a b PennDOT Plans Improvements To Route 28 At Highland Park Bridge KDKA TV 12 12 2017 Schmitz Jon September 28 2011 Whole new Route 28 beginning to emerge through construction Pittsburgh Post Gazette Retrieved October 4 2011 Plaza historic marker to memorialize St Nicholas Church in Troy Hill Pittsburgh Post Gazette 06 15 2015 Google August 13 2014 PA Route 28 Truck Map Google Maps Google Retrieved August 13 2014 External links EditRoute map KML file edit help Template Attached KML Pennsylvania Route 28KML is from Wikidata Wikimedia Commons has media related to Pennsylvania Route 28 Pennsylvania Highways PA 28 Retrieved from https en wikipedia org w index php title Pennsylvania Route 28 amp oldid 1138248313, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.