fbpx
Wikipedia

Pakyong Airport

Pakyong Airport (IATA: PYG, ICAO: VEPY) is a seasonal domestic airport serving Gangtok, the capital of Sikkim, India.[4]

Pakyong Airport
Summary
Airport typePublic
OwnerGovernment of India
OperatorAirports Authority of India
ServesGangtok
LocationPakyong, Pakyong District, Sikkim, India
Opened24 September 2018; 5 years ago (2018-09-24)
Time zoneIndian Standard Time (+5:30)
Elevation AMSL1,416 m / 4,646 ft
Coordinates27°13′57″N 88°35′18″E / 27.23250°N 88.58833°E / 27.23250; 88.58833
Map
PYG
Location in Sikkim
PYG
PYG (India)
Runways
Direction Length Surface
m ft
02/20 1,700 5,577 Concrete
Statistics (April 2022 - March 2023)
Passengers15,707 ( 64.9%)
Aircraft movements324 ( 57%)
Cargo tonnage
Source: AAI[1][2][3]

Spread over 201 acres (81 ha), the airport is located at Pakyong, about 31 km (22 mi) south of Gangtok.[5] At 4,646 ft, Pakyong Airport is one of the five highest airports in India.[6] It is also the first greenfield airport constructed in the Northeast India,[7] the 100th operational airport in India, and the only airport in the state of Sikkim.[8][9]

Inaugurated on 24 September 2018 by Prime Minister Narendra Modi,[10] commercial flight operations started 4 October 2018.[11] Upon its opening, major media across the globe praised its engineering and described it as one of the most scenic airports in the world.[12] However, commercial flights have remained inoperative due to known weather conditions, being originally planned and designed as a Visual Flight Rules (VFR) Airport. Due to these visibility issues along with agitation from the local villagers who were displaced and strip area issues, the airport's only commercial passenger airline SpiceJet temporarily suspended flight operations to the airport effective 1 June 2019. After a suspension of 19 months, flight operations by SpiceJet resumed on 23 January 2021, following the establishment of Required Navigation Performance (RNP) approaches.[13][14]

History edit

Prior to the construction of Pakyong Airport, Sikkim had been the sole state in India possessing no functional airport.[15] Previously, the nearest airports used to access Sikkim were Bagdogra, located 124 km (77 mi) (and a five-hour drive) away in the neighboring state of West Bengal, and Paro Airport in Bhutan.[16]

The project to develop Pakyong Airport was approved by the Cabinet Committee on Economic Affairs in October 2008. The Punj Lloyd Group was awarded the 2,640 million (equivalent to 3.7 billion or US$46 million in 2023) contract to construct a runway, taxiway, apron drainage system, and electrical work for the greenfield airport in January 2009. The foundation stone for the greenfield airport was laid by the then Civil Aviation Minister, Praful Patel, in February 2009.[17]

The project was initially slated to be completed by 2012, but protests by local villagers, demanding proper rehabilitation and compensation, had resulted in suspension of work in January 2014.[18] The AAI intervened and held discussions with agitating villagers and paid part compensation allowing work to resume in October 2014. However, in January 2015, work came to a halt once again as villagers took to protests.[19] In July 2015, AAI and the State Government signed an MoU with AAI, promising to shift the affected households by 15 August so that AAI could resume work from October 2015.[20] These protest-related delays and landslides upslope of the runway resulted in suspension of work twice, escalating costs from 3,090 million (equivalent to 4.3 billion or US$54 million in 2023) to 6,050 million (equivalent to 8.5 billion or US$110 million in 2023).[20] Maximally ecological slope-stabilization techniques were used to remedy the landslide situation.[21]

On 5 March 2018, an IAF Dornier 228 landed on the completed airstrip, becoming the first aircraft to land at Pakyong.[22]SpiceJet had been awarded the Pakyong to Kolkata and Guwahati sectors under the second round of bidding for the Government's UDAN Regional Connectivity Scheme in January 2018[23] and it conducted a trial landing of its Q400 aircraft after getting approval from DGCA for M/s SpiceJet at Pakyong on 10 March 2018.[24] The airport received its commercial operating license from the Directorate General of Civil Aviation (DGCA) on 5 May 2018.[25]

On 5 December 2019, 35 families affected by the airport's construction signed off on a joint agreement and accepted the first installment in compensation for their loss of land bringing years of protest to a close.[26]

Structure edit

The airport was built by the AAI at an estimated cost of 605 crore[20] featuring a 1,700 m × 30 m (5,577 ft × 98 ft) runway and a 116 m (381 ft) long taxiway connecting it to an apron measuring 106 by 76 metres (348 ft × 249 ft) that can accommodate two ATR 72 aircraft at a time.

A terminal building measuring 2,380 m2 (25,600 sq ft) with a capacity of 100 passengers, a car park for 80 vehicles and a fire station cum Air Traffic Control Tower was constructed by Ms PABSCON. Navigation facilities include DVOR, High Intensity Runway Lights (HIRL), Aerodrome beacon, and a PAPI.

The Pakyong Airport project is one of the tallest reinforced soil structures in the world.[27] The land for the airport was carved from the mountainside using massive geotechnical 'cut and fill' engineering works. These state-of-the-art geogrid soil reinforcement and slope stabilisation techniques were employed as traditional retaining structures and embankments were ruled out as being unfeasible. Italian geotechnical company Maccaferri given consultancy services to execute the project that envisaged a 150 m (490 ft) wide, 2 km (1.2 mi) long corridor on which the runway and airport buildings were to be constructed. The company, which completed the project with partners Mott MacDonald and Punj Lloyd, won the 'International Project of the Year' award at the Ground Engineering Awards 2012 for its work in constructing 74 m (243 ft) high reinforced soil walls and slopes at the site.[27]

Commercial flight operations edit

 
The Prime Minister, Shri Narendra Modi at the inauguration of the Pakyong Airport

Although initially praised by worldwide media upon its opening as being "a breathtaking piece of engineering on the roof of the world" offering arriving passengers "one of the most dramatic airport approaches on the planet",[12] the airport's commercial flight operations have since been disrupted by poor weather conditions affecting flight visibility. In December 2018, 21 of SpiceJet's 31 daily flights (nearly 70% of its schedule) were forced to divert to Bagdogra (up to a five-hour drive away) because Pakyong "lacked the requisite navigation equipment for low-visibility situations", being a Visual flight rule (VFR) Airport as originally planned as per MOU 2002 & MOU 2015 among Civil Aviation GOI, Tourism Deptt Govt of Sikkim and AAI. Currently, Pakyong requires at least 5 km (5,000m)under Visual flight rule (VFR) conditions for Non-Schedule Airlines. For schedule flight operations by SpiceJet Required navigation performance (RNP) procedure was approved by DGCA with visibility requirement of 2,400m.

On 1 June 2019, SpiceJet, the airport's sole airline providing commercial passenger service, temporarily suspended its once daily Kolkata-Pakyong-Kolkata flight due to "unpredictable weather in Pakyong which results in very low visibility", having earlier suspended the other daily service between Pakyong and Guwahati.[28] Airline officials also cited the approaching monsoon season's aggravating effect on flight operations when announcing the service suspension. SpiceJet earlier conveyed that they will restart flight operation with effect from winter schedule i.e., 27 October 2019, however, the flight operations remained suspended for the rest of the year and 2020.[29][30]

In addition to fluctuating weather, adequate basic strip area (western side) issues have also hampered commercial flight operations. The basic strip, which is mandated to be a minimum of 75 m wide, is only 40 m in western side & 80m wide Eastern side along 2 km long. Contractors have been "unable to take up Civil works to extend the stretch of basic strip and erect a strong RCC Retaining wall with anchoring system" because the State Government of Sikkim at the time had not compensated few of the affected landowners.[31] On 5 December 2019, it was reported that 35 families affected by the airport's construction had been offered a compensation of 20.6 crore by the State Government and that there would be support in ensuring the full completion and operation of the airport.[32] On 18 November 2020, a trial landing was conducted at the airport by SpiceJet involving a Required navigation performance (RNP) procedure and commercial flight operations resumed on 23 January 2021 after a suspension of 19 months.[13][14] Upon its resumption, the first ever Delhi-Pakyong direct flight started from 23 January 2021[33] while flights to Kolkata resumed on 1 February 2021.[34] After suspension of both services in October 2022, flight services resumed in March 2023 with SpiceJet connecting Delhi.[35]

Airlines and destinations edit

AirlinesDestinations
SpiceJetDelhi,[36] Kolkata (resumes 15 October 2023)[37]

Statistics edit

Annual passenger traffic at PYG airport. See Wikidata query.

Passenger amenities edit

Pakyong Airport has snack bar, Prepaid Taxi counter for passengers within its premises. Prepaid taxis can be availed on a very reasonable rate to visit nearby cities like Gangtok, Namchi, Mangan, Pelling etc. or any other tourist places of Sikkim on hiring basis. The airport is just 1 kilometre away from NH717A at Pakyong.

Military flight operations edit

As Pakyong Airport sits approximately 60 km (37.28 mi) from the India-China border, it is considered strategically important. In March 2018, the Indian Air Force (IAF) was the first to land an aircraft, a Dornier 228, at the airport. And in January 2019, an IAF Antonov-32 transport plane arrived "in an effort to boost the transportation of troops and material to this region."[38] At present security is being provided by State government of Sikkim as per MoU dated 30.6.2015 signed among Government of Sikkim, Ministry of Civil Aviation, Government of India and Airports Authority of India.

See also edit

Military bases
Borders
Other related topics

References edit

  1. ^ "Annexure III – Passenger Data" (PDF). aai.aero. Retrieved 24 April 2023.
  2. ^ "Annexure II – Aircraft Movement Data" (PDF). aai.aero. Retrieved 24 April 2023.
  3. ^ "Annexure IV – Freight Movement Data" (PDF). aai.aero. Retrieved 24 April 2023.
  4. ^ "Sikkim to have 100th functional airport in India". 2 May 2018.
  5. ^ . Archived from the original on 12 June 2018.
  6. ^ "Sikkim's Greenfield Airport". Punjlloyd. Retrieved 4 August 2012.
  7. ^ "Sikkim's Pakyong airport stuns before it flies". 24 September 2018.
  8. ^ "Sikkim to get its first airport at Pakyong". The Indian Express. 17 November 2007. Retrieved 4 August 2012.
  9. ^ "Pakyong airport in Sikkim to become the 100th functional airport in India: Jayant Sinha". The Financial Express. Press Trust of India. 3 May 2018. Retrieved 5 May 2018.
  10. ^ "PM Narendra Modi inaugurates Sikkim's Pakyong airport". The Economic Times. 24 September 2018. Retrieved 24 September 2018.
  11. ^ "Sikkim's Pakyong Airport welcomes first commercial flight in state with water cannon salute". First Post. 4 October 2018. Retrieved 4 October 2018.
  12. ^ a b Hiufu Wong, Maggie (25 September 2018). "India's new Pakyong Airport opens in incredible Himalayan surroundings". CNN. Retrieved 3 June 2019.
  13. ^ a b "Trial touchdown successful at Sikkim airport". The Times of India. 18 November 2020. Retrieved 21 November 2020.
  14. ^ a b "Airline operations at Sikkim's Pakyong airport resume after 19 months". All India Radio. Retrieved 23 January 2021.
  15. ^ Dey, Panchali. "Pakyong Airport to finally become operational this month". The Times of India. Retrieved 6 June 2018.
  16. ^ Sen, Sutapa (19 August 2018). "Good news: Sikkim's first airport ready to start operations, 5 facts you need to know". DNA. iligent Media Corporation Ltd. Retrieved 21 August 2018.
  17. ^ . ProjectsMonitor. 6 December 2010. Archived from the original on 19 July 2012. Retrieved 4 August 2012.
  18. ^ Dey, Supratim (30 January 2015). "Work on N-E's first greenfield airport comes to a halt". Business Standard India. Retrieved 16 July 2019.
  19. ^ "North East's first greenfield airport comes to a halt". Business Standard. 30 January 2015. Retrieved 7 May 2015.
  20. ^ a b c "AAI, Sikkim govt sign MoU for Pakyong Airport". Business Standard. 3 July 2015. Retrieved 6 July 2015.
  21. ^ "The Pakyong Airport landslide issue in India". 29 January 2015.
  22. ^ IAF's Dornier aircraft lands at Pakyong airport Economic Times 5 March 2018
  23. ^ "SpiceJet awarded 17 proposals and 20 new sectors under the second round of bidding for UDAN". SpiceJet Press Release. 24 January 2018. Retrieved 24 September 2018.
  24. ^ Spicejet Bombardier Q400 78 seater aircraft makes historic landing at Pakyong Airport Voice of Sikkim 10 March 2018
  25. ^ "Sikkim's Pakyong Airport gets license". Millennium Post. 5 May 2018. Retrieved 24 September 2018.
  26. ^ "35 Airport affected families compensated, thanks CM for speedy solution". The Voice of Sikkim. IPR. 5 December 2019. Retrieved 14 December 2019.
  27. ^ a b "Sikkim airport project wins UK award". The Economic Times. 15 May 2012. Retrieved 4 August 2012.
  28. ^ "No flights to Sikkim from June 1". The Times of India. 23 May 2019. Retrieved 22 August 2019.
  29. ^ "SpiceJet's Flights Schedule & Information for Domestic & International Flight".
  30. ^ Sinha, Saurabh (25 May 2019). "No flights to Sikkim's first airport Pakyong from June 1 'till further notice', says SpiceJet". The Times of India. Retrieved 3 June 2019.
  31. ^ Adhikary, Prakash (21 May 2019). "Operations at Sikkim's First Airport, Inaugurated Last Year, Likely to Be Indefinitely Halted". News 18. Retrieved 3 June 2019.
  32. ^ "35 Airport affected families compensated, thanks CM for speedy solution". The Voice of Sikkim. Retrieved 9 December 2019.
  33. ^ "Flight operations resume at Sikkim's Pakyong Airport after 18 months". 24 January 2021.
  34. ^ "Spice Jet flight resumes". United News of India. Retrieved 10 February 2021.
  35. ^ "Flight services resume at Sikkim's Pakyong airport". The Economic Times. 14 March 2023.
  36. ^ Rajeev Ravidas (23 February 2023). "SpiceJet mulls Sikkim flights". The Telegraph India. Retrieved 23 February 2023.
  37. ^ "SpiceJet Flight Schedule". SpiceJet. Retrieved 3 September 2023.
  38. ^ "IAF lands An-32 aircraft at Pakyong Airport in Sikkim". ANI News. 17 January 2019. Retrieved 3 June 2019.

External links edit

pakyong, airport, iata, icao, vepy, seasonal, domestic, airport, serving, gangtok, capital, sikkim, india, iata, pygicao, vepysummaryairport, typepublicownergovernment, indiaoperatorairports, authority, indiaservesgangtoklocationpakyong, pakyong, district, sik. Pakyong Airport IATA PYG ICAO VEPY is a seasonal domestic airport serving Gangtok the capital of Sikkim India 4 Pakyong AirportIATA PYGICAO VEPYSummaryAirport typePublicOwnerGovernment of IndiaOperatorAirports Authority of IndiaServesGangtokLocationPakyong Pakyong District Sikkim IndiaOpened24 September 2018 5 years ago 2018 09 24 Time zoneIndian Standard Time 5 30 Elevation AMSL1 416 m 4 646 ftCoordinates27 13 57 N 88 35 18 E 27 23250 N 88 58833 E 27 23250 88 58833MapPYGLocation in SikkimShow map of SikkimPYGPYG India Show map of IndiaRunwaysDirection Length Surfacem ft02 20 1 700 5 577 ConcreteStatistics April 2022 March 2023 Passengers15 707 64 9 Aircraft movements324 57 Cargo tonnage Source AAI 1 2 3 Spread over 201 acres 81 ha the airport is located at Pakyong about 31 km 22 mi south of Gangtok 5 At 4 646 ft Pakyong Airport is one of the five highest airports in India 6 It is also the first greenfield airport constructed in the Northeast India 7 the 100th operational airport in India and the only airport in the state of Sikkim 8 9 Inaugurated on 24 September 2018 by Prime Minister Narendra Modi 10 commercial flight operations started 4 October 2018 11 Upon its opening major media across the globe praised its engineering and described it as one of the most scenic airports in the world 12 However commercial flights have remained inoperative due to known weather conditions being originally planned and designed as a Visual Flight Rules VFR Airport Due to these visibility issues along with agitation from the local villagers who were displaced and strip area issues the airport s only commercial passenger airline SpiceJet temporarily suspended flight operations to the airport effective 1 June 2019 After a suspension of 19 months flight operations by SpiceJet resumed on 23 January 2021 following the establishment of Required Navigation Performance RNP approaches 13 14 Contents 1 History 2 Structure 3 Commercial flight operations 4 Airlines and destinations 5 Statistics 6 Passenger amenities 7 Military flight operations 8 See also 9 References 10 External linksHistory editPrior to the construction of Pakyong Airport Sikkim had been the sole state in India possessing no functional airport 15 Previously the nearest airports used to access Sikkim were Bagdogra located 124 km 77 mi and a five hour drive away in the neighboring state of West Bengal and Paro Airport in Bhutan 16 The project to develop Pakyong Airport was approved by the Cabinet Committee on Economic Affairs in October 2008 The Punj Lloyd Group was awarded the 2 640 million equivalent to 3 7 billion or US 46 million in 2023 contract to construct a runway taxiway apron drainage system and electrical work for the greenfield airport in January 2009 The foundation stone for the greenfield airport was laid by the then Civil Aviation Minister Praful Patel in February 2009 17 The project was initially slated to be completed by 2012 but protests by local villagers demanding proper rehabilitation and compensation had resulted in suspension of work in January 2014 18 The AAI intervened and held discussions with agitating villagers and paid part compensation allowing work to resume in October 2014 However in January 2015 work came to a halt once again as villagers took to protests 19 In July 2015 AAI and the State Government signed an MoU with AAI promising to shift the affected households by 15 August so that AAI could resume work from October 2015 20 These protest related delays and landslides upslope of the runway resulted in suspension of work twice escalating costs from 3 090 million equivalent to 4 3 billion or US 54 million in 2023 to 6 050 million equivalent to 8 5 billion or US 110 million in 2023 20 Maximally ecological slope stabilization techniques were used to remedy the landslide situation 21 On 5 March 2018 an IAF Dornier 228 landed on the completed airstrip becoming the first aircraft to land at Pakyong 22 SpiceJet had been awarded the Pakyong to Kolkata and Guwahati sectors under the second round of bidding for the Government s UDAN Regional Connectivity Scheme in January 2018 23 and it conducted a trial landing of its Q400 aircraft after getting approval from DGCA for M s SpiceJet at Pakyong on 10 March 2018 24 The airport received its commercial operating license from the Directorate General of Civil Aviation DGCA on 5 May 2018 25 On 5 December 2019 35 families affected by the airport s construction signed off on a joint agreement and accepted the first installment in compensation for their loss of land bringing years of protest to a close 26 Structure editThe airport was built by the AAI at an estimated cost of 605 crore 20 featuring a 1 700 m 30 m 5 577 ft 98 ft runway and a 116 m 381 ft long taxiway connecting it to an apron measuring 106 by 76 metres 348 ft 249 ft that can accommodate two ATR 72 aircraft at a time A terminal building measuring 2 380 m2 25 600 sq ft with a capacity of 100 passengers a car park for 80 vehicles and a fire station cum Air Traffic Control Tower was constructed by Ms PABSCON Navigation facilities include DVOR High Intensity Runway Lights HIRL Aerodrome beacon and a PAPI The Pakyong Airport project is one of the tallest reinforced soil structures in the world 27 The land for the airport was carved from the mountainside using massive geotechnical cut and fill engineering works These state of the art geogrid soil reinforcement and slope stabilisation techniques were employed as traditional retaining structures and embankments were ruled out as being unfeasible Italian geotechnical company Maccaferri given consultancy services to execute the project that envisaged a 150 m 490 ft wide 2 km 1 2 mi long corridor on which the runway and airport buildings were to be constructed The company which completed the project with partners Mott MacDonald and Punj Lloyd won the International Project of the Year award at the Ground Engineering Awards 2012 for its work in constructing 74 m 243 ft high reinforced soil walls and slopes at the site 27 Commercial flight operations edit nbsp The Prime Minister Shri Narendra Modi at the inauguration of the Pakyong AirportAlthough initially praised by worldwide media upon its opening as being a breathtaking piece of engineering on the roof of the world offering arriving passengers one of the most dramatic airport approaches on the planet 12 the airport s commercial flight operations have since been disrupted by poor weather conditions affecting flight visibility In December 2018 21 of SpiceJet s 31 daily flights nearly 70 of its schedule were forced to divert to Bagdogra up to a five hour drive away because Pakyong lacked the requisite navigation equipment for low visibility situations being a Visual flight rule VFR Airport as originally planned as per MOU 2002 amp MOU 2015 among Civil Aviation GOI Tourism Deptt Govt of Sikkim and AAI Currently Pakyong requires at least 5 km 5 000m under Visual flight rule VFR conditions for Non Schedule Airlines For schedule flight operations by SpiceJet Required navigation performance RNP procedure was approved by DGCA with visibility requirement of 2 400m On 1 June 2019 SpiceJet the airport s sole airline providing commercial passenger service temporarily suspended its once daily Kolkata Pakyong Kolkata flight due to unpredictable weather in Pakyong which results in very low visibility having earlier suspended the other daily service between Pakyong and Guwahati 28 Airline officials also cited the approaching monsoon season s aggravating effect on flight operations when announcing the service suspension SpiceJet earlier conveyed that they will restart flight operation with effect from winter schedule i e 27 October 2019 however the flight operations remained suspended for the rest of the year and 2020 29 30 In addition to fluctuating weather adequate basic strip area western side issues have also hampered commercial flight operations The basic strip which is mandated to be a minimum of 75 m wide is only 40 m in western side amp 80m wide Eastern side along 2 km long Contractors have been unable to take up Civil works to extend the stretch of basic strip and erect a strong RCC Retaining wall with anchoring system because the State Government of Sikkim at the time had not compensated few of the affected landowners 31 On 5 December 2019 it was reported that 35 families affected by the airport s construction had been offered a compensation of 20 6 crore by the State Government and that there would be support in ensuring the full completion and operation of the airport 32 On 18 November 2020 a trial landing was conducted at the airport by SpiceJet involving a Required navigation performance RNP procedure and commercial flight operations resumed on 23 January 2021 after a suspension of 19 months 13 14 Upon its resumption the first ever Delhi Pakyong direct flight started from 23 January 2021 33 while flights to Kolkata resumed on 1 February 2021 34 After suspension of both services in October 2022 flight services resumed in March 2023 with SpiceJet connecting Delhi 35 Airlines and destinations editAirlinesDestinationsSpiceJetDelhi 36 Kolkata resumes 15 October 2023 37 Statistics editGraphs are unavailable due to technical issues Annual passenger traffic at PYG airport See Wikidata query Passenger amenities editPakyong Airport has snack bar Prepaid Taxi counter for passengers within its premises Prepaid taxis can be availed on a very reasonable rate to visit nearby cities like Gangtok Namchi Mangan Pelling etc or any other tourist places of Sikkim on hiring basis The airport is just 1 kilometre away from NH717A at Pakyong Military flight operations editAs Pakyong Airport sits approximately 60 km 37 28 mi from the India China border it is considered strategically important In March 2018 the Indian Air Force IAF was the first to land an aircraft a Dornier 228 at the airport And in January 2019 an IAF Antonov 32 transport plane arrived in an effort to boost the transportation of troops and material to this region 38 At present security is being provided by State government of Sikkim as per MoU dated 30 6 2015 signed among Government of Sikkim Ministry of Civil Aviation Government of India and Airports Authority of India See also editMilitary basesList of ALGs List of Indian Air Force stations India China military deployment on LAC List of disputed India China areas Tianwendian UkdungleBordersLine of Actual Control LAC Borders of China Borders of IndiaOther related topicsIndia China Border Roads List of extreme points of India Defence Institute of High Altitude ResearchReferences edit Annexure III Passenger Data PDF aai aero Retrieved 24 April 2023 Annexure II Aircraft Movement Data PDF aai aero Retrieved 24 April 2023 Annexure IV Freight Movement Data PDF aai aero Retrieved 24 April 2023 Sikkim to have 100th functional airport in India 2 May 2018 Wait for Sikkim air link Archived from the original on 12 June 2018 Sikkim s Greenfield Airport Punjlloyd Retrieved 4 August 2012 Sikkim s Pakyong airport stuns before it flies 24 September 2018 Sikkim to get its first airport at Pakyong The Indian Express 17 November 2007 Retrieved 4 August 2012 Pakyong airport in Sikkim to become the 100th functional airport in India Jayant Sinha The Financial Express Press Trust of India 3 May 2018 Retrieved 5 May 2018 PM Narendra Modi inaugurates Sikkim s Pakyong airport The Economic Times 24 September 2018 Retrieved 24 September 2018 Sikkim s Pakyong Airport welcomes first commercial flight in state with water cannon salute First Post 4 October 2018 Retrieved 4 October 2018 a b Hiufu Wong Maggie 25 September 2018 India s new Pakyong Airport opens in incredible Himalayan surroundings CNN Retrieved 3 June 2019 a b Trial touchdown successful at Sikkim airport The Times of India 18 November 2020 Retrieved 21 November 2020 a b Airline operations at Sikkim s Pakyong airport resume after 19 months All India Radio Retrieved 23 January 2021 Dey Panchali Pakyong Airport to finally become operational this month The Times of India Retrieved 6 June 2018 Sen Sutapa 19 August 2018 Good news Sikkim s first airport ready to start operations 5 facts you need to know DNA iligent Media Corporation Ltd Retrieved 21 August 2018 Pakyong first ever airport in Sikkim makes steady progress ProjectsMonitor 6 December 2010 Archived from the original on 19 July 2012 Retrieved 4 August 2012 Dey Supratim 30 January 2015 Work on N E s first greenfield airport comes to a halt Business Standard India Retrieved 16 July 2019 North East s first greenfield airport comes to a halt Business Standard 30 January 2015 Retrieved 7 May 2015 a b c AAI Sikkim govt sign MoU for Pakyong Airport Business Standard 3 July 2015 Retrieved 6 July 2015 The Pakyong Airport landslide issue in India 29 January 2015 IAF s Dornier aircraft lands at Pakyong airport Economic Times 5 March 2018 SpiceJet awarded 17 proposals and 20 new sectors under the second round of bidding for UDAN SpiceJet Press Release 24 January 2018 Retrieved 24 September 2018 Spicejet Bombardier Q400 78 seater aircraft makes historic landing at Pakyong Airport Voice of Sikkim 10 March 2018 Sikkim s Pakyong Airport gets license Millennium Post 5 May 2018 Retrieved 24 September 2018 35 Airport affected families compensated thanks CM for speedy solution The Voice of Sikkim IPR 5 December 2019 Retrieved 14 December 2019 a b Sikkim airport project wins UK award The Economic Times 15 May 2012 Retrieved 4 August 2012 No flights to Sikkim from June 1 The Times of India 23 May 2019 Retrieved 22 August 2019 SpiceJet s Flights Schedule amp Information for Domestic amp International Flight Sinha Saurabh 25 May 2019 No flights to Sikkim s first airport Pakyong from June 1 till further notice says SpiceJet The Times of India Retrieved 3 June 2019 Adhikary Prakash 21 May 2019 Operations at Sikkim s First Airport Inaugurated Last Year Likely to Be Indefinitely Halted News 18 Retrieved 3 June 2019 35 Airport affected families compensated thanks CM for speedy solution The Voice of Sikkim Retrieved 9 December 2019 Flight operations resume at Sikkim s Pakyong Airport after 18 months 24 January 2021 Spice Jet flight resumes United News of India Retrieved 10 February 2021 Flight services resume at Sikkim s Pakyong airport The Economic Times 14 March 2023 Rajeev Ravidas 23 February 2023 SpiceJet mulls Sikkim flights The Telegraph India Retrieved 23 February 2023 SpiceJet Flight Schedule SpiceJet Retrieved 3 September 2023 IAF lands An 32 aircraft at Pakyong Airport in Sikkim ANI News 17 January 2019 Retrieved 3 June 2019 External links edit Retrieved from https en wikipedia org w index php title Pakyong Airport amp oldid 1173604807, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.