The Northstar Line (reporting mark MNRX) is a commuter rail route in the US state of Minnesota. Northstar runs 40 miles (64 km) from Big Lake to downtown Minneapolis at Target Field using existing track and right-of-way owned by the BNSF Railway. Passenger service began on November 16, 2009.[4][1] The rail line serves part of the Northstar Corridor between Minneapolis and St. Cloud. Planning for the line began in 1997 when the Northstar Corridor Development Authority (NCDA) was formed.[5] The corridor is also served by Interstate 94 and U.S. Highway 10. In 2023, the system had a ridership of 142,200, or about 500 per weekday as of the fourth quarter of 2023.

Northstar Line
Overview
Service typeCommuter rail
SystemMetro Transit (Metropolitan Council)
LocaleMinnesota (Minneapolis, Hennepin County, Anoka County and Sherburne County)
First serviceNovember 16, 2009 (2009-11-16)[1]
Current operator(s)BNSF Railway (locomotives)
Metropolitan Council (train staff)
Daily ridership500 (weekdays, Q4 2023)[2]
Annual ridership142,200 (2023)[3]
Websitemetrotransit.org/northstar
Route
TerminiTarget Field
Big Lake
Stops5
Distance travelled40 miles (64 km)
Service frequency4 weekday round trips
Technical
Rolling stockMotivePower MP36PH-3C,
Bombardier BiLevel Coach
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Operating speed79 mph (127 km/h) maximum
47 mph (76 km/h) average
Track owner(s)BNSF Railway
Route map
Northstar
Northstar Link
Light Rail
all stations
accessible

Background edit

The route was initially designed to run the full distance between Minneapolis and Rice, Minnesota, northwest of St. Cloud. The project was counting on federal funding for half of its construction costs. The estimated ridership for the full route was not high enough to qualify for that much needed federal funding.[6]

When the line was first proposed, then-Governor Jesse Ventura was an early advocate and convinced some people to come around to his point of view.[7] Ventura's successor, Governor Tim Pawlenty, did not initially support it. He changed his mind after MnDOT determined that a scaled-back version of the line would qualify for federal funding.

The 2004 Minnesota Legislative session did not pass a bonding bill, which meant a lack of funds for initial project work. Some counties in the area and the Metropolitan Council came up with matching funds to allow funding from the United States federal government to continue.

During the 2005 state legislative session, a bonding bill including $37.5 million of funding for the proposed project was passed. The bill was signed on April 11, 2005, by Governor Tim Pawlenty at the site of the Riverdale station in Coon Rapids.[8] The 2006 state legislature, along with city, county and federal governments, provided funding to complete the corridor to Big Lake.[9]

Construction began on the maintenance facility near Big Lake station and on the Blue Line light rail extension in September 2007, before full funding for the line had been secured.[5] On December 11, 2007, U.S. Deputy Secretary of Transportation Thomas Barrett met with Governor Pawlenty in Anoka County and officially signed a Full Funding Grant Agreement of $156.8 million, nearly half of the funding for the $317 million, 40-mile (64 km) line from Minneapolis to Big Lake. The money enabled the release of an additional $97.5 million in state bonding money set aside for the project.[10][11]

The federal government paid $156.8 million, the state paid $98.6 million and the Anoka County Regional Rail Authority pledged $34.8 million. The remaining partners were Sherburne County Regional Rail Authority ($8.2 million), Hennepin County Regional Rail Authority ($8 million), the Metropolitan Council ($5.9 million) and the Minnesota Twins ($2.6 million, for the station improvements under the new Target Field where the Minneapolis station was constructed).[10] Of the $317 million total, $107.5 million went to paying BNSF for a perpetual easement for track rights and facilities along the line and to pay the BNSF employees that operate the trains. The operating budget for the first full year of service, 2010, was $16.8 million.[12]

Construction and operation edit

 
The platforms at Target Field under construction in 2009

The Minnesota Department of Transportation (Mn/DOT) and the Northstar Corridor Development Authority (NCDA) studied options for development of the corridor to handle the increasing commuter load and felt that a commuter rail line was the best option. It was expected to cost about US$265 million in 2008 dollars, estimated to be less than one-third the cost of upgrading existing highways,[13][14] though the cost would later climb to $317 million.[12] Because almost all of the route being used already existed, the investment mostly went into building new stations, upgrading track, enhancing the safety of crossings, and updating signals. A significant portion of the funds were to extend the METRO Blue Line to the Target Field station on the west side of Interstate 394 and 5th Street. This terminal station is integrated into the Minnesota Twins' new ballpark, Target Field, which opened in March 2010.

During normal operation, the line had six trains running in the morning and evening rush hour periods, and limited service on weekends and holidays. Bus feeder lines, including the Northstar Link from St. Cloud to Big Lake station,[15] bring residents along the corridor to the nearest train station. Once in downtown, commuters can walk upstairs to the METRO Blue and Green Lines, take a bus into other areas of the city, or go into one of the nearby buildings integrated into the Minneapolis skyway system. In the first year, 2010, Metro Ridership fell well short of its goal of 3,400 weekday trips from this station. Metro Transit has a goal for of 5,900 by 2030[16] intending to save those commuters 900,000 hours over the course of a year when compared to taking a dedicated bus line.[13]

From its opening until January 2014, Northstar trains arrived on time for 96 percent of trips making it one of the most reliable services from Metro Transit. Starting in the winter of 2014, on-time performance suffered due to heavy freight traffic and severe cold weather. By the end of February 2014, on-time reliability was down to 74 percent.[17] Freight traffic from the North Dakota oil boom contributed to congestion and delays for trains. The delays were also felt by the Amtrak Empire Builder route which travels through the same corridor.[18] Delays were severe enough for legislators to hold a public hearing at the State Capitol with BNSF in attendance.[19] During the hearing, BNSF stated that delays were due to cold weather and not freight traffic. The cold weather caused mechanical issues and limited how long crews could work outside.[20][17][21] BNSF spent money on repairs and maintenance along the corridor over 2014, which included replacing ties, switches, and adding switch covers which would protect switches from ice and snow.[22] While January through October 2014 saw trains arriving on-time just 65.7 percent of the time, during the month of December trains were back to 95 percent on-time performance. Metro Transit offered refunds to customers whose trains were more than 10 minutes late in January and February 2015 in an effort to draw back ridership. During January 2015 trips were on time 98% of the time.[23][24]

Ridership edit

Annual Passenger Ridership
Year Ridership % Change
2009 - -
2010 710,426 -
2011 703,427 −1.3%
2012 700,276 −0.4%
2013 787,239 12.3%
2014 721,214 −8.4%
2015 722,637 0.2%
2016 711,168 −1.6%
2017 793,796 11.6%
2018 787,327 −0.8%
2019 767,500 −2.5%
2020 152,600 −80.1%
Sources:[25][26][27][28][29]

Ridership in the first 15 days averaged 2,207 per day (33,112 total), short of a goal of 2,460.[30] By the end of January 2010, goals were exceeded by 3%.[31] Ridership for 2010 was originally projected to be 897,000 though ultimately ended up at 715,000.[32] Because ridership varies significantly through the course of a year, Metro Transit's month-to-month goals are different from the yearly average goal. Daily ridership was 2,814 in 2019, the same level it was in 2017.[33] It was projected to be 5,590 in 2025 and 6,200 in 2030, according to a 2009 study by Kimley-Horn and Associates Inc.[34]

Route edit

 
A Northstar train crosses the Mississippi River at Nicollet Island

At Target Field Station, the parallel rail lines of the old Great Northern Railway (north side track now BNSF) and the Minneapolis and St. Louis Railway (south side track now Union Pacific) travel eastbound past the Federal Reserve Bank, the site of the old Minneapolis Great Northern Depot, across the Mississippi River on the Minneapolis BNSF Rail Bridge and then across Nicollet Island. At a wye, the route turns northwest in the GN East side line, which then joins the parallel ex-Northern Pacific main line. The ex-Great Northern and ex-Northern Pacific lines are merged into BNSF and this is now the BNSF Northern Transcon (transcontinental) line.

The route travels north through the Northtown Classification Yards, over Interstate 694 and makes its first stop at 61st Avenue in Fridley at the yard limit of Northtown, where it enters BNSF's Staples Subdivision. The double track line continues past the current Foley Boulevard park-and-ride bus station, which is planned to be a future Northstar station and turns northwest at Coon Creek Junction, where the old GN route to Duluth (now BNSF's Hinckley Subdivision) splits off and heads straight north. The current Coon Rapids station is behind the Riverdale shopping center by Round Lake Boulevard and new stations were also built in Anoka, Elk River, and Big Lake.

The Great Northern Railway and Northern Pacific Railway had local services from Minneapolis to all of the cities currently served by Northstar up through the early 20th century. One Fridley station was about a mile north of the current stop, at Mississippi Boulevard. There possibly was a stop shared by GN and NP at Coon Creek Junction.[35] There were at least three stations built in Anoka over the years, and two stations in Elk River and Big Lake, with both cities having one stop for each railroad.[36]

Upgrades and potential extension to St. Cloud edit

The double-track main line between Northtown Yard in Minneapolis and Coon Creek Junction in Coon Rapids is the busiest rail corridor in the Twin Cities metropolitan area. In July 2009, before the Northstar Commuter Rail commuter line began operation, this segment had hosted 63 trains per day.[37] The Minnesota Department of Transportation would like to run more passenger trains through the corridor, including Northstar and other proposed passenger rail routes like the proposed Northern Lights Express to Duluth. A $113.4 million project to add a third main line and a new station at Foley Boulevard in Coon Rapids is planned. A $99 million grant request was filed under the American Recovery and Reinvestment Act of 2009 to cover most of the cost.[38] TIGER grants are expected to be awarded on February 17, 2010.[39]

Foley station was among cuts to the Northstar plan in 2003 while federal funding was being sought prior to construction. Despite the fact the 3,200-stall parking facility already existed (sans boarding platforms), riders would not save enough time by switching from existing bus service to rail to make the stop fit within the guidelines enforced by Federal Transit Administration's cost-effectiveness index.[40] A station in Ramsey at Ramsey Town Center was also cut prior to construction. Ramsey station construction has since been fully funded, and construction began on March 27, 2012;[41] it was completed on November 8[42] and opened on November 14, 2012.[43]

A major obstacle to extending Northstar to St. Cloud had been the lack of double-tracked rail for nine miles (14 km) from Big Lake to Becker.[44] However, due to increased freight traffic on the line, BNSF double-tracked the corridor in 2015.[45] The Minnesota Department of Transportation says that extending Northstar would result in 1 to 1.5 million annual trips on the line[citation needed]. In its 2010 State Rail Plan, the agency stated an expectation of farebox recovery ratios between 70% and 111% on the full line.[46] However, the same plan estimated farebox recovery ratios of just 21% to 34% on the proposed Northern Lights Express, which in a 2007 business plan had calculated ratios of over 100%.[47] On November 8, 2010, it was announced that the planned extension of the line to St. Cloud had been indefinitely delayed. Projected ridership is not sufficient to qualify for federal funding.[48]

Proposals to extend the line have continued to surface in the years following opening of the line. In 2016 and 2018, Minnesota state legislators proposed extending the line to St. Cloud using existing equipment by running two daily round-trips to St. Cloud and reducing other trips to Minneapolis from five to four.[49][50] Governor Mark Dayton proposed a six month demonstration service to St. Cloud in 2017 but the demonstration would have only included 1 round trip a day and not have trains stopping at stations between Minneapolis and St. Cloud.[51] Extending the line to Camp Ripley was proposed in 2019 by House of Representative legislators.[52] Another extension feasibility study sponsored by MnDOT was released in July 2020.[53]

Possible extension of the line has been revived in the 2022 Transportation Omnibus bill passed by the MN legislature. The bill includes funding for a study that would consider different possible rail service to the St Cloud and Fargo-Moorhead regions. This could include recommendations to extend Northstar.

Pandemic and future edit

After the onset of the COVID-19 pandemic, Metro Transit eliminated weekend service and special event service. Weekly trips dropped from 72 to 20. Ridership on the line was down 95% in August 2020 compared to before the pandemic. [54] Lakeville's state representative, Jon Koznick, proposed shuttering Northstar operations in 2021 but that would require the repayment of $85 million in federal funds used to construct the project.[55] The Republican-controlled Minnesota Senate proposed closing Northstar in the 2022 legislative session and included asking the federal government to not require the repayment of federal funds.[56]

Metro Transit and MnDOT in combination with three counties that Northstar operates in, Anoka County, Hennepin County, and Sherburne County, agreed to a master funding agreement in 2018 that covered operating expenses through 2022. Anoka County ceased paying their financial contribution by the second half of 2020. The county requested a reduced payment due to reduced ridership.[57] By 2022, the county owed Metro Transit $7.9 million for operating expenses stretching from 2020 to 2022. Special event service to Minnesota Twins games was not offered in 2022 due to the funding issue. Northstar served 81,561 rides to 64 Minnesota Twins games in 2019.[58]

Anoka County ended up paying Metro Transit for 2020 and 2021 operating expenses after the 2021 bill was reduced from nearly $6 million to $1.95 million due to funds from BNSF and federal COVID relief bills. For the 2022 operating budget, Anoka County considered a $1.95 million payment to be their "full and final payment for 2022" despite Metro Transit requesting $4.6 million. Anoka County argued that they are paying the same amount from their 2021 bill for 2022 because the same amount of service is being offered while Metro Transit states it cannot increase service without covering the full operating costs of the line.[59][60]

The Metropolitan Council is conducting a study on the future of Northstar post pandemic but the study will not produce any decisions or recommendations. The study is tentatively expected to be completed the winter of 2022–2023.[61]

Construction of the Northern Lights Express Intercity passenger train from Downtown Minneapolis to Duluth may add a transfer station at Coon-Rapids Foley Boulevard to allow for transfers between Northstar and NLX trains to other Amtrak intercity routes.

On October 2, 2023, service was increased to 4 round trips every weekday, including 1 reverse peak trip.[62] Special event service returned, serving Twins and Vikings games. There is still no weekend service. An increase in the sales tax in the seven-county metropolitan area approved in the 2023 Minnesota legislative session will help cover the increased expenses.[63]

Rolling stock edit

The line opened in 2009 with five MPI MP36PH-3C locomotives and seventeen Bombardier BiLevel Coach cars. Each passenger car has about 140 seats and room for 355 when full with standees. The coaches have two doors on either side.[64] Upon the opening, Metro Transit immediately announced that a sixth locomotive was being acquired from the Utah Transit Authority's FrontRunner service in the Salt Lake City area and a lease agreement was soon signed.[30] Typical weekday operation requires five trains, each consisting of one locomotive and three or four coaches. A single train is used for weekend service, making three round trips each day. The platforms are only designed for five-car trains, so longer trains would require additional construction.

Metro Transit did begin experimenting in April 2010 with six-car trains for taking riders to and from weekend Twins games at Target Field.[65] These trains overhang the platform at either end and only open one door on each of the end cars. In May, trains serving Twins games grew to eight cars, with some completely overhanging the platforms so some riders would have to board and then walk from one car to another.[66] By June, Metro Transit had decided to purchase the sixth locomotive it had leased from UTA (No. 512) due to high leasing costs and the need to have an extra locomotive for when others are being repaired or inspected. A $10.1 million contingency fund built into the original cost of the service provided $2.85 million for buying the locomotive and repainting it in Northstar livery.[67]

Manufacturer Model Inventory Number Image
MotivePower MP36PH-3C 6 501–505, 512  
Bombardier BiLevel Coach 12 701–712  
BiLevel Cab Cars 6 601–606  

References edit

  1. ^ a b (Press release). Metropolitan Council. August 31, 2009. Archived from the original on November 19, 2009. Retrieved November 30, 2009.
  2. ^ "Transit Ridership Report Fourth Quarter 2023" (PDF). American Public Transportation Association. March 4, 2024. Retrieved March 14, 2024.
  3. ^ "Transit Ridership Report Fourth Quarter 2023" (PDF). American Public Transportation Association. March 4, 2024. Retrieved March 14, 2024.
  4. ^ Hult, Karla (November 15, 2009). "Northstar Commuter Rail service officially begins Monday". kare11 News. Retrieved November 30, 2009.[permanent dead link]
  5. ^ a b . Northstar Commuter Rail. Northstar Corridor Development Authority. 2009. Archived from the original on July 14, 2011. Retrieved February 11, 2010.
  6. ^ "Northstar commuter line hits the (rail) road". Star Tribune. November 16, 2009.
  7. ^ . Archived from the original on February 25, 2014. Retrieved September 16, 2012.
  8. ^ (July 2005), "City Rail briefs", Trains Magazine, p. 29.
  9. ^ "Legislature passes $1 billion public works bill". Pioneer Press. 2006.
  10. ^ a b Paul Levy & Joy Powell (December 10, 2007). "Finally, all aboard Northstar rail". Star Tribune. Retrieved February 11, 2010.
  11. ^ Paul Levy (December 11, 2007). "Northstar set to roll, but how far?". Star Tribune. Retrieved February 11, 2010.
  12. ^ a b Jim Foti (November 27, 2009). . Star Tribune. Archived from the original on December 1, 2009. Retrieved January 5, 2010.
  13. ^ a b . Northstar Commuter Rail. Minnesota Department of Transportation and Northstar Corridor Development Authority. Archived from the original on June 4, 2008. Retrieved February 11, 2010.
  14. ^ . Northstar Commuter Rail. Minnesota Department of Transportation and Northstar Corridor Development Authority. Archived from the original on September 27, 2007. Retrieved February 11, 2010.
  15. ^ "Northstar Link Commuter Bus". CatchTheLink.com. Northstar Corridor Development Authority, Sherburne County, Stearns County. Retrieved February 11, 2010.
  16. ^ "Northstar facts and funding". Metro Transit. Retrieved February 11, 2010.
  17. ^ a b Harlow, Tim (February 28, 2014). "BNSF: Blame the weather, not oil trains, for Northstar's delays". Star Tribune. Retrieved May 6, 2022.
  18. ^ Walsh, Paul (February 25, 2014). "Freight traffic disrupting Northstar". Star Tribune. Retrieved May 6, 2022.
  19. ^ Harlow, Tim (February 26, 2014). "Northstar delays get Capitol hearing". Star Tribune. Retrieved May 6, 2022.
  20. ^ Gilbert, Curtis (February 27, 2014). "BNSF: Cold, not oil trains, delaying Northstar". MPR News.
  21. ^ Sommerhauser, Mark (February 28, 2014). "BNSF official says weather, not oil trains, caused Northstar woes". St. Cloud Times. pp. 1A, 5A. Retrieved May 6, 2022.
  22. ^ Prather, Shannon (November 16, 2014). "Northstar struggles with delays, dip in ridership". Star Tribune. Retrieved May 6, 2022.
  23. ^ Harlow, Tim (December 19, 2014). "Northstar riders get money-back guarantee". Star Tribune. Retrieved May 6, 2022.
  24. ^ Harlow, Tim (January 29, 2015). "Money-back guarantee on Northstar extended through February". Star Tribune. Retrieved May 6, 2022.
  25. ^ Tim Harlow. "With reliability issues behind, Northstar sees positive momentum with slight rise in ridership" (PDF). Star Tribune. Retrieved June 18, 2017.
  26. ^ Metropolitan Council. "2016 Transit Ridership in Twin Cities Region" (PDF). Retrieved June 18, 2017.
  27. ^ Joni Astrup. "Daily commuter ridership up on Northstar; overall ridership drops slightly" (PDF). Retrieved June 18, 2017.
  28. ^ Drew Kerr. "Rail lines set records as Metro Transit ridership tops 81.9 million in 2017" (web). Retrieved July 20, 2018.
  29. ^ Kerr, Drew (February 11, 2019). "Light rail, Bus Rapid Transit lines set annual ridership records". Metro Transit (Press release).
  30. ^ a b Bob von Sternberg (December 10, 2009). . Star Tribune. Archived from the original on December 13, 2009. Retrieved January 19, 2009.
  31. ^ Article does not clearly state whether these were December 2009 or January 2010 figures. Cory Kampschroer (February 6, 2010). "Metro Transit Ridership Is Dropping". WCCO.com. Retrieved February 11, 2010.
  32. ^ "Northstar commuter ridership falling below forecast". Trains Magazine. December 6, 2010. Retrieved December 7, 2010.
  33. ^ "Rider's Almanac Blog". www.metrotransit.org.
  34. ^ Boyle, Jim (November 26, 2019). "The little train that couldn't". Elk River Star News.
  35. ^ Dan West. "Anoka County Minnesota Railroad Stations". Minnesota Railroad Stations Past and Present. Retrieved February 11, 2010.
  36. ^ Dan West. "Sherburne County Minnesota Railroad Stations". Minnesota Railroad Stations Past and Present. Retrieved February 11, 2010.
  37. ^ (PDF). Minnesota Department of Transportation. July 2009. Archived from the original (PDF) on May 19, 2011. Retrieved January 6, 2010.
  38. ^ (PDF). Minnesota Department of Transportation. September 15, 2009. Archived from the original (PDF) on September 2, 2012. Retrieved January 6, 2010.
  39. ^ Elana Schor (February 5, 2010). "TIGER Grant Winners to be Announced By February 17". DC.StreetsBlog.org. Retrieved February 15, 2010.
  40. ^ Peter Bodley (December 24, 2003). "Scaled-back Northstar is likely". Coon Rapids Herald. ABC Newspapers. Retrieved February 11, 2009. [dead link]
  41. ^ "Groundbreaking on Ramsey Northstar Station Starts Construction". Northstar Corridor.
  42. ^ Sakry, Tammy (October 27, 2012). "Ramsey station will be ready for Northstar service Nov. 14". ABC Newspapers.com. ECM Publishers. Retrieved February 4, 2013.
  43. ^ Hudson, Bill (November 13, 2012). "New Northstar Rail Station Opens In Ramsey". CBS Minnesota. Retrieved February 4, 2013.
  44. ^ "Minnesota Comprehensive Statewide Freight and Passenger Rail Plan: Freight and Passenger Rail System Planning (Draft Technical Memorandum 4)" (PDF). Cambridge Systematics. August 2009. Retrieved January 6, 2010.
  45. ^ "Rail Line Work, Big Lake to Becker, Is Underway". Citizen Tribune. May 2015. Retrieved February 5, 2016.
  46. ^ Cambridge Systematics, Inc., Kimley Horn and Associates, Inc., and TKDA, Inc. (February 2009). "Minnesota Comprehensive Statewide Freight and Passenger Rail Plan (Final Report)" (PDF). Minnesota Department of Transportation. Retrieved February 11, 2010.{{cite web}}: CS1 maint: multiple names: authors list (link)
  47. ^ Minneapolis-Duluth/Superior: Restoration of Intercity Passenger Rail Service Comprehensive Feasibility Study and Business Plan (ch. 1–2, ch 3, ch 4–10, appendices). Transportation Economics & Management Systems, Inc., December 2007. Accessed December 18, 2009.
  48. ^ "Northstar commuter train expansion put on hold". Trains Magazine. November 8, 2010. Retrieved November 8, 2010.
  49. ^ Bakst, Brian (March 28, 2016). "Two GOP lawmakers want Northstar to go to St. Cloud". MPR News. Retrieved July 21, 2022.
  50. ^ Hertel, Nora G. (March 29, 2018). "Pitch for St. Cloud Northstar rail route gets one green light". St. Cloud Times. Retrieved July 21, 2022.
  51. ^ Dickrell, Stephanie (March 17, 2017). "Advocates welcome Northstar demonstration plan". St. Cloud Times. Retrieved July 21, 2022.
  52. ^ "HF 856 Status in the House for the 91st Legislature (2019 - 2020)". www.revisor.mn.gov. Minnesota House of Representatives. February 7, 2019. Retrieved July 21, 2022.
  53. ^ "Northstar Commuter Rail Extension Feasibility Assessment" (PDF). Minnesota Department of Transportation and Quandel Consultants. July 31, 2020. Retrieved July 21, 2022.
  54. ^ Moore, Janet (October 15, 2020). "Transit officials consider future of Minnesota's Northstar rail line". Star Tribune. Retrieved May 3, 2022.
  55. ^ Moore, Janet (March 26, 2021). "Talks surface again about shuttering Minnesota's Northstar rail line". Star Tribune. Retrieved May 4, 2022.
  56. ^ Pan, Henry (April 29, 2022). "Divided Legislature hits usual roadblocks on transportation deal". Minnesota Reformer. Retrieved May 4, 2022.
  57. ^ Moore, Janet (October 31, 2021). "Northstar rail runs into trouble in Anoka County". Star Tribune. Retrieved May 4, 2022.
  58. ^ Harlow, Tim (April 6, 2022). "Funding flap at center of decision to suspend Northstar service for Twins games". Star Tribune. Retrieved May 4, 2022.
  59. ^ Bodley, Peter (July 11, 2022). "County makes payments for commuter rail service". hometownsource.com. Retrieved July 22, 2022.
  60. ^ Harlow, Tim (July 18, 2022). "Anoka County, Metro Transit locked in Northstar funding dispute". Star Tribune. Retrieved July 22, 2022.
  61. ^ Hiniker, Cole; Elmer, Steve (April 25, 2022). "Northstar Rail Corridor Post Pandemic Study". Metropolitan Council. Retrieved May 4, 2022.
  62. ^ "News & Events". www.metrotransit.org. Retrieved October 2, 2023.
  63. ^ Harlow, Tim (September 12, 2023). "Metro Transit to add Northstar service on weekdays and for Vikings games". Star Tribune. Retrieved November 2, 2023.
  64. ^ Eddie Thomas; Jim Foti; Paul Levy. . Star Tribune. Archived from the original on November 20, 2009. Retrieved February 11, 2010.
  65. ^ "Northstar rail line to alter its schedule". April 17, 2010. Retrieved April 20, 2010. [dead link]
  66. ^ wleif (May 22, 2010). "Northstar Twins". Flickr.com.
  67. ^ Peter Bodley (June 2, 2010). . Coon Rapids Herald. ABC Newspapers. Archived from the original on October 3, 2011. Retrieved April 27, 2011.

External links edit

KML is from Wikidata
  • Northstar Commuter Rail
  • Northstar route map
  • Northstar Link

northstar, line, this, article, about, metro, transit, commuter, rail, service, other, trains, called, north, star, north, star, disambiguation, rail, reporting, mark, mnrx, commuter, rail, route, state, minnesota, northstar, runs, miles, from, lake, downtown,. This article is about the Metro Transit commuter rail service For other trains called North Star see North Star disambiguation Rail The Northstar Line reporting mark MNRX is a commuter rail route in the US state of Minnesota Northstar runs 40 miles 64 km from Big Lake to downtown Minneapolis at Target Field using existing track and right of way owned by the BNSF Railway Passenger service began on November 16 2009 4 1 The rail line serves part of the Northstar Corridor between Minneapolis and St Cloud Planning for the line began in 1997 when the Northstar Corridor Development Authority NCDA was formed 5 The corridor is also served by Interstate 94 and U S Highway 10 In 2023 the system had a ridership of 142 200 or about 500 per weekday as of the fourth quarter of 2023 Northstar LineOverviewService typeCommuter railSystemMetro Transit Metropolitan Council LocaleMinnesota Minneapolis Hennepin County Anoka County and Sherburne County First serviceNovember 16 2009 2009 11 16 1 Current operator s BNSF Railway locomotives Metropolitan Council train staff Daily ridership500 weekdays Q4 2023 2 Annual ridership142 200 2023 3 Websitemetrotransit org northstarRouteTerminiTarget FieldBig LakeStops5Distance travelled40 miles 64 km Service frequency4 weekday round tripsTechnicalRolling stockMotivePower MP36PH 3C Bombardier BiLevel CoachTrack gauge4 ft 8 1 2 in 1 435 mm standard gaugeOperating speed79 mph 127 km h maximum47 mph 76 km h averageTrack owner s BNSF RailwayRoute mapLegend Metro Bus Transit Center SCSU Miller Center Mississippi River Amtrak Empire Builder St Cloud planned East Saint Cloud Becker Big Lake Operations and Maintenance Facility US 10 Elk River US 169 Elk River Ramsey Rum River Anoka US 10 MN 47 Coon Rapids Riverdale Coon Creek Northern Lights Express planned Coon Rapids Foley Boulevard planned MN 610 Rice Creek Fridley I 694 Northtown Rail Yard Amtrak Empire Builder BNSF Bridgeover Mississippi River Minneapolis Target Field Blue Line and Green Line Southwest LRT under construction Northstar Northstar Link Light Rail all stationsaccessible This diagram viewtalkedit Contents 1 Background 2 Construction and operation 3 Ridership 4 Route 5 Upgrades and potential extension to St Cloud 6 Pandemic and future 7 Rolling stock 8 References 9 External linksBackground editThe route was initially designed to run the full distance between Minneapolis and Rice Minnesota northwest of St Cloud The project was counting on federal funding for half of its construction costs The estimated ridership for the full route was not high enough to qualify for that much needed federal funding 6 When the line was first proposed then Governor Jesse Ventura was an early advocate and convinced some people to come around to his point of view 7 Ventura s successor Governor Tim Pawlenty did not initially support it He changed his mind after MnDOT determined that a scaled back version of the line would qualify for federal funding The 2004 Minnesota Legislative session did not pass a bonding bill which meant a lack of funds for initial project work Some counties in the area and the Metropolitan Council came up with matching funds to allow funding from the United States federal government to continue During the 2005 state legislative session a bonding bill including 37 5 million of funding for the proposed project was passed The bill was signed on April 11 2005 by Governor Tim Pawlenty at the site of the Riverdale station in Coon Rapids 8 The 2006 state legislature along with city county and federal governments provided funding to complete the corridor to Big Lake 9 Construction began on the maintenance facility near Big Lake station and on the Blue Line light rail extension in September 2007 before full funding for the line had been secured 5 On December 11 2007 U S Deputy Secretary of Transportation Thomas Barrett met with Governor Pawlenty in Anoka County and officially signed a Full Funding Grant Agreement of 156 8 million nearly half of the funding for the 317 million 40 mile 64 km line from Minneapolis to Big Lake The money enabled the release of an additional 97 5 million in state bonding money set aside for the project 10 11 The federal government paid 156 8 million the state paid 98 6 million and the Anoka County Regional Rail Authority pledged 34 8 million The remaining partners were Sherburne County Regional Rail Authority 8 2 million Hennepin County Regional Rail Authority 8 million the Metropolitan Council 5 9 million and the Minnesota Twins 2 6 million for the station improvements under the new Target Field where the Minneapolis station was constructed 10 Of the 317 million total 107 5 million went to paying BNSF for a perpetual easement for track rights and facilities along the line and to pay the BNSF employees that operate the trains The operating budget for the first full year of service 2010 was 16 8 million 12 Construction and operation edit nbsp The platforms at Target Field under construction in 2009 The Minnesota Department of Transportation Mn DOT and the Northstar Corridor Development Authority NCDA studied options for development of the corridor to handle the increasing commuter load and felt that a commuter rail line was the best option It was expected to cost about US 265 million in 2008 dollars estimated to be less than one third the cost of upgrading existing highways 13 14 though the cost would later climb to 317 million 12 Because almost all of the route being used already existed the investment mostly went into building new stations upgrading track enhancing the safety of crossings and updating signals A significant portion of the funds were to extend the METRO Blue Line to the Target Field station on the west side of Interstate 394 and 5th Street This terminal station is integrated into the Minnesota Twins new ballpark Target Field which opened in March 2010 During normal operation the line had six trains running in the morning and evening rush hour periods and limited service on weekends and holidays Bus feeder lines including the Northstar Link from St Cloud to Big Lake station 15 bring residents along the corridor to the nearest train station Once in downtown commuters can walk upstairs to the METRO Blue and Green Lines take a bus into other areas of the city or go into one of the nearby buildings integrated into the Minneapolis skyway system In the first year 2010 Metro Ridership fell well short of its goal of 3 400 weekday trips from this station Metro Transit has a goal for of 5 900 by 2030 16 intending to save those commuters 900 000 hours over the course of a year when compared to taking a dedicated bus line 13 From its opening until January 2014 Northstar trains arrived on time for 96 percent of trips making it one of the most reliable services from Metro Transit Starting in the winter of 2014 on time performance suffered due to heavy freight traffic and severe cold weather By the end of February 2014 on time reliability was down to 74 percent 17 Freight traffic from the North Dakota oil boom contributed to congestion and delays for trains The delays were also felt by the Amtrak Empire Builder route which travels through the same corridor 18 Delays were severe enough for legislators to hold a public hearing at the State Capitol with BNSF in attendance 19 During the hearing BNSF stated that delays were due to cold weather and not freight traffic The cold weather caused mechanical issues and limited how long crews could work outside 20 17 21 BNSF spent money on repairs and maintenance along the corridor over 2014 which included replacing ties switches and adding switch covers which would protect switches from ice and snow 22 While January through October 2014 saw trains arriving on time just 65 7 percent of the time during the month of December trains were back to 95 percent on time performance Metro Transit offered refunds to customers whose trains were more than 10 minutes late in January and February 2015 in an effort to draw back ridership During January 2015 trips were on time 98 of the time 23 24 Ridership editAnnual Passenger Ridership Year Ridership Change 2009 2010 710 426 2011 703 427 1 3 2012 700 276 0 4 2013 787 239 12 3 2014 721 214 8 4 2015 722 637 0 2 2016 711 168 1 6 2017 793 796 11 6 2018 787 327 0 8 2019 767 500 2 5 2020 152 600 80 1 Sources 25 26 27 28 29 Ridership in the first 15 days averaged 2 207 per day 33 112 total short of a goal of 2 460 30 By the end of January 2010 goals were exceeded by 3 31 Ridership for 2010 was originally projected to be 897 000 though ultimately ended up at 715 000 32 Because ridership varies significantly through the course of a year Metro Transit s month to month goals are different from the yearly average goal Daily ridership was 2 814 in 2019 the same level it was in 2017 33 It was projected to be 5 590 in 2025 and 6 200 in 2030 according to a 2009 study by Kimley Horn and Associates Inc 34 Route edit nbsp A Northstar train crosses the Mississippi River at Nicollet Island At Target Field Station the parallel rail lines of the old Great Northern Railway north side track now BNSF and the Minneapolis and St Louis Railway south side track now Union Pacific travel eastbound past the Federal Reserve Bank the site of the old Minneapolis Great Northern Depot across the Mississippi River on the Minneapolis BNSF Rail Bridge and then across Nicollet Island At a wye the route turns northwest in the GN East side line which then joins the parallel ex Northern Pacific main line The ex Great Northern and ex Northern Pacific lines are merged into BNSF and this is now the BNSF Northern Transcon transcontinental line The route travels north through the Northtown Classification Yards over Interstate 694 and makes its first stop at 61st Avenue in Fridley at the yard limit of Northtown where it enters BNSF s Staples Subdivision The double track line continues past the current Foley Boulevard park and ride bus station which is planned to be a future Northstar station and turns northwest at Coon Creek Junction where the old GN route to Duluth now BNSF s Hinckley Subdivision splits off and heads straight north The current Coon Rapids station is behind the Riverdale shopping center by Round Lake Boulevard and new stations were also built in Anoka Elk River and Big Lake The Great Northern Railway and Northern Pacific Railway had local services from Minneapolis to all of the cities currently served by Northstar up through the early 20th century One Fridley station was about a mile north of the current stop at Mississippi Boulevard There possibly was a stop shared by GN and NP at Coon Creek Junction 35 There were at least three stations built in Anoka over the years and two stations in Elk River and Big Lake with both cities having one stop for each railroad 36 Upgrades and potential extension to St Cloud editThe double track main line between Northtown Yard in Minneapolis and Coon Creek Junction in Coon Rapids is the busiest rail corridor in the Twin Cities metropolitan area In July 2009 before the Northstar Commuter Rail commuter line began operation this segment had hosted 63 trains per day 37 The Minnesota Department of Transportation would like to run more passenger trains through the corridor including Northstar and other proposed passenger rail routes like the proposed Northern Lights Express to Duluth A 113 4 million project to add a third main line and a new station at Foley Boulevard in Coon Rapids is planned A 99 million grant request was filed under the American Recovery and Reinvestment Act of 2009 to cover most of the cost 38 TIGER grants are expected to be awarded on February 17 2010 39 Foley station was among cuts to the Northstar plan in 2003 while federal funding was being sought prior to construction Despite the fact the 3 200 stall parking facility already existed sans boarding platforms riders would not save enough time by switching from existing bus service to rail to make the stop fit within the guidelines enforced by Federal Transit Administration s cost effectiveness index 40 A station in Ramsey at Ramsey Town Center was also cut prior to construction Ramsey station construction has since been fully funded and construction began on March 27 2012 41 it was completed on November 8 42 and opened on November 14 2012 43 A major obstacle to extending Northstar to St Cloud had been the lack of double tracked rail for nine miles 14 km from Big Lake to Becker 44 However due to increased freight traffic on the line BNSF double tracked the corridor in 2015 45 The Minnesota Department of Transportation says that extending Northstar would result in 1 to 1 5 million annual trips on the line citation needed In its 2010 State Rail Plan the agency stated an expectation of farebox recovery ratios between 70 and 111 on the full line 46 However the same plan estimated farebox recovery ratios of just 21 to 34 on the proposed Northern Lights Express which in a 2007 business plan had calculated ratios of over 100 47 On November 8 2010 it was announced that the planned extension of the line to St Cloud had been indefinitely delayed Projected ridership is not sufficient to qualify for federal funding 48 Proposals to extend the line have continued to surface in the years following opening of the line In 2016 and 2018 Minnesota state legislators proposed extending the line to St Cloud using existing equipment by running two daily round trips to St Cloud and reducing other trips to Minneapolis from five to four 49 50 Governor Mark Dayton proposed a six month demonstration service to St Cloud in 2017 but the demonstration would have only included 1 round trip a day and not have trains stopping at stations between Minneapolis and St Cloud 51 Extending the line to Camp Ripley was proposed in 2019 by House of Representative legislators 52 Another extension feasibility study sponsored by MnDOT was released in July 2020 53 Possible extension of the line has been revived in the 2022 Transportation Omnibus bill passed by the MN legislature The bill includes funding for a study that would consider different possible rail service to the St Cloud and Fargo Moorhead regions This could include recommendations to extend Northstar Pandemic and future editAfter the onset of the COVID 19 pandemic Metro Transit eliminated weekend service and special event service Weekly trips dropped from 72 to 20 Ridership on the line was down 95 in August 2020 compared to before the pandemic 54 Lakeville s state representative Jon Koznick proposed shuttering Northstar operations in 2021 but that would require the repayment of 85 million in federal funds used to construct the project 55 The Republican controlled Minnesota Senate proposed closing Northstar in the 2022 legislative session and included asking the federal government to not require the repayment of federal funds 56 Metro Transit and MnDOT in combination with three counties that Northstar operates in Anoka County Hennepin County and Sherburne County agreed to a master funding agreement in 2018 that covered operating expenses through 2022 Anoka County ceased paying their financial contribution by the second half of 2020 The county requested a reduced payment due to reduced ridership 57 By 2022 the county owed Metro Transit 7 9 million for operating expenses stretching from 2020 to 2022 Special event service to Minnesota Twins games was not offered in 2022 due to the funding issue Northstar served 81 561 rides to 64 Minnesota Twins games in 2019 58 Anoka County ended up paying Metro Transit for 2020 and 2021 operating expenses after the 2021 bill was reduced from nearly 6 million to 1 95 million due to funds from BNSF and federal COVID relief bills For the 2022 operating budget Anoka County considered a 1 95 million payment to be their full and final payment for 2022 despite Metro Transit requesting 4 6 million Anoka County argued that they are paying the same amount from their 2021 bill for 2022 because the same amount of service is being offered while Metro Transit states it cannot increase service without covering the full operating costs of the line 59 60 The Metropolitan Council is conducting a study on the future of Northstar post pandemic but the study will not produce any decisions or recommendations The study is tentatively expected to be completed the winter of 2022 2023 61 Construction of the Northern Lights Express Intercity passenger train from Downtown Minneapolis to Duluth may add a transfer station at Coon Rapids Foley Boulevard to allow for transfers between Northstar and NLX trains to other Amtrak intercity routes On October 2 2023 service was increased to 4 round trips every weekday including 1 reverse peak trip 62 Special event service returned serving Twins and Vikings games There is still no weekend service An increase in the sales tax in the seven county metropolitan area approved in the 2023 Minnesota legislative session will help cover the increased expenses 63 Rolling stock editSee also Metro Transit rolling stock The line opened in 2009 with five MPI MP36PH 3C locomotives and seventeen Bombardier BiLevel Coach cars Each passenger car has about 140 seats and room for 355 when full with standees The coaches have two doors on either side 64 Upon the opening Metro Transit immediately announced that a sixth locomotive was being acquired from the Utah Transit Authority s FrontRunner service in the Salt Lake City area and a lease agreement was soon signed 30 Typical weekday operation requires five trains each consisting of one locomotive and three or four coaches A single train is used for weekend service making three round trips each day The platforms are only designed for five car trains so longer trains would require additional construction Metro Transit did begin experimenting in April 2010 with six car trains for taking riders to and from weekend Twins games at Target Field 65 These trains overhang the platform at either end and only open one door on each of the end cars In May trains serving Twins games grew to eight cars with some completely overhanging the platforms so some riders would have to board and then walk from one car to another 66 By June Metro Transit had decided to purchase the sixth locomotive it had leased from UTA No 512 due to high leasing costs and the need to have an extra locomotive for when others are being repaired or inspected A 10 1 million contingency fund built into the original cost of the service provided 2 85 million for buying the locomotive and repainting it in Northstar livery 67 Manufacturer Model Inventory Number Image MotivePower MP36PH 3C 6 501 505 512 nbsp Bombardier BiLevel Coach 12 701 712 nbsp BiLevel Cab Cars 6 601 606 nbsp References edit a b Minnesota s new star to begin service Nov 16 Press release Metropolitan Council August 31 2009 Archived from the original on November 19 2009 Retrieved November 30 2009 Transit Ridership Report Fourth Quarter 2023 PDF American Public Transportation Association March 4 2024 Retrieved March 14 2024 Transit Ridership Report Fourth Quarter 2023 PDF American Public Transportation Association March 4 2024 Retrieved March 14 2024 Hult Karla November 15 2009 Northstar Commuter Rail service officially begins Monday kare11 News Retrieved November 30 2009 permanent dead link a b History of Northstar Northstar Commuter Rail Northstar Corridor Development Authority 2009 Archived from the original on July 14 2011 Retrieved February 11 2010 Northstar commuter line hits the rail road Star Tribune November 16 2009 Northstar remains high on list of epic transportation battles at Capitol Hometown Source Archived from the original on February 25 2014 Retrieved September 16 2012 July 2005 City Rail briefs Trains Magazine p 29 Legislature passes 1 billion public works bill Pioneer Press 2006 a b Paul Levy amp Joy Powell December 10 2007 Finally all aboard Northstar rail Star Tribune Retrieved February 11 2010 Paul Levy December 11 2007 Northstar set to roll but how far Star Tribune Retrieved February 11 2010 a b Jim Foti November 27 2009 Now riders and nonriders can add up value of Northstar Star Tribune Archived from the original on December 1 2009 Retrieved January 5 2010 a b Why Northstar Commuter Rail Northstar Commuter Rail Minnesota Department of Transportation and Northstar Corridor Development Authority Archived from the original on June 4 2008 Retrieved February 11 2010 Facts and Figures Northstar Commuter Rail Minnesota Department of Transportation and Northstar Corridor Development Authority Archived from the original on September 27 2007 Retrieved February 11 2010 Northstar Link Commuter Bus CatchTheLink com Northstar Corridor Development Authority Sherburne County Stearns County Retrieved February 11 2010 Northstar facts and funding Metro Transit Retrieved February 11 2010 a b Harlow Tim February 28 2014 BNSF Blame the weather not oil trains for Northstar s delays Star Tribune Retrieved May 6 2022 Walsh Paul February 25 2014 Freight traffic disrupting Northstar Star Tribune Retrieved May 6 2022 Harlow Tim February 26 2014 Northstar delays get Capitol hearing Star Tribune Retrieved May 6 2022 Gilbert Curtis February 27 2014 BNSF Cold not oil trains delaying Northstar MPR News Sommerhauser Mark February 28 2014 BNSF official says weather not oil trains caused Northstar woes St Cloud Times pp 1A 5A Retrieved May 6 2022 Prather Shannon November 16 2014 Northstar struggles with delays dip in ridership Star Tribune Retrieved May 6 2022 Harlow Tim December 19 2014 Northstar riders get money back guarantee Star Tribune Retrieved May 6 2022 Harlow Tim January 29 2015 Money back guarantee on Northstar extended through February Star Tribune Retrieved May 6 2022 Tim Harlow With reliability issues behind Northstar sees positive momentum with slight rise in ridership PDF Star Tribune Retrieved June 18 2017 Metropolitan Council 2016 Transit Ridership in Twin Cities Region PDF Retrieved June 18 2017 Joni Astrup Daily commuter ridership up on Northstar overall ridership drops slightly PDF Retrieved June 18 2017 Drew Kerr Rail lines set records as Metro Transit ridership tops 81 9 million in 2017 web Retrieved July 20 2018 Kerr Drew February 11 2019 Light rail Bus Rapid Transit lines set annual ridership records Metro Transit Press release a b Bob von Sternberg December 10 2009 Northstar ridership below Metro Transit goals Star Tribune Archived from the original on December 13 2009 Retrieved January 19 2009 Article does not clearly state whether these were December 2009 or January 2010 figures Cory Kampschroer February 6 2010 Metro Transit Ridership Is Dropping WCCO com Retrieved February 11 2010 Northstar commuter ridership falling below forecast Trains Magazine December 6 2010 Retrieved December 7 2010 Rider s Almanac Blog www metrotransit org Boyle Jim November 26 2019 The little train that couldn t Elk River Star News Dan West Anoka County Minnesota Railroad Stations Minnesota Railroad Stations Past and Present Retrieved February 11 2010 Dan West Sherburne County Minnesota Railroad Stations Minnesota Railroad Stations Past and Present Retrieved February 11 2010 Minneapolis St Paul Metro Area 2009 Railroad Volume and Speed Map PDF Minnesota Department of Transportation July 2009 Archived from the original PDF on May 19 2011 Retrieved January 6 2010 BNSF Easement Rights and Passenger Rail Capacity Improvements PDF Minnesota Department of Transportation September 15 2009 Archived from the original PDF on September 2 2012 Retrieved January 6 2010 Elana Schor February 5 2010 TIGER Grant Winners to be Announced By February 17 DC StreetsBlog org Retrieved February 15 2010 Peter Bodley December 24 2003 Scaled back Northstar is likely Coon Rapids Herald ABC Newspapers Retrieved February 11 2009 dead link Groundbreaking on Ramsey Northstar Station Starts Construction Northstar Corridor Sakry Tammy October 27 2012 Ramsey station will be ready for Northstar service Nov 14 ABC Newspapers com ECM Publishers Retrieved February 4 2013 Hudson Bill November 13 2012 New Northstar Rail Station Opens In Ramsey CBS Minnesota Retrieved February 4 2013 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan Freight and Passenger Rail System Planning Draft Technical Memorandum 4 PDF Cambridge Systematics August 2009 Retrieved January 6 2010 Rail Line Work Big Lake to Becker Is Underway Citizen Tribune May 2015 Retrieved February 5 2016 Cambridge Systematics Inc Kimley Horn and Associates Inc and TKDA Inc February 2009 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan Final Report PDF Minnesota Department of Transportation Retrieved February 11 2010 a href Template Cite web html title Template Cite web cite web a CS1 maint multiple names authors list link Minneapolis Duluth Superior Restoration of Intercity Passenger Rail Service Comprehensive Feasibility Study and Business Plan ch 1 2 ch 3 ch 4 10 appendices Transportation Economics amp Management Systems Inc December 2007 Accessed December 18 2009 Northstar commuter train expansion put on hold Trains Magazine November 8 2010 Retrieved November 8 2010 Bakst Brian March 28 2016 Two GOP lawmakers want Northstar to go to St Cloud MPR News Retrieved July 21 2022 Hertel Nora G March 29 2018 Pitch for St Cloud Northstar rail route gets one green light St Cloud Times Retrieved July 21 2022 Dickrell Stephanie March 17 2017 Advocates welcome Northstar demonstration plan St Cloud Times Retrieved July 21 2022 HF 856 Status in the House for the 91st Legislature 2019 2020 www revisor mn gov Minnesota House of Representatives February 7 2019 Retrieved July 21 2022 Northstar Commuter Rail Extension Feasibility Assessment PDF Minnesota Department of Transportation and Quandel Consultants July 31 2020 Retrieved July 21 2022 Moore Janet October 15 2020 Transit officials consider future of Minnesota s Northstar rail line Star Tribune Retrieved May 3 2022 Moore Janet March 26 2021 Talks surface again about shuttering Minnesota s Northstar rail line Star Tribune Retrieved May 4 2022 Pan Henry April 29 2022 Divided Legislature hits usual roadblocks on transportation deal Minnesota Reformer Retrieved May 4 2022 Moore Janet October 31 2021 Northstar rail runs into trouble in Anoka County Star Tribune Retrieved May 4 2022 Harlow Tim April 6 2022 Funding flap at center of decision to suspend Northstar service for Twins games Star Tribune Retrieved May 4 2022 Bodley Peter July 11 2022 County makes payments for commuter rail service hometownsource com Retrieved July 22 2022 Harlow Tim July 18 2022 Anoka County Metro Transit locked in Northstar funding dispute Star Tribune Retrieved July 22 2022 Hiniker Cole Elmer Steve April 25 2022 Northstar Rail Corridor Post Pandemic Study Metropolitan Council Retrieved May 4 2022 News amp Events www metrotransit org Retrieved October 2 2023 Harlow Tim September 12 2023 Metro Transit to add Northstar service on weekdays and for Vikings games Star Tribune Retrieved November 2 2023 Eddie Thomas Jim Foti Paul Levy Riding the Northstar Rail Star Tribune Archived from the original on November 20 2009 Retrieved February 11 2010 Northstar rail line to alter its schedule April 17 2010 Retrieved April 20 2010 dead link wleif May 22 2010 Northstar Twins Flickr com Peter Bodley June 2 2010 Northstar Commuter Rail adds locomotive Coon Rapids Herald ABC Newspapers Archived from the original on October 3 2011 Retrieved April 27 2011 External links editKML file edit help Template Attached KML Northstar LineKML is from Wikidata nbsp Wikimedia Commons has media related to Northstar Commuter Rail Northstar Commuter Rail Northstar route map Northstar Link Retrieved from https en wikipedia org w index php title Northstar Line amp oldid 1223949546, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.