fbpx
Wikipedia

New Zealand Railways Department

The New Zealand Railways Department, NZR or NZGR (New Zealand Government Railways) and often known as the "Railways", was a government department charged with owning and maintaining New Zealand's railway infrastructure and operating the railway system.[1] The Department was created in 1880 and was corporatised on 1 April 1982 into the New Zealand Railways Corporation.[2] Originally, railway construction and operation took place under the auspices of the former provincial governments and some private railways, before all of the provincial operations came under the central Public Works Department. The role of operating the rail network was subsequently separated from that of the network's construction. From 1895 to 1993 there was a responsible Minister, the Minister of Railways. He was often also the Minister of Public Works.

New Zealand Government Railways
Overview
HeadquartersWellington
Reporting markNZGR
LocaleNew Zealand
Dates of operation1880–1982
PredecessorPublic Works Department (rail operations, acquired 1880)
Port Chalmers Railway Company (acquired 1880)
Waimea Plains Railway (acquired 1886)
Thames Valley and Rotorua Railway Company (acquired 1886)
New Zealand Midland Railway Company (acquired 1891)
Wellington and Manawatu Railway Company (acquired 1908)
SuccessorNew Zealand Railways Corporation
Technical
Track gauge1,067 mm (3 ft 6 in)
Length1,828 km (1,136 mi) (1880)
5,696 km (3,539 mi) (1952, peak)
4,799 km (2,982 mi) (1981)

Apart from four brief experiments with independent boards, NZR remained under direct ministerial control for most of its history.[3]

History edit

 
Railway train and carriages moving along the side of the Wellington Harbour toward the Hutt Valley, c.1875

Originally, New Zealand's railways were constructed by provincial governments and private firms. The largest provincial operation was the Canterbury Provincial Railways, which opened the first public railway at Ferrymead on 1 December 1863. During The Vogel Era of the late 1860s to the 1870s, railway construction by central government expanded greatly, from just 80 kilometres (50 miles) in 1869 to 1,900 kilometres (1,200 miles) in 1880.

Following the abolition of the provinces in 1877, the Public Works Department took over the various provincial railways. Since the Public Works Department was charged with constructing new railway lines (among other public works) the day to day railway operations were transferred into a new government department on the recommendation of a parliamentary select committee.[4] At the time 1,828 kilometres (1,136 miles) of railway lines were open for traffic, 546 km (339 mi) in the North Island and 1,283 km (797 mi) in the South Island, mainly consisting of the 630 km (390 mi) Main South Line from the port of Lyttelton to Bluff.[5]

Formation and early years edit

 
New Zealand Railways Department Head Office, Wellington, photographed circa 1905–1908 by J N Taylor.

The Railways Department was formed in 1880 during the premiership of Sir John Hall. That year, the private Port Chalmers Railway Company Limited was acquired by the department and new workshops at Addington opened. Ironically, the first few years of NZR were marked by the Long Depression, which led to great financial constraint on the department.[6] As a result, the central government passed legislation to allow for the construction of more private railways. A Royal Commission, ordered by Hall, had removed plans for a railway line on the west coast of the North Island from Foxton to Wellington. Instead, in August 1881 the Railways Construction and Land Act was passed, allowing joint-stock companies to build and run private railways, as long as they were built to the government's standard rail gauge of 1,067 mm (3 ft 6 in) and connected with the government railway lines. The Act had the effect of authorising the Wellington and Manawatu Railway Company to build the Wellington-Manawatu Line.[7]

In 1877 the first American locomotives were purchased; the NZR K class (1877) from Rogers, followed by the NZR T class of 1879 from Baldwin.

The most important construction project for NZR at this time was the central section of the North Island Main Trunk. Starting from Te Awamutu on 15 April 1885, the section—including the famous Raurimu Spiral—was not completed for another 23 years.[8]

The economy gradually improved and in 1895 the Liberal Government of Premier Richard Seddon appointed Alfred Cadman as the first Minister of Railways. The Minister appointed a General Manager for the railways, keeping the operation under tight political control.[9] Apart from four periods of government-appointed commissions (1889–1894, 1924–1928, 1931–1936 and 1953–1957), this system remained in place until the department was corporatised in 1982.[9] In 1895, patronage had reached 3.9M passengers per annum and 2.048M tonnes.[10]

NZR produced its first New Zealand-built steam locomotive in 1889; the W class built in the Addington Railway Workshops.

Along with opening new lines, NZR began acquiring a number of the private railways which had built railway lines around the country. It acquired the Waimea Plains Railway Company in 1886. At the same time, a protracted legal battle began with the New Zealand Midland Railway Company, which was only resolved in 1898. The partially completed Midland line was not handed over to NZR until 1900.[11] By that time, 3,200 km (2,000 mi) of railway lines were open for traffic.[5] The acquisition in 1908 of the Wellington and Manawatu Railway Company and its railway line marked the completion of the North Island Main Trunk from Wellington to Auckland. A new locomotive class, the X class, was introduced in 1909 for traffic on the line. The X class was the most powerful locomotive at the time. Gold rushes led to the construction of the Thames Branch, opening in 1898.

In 1906 the Dunedin railway station was completed, architect George Troup. A. L. Beattie became Chief Mechanical Officer in April 1900. Beattie designed the famous A class, the Q class (the first "Pacific" type locomotive in the world), and many other locomotive classes.[12]

NZR's first bus operation began on 1 October 1907, between Culverden on the Waiau Branch and Waiau Ferry in Canterbury. By the 1920s NZR was noticing a considerable downturn in rail passenger traffic on many lines due to increasing ownership of private cars, and from 1923 it began to co-ordinate rail passenger services with private bus services. The New Zealand Railways Road Services branch was formed to operate bus services.

In 1911 tenders for bookstalls were being advertised for 33 main stations - Auckland, Frankton Junction, Rotorua. Paeroa, Taumarunui, Ohakune, Taihape, Marton, Feilding, Palmerston North, Levin, Wellington Thorndon and Lambton, Masterton, Woodville, Dannevirke. Waipukurau. Hastings, Napier, New Plymouth, Stratford, Hāwera, Aramoho, Whanganui, Nelson, Christchurch, Ashburton, Timaru, Oamaru, Dunedin, Milton, Gore, and Invercargill.[13]

By 1912, patronage had reached 13.4M passengers per annum (a 242% increase since 1895) and 5.9M tonnes of freight (a 188% increase since 1895).[10]

In 1913, damages of £15 were awarded against New Zealand Railways to S. J. Gibbons by the Supreme Court in a precedent-setting case; for damages to a car that hit a train at a level crossing: see Cliff Road railway station.

World War I edit

 
The AB class were introduced in 1915. Over 141 of these locomotives were introduced, from three different builders. Here preserved AB 778 hauls the Kingston Flyer.

The outbreak of World War I in 1914 had a significant impact on the Railways Department. That year the AA class appeared, and the following year the first AB class locomotives were introduced. This class went on to become the most numerous locomotive class in New Zealand history, with several examples surviving into preservation.

The war itself led to a decline in passenger, freight and train miles run but also led to an increase in profitability. In the 1917 Annual Report, a record 5.3% return on investment was made.[14] The war did take its toll on railway services, with dining cars being removed from passenger trains in 1917, replaced by less labour-intensive refreshment rooms at railway stations along the way. As a result, the "scramble for pie and tea at Taihape" became a part of New Zealand folklore.[14]

Non-essential rail services were curtailed as more staff took part in the war effort, and railway workshops were converted for producing military equipment, on top of their existing maintenance and construction work.[14] The war soon affected the supply of coal to the railways. Although hostilities ended in 1918, the coal shortage carried on into 1919 as first miners strikes and then an influenza epidemic cut supplies. As a result, non-essential services remained in effect until the end of 1919. Shortages of spare parts and materials led to severe inflation, and repairs on locomotives being deferred. Similar coal-saving timetable cuts occurred at the end of the next war in 1945 and 1946.[15][16]

Increasing competition and great depression edit

 
Gordon Coates became Minister of Railways in 1923. His tenure was to have a profound effect on the department.
 
NZR's G class Garratt locomotives failed to live up to expectations.
 
The Standard class railcars were introduced from July 1938. This example, RM 31, is seen at Paihiatua, Wairarapa.
 
The J class also appeared in 1939. This locomotive, J 1211, survived for preservation.

In 1920 the 3,000-mile (4,800 km) milestone of open railway lines was reached and 15 million passengers were carried by the department.[17] An acute housing shortage following the war led to the creation of Railways Department's Housing Scheme in 1922. The first of the now-iconic railway houses were prefabricated in a factory in Frankton for NZR staff. This scheme was shut down in 1929 as it was considered improper for a government department to compete with private builders.[17]

The Otira Tunnel was completed in 1923, heralding the completion of the Midland Line in the South Island. The tunnel included the first section of railway electrification in New Zealand and its first electric locomotives, the original EO class. The section was electrified at 1,500 V DC, due to the steep grade in the tunnel, and included its own hydro-electric power station.[18] The second section to be electrified by the department was the Lyttelton Line in Christchurch, completed in 1929, at the same voltage and current. This again saw English Electric supply locomotives, the EC class.

Gordon Coates, on 24 October 1922, as Minister of Public Works, in introducing his Main Highways Act, said, “I say the day will come when it will be found that through the use of motor transport certain railways in New Zealand will be relegated to a secondary place altogether, and probably will be torn up, and we shall have motor traffic taking their place.”[19] Section 12 of that Act allowed for government borrowing and Section 19 required local councils to provide half the cost of road improvements.[20] By setting in place a system of subsidy from ratepayers and taxpayers, whilst requiring railways to make a 3¾% profit[21] (at that rate, interest amounted to over 22% of total earnings),[22] Coates ensured his prophecy came true, as railways gradually became uneconomic.[23]

The following year, Gordon Coates became the Minister of Railways.[24] Coates was an ambitious politician who had an almost "religious zeal" for his portfolio. During the summer of 1923, he spent the entire parliamentary recess inspecting the department's operations. The following year, he put forward a "Programme of Improvements and New Works'".[25]

Coates scheme proposed spending £8 million over 8 years. This was later expanded to £10 million over 10 years. The programme included:

An independent commission, led by Sir Sam Fay and Sir Vincent Raven produced a report known as the "Fay Raven Report"[26] which gave qualified approval to Coates' programme. The reports only significant change was the proposal of a Cook Strait train ferry service between Wellington and Picton, to link the two systems up.[27] Coates went on to become Prime Minister in 1925, an office he held until 1928 when he was defeated at the general election of that year. While the Westfield and Tawa Flat deviations proceeded, the Milson deviation and Rimutaka Tunnel projects remained stalled. The onset of the Great Depression from late 1929 saw these projects scaled back or abandoned. The Westfield deviation was completed in 1930 and the Tawa deviation proceeded at a snail's pace. A number of new lines under construction were casualties, including the Rotorua-Taupo line, approved in July 1928 but abandoned almost a year later due to the depression.[28] An exception was the Stratford–Okahukura Line, finished in 1933.[29]

However, there was criticism that maintenance was being neglected. In the Liberals last year of office in 1912, 140 miles (230 km) of line had been relaid, but that was reduced to 118 in 1913, 104 in 1914, 81 in 1924 and 68 in 1925, during the Reform Government's years.[30]

Once again, growing traffic requirements led to the introduction of a new type of locomotive, the ill-fated G class Garratt locomotives in 1928. Three of the locomotives were introduced for operation on the North Island Main Trunk. They were not well suited to New Zealand conditions: they had overly complex valve gear, were too hot for crews manning them and too powerful for the wagons they were hauling.[31] The failure of this class lead to the introduction of the K class in 1932.

Government Railways Board edit

Tough economic conditions and increasing competition from road transport led to calls for regulation of the land transport sector. In 1931 it was claimed half a million tons of freight had been lost to road transport.[32] That year, the department carried 7.2 million passengers per year, down from 14.2 million in 1923.[28] In 1930 a Royal Commission on Railways recommended that land transport should be "co-ordinated" and the following year Parliament passed the Transport Licensing Act 1931. The Act regulated the carriage of goods and entrenched the monopoly the department had on land transport. It set a minimum distance road transport operators could transport goods at 30 miles (48 km) before they had to be licensed. The Act was repealed in 1982.[33]

Alongside these changes, in 1931 the Railways Department was briefly restructured into the Government Railways Board. Another Act of Parliament, the Government Railways Amendment Act 1931 was passed.[34] The Railways Board was independent of the Government of the day and answered to the Minister of Finance.[3] During this period the Prime Minister George Forbes was also Minister of Railways, and Minister of Finance was former Minister of Railways Gordon Coates. The Railways Board was chaired by Herbert Harry Sterling, the former General Manager,[35] and had 10 members[36] from around the country.[37] The Board stopped building on the Dargaville branch, Gisborne line, Main South Line, Nelson Section, Okaihau to Rangiahua line and Westport-Inangahua line.[38] For that it was criticised by Bob Semple, the new Minister of Public Works, in a speech in 1935[37] and abolished by the First Labour Government in 1936.[3]

In 1933 plans for a new railway station and head office in Wellington were approved, along with the electrification of the Johnsonville Line (then still part of the North Island Main Trunk). The Wellington railway station and Tawa flat deviation were both completed in 1937.[39] As part of attempts by NZR to win back passengers from private motor vehicles, the same year the first 56-foot carriages were introduced.

Garnet Mackley was appointed General Manager in 1933, and worked hard to improve the standard and range of services provided by the Department. This included a number of steps to make passenger trains faster, more efficient and cheaper to run. In the early 20th century, NZR had begun investigating railcar technology to provide passenger services on regional routes and rural branch lines where carriage trains were not economic and "mixed" trains (passenger carriages attached to freight trains) were undesirably slow. However, due to New Zealand's rugged terrain overseas technology could not simply be directly introduced. A number of experimental railcars and railbuses were developed. From 1925 these included the Leyland experimental petrol railcar and a fleet of Model T Ford railbuses, the Sentinel-Cammell steam railcar and from 1926 the Clayton steam railcar and successful Edison battery-electric railcar. 10 years later in 1936 the Leyland diesel railbus was introduced, but the first truly successful railcar class to enter service began operating that year, the Wairarapa railcar specially designed to operate over the Rimutaka Incline. This class followed the building of the Red Terror (an inspection car on a Leyland Cub chassis) for the General Manager in 1933. More classes followed over the years, primarily to operate regional services.

Following the success of the Wairarapa railcar class, in 1938 the Standard class railcars were introduced. A further improvement to passenger transport came in July that year, with electric services on the Johnsonville Line starting with the introduction of the DM/D English Electric Multiple Units.[40]

Three new locomotive classes appeared in 1939: the KA class, KB class and the J class. The KA was a further development of the K class, while the J class was primarily for lighter trackage in the South Island. The numerically smaller KB class were allocated to the Midland line, where they dominated traffic. This led to the coining of the phrase "KB country" to describe the area, made famous by the National Film Unit's documentary of the same title.

World War II and its aftermath edit

 
The JA class were introduced in 1946, and were the last steam locomotives built by NZR.

As with the first world war, the Second World War had a significant impact on railways. The war created major labour shortages across the economy generally, and while considered "essential industry", railways were no exception. A large number of NZR employees signed up to fight in the war. For the first time, the Department employed significant numbers of women to meet the shortages. The war created serious coal shortages as imported coal was no longer available. Despite this, NZR had record revenues in 1940.

Despite the war and associated labour and material shortages, new railway construction continued. In 1942 the Gisborne Line was finally opened, followed by the Main North Line between Picton and Christchurch being completed in 1945. The final section of the then ECMT, the Taneatua Branch, was also completed. Centralised Traffic Control (CTC) was installed from Taumaranui to Auckland at the same time.

In 1946 the last class of steam locomotives built by NZR was introduced, the JA class. Due to coal shortages the K, J, KA, JA classes of steam locomotives were converted from coal to oil burning.

Following the war, NZR contracted the Royal New Zealand Air Force from 1947 to ship inter-island freight across Cook's Strait between Paraparaumu in the North Island and Blenheim in the South Island, as part of the "Rail Air" service. In 1950, Straits Air Freight Express (later known as SAFE Air) took over the contract from the RNZAF. The service was discontinued in the early 1980s.[41]

Modernisation edit

 
A DE class locomotive, the first diesel-electric locomotives introduced by NZR.
 
DF class locomotive, the first mainline diesel-electric locomotives.
 
A DA class locomotive.
 
RM 114 at Kaikoura during the 1960s.
 
The DJ class, introduced from 1968, led to the end of steam traction in the South Island, and the whole of New Zealand, by 1971.

The General Manager of NZR, Frank Aickin, was an advocate for electrifying the entire North Island Main Trunk to alleviate the shortage of coal and the cost of importing diesel fuel; though he also recognised that steam and diesel traction would be required on other lines. NZR's first diesel-electric locomotives, the English Electric built DE class, were introduced in 1951. The locomotives gave good service but were not powerful or numerous enough to seriously displace steam traction.

In 1954, the New Zealand railway network reached its zenith in terms of distance with 5,600 km (3,500 mi), 60% of it on gradients between 1 in 100 and 1 in 200 and 33% steeper than 1 in 100.[42] The EW class electric locomotives introduced for the Wellington electric system. They were the second class of electric locomotive to be used on this section of electrification. They were the most powerful locomotives on the system till the DX class arrived in 1972.

Aicken went as far as negotiating a tentative contract for the construction of electrification and locomotives for it, but fell out with the Government in late 1951 and resigned. His successor, H.C. Lusty, terminated the contract and entered into an agreement with General Motors for the supply of 40 EMD G12 model locomotives, designated by NZR as the DA class. The first of these locomotives entered service in September 1955, with all of this initial order running by September 1957.

On Christmas Eve 1953, the worst disaster in NZR's history, and one of the worst in New Zealand's history occurred. 151 people died when the Wellington-Auckland express was derailed due to a bridge collapse north of Tangiwai due to a lahar from a volcanic eruption, in what became known as the Tangiwai disaster.

The following year NZR introduced the dual-cab DF class in 1954, the first main-line diesel-electric locomotives in service. They proved to be unsuccessful in service and the original order of 31 was cancelled, and DG class locomotives, also built by English Electric, ordered instead. While the DG class proved more successful than the DF class, steam remained the dominant form of traction.

This led to the introduction of the DA class in 1955, the largest fleet of diesel-electric locomotives NZR ever introduced. The DA class, more than any other class, displaced steam locomotives from the North Island. On 3 November of the same year the 8.798 kilometres (5.467 mi) long Rimutaka Tunnel opened, greatly reducing transit times between the Wairarapa and Wellington. This led to the closure of the Rimutaka Incline and its unique Fell railway system. Because steam locomotives could not be operated through the new tunnel, the Wairarapa Line was the first to be fully "dieselised". Amid many protests, the isolated Nelson Section was closed, although future Nelson Railway Proposals resurfaced from 1957.

The RM class "88 seater" or "Fiats" also began entering service from 1955. The railcars were designed to take over provincial inter-city routes but proved to be mechanically unreliable.

Despite large orders for diesel-electric locomotives, NZR was still building steam locomotives until 1956, when the last steam locomotive built by NZR, JA1274, was completed at Hillside Workshops, Dunedin. The locomotive is now preserved in Dunedin near the railway station.

During the 1950s New Zealand industry was diversifying, particularly into the timber industry. On 6 October 1952 the Kinleith Branch, formerly part of the Taupo Totara Timber Company's line, was opened to service a new pulp and paper mill at its terminus. NZR's first single-purpose log trains, called "express loggers", began to operate on this branch. The Kinleith Branch was shortly followed in 1957 by the 57 kilometres (35 mi) long Murupara Branch, which was opened running through the Bay of Plenty's Kaingaroa Forest. The branch is the last major branch line to open in New Zealand to date. The line was primarily built to service the Tasman Pulp and Paper Mill in Kawerau, with several loading points along its length.[43] The line's success led to several Taupo Railway Proposals being put forward, with extensions of the branch being mooted at various times.

1960s edit

In 1960 the second Christchurch railway station, at Moorhouse Avenue, was opened. The station was closed in 1990, with a new station being built at Addington. In 1961, livestock was exempted from the Transport Licensing Act, effectively opening the sector up to competition.[44]

 
MV Aranui, the second inter-island rail ferry operated by NZR

The introduction of GMV Aramoana in 1962 heralded the start of inter-island ferry services run by NZR.[45] The service was very successful, leading to criticism, when the Wellington–Lyttelton overnight ferry was withdrawn, that NZR was competing unfairly with private operators. Before the Aramoana was introduced, NZR could not compete for inter-island freight business, and the rail networks of both the North and South Islands were not well integrated. To send goods between the islands, freight had to be unloaded from wagons onto a ship on one island, unloaded at the other and then loaded back into wagons to resume its journey by rail. The introduction of a roll-on roll-off train ferry changed that. Wagons were rolled onto the ferry and rolled off at the other side. This led to many benefits for NZR customers.[45]

NZR's 1963–1964 year-end financial report showed that inter-island ferry services contributed $1.07 million to NZRs profit of $1.077 million. A second ferry, MV Aranui, arrived in 1965.[45]

Closures of rural branch lines reduced the total network length to 3,254 miles (5,237 km) in 1966.[46]

In 1968 the "Blue Streak" refurbished railcars were introduced to the WellingtonAuckland run, having failed to raise patronage between Hamilton and Auckland. The success of the Blue Streaks led to the purchase of three new railcars in 1972. The Blue Streaks were then allocated to the Wellington—New Plymouth service. The introduction of the Japanese-built DJ class diesels from that year in the South Island accelerated the demise of steam, replacing the remaining steam locomotives. The final demise of steam came on 26 October 1971 with the withdrawal of the last class of mainline steam locomotives, the JA class in the South Island (although the NZR-operated heritage Kingston Flyer service, using two AB class steam locomotives began just two months later in December 1971).

1970s edit

 
Timetable published by Railways from 1976

Railways' management had entered the 1970s with a modernisation plan around the theme "Great things are happening to Railways", to counter negative views of the railways' held by the general public and political elites.[47] In 1970, a red, black and white corporate logo designed by Barry Ellis was introduced and a new Passenger Division was established.[48][49] The Southerner between Christchurch and Invercargill was introduced, replacing the South Island Limited. The new service featured buffet cars and modernised rolling stock. New rolling stock included the Silver Star luxury WellingtonAuckland overnight train, sourced from Japan. The service never lived up to its promise and was withdrawn in 1979 due to poor patronage. In 1972 the first Silver Fern railcars were introduced for the daytime Wellington–Auckland run.

Freight traffic was again changing. In October 1969, the first unit coal trains were introduced, between coal mines at Huntly and New Zealand Steel at Mission Bush.[48] The US-built General Electric U26C DX class locomotives were introduced in 1972, with a further batch arriving in 1975. They were at the time the most powerful class of locomotives in New Zealand. At first, they were deployed to the North Island Main Trunk but gradually began working the express freight trains for which they were ordered throughout the North Island. The DX continued to dominate North Island traffic until the electrification of the main trunk in the 1980s. 1971 saw the introduction of scheduled ISO shipping container services to New Zealand.[50] NZR introduced its first purpose-built container wagons, the UK class, for the growing traffic that was quickly changing freight patterns. NZR was criticized for not investing enough in new bogie wagons.

Freight volumes greatly increased during the 1970s, despite the oil shocks of 1973 and 1979, with the greatest setback for freight volumes being Britain's entry into the European Economic Community in 1973. Inflationary pressures within the economy greatly rose, at the same time exports were falling. In reaction to this, the government attempted to control inflation by fixing prices; in 1972 it was decided that NZR could only charge for its services at no more than 1971 rates, despite rising fuel and labour costs. As a result, Railways' accounts were in a deficit for much of the decade and were topped up with a special "Vote Stabilisation" in the budget.

Following a change of Government in 1975, the Robert Muldoon led National Government decided to increase the transport licensing limited from 40 miles (64 km) to 150 km. This change took effect from 1977,[51] and greatly increased competition for NZR on key routes between larger centres within 150 km of each other—routes such as Auckland–Hamilton, Hamilton–Tauranga, Wellington–Palmerston North and Christchurch–Ashburton.[51]

In 1978 a major rebuilding program of the ageing DA class was launched, creating the DC class. Locomotives were sent to Australia for rebuilding, with five being rebuilt at the NZR's own Hutt Workshops. Ten of the DB class were rebuilt into the DBR class at the same time. The following year the Canadian built General Motors DF class was introduced.

Despite these efforts, there was still considerable negativity about railways and the service they offered. In its 30 May 1979 issue, the National Business Review said "long-distance rail travel is likely to completely disappear in the early 1980s. This will leave the slow creaking third world narrow gauge network to bulk freight where it can be more efficient."[47]

Traffic Monitoring System edit

On 12 February 1979, NZR introduced a computerised "Traffic Monitoring System", known as TMS.[52] A pilot scheme of TMS began in 1973 on the Palmerston North - Gisborne Line between Woodville and Gisborne.[53] TMS resulted in an 8 per cent improvement in wagon utilisation.[53] As a result of the introduction of TMS, all locomotives, railcars, carriages and other rolling stock were re-numbered. Class notations changed to machine-readable capital letters, rather than the previous superscript capital letter (e.g. DA became DA.)[52] TMS was replaced in 1989 with Amicus.[54]

"Time for Change" edit

Following the increase in distance for road transport licensing in 1977, NZR General Manager Trevor Hayward published a pamphlet entitled "Time for Change".[51] In it, he spelt out the basic challenge facing NZR at the time: providing both commercial and loss-making "social" services.[51] While Hayward was not against road transport deregulation, he was in favour of greater investment in NZR to meet freight requirements and shutting down uneconomic services.[51]

In 1981, parliament passed the New Zealand Railways Corporation Act, and the department was corporatised as the New Zealand Railways Corporation on 1 April 1982.[2]

Branches edit

The Railways Department followed a traditional branch structure, which was carried over to the corporation.

  • Commercial;
  • Finance and Accounts;
  • Mechanical;
  • Publicity and Advertising;
  • Refreshment;
  • Railways Road Services;
  • Stores;
  • Traffic; and
  • Way and Works.

Performance edit

The table below records the performance of the Railways Department in terms of freight tonnage:[55]

Year Tonnes (000s) Net tonne-km (millions)
1972 11,300 2,980
1973 12,100 3,305
1974 13,200 3,819
1975 12,900 3,695
1976 13,200 3,803
1977 13,600 4,058.9
1978 12,600 3,824
1979 11,700 3,693
1980 11,800 3,608
1981 11,400 3,619
1982 11,500 3,738.9

Workshops edit

The following NZR workshops were builders of locomotives:

Minor workshops edit

None of these minor workshops manufactured locomotives, although major overhauls were carried out:

Locomotives edit

Steam locomotives built and rebuilt at NZR workshops:[58]

Workshops New Rebuild Total
Addington 114 12 126
Hillside 165 21 186
Hutt 77 0 77
Petone 4 7 11
Newmarket 1 9 10
Westport 0 2 2
Total 361 49 410

Nine of the ED electric locomotives were constructed (assembled) at the Hutt (7) and Addington (2) workshops. Various diesel locomotives have been rebuilt at NZR workshops, for example, five of the DA as DC, though most rebuilding has been contracted out. Hillside built 9 NZR TR class diesel shunters.

The Auckland workshops (Newmarket, then Otahuhu) specialised in car and wagon work, and in repairs and maintenance.

Private firms that built steam locomotives for NZR edit

British companies, e.g.:

American companies, e.g.:

New Zealand companies:

Companies that supplied NZR with diesel locomotives edit

Suppliers of electric traction to NZR edit

Suppliers of bus and coach chassis to NZR edit

Suppliers of ferries to NZR edit

People edit

See also edit

References edit

Citations edit

  1. ^ Churchman & Hurst 2001, p. 1.
  2. ^ a b "New Zealand Railways Corporation Act 1981, s1(2)". Public Access to Legislation website. Retrieved 23 February 2012.
  3. ^ a b c "Railway administration has reflected public expectation of rail's social and economic role". KiwiRail. Retrieved 10 February 2019.
  4. ^ Stott & Leitch 1988, p. 15.
  5. ^ a b "Birth of a National Railway System". Te Ara: The Encyclopedia of New Zealand. 1966.
  6. ^ Stott & Leitch 1988, p. 21.
  7. ^ Cassels 1994, p. 2.
  8. ^ Pierre 1981, p. 26.
  9. ^ a b Stott & Leitch 1988, p. 171.
  10. ^ a b Stott & Leitch 1988, p. 45.
  11. ^ Stott & Leitch 1988, p. 44.
  12. ^ Stott & Leitch 1988, p. 43.
  13. ^ "TARANAKI DAILY NEWS". paperspast.natlib.govt.nz. 13 March 1911. Retrieved 17 April 2021.
  14. ^ a b c Stott & Leitch 1988, p. 51.
  15. ^ "North Island Rail Services To Be Cut NORTHERN ADVOCATE". paperspast.natlib.govt.nz. 12 February 1945. Retrieved 22 December 2018.
  16. ^ "SOUTH ISLAND MAIN TRUNK, PRESS". paperspast.natlib.govt.nz. 14 December 1945. Retrieved 22 December 2018.
  17. ^ a b Stott & Leitch 1988, p. 52.
  18. ^ Stott & Leitch 1988, p. 54.
  19. ^ New Zealand (1854). "Parliamentary debates". {{cite journal}}: Cite journal requires |journal= (help)
  20. ^ "Main Highways Act 1922 (13 GEO V 1922 No 47)". nzlii.org. Retrieved 28 September 2022.
  21. ^ "NEW ZEALAND RAILWAYS. WAIKATO TIMES". paperspast.natlib.govt.nz. 6 May 1924. Retrieved 28 September 2022.
  22. ^ "RAILWAYS COMMISSION". paperspast.natlib.govt.nz. 1925. p. 7. Retrieved 28 October 2022.
  23. ^ "The April report: report of the Royal Commission on Social Policy. Volume 4: Social Perspectives". paperspast.natlib.govt.nz. 1988. Retrieved 28 September 2022.
  24. ^ "RAILWAYS PORTFOLIO. AUCKLAND STAR". paperspast.natlib.govt.nz. 9 June 1923. Retrieved 28 September 2022.
  25. ^ Stott & Leitch 1988, p. 55.
  26. ^ Pierre 1981, p. 151.
  27. ^ Pierre 1981, p. 152.
  28. ^ a b Stott & Leitch 1988, p. 57.
  29. ^ Churchman & Hurst 2001, p. 30.
  30. ^ "RAILWAY POLICY. (Auckland Star, 1925-08-27)". paperspast.natlib.govt.nz. National Library of New Zealand. Retrieved 23 October 2016.
  31. ^ Pierre 1981, p. 157.
  32. ^ Stott & Leitch 1988, p. 56.
  33. ^ Stott & Leitch 1988, p. 62.
  34. ^ "Appendix to the Journals of the House of Representatives, Report of the Government Railways Board". National Library of New Zealand. 9 September 1931. Retrieved 10 February 2019.
  35. ^ "Obituary MR H. H. STERLING Press". paperspast.natlib.govt.nz. 8 August 1959. Retrieved 15 October 2023.
  36. ^ "Railway Board". Nelson Provincial Museum. Retrieved 15 October 2023.
  37. ^ a b "BOARD WARNED New Zealand Herald". paperspast.natlib.govt.nz. 17 December 1935. Retrieved 15 October 2023.
  38. ^ "Government Railways Board (Report by)". atojs.natlib.govt.nz. 1931. Retrieved 15 October 2023.
  39. ^ Churchman & Hurst 2001, p. 31.
  40. ^ "Electric trains come to Wellington". New Zealand History online. 20 December 2012.
  41. ^ Stott & Leitch 1988, p. 153.
  42. ^ Snell, J. B. (June 1954). Cooke, B.W.C. (ed.). "The New Zealand Government Railways – 1". The Railway Magazine. Vol. 100, no. 638. Westminster: Tothill Press. p. 379.
  43. ^ Bromby 2003, p. 61.
  44. ^ Leitch & Scott 1995, p. 92.
  45. ^ a b c "Cook Strait ferries". NZhistory.net.nz. Retrieved 10 February 2019.
  46. ^ "The Railway System Takes Shape". Te Ara. 1966.
  47. ^ a b Miles 1995, p. 15.
  48. ^ a b Tom McGavin, ed. (1970). New Zealand Railway Observer, Summer 1969–1970. Vol. 26. New Zealand Railway and Locomotive Society.
  49. ^ "Silver Star poster". NZHistory.net.nz. Retrieved 6 March 2012.
  50. ^ "Transforming our economy—Container shipping". nzhistory.net.nz. Retrieved 22 February 2012.
  51. ^ a b c d e "Road transport regulation a controversial measure to protect railways". KiwiRail. Retrieved 10 February 2019.
  52. ^ a b Parsons 2002, p. 15.
  53. ^ a b "Computerised Wagon Control on New Zealand Railways". New Zealand Railway Observer. New Zealand Railway and Locomotive Society. 36 (2): 58. Winter 1979. ISSN 0028-8624.
  54. ^ Noel Coom (21 November 2002). "Tranz Rail moves deliver gains". Retrieved 19 April 2022.
  55. ^ Merrifield, Rob (Spring 1990). T. A. Gavin (ed.). "Land Transport Deregulation in New Zealand, 1983–1989". The New Zealand Railway Observer. New Zealand Railway and Locomotive Society. 45 (3). ISSN 0028-8624.
  56. ^ "WORKSHOPS". railheritage.org.nz. Retrieved 1 October 2020.
  57. ^ "Nelson N.Z. Looking .S." Nelson Provincial Museum. Retrieved 1 October 2020.
  58. ^ Lloyd 2002, p. 187-189.

Bibliography edit

External links edit

  • "Rail tourism" at NZHistory
  • New Zealand Railways on Youtube at Youtube
  • New Zealand Railways Magazine on NZETC
  • New Zealand Railway Observer (Magazine) on NZRLS
Preceded by New Zealand Railways Department  
1880–1981
Succeeded by

zealand, railways, department, nzgr, zealand, government, railways, often, known, railways, government, department, charged, with, owning, maintaining, zealand, railway, infrastructure, operating, railway, system, department, created, 1880, corporatised, april. The New Zealand Railways Department NZR or NZGR New Zealand Government Railways and often known as the Railways was a government department charged with owning and maintaining New Zealand s railway infrastructure and operating the railway system 1 The Department was created in 1880 and was corporatised on 1 April 1982 into the New Zealand Railways Corporation 2 Originally railway construction and operation took place under the auspices of the former provincial governments and some private railways before all of the provincial operations came under the central Public Works Department The role of operating the rail network was subsequently separated from that of the network s construction From 1895 to 1993 there was a responsible Minister the Minister of Railways He was often also the Minister of Public Works New Zealand Government RailwaysOverviewHeadquartersWellingtonReporting markNZGRLocaleNew ZealandDates of operation1880 1982PredecessorPublic Works Department rail operations acquired 1880 Port Chalmers Railway Company acquired 1880 Waimea Plains Railway acquired 1886 Thames Valley and Rotorua Railway Company acquired 1886 New Zealand Midland Railway Company acquired 1891 Wellington and Manawatu Railway Company acquired 1908 SuccessorNew Zealand Railways CorporationTechnicalTrack gauge1 067 mm 3 ft 6 in Length1 828 km 1 136 mi 1880 5 696 km 3 539 mi 1952 peak 4 799 km 2 982 mi 1981 Apart from four brief experiments with independent boards NZR remained under direct ministerial control for most of its history 3 Contents 1 History 1 1 Formation and early years 1 2 World War I 1 2 1 Increasing competition and great depression 1 3 Government Railways Board 1 4 World War II and its aftermath 1 5 Modernisation 1 6 1960s 1 7 1970s 1 8 Traffic Monitoring System 1 9 Time for Change 2 Branches 3 Performance 4 Workshops 4 1 Minor workshops 4 2 Locomotives 5 Private firms that built steam locomotives for NZR 6 Companies that supplied NZR with diesel locomotives 7 Suppliers of electric traction to NZR 8 Suppliers of bus and coach chassis to NZR 9 Suppliers of ferries to NZR 10 People 11 See also 12 References 12 1 Citations 12 2 Bibliography 13 External linksHistory edit nbsp Railway train and carriages moving along the side of the Wellington Harbour toward the Hutt Valley c 1875Originally New Zealand s railways were constructed by provincial governments and private firms The largest provincial operation was the Canterbury Provincial Railways which opened the first public railway at Ferrymead on 1 December 1863 During The Vogel Era of the late 1860s to the 1870s railway construction by central government expanded greatly from just 80 kilometres 50 miles in 1869 to 1 900 kilometres 1 200 miles in 1880 Following the abolition of the provinces in 1877 the Public Works Department took over the various provincial railways Since the Public Works Department was charged with constructing new railway lines among other public works the day to day railway operations were transferred into a new government department on the recommendation of a parliamentary select committee 4 At the time 1 828 kilometres 1 136 miles of railway lines were open for traffic 546 km 339 mi in the North Island and 1 283 km 797 mi in the South Island mainly consisting of the 630 km 390 mi Main South Line from the port of Lyttelton to Bluff 5 Formation and early years edit nbsp New Zealand Railways Department Head Office Wellington photographed circa 1905 1908 by J N Taylor The Railways Department was formed in 1880 during the premiership of Sir John Hall That year the private Port Chalmers Railway Company Limited was acquired by the department and new workshops at Addington opened Ironically the first few years of NZR were marked by the Long Depression which led to great financial constraint on the department 6 As a result the central government passed legislation to allow for the construction of more private railways A Royal Commission ordered by Hall had removed plans for a railway line on the west coast of the North Island from Foxton to Wellington Instead in August 1881 the Railways Construction and Land Act was passed allowing joint stock companies to build and run private railways as long as they were built to the government s standard rail gauge of 1 067 mm 3 ft 6 in and connected with the government railway lines The Act had the effect of authorising the Wellington and Manawatu Railway Company to build the Wellington Manawatu Line 7 In 1877 the first American locomotives were purchased the NZR K class 1877 from Rogers followed by the NZR T class of 1879 from Baldwin The most important construction project for NZR at this time was the central section of the North Island Main Trunk Starting from Te Awamutu on 15 April 1885 the section including the famous Raurimu Spiral was not completed for another 23 years 8 The economy gradually improved and in 1895 the Liberal Government of Premier Richard Seddon appointed Alfred Cadman as the first Minister of Railways The Minister appointed a General Manager for the railways keeping the operation under tight political control 9 Apart from four periods of government appointed commissions 1889 1894 1924 1928 1931 1936 and 1953 1957 this system remained in place until the department was corporatised in 1982 9 In 1895 patronage had reached 3 9M passengers per annum and 2 048M tonnes 10 NZR produced its first New Zealand built steam locomotive in 1889 the W class built in the Addington Railway Workshops Along with opening new lines NZR began acquiring a number of the private railways which had built railway lines around the country It acquired the Waimea Plains Railway Company in 1886 At the same time a protracted legal battle began with the New Zealand Midland Railway Company which was only resolved in 1898 The partially completed Midland line was not handed over to NZR until 1900 11 By that time 3 200 km 2 000 mi of railway lines were open for traffic 5 The acquisition in 1908 of the Wellington and Manawatu Railway Company and its railway line marked the completion of the North Island Main Trunk from Wellington to Auckland A new locomotive class the X class was introduced in 1909 for traffic on the line The X class was the most powerful locomotive at the time Gold rushes led to the construction of the Thames Branch opening in 1898 In 1906 the Dunedin railway station was completed architect George Troup A L Beattie became Chief Mechanical Officer in April 1900 Beattie designed the famous A class the Q class the first Pacific type locomotive in the world and many other locomotive classes 12 NZR s first bus operation began on 1 October 1907 between Culverden on the Waiau Branch and Waiau Ferry in Canterbury By the 1920s NZR was noticing a considerable downturn in rail passenger traffic on many lines due to increasing ownership of private cars and from 1923 it began to co ordinate rail passenger services with private bus services The New Zealand Railways Road Services branch was formed to operate bus services In 1911 tenders for bookstalls were being advertised for 33 main stations Auckland Frankton Junction Rotorua Paeroa Taumarunui Ohakune Taihape Marton Feilding Palmerston North Levin Wellington Thorndon and Lambton Masterton Woodville Dannevirke Waipukurau Hastings Napier New Plymouth Stratford Hawera Aramoho Whanganui Nelson Christchurch Ashburton Timaru Oamaru Dunedin Milton Gore and Invercargill 13 By 1912 patronage had reached 13 4M passengers per annum a 242 increase since 1895 and 5 9M tonnes of freight a 188 increase since 1895 10 In 1913 damages of 15 were awarded against New Zealand Railways to S J Gibbons by the Supreme Court in a precedent setting case for damages to a car that hit a train at a level crossing see Cliff Road railway station World War I edit nbsp The AB class were introduced in 1915 Over 141 of these locomotives were introduced from three different builders Here preserved AB 778 hauls the Kingston Flyer The outbreak of World War I in 1914 had a significant impact on the Railways Department That year the AA class appeared and the following year the first AB class locomotives were introduced This class went on to become the most numerous locomotive class in New Zealand history with several examples surviving into preservation The war itself led to a decline in passenger freight and train miles run but also led to an increase in profitability In the 1917 Annual Report a record 5 3 return on investment was made 14 The war did take its toll on railway services with dining cars being removed from passenger trains in 1917 replaced by less labour intensive refreshment rooms at railway stations along the way As a result the scramble for pie and tea at Taihape became a part of New Zealand folklore 14 Non essential rail services were curtailed as more staff took part in the war effort and railway workshops were converted for producing military equipment on top of their existing maintenance and construction work 14 The war soon affected the supply of coal to the railways Although hostilities ended in 1918 the coal shortage carried on into 1919 as first miners strikes and then an influenza epidemic cut supplies As a result non essential services remained in effect until the end of 1919 Shortages of spare parts and materials led to severe inflation and repairs on locomotives being deferred Similar coal saving timetable cuts occurred at the end of the next war in 1945 and 1946 15 16 Increasing competition and great depression edit nbsp Gordon Coates became Minister of Railways in 1923 His tenure was to have a profound effect on the department nbsp NZR s G class Garratt locomotives failed to live up to expectations nbsp The Standard class railcars were introduced from July 1938 This example RM 31 is seen at Paihiatua Wairarapa nbsp The J class also appeared in 1939 This locomotive J 1211 survived for preservation In 1920 the 3 000 mile 4 800 km milestone of open railway lines was reached and 15 million passengers were carried by the department 17 An acute housing shortage following the war led to the creation of Railways Department s Housing Scheme in 1922 The first of the now iconic railway houses were prefabricated in a factory in Frankton for NZR staff This scheme was shut down in 1929 as it was considered improper for a government department to compete with private builders 17 The Otira Tunnel was completed in 1923 heralding the completion of the Midland Line in the South Island The tunnel included the first section of railway electrification in New Zealand and its first electric locomotives the original EO class The section was electrified at 1 500 V DC due to the steep grade in the tunnel and included its own hydro electric power station 18 The second section to be electrified by the department was the Lyttelton Line in Christchurch completed in 1929 at the same voltage and current This again saw English Electric supply locomotives the EC class Gordon Coates on 24 October 1922 as Minister of Public Works in introducing his Main Highways Act said I say the day will come when it will be found that through the use of motor transport certain railways in New Zealand will be relegated to a secondary place altogether and probably will be torn up and we shall have motor traffic taking their place 19 Section 12 of that Act allowed for government borrowing and Section 19 required local councils to provide half the cost of road improvements 20 By setting in place a system of subsidy from ratepayers and taxpayers whilst requiring railways to make a 3 profit 21 at that rate interest amounted to over 22 of total earnings 22 Coates ensured his prophecy came true as railways gradually became uneconomic 23 The following year Gordon Coates became the Minister of Railways 24 Coates was an ambitious politician who had an almost religious zeal for his portfolio During the summer of 1923 he spent the entire parliamentary recess inspecting the department s operations The following year he put forward a Programme of Improvements and New Works 25 Coates scheme proposed spending 8 million over 8 years This was later expanded to 10 million over 10 years The programme included The Auckland Westfield deviation of the North Island Main Trunk New marshalling yards at Auckland Wellington and Christchurch The Milson Deviation of the North Island Main Trunk through Palmerston North The Rimutaka Tunnel under the Rimutaka Ranges in Wellington The Tawa Flat deviation of the North Island Main Trunk out of Wellington Electric lighting New locomotive facilities and New signalling systems An independent commission led by Sir Sam Fay and Sir Vincent Raven produced a report known as the Fay Raven Report 26 which gave qualified approval to Coates programme The reports only significant change was the proposal of a Cook Strait train ferry service between Wellington and Picton to link the two systems up 27 Coates went on to become Prime Minister in 1925 an office he held until 1928 when he was defeated at the general election of that year While the Westfield and Tawa Flat deviations proceeded the Milson deviation and Rimutaka Tunnel projects remained stalled The onset of the Great Depression from late 1929 saw these projects scaled back or abandoned The Westfield deviation was completed in 1930 and the Tawa deviation proceeded at a snail s pace A number of new lines under construction were casualties including the Rotorua Taupo line approved in July 1928 but abandoned almost a year later due to the depression 28 An exception was the Stratford Okahukura Line finished in 1933 29 However there was criticism that maintenance was being neglected In the Liberals last year of office in 1912 140 miles 230 km of line had been relaid but that was reduced to 118 in 1913 104 in 1914 81 in 1924 and 68 in 1925 during the Reform Government s years 30 Once again growing traffic requirements led to the introduction of a new type of locomotive the ill fated G class Garratt locomotives in 1928 Three of the locomotives were introduced for operation on the North Island Main Trunk They were not well suited to New Zealand conditions they had overly complex valve gear were too hot for crews manning them and too powerful for the wagons they were hauling 31 The failure of this class lead to the introduction of the K class in 1932 Government Railways Board edit Tough economic conditions and increasing competition from road transport led to calls for regulation of the land transport sector In 1931 it was claimed half a million tons of freight had been lost to road transport 32 That year the department carried 7 2 million passengers per year down from 14 2 million in 1923 28 In 1930 a Royal Commission on Railways recommended that land transport should be co ordinated and the following year Parliament passed the Transport Licensing Act 1931 The Act regulated the carriage of goods and entrenched the monopoly the department had on land transport It set a minimum distance road transport operators could transport goods at 30 miles 48 km before they had to be licensed The Act was repealed in 1982 33 Alongside these changes in 1931 the Railways Department was briefly restructured into the Government Railways Board Another Act of Parliament the Government Railways Amendment Act 1931 was passed 34 The Railways Board was independent of the Government of the day and answered to the Minister of Finance 3 During this period the Prime Minister George Forbes was also Minister of Railways and Minister of Finance was former Minister of Railways Gordon Coates The Railways Board was chaired by Herbert Harry Sterling the former General Manager 35 and had 10 members 36 from around the country 37 The Board stopped building on the Dargaville branch Gisborne line Main South Line Nelson Section Okaihau to Rangiahua line and Westport Inangahua line 38 For that it was criticised by Bob Semple the new Minister of Public Works in a speech in 1935 37 and abolished by the First Labour Government in 1936 3 In 1933 plans for a new railway station and head office in Wellington were approved along with the electrification of the Johnsonville Line then still part of the North Island Main Trunk The Wellington railway station and Tawa flat deviation were both completed in 1937 39 As part of attempts by NZR to win back passengers from private motor vehicles the same year the first 56 foot carriages were introduced Garnet Mackley was appointed General Manager in 1933 and worked hard to improve the standard and range of services provided by the Department This included a number of steps to make passenger trains faster more efficient and cheaper to run In the early 20th century NZR had begun investigating railcar technology to provide passenger services on regional routes and rural branch lines where carriage trains were not economic and mixed trains passenger carriages attached to freight trains were undesirably slow However due to New Zealand s rugged terrain overseas technology could not simply be directly introduced A number of experimental railcars and railbuses were developed From 1925 these included the Leyland experimental petrol railcar and a fleet of Model T Ford railbuses the Sentinel Cammell steam railcar and from 1926 the Clayton steam railcar and successful Edison battery electric railcar 10 years later in 1936 the Leyland diesel railbus was introduced but the first truly successful railcar class to enter service began operating that year the Wairarapa railcar specially designed to operate over the Rimutaka Incline This class followed the building of the Red Terror an inspection car on a Leyland Cub chassis for the General Manager in 1933 More classes followed over the years primarily to operate regional services Following the success of the Wairarapa railcar class in 1938 the Standard class railcars were introduced A further improvement to passenger transport came in July that year with electric services on the Johnsonville Line starting with the introduction of the DM D English Electric Multiple Units 40 Three new locomotive classes appeared in 1939 the KA class KB class and the J class The KA was a further development of the K class while the J class was primarily for lighter trackage in the South Island The numerically smaller KB class were allocated to the Midland line where they dominated traffic This led to the coining of the phrase KB country to describe the area made famous by the National Film Unit s documentary of the same title World War II and its aftermath edit nbsp The JA class were introduced in 1946 and were the last steam locomotives built by NZR As with the first world war the Second World War had a significant impact on railways The war created major labour shortages across the economy generally and while considered essential industry railways were no exception A large number of NZR employees signed up to fight in the war For the first time the Department employed significant numbers of women to meet the shortages The war created serious coal shortages as imported coal was no longer available Despite this NZR had record revenues in 1940 Despite the war and associated labour and material shortages new railway construction continued In 1942 the Gisborne Line was finally opened followed by the Main North Line between Picton and Christchurch being completed in 1945 The final section of the then ECMT the Taneatua Branch was also completed Centralised Traffic Control CTC was installed from Taumaranui to Auckland at the same time In 1946 the last class of steam locomotives built by NZR was introduced the JA class Due to coal shortages the K J KA JA classes of steam locomotives were converted from coal to oil burning Following the war NZR contracted the Royal New Zealand Air Force from 1947 to ship inter island freight across Cook s Strait between Paraparaumu in the North Island and Blenheim in the South Island as part of the Rail Air service In 1950 Straits Air Freight Express later known as SAFE Air took over the contract from the RNZAF The service was discontinued in the early 1980s 41 Modernisation edit nbsp A DE class locomotive the first diesel electric locomotives introduced by NZR nbsp DF class locomotive the first mainline diesel electric locomotives nbsp A DA class locomotive nbsp RM 114 at Kaikoura during the 1960s nbsp The DJ class introduced from 1968 led to the end of steam traction in the South Island and the whole of New Zealand by 1971 The General Manager of NZR Frank Aickin was an advocate for electrifying the entire North Island Main Trunk to alleviate the shortage of coal and the cost of importing diesel fuel though he also recognised that steam and diesel traction would be required on other lines NZR s first diesel electric locomotives the English Electric built DE class were introduced in 1951 The locomotives gave good service but were not powerful or numerous enough to seriously displace steam traction In 1954 the New Zealand railway network reached its zenith in terms of distance with 5 600 km 3 500 mi 60 of it on gradients between 1 in 100 and 1 in 200 and 33 steeper than 1 in 100 42 The EW class electric locomotives introduced for the Wellington electric system They were the second class of electric locomotive to be used on this section of electrification They were the most powerful locomotives on the system till the DX class arrived in 1972 Aicken went as far as negotiating a tentative contract for the construction of electrification and locomotives for it but fell out with the Government in late 1951 and resigned His successor H C Lusty terminated the contract and entered into an agreement with General Motors for the supply of 40 EMD G12 model locomotives designated by NZR as the DA class The first of these locomotives entered service in September 1955 with all of this initial order running by September 1957 On Christmas Eve 1953 the worst disaster in NZR s history and one of the worst in New Zealand s history occurred 151 people died when the Wellington Auckland express was derailed due to a bridge collapse north of Tangiwai due to a lahar from a volcanic eruption in what became known as the Tangiwai disaster The following year NZR introduced the dual cab DF class in 1954 the first main line diesel electric locomotives in service They proved to be unsuccessful in service and the original order of 31 was cancelled and DG class locomotives also built by English Electric ordered instead While the DG class proved more successful than the DF class steam remained the dominant form of traction This led to the introduction of the DA class in 1955 the largest fleet of diesel electric locomotives NZR ever introduced The DA class more than any other class displaced steam locomotives from the North Island On 3 November of the same year the 8 798 kilometres 5 467 mi long Rimutaka Tunnel opened greatly reducing transit times between the Wairarapa and Wellington This led to the closure of the Rimutaka Incline and its unique Fell railway system Because steam locomotives could not be operated through the new tunnel the Wairarapa Line was the first to be fully dieselised Amid many protests the isolated Nelson Section was closed although future Nelson Railway Proposals resurfaced from 1957 The RM class 88 seater or Fiats also began entering service from 1955 The railcars were designed to take over provincial inter city routes but proved to be mechanically unreliable Despite large orders for diesel electric locomotives NZR was still building steam locomotives until 1956 when the last steam locomotive built by NZR JA1274 was completed at Hillside Workshops Dunedin The locomotive is now preserved in Dunedin near the railway station During the 1950s New Zealand industry was diversifying particularly into the timber industry On 6 October 1952 the Kinleith Branch formerly part of the Taupo Totara Timber Company s line was opened to service a new pulp and paper mill at its terminus NZR s first single purpose log trains called express loggers began to operate on this branch The Kinleith Branch was shortly followed in 1957 by the 57 kilometres 35 mi long Murupara Branch which was opened running through the Bay of Plenty s Kaingaroa Forest The branch is the last major branch line to open in New Zealand to date The line was primarily built to service the Tasman Pulp and Paper Mill in Kawerau with several loading points along its length 43 The line s success led to several Taupo Railway Proposals being put forward with extensions of the branch being mooted at various times 1960s edit In 1960 the second Christchurch railway station at Moorhouse Avenue was opened The station was closed in 1990 with a new station being built at Addington In 1961 livestock was exempted from the Transport Licensing Act effectively opening the sector up to competition 44 nbsp MV Aranui the second inter island rail ferry operated by NZRThe introduction of GMV Aramoana in 1962 heralded the start of inter island ferry services run by NZR 45 The service was very successful leading to criticism when the Wellington Lyttelton overnight ferry was withdrawn that NZR was competing unfairly with private operators Before the Aramoana was introduced NZR could not compete for inter island freight business and the rail networks of both the North and South Islands were not well integrated To send goods between the islands freight had to be unloaded from wagons onto a ship on one island unloaded at the other and then loaded back into wagons to resume its journey by rail The introduction of a roll on roll off train ferry changed that Wagons were rolled onto the ferry and rolled off at the other side This led to many benefits for NZR customers 45 NZR s 1963 1964 year end financial report showed that inter island ferry services contributed 1 07 million to NZRs profit of 1 077 million A second ferry MV Aranui arrived in 1965 45 Closures of rural branch lines reduced the total network length to 3 254 miles 5 237 km in 1966 46 In 1968 the Blue Streak refurbished railcars were introduced to the Wellington Auckland run having failed to raise patronage between Hamilton and Auckland The success of the Blue Streaks led to the purchase of three new railcars in 1972 The Blue Streaks were then allocated to the Wellington New Plymouth service The introduction of the Japanese built DJ class diesels from that year in the South Island accelerated the demise of steam replacing the remaining steam locomotives The final demise of steam came on 26 October 1971 with the withdrawal of the last class of mainline steam locomotives the JA class in the South Island although the NZR operated heritage Kingston Flyer service using two AB class steam locomotives began just two months later in December 1971 1970s edit nbsp Timetable published by Railways from 1976Railways management had entered the 1970s with a modernisation plan around the theme Great things are happening to Railways to counter negative views of the railways held by the general public and political elites 47 In 1970 a red black and white corporate logo designed by Barry Ellis was introduced and a new Passenger Division was established 48 49 The Southerner between Christchurch and Invercargill was introduced replacing the South Island Limited The new service featured buffet cars and modernised rolling stock New rolling stock included the Silver Star luxury Wellington Auckland overnight train sourced from Japan The service never lived up to its promise and was withdrawn in 1979 due to poor patronage In 1972 the first Silver Fern railcars were introduced for the daytime Wellington Auckland run Freight traffic was again changing In October 1969 the first unit coal trains were introduced between coal mines at Huntly and New Zealand Steel at Mission Bush 48 The US built General Electric U26C DX class locomotives were introduced in 1972 with a further batch arriving in 1975 They were at the time the most powerful class of locomotives in New Zealand At first they were deployed to the North Island Main Trunk but gradually began working the express freight trains for which they were ordered throughout the North Island The DX continued to dominate North Island traffic until the electrification of the main trunk in the 1980s 1971 saw the introduction of scheduled ISO shipping container services to New Zealand 50 NZR introduced its first purpose built container wagons the UK class for the growing traffic that was quickly changing freight patterns NZR was criticized for not investing enough in new bogie wagons Freight volumes greatly increased during the 1970s despite the oil shocks of 1973 and 1979 with the greatest setback for freight volumes being Britain s entry into the European Economic Community in 1973 Inflationary pressures within the economy greatly rose at the same time exports were falling In reaction to this the government attempted to control inflation by fixing prices in 1972 it was decided that NZR could only charge for its services at no more than 1971 rates despite rising fuel and labour costs As a result Railways accounts were in a deficit for much of the decade and were topped up with a special Vote Stabilisation in the budget Following a change of Government in 1975 the Robert Muldoon led National Government decided to increase the transport licensing limited from 40 miles 64 km to 150 km This change took effect from 1977 51 and greatly increased competition for NZR on key routes between larger centres within 150 km of each other routes such as Auckland Hamilton Hamilton Tauranga Wellington Palmerston North and Christchurch Ashburton 51 In 1978 a major rebuilding program of the ageing DA class was launched creating the DC class Locomotives were sent to Australia for rebuilding with five being rebuilt at the NZR s own Hutt Workshops Ten of the DB class were rebuilt into the DBR class at the same time The following year the Canadian built General Motors DF class was introduced Despite these efforts there was still considerable negativity about railways and the service they offered In its 30 May 1979 issue the National Business Review said long distance rail travel is likely to completely disappear in the early 1980s This will leave the slow creaking third world narrow gauge network to bulk freight where it can be more efficient 47 Traffic Monitoring System edit On 12 February 1979 NZR introduced a computerised Traffic Monitoring System known as TMS 52 A pilot scheme of TMS began in 1973 on the Palmerston North Gisborne Line between Woodville and Gisborne 53 TMS resulted in an 8 per cent improvement in wagon utilisation 53 As a result of the introduction of TMS all locomotives railcars carriages and other rolling stock were re numbered Class notations changed to machine readable capital letters rather than the previous superscript capital letter e g DA became DA 52 TMS was replaced in 1989 with Amicus 54 Time for Change edit Following the increase in distance for road transport licensing in 1977 NZR General Manager Trevor Hayward published a pamphlet entitled Time for Change 51 In it he spelt out the basic challenge facing NZR at the time providing both commercial and loss making social services 51 While Hayward was not against road transport deregulation he was in favour of greater investment in NZR to meet freight requirements and shutting down uneconomic services 51 In 1981 parliament passed the New Zealand Railways Corporation Act and the department was corporatised as the New Zealand Railways Corporation on 1 April 1982 2 Branches editThe Railways Department followed a traditional branch structure which was carried over to the corporation Commercial Finance and Accounts Mechanical Publicity and Advertising Refreshment Railways Road Services Stores Traffic and Way and Works Performance editThe table below records the performance of the Railways Department in terms of freight tonnage 55 Year Tonnes 000s Net tonne km millions 1972 11 300 2 9801973 12 100 3 3051974 13 200 3 8191975 12 900 3 6951976 13 200 3 8031977 13 600 4 058 91978 12 600 3 8241979 11 700 3 6931980 11 800 3 6081981 11 400 3 6191982 11 500 3 738 9Workshops editThe following NZR workshops were builders of locomotives Hutt Workshops Lower Hutt at Petone to 1929 Hillside Workshops Dunedin now Hillside Engineering Addington Workshops Christchurch closed 1990 East Town Workshops Wanganui closed 1986 also Aramoho Newmarket Workshops Auckland opened 1875 closed 1928 Otahuhu Workshops Auckland opened 1928 closed 1992 Minor workshops edit None of these minor workshops manufactured locomotives although major overhauls were carried out Greymouth Elmer Lane Invercargill Kaiwharawhara signals 56 Napier Nelson 57 New Plymouth Sentry Hill from 1880 Westport Whanganui East Town Locomotives edit Steam locomotives built and rebuilt at NZR workshops 58 Workshops New Rebuild TotalAddington 114 12 126Hillside 165 21 186Hutt 77 0 77Petone 4 7 11Newmarket 1 9 10Westport 0 2 2Total 361 49 410Nine of the ED electric locomotives were constructed assembled at the Hutt 7 and Addington 2 workshops Various diesel locomotives have been rebuilt at NZR workshops for example five of the DA as DC though most rebuilding has been contracted out Hillside built 9 NZR TR class diesel shunters The Auckland workshops Newmarket then Otahuhu specialised in car and wagon work and in repairs and maintenance Private firms that built steam locomotives for NZR editBritish companies e g Avonside Engine Company Fairlie and Fell locomotives Beyer Peacock and Company Clayton Carriage and Wagon Dubs and Company Henry Hughes s Locomotive amp Tramway Engine Works Hunslet Engine Company Nasmyth Wilson and Company Neilson and Company North British Locomotive Company built a quarter 141 of NZR steam locomotives the NZR J class 1939 Robert Stephenson and Hawthorns Sharp Stewart and Company Vulcan Foundry Yorkshire Engine CoAmerican companies e g Baldwin Locomotive Works Built 111 steam locomotives for NZR and the WMR the first were the NZR T class of 1879 Rogers Locomotive and Machine Works Built eight NZR K class 1877 the first American locomotives purchased Brooks Locomotive Works Built Ub17 during purchase by ALCO Richmond Locomotive Works Built Ub371 during purchase by ALCO ten of the NZR Ub class were built by Baldwin New Zealand companies James Davidson amp Co Dunedin A amp G Price Thames E W Mills and Company Scott Brothers ChristchurchCompanies that supplied NZR with diesel locomotives editClyde Engineering Commonwealth Engineering Drewry Car Co Electro Motive Diesel English Electric various British contractors and English Electric Australia General Electric General Motors Diesel Hitachi Hunslet Engine Company Mitsubishi Heavy Industries A amp G Price Thames Toshiba Vulcan FoundrySuppliers of electric traction to NZR editEnglish Electric New Zealand DM class electric multiple unit and NZR EC class NZR ED class NZR EO class 1923 NZR EW class locomotives Goodman Manufacturing New Zealand EB class locomotive Toshiba New Zealand EA class locomotive Suppliers of bus and coach chassis to NZR editAssociated Equipment Company Albion Motors Bedford Vehicles Supplied a record 1260 Bedford SB chassis largest fleet of Bedford SB buses in the world As well as around 400 trucks Ford Hino Motors VolvoSuppliers of ferries to NZR editMcGregor and Company Dunedin New Zealand Builders of TSS Earnslaw William Denny and Brothers Dumbarton Scotland Builders of GMV Aramoana Vickers Limited Newcastle England Builders of GMV Aranui Chantiers Dubegion Nantes France Builders of MV Arahanga and MV Aratika People editA L Beattie Chief Mechanical Engineer Whitford Brown civil engineer Mayor of Porirua Alf Cleverley fitter at Petone and Hutt Workshops Olympic boxer Major Norman Frederick Hastings DSO engineering fitter at Petone Railways Workshop killed on Gallipoli and commemorated on the Petone railway station memorial Graham Latimer was stationmaster Kaiwaka later president of New Zealand Maori Council Ritchie Macdonald worked at Otahuhu Workshops union secretary later member of parliament Garnet Mackley General Manager 1933 1940 later member of parliament George Troup Architect Mayor of WellingtonSee also editList of Chief Executives of New Zealand Railways New Zealand Railways Corporation Rail transport in New Zealand Railway housesReferences editCitations edit Churchman amp Hurst 2001 p 1 a b New Zealand Railways Corporation Act 1981 s1 2 Public Access to Legislation website Retrieved 23 February 2012 a b c Railway administration has reflected public expectation of rail s social and economic role KiwiRail Retrieved 10 February 2019 Stott amp Leitch 1988 p 15 a b Birth of a National Railway System Te Ara The Encyclopedia of New Zealand 1966 Stott amp Leitch 1988 p 21 Cassels 1994 p 2 Pierre 1981 p 26 a b Stott amp Leitch 1988 p 171 a b Stott amp Leitch 1988 p 45 Stott amp Leitch 1988 p 44 Stott amp Leitch 1988 p 43 TARANAKI DAILY NEWS paperspast natlib govt nz 13 March 1911 Retrieved 17 April 2021 a b c Stott amp Leitch 1988 p 51 North Island Rail Services To Be Cut NORTHERN ADVOCATE paperspast natlib govt nz 12 February 1945 Retrieved 22 December 2018 SOUTH ISLAND MAIN TRUNK PRESS paperspast natlib govt nz 14 December 1945 Retrieved 22 December 2018 a b Stott amp Leitch 1988 p 52 Stott amp Leitch 1988 p 54 New Zealand 1854 Parliamentary debates a href Template Cite journal html title Template Cite journal cite journal a Cite journal requires journal help Main Highways Act 1922 13 GEO V 1922 No 47 nzlii org Retrieved 28 September 2022 NEW ZEALAND RAILWAYS WAIKATO TIMES paperspast natlib govt nz 6 May 1924 Retrieved 28 September 2022 RAILWAYS COMMISSION paperspast natlib govt nz 1925 p 7 Retrieved 28 October 2022 The April report report of the Royal Commission on Social Policy Volume 4 Social Perspectives paperspast natlib govt nz 1988 Retrieved 28 September 2022 RAILWAYS PORTFOLIO AUCKLAND STAR paperspast natlib govt nz 9 June 1923 Retrieved 28 September 2022 Stott amp Leitch 1988 p 55 Pierre 1981 p 151 Pierre 1981 p 152 a b Stott amp Leitch 1988 p 57 Churchman amp Hurst 2001 p 30 RAILWAY POLICY Auckland Star 1925 08 27 paperspast natlib govt nz National Library of New Zealand Retrieved 23 October 2016 Pierre 1981 p 157 Stott amp Leitch 1988 p 56 Stott amp Leitch 1988 p 62 Appendix to the Journals of the House of Representatives Report of the Government Railways Board National Library of New Zealand 9 September 1931 Retrieved 10 February 2019 Obituary MR H H STERLING Press paperspast natlib govt nz 8 August 1959 Retrieved 15 October 2023 Railway Board Nelson Provincial Museum Retrieved 15 October 2023 a b BOARD WARNED New Zealand Herald paperspast natlib govt nz 17 December 1935 Retrieved 15 October 2023 Government Railways Board Report by atojs natlib govt nz 1931 Retrieved 15 October 2023 Churchman amp Hurst 2001 p 31 Electric trains come to Wellington New Zealand History online 20 December 2012 Stott amp Leitch 1988 p 153 Snell J B June 1954 Cooke B W C ed The New Zealand Government Railways 1 The Railway Magazine Vol 100 no 638 Westminster Tothill Press p 379 Bromby 2003 p 61 Leitch amp Scott 1995 p 92 a b c Cook Strait ferries NZhistory net nz Retrieved 10 February 2019 The Railway System Takes Shape Te Ara 1966 a b Miles 1995 p 15 a b Tom McGavin ed 1970 New Zealand Railway Observer Summer 1969 1970 Vol 26 New Zealand Railway and Locomotive Society Silver Star poster NZHistory net nz Retrieved 6 March 2012 Transforming our economy Container shipping nzhistory net nz Retrieved 22 February 2012 a b c d e Road transport regulation a controversial measure to protect railways KiwiRail Retrieved 10 February 2019 a b Parsons 2002 p 15 a b Computerised Wagon Control on New Zealand Railways New Zealand Railway Observer New Zealand Railway and Locomotive Society 36 2 58 Winter 1979 ISSN 0028 8624 Noel Coom 21 November 2002 Tranz Rail moves deliver gains Retrieved 19 April 2022 Merrifield Rob Spring 1990 T A Gavin ed Land Transport Deregulation in New Zealand 1983 1989 The New Zealand Railway Observer New Zealand Railway and Locomotive Society 45 3 ISSN 0028 8624 WORKSHOPS railheritage org nz Retrieved 1 October 2020 Nelson N Z Looking S Nelson Provincial Museum Retrieved 1 October 2020 Lloyd 2002 p 187 189 Bibliography edit Bromby Robin 2003 Rails that built a nation an encyclopedia of New Zealand Railways Grantham House New Zealand ISBN 978 1 86934 080 3 Cassels KR Ken 1994 Uncommon Carrier The History of the Wellington amp Manawatu Railway Company 1882 1908 New Zealand Railway and Locomotive Society ISBN 978 0908573639 Churchman Geoffrey B Hurst Tony 2001 1990 1991 The Railways of New Zealand A Journey through History Second ed Transpress New Zealand ISBN 0 908876 20 3 Leitch David Scott Brian 1995 Exploring New Zealand s Ghost Railways 1998 ed Wellington Grantham House ISBN 1 86934048 5 Lloyd W G 2002 Register of New Zealand Railways Steam Locomotives 1863 1971 ISBN 978 0 9582072 1 8 Miles Robert 1995 The End of the New Zealand Passenger Train Beynon Printing Company p 32 ISBN 978 0473033200 Parsons David 2002 New Zealand Railway Motive Power 2002 New Zealand Railway and Locomotive Society p 64 ISBN 978 0 908573 78 3 Pierre Bill 1981 North Island Main Trunk An Illustrated History A H amp A W Reed ISBN 978 0 589 01316 5 Stott Bob Leitch David 1988 New Zealand Railways The First 125 Years Auckland Heinemann Reed p 176 ISBN 0 7900 0000 8 External links edit Rail tourism at NZHistory New Zealand Railways on Youtube at Youtube New Zealand Railways Magazine on NZETC New Zealand Railway Observer Magazine on NZRLSPreceded byPublic Works Department New Zealand Railways Department nbsp 1880 1981 Succeeded byNew Zealand Railways Corporation Retrieved from https en wikipedia org w index php title New Zealand Railways Department amp oldid 1182491841, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.