fbpx
Wikipedia

Mysuru–Mayiladuthurai Express

Mysore–Mayiladuthurai Express is a overnight regional rail service connecting Mayiladuthurai Junction in Tamil Nadu with Mysore Junction in Karnataka via Bangalore City, Erode Junction, Tiruchchirappalli Junction and Thanjavur Junction.

Mysore–Mayiladuthurai Express
Mayiladuthurai - Mysuru (Thanjavur) Express Is At Thanjavur Junction Railway Station With S.R 37600 RPM/WAP-7
Overview
Service typeMail/Express
StatusActive
LocaleKarnataka & Tamil Nadu
First service1989 (35 years ago) (1989)
Current operator(s)South Western Railway zone
Former operator(s)Indian Railways
RidershipMail/Express
Annual ridershipMail/Express
Websitewww.indianrailways.gov.in
Route
TerminiMysore Junction (MYS)
Mayiladuthurai Junction (MV)
Stops21
Distance travelled667 km (414 mi)
Average journey time14 Hours 05 Minutes
Service frequencyDaily
Train number(s)
  • 16231 (UP)
  • 16232 (DOWN)
Line(s) used
  • MV - TPJ : Trichy - Thanjavur - Villupuram Main Line
  • TPJ - ED : Trichy - Coimbatore Main Line
  • ED - SA : Coimbatore - Jolarpettai - Katpadi Main Line
  • SA - MYS : Salem - Bangalore - Mysore Main Line
On-board services
Class(es)
  • 1 2nd A/C II Tire (A)
  • 5 3rd A/C III Tire (B)
  • 11 Sleeper (SL)
  • 2 Unreserved (GS)
  • 2 End On Generator (EOG)
Disabled access
Seating arrangementsCorridor coach
(unreserved)
Sleeping arrangementsCouchette car
Auto-rack arrangementsNo
Catering facilitiesNo
Observation facilitiesWindows in all carriages
Entertainment facilitiesNo
Baggage facilitiesOverhead racks
Baggage carriage
Other facilitiesCCTV Camera's In All Coaches
Technical
Rolling stock
Track gauge1,676 mm (5 ft 6 in)
Electrification25 kV AC 50 Hz (Overhead Electric Traction)
Operating speed65 kilometres per hour (40 mph)
Average length21 Coaches
Track owner(s)Indian Railways
Timetable number(s)69 / 69A
Rake maintenanceTiruchchirappalli Junction
Rake sharing16233/16234 Tiruchchirappalli - Mayiladuthurai Express

History edit

 

Initially, numbered as 31 / 32, this service had 4 slip coaches linked with Island Express at Erode.[1] Later, C. K. Jaffer Sharief, the then Minister of Railways, introduced an exclusive full service between Bengaluru and Trichy as Train No.6531 / 6532 operated by Bengaluru railway division of Southern Railway zone, (before the formation of South Western Railway zone).[2]

Extensions edit

 

Few coaches of the train were amalgamated and bifurcated at Karur for Madurai, numbered as 6531A / 6532A. After changing the train number from 6531 / 6532 to 6231 / 6232, it was first extended to Mysore, then to Thanjavur and to Nagore.[3] On 29 June 2002, the train number was changed from 6231 / 6232 to 6831 / 6832 as the service was transferred from Mysore railway division to Tiruchirappalli Railway Division with stoppage at Maddur was cancelled.[4] The Tiruchi–Nagore service was trimmed for the execution of gauge conversion in the Tiruchi–Nagore section, sanctioned in 1995–1996 Railway Budget.[5] As the Tiruchi–Thanjavur part was completed in 1998, the service again extended back to Thanjavur.[3] After the completion of gauge conversion ThanjavurKumbakonam section in Chennai Egmore–Thanjavur line, Lalu Prasad Yadav, the then Railway Minister extended the service up to Kumbakonam,[6][7] which was effected since 9 January 2006 along with change in train number from 6831 / 6832 to 6231 / 6232.[8][9] Further, the service was extended up to Mayiladuthurai Junction,[10][11][12][13] and was effected since 17 June 2006.[14][15] The train number was changed from 6231 / 6232 to 16231 / 16232 since December 2010 onwards as a part of train management system over the entire Indian Railways network.[16][17] There is a constant demand from delta people to divert this train through Salem - Namakkal -Karur line for reduce the travel time and also the fare.

Coach composition edit

 

The train runs consists of 21 carriages:

Loco 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
  EOG UR UR S11 S10 S9 S8 S7 S6 S5 S4 S3 S2 S1 B5 B4 B3 B2 B1 A1 EOG

Schedule edit

Some of the prominent stoppages include Dharmapuri, Thanjavur Junction, Tiruchchirappalli Junction, Erode Junction, Salem Junction, Hosur , Bangalore City and Kengeri. This daily train numbered 16231 departs, Mayiladuthurai Junction every evening as "Mysore Express", reverses loco twice at Tiruchirappalli Junction and Erode Junction arrives Mysore Junction next morning.[18] In the return journey, the train departs Mysore Junction as "Mayiladuthurai Express", numbered 16232 during late noon, follows the same route and reverses loco twice at Erode Junction and Tiruchirappalli Junction arrives Mayiladuthurai Junction next morning.[19][a]

 
16231 - Mayiladuthurai → Mysuru ~ Mysuru Express
Station/Junction Name Station Code Arrival Departure Day
Mayiladuthurai Junction SOURCE MV 17:55 1
Kutralam KTM 18:07 18:08 1
Aduthurai ADT 18:20 18:21 1
Kumbakonam KMU 18:33 18:35 1
Papanasam PML 18:46 18:47 1
Thanjavur Junction TJ 19:08 19:10 1
Budalur BAL 19:27 19:28 1
Thiruverumbur TRB 19:45 19:46 1
Tiruchchirappalli Junction TPJ 20:25 20:35 1
Tiruchchirappalli Fort TP 20:43 20:45 1
Kulithalai KLT 21:19 21:20 1
Karur Junction KRR 21:58 22:00 1
Pugalur PGR 22:19 22:20 1
Erode Junction ED 23:20 23:30 1
Salem Junction SA 00:17 00:20 2
Dharmapuri DPJ 02:14 02:15 2
Hosur HSRA 03:48 03:50 2
Karmelaram CRLM 04:23 04:23 2
Bangalore East BNCE 04:56 04:58 2
Bangalore Cantonment BNC 05:03 05:05 2
KSR Bengaluru City Junction SBC 05:40 05:45 2
Kengeri KGI 06:04 06:05 2
Mandya MAY 07:04 07:05 2
Mysore Junction MYS 08:00 DEST 2
16232 - Mysuru → Mayiladuthurai ~ Mayiladuthurai Express
Mysore Junction MV SOURCE 16:15 1
Mandya MAY 16:55 16:56 1
Maddur MAD 17:13 17:14 1
Kengeri KGI 18:04 18:05 1
KSR Bengaluru City Junction SBC 18:50 19:00 1
Bangalore Cantonment BNC 19:10 19:12 1
Karmelaram CRLM 19:46 19:47 1
Hosur HSRA 20:12 20:14 1
Dharmapuri DPJ 21:56 21:58 1
Salem Junction SA 23:42 23:45 1
Erode Junction ED 00:50 01:00 2
Pugalur PGR 01:39 01:40 2
Karur Junction KRR 01:58 02:00 2
Kulithalai KLT 02:34 02:35 2
Tiruchchirappalli Junction TPJ 04:00 04:10 2
Thiruverumbur TRB 04:28 04:29 2
Budalur BAL 04:44 04:45 2
Thanjavur Junction TJ 05:03 05:05 2
Papanasam PML 05:27 05:28 2
Kumbakonam KMU 05:38 05:40 2
Aduthurai ADT 05:50 05:51 2
Kutralam KTM 06:02 06:03 2
Mayiladuthurai Junction MV 07:00 DEST 2

See also edit

Notes edit

  1. ^ The schedule and route are subject to change.

References edit

  1. ^ Aravind (29 October 1990). "Trichy - Madras Central via Erode". IRFCA. Retrieved 19 March 2014.
  2. ^ . ckjaffersharief.com. Archived from the original on 19 March 2014. Retrieved 19 March 2014.
  3. ^ a b Syed Muthahar, Saqaf (5 June 2008). "No change in train origin". The Hindu. Tiruchi. Retrieved 19 March 2014.
  4. ^ "Four new trains from Bengaluru soon". The Hindu. Bengaluru. 29 June 2002. Retrieved 19 March 2014.
  5. ^ "Railway Budget : 1995–1996" (PDF). Indian Railways. Railway Board. p. 11. Retrieved 19 March 2014.
  6. ^ "Speech: Railway Budget 2005-06". Press Information Bureau. Government of India. 26 February 2005. Retrieved 19 March 2014.
  7. ^ "28 trains extended". The Hindu. New Delhi. 27 February 2005. Retrieved 19 March 2014.
  8. ^ "Revised Train Timings of South Western Railways". Deccan Herald. Hubli. 29 June 2005. Retrieved 19 March 2014.
  9. ^ "Express train to be extended up to Kumbakonam". The Hindu. Tiruchi. 6 January 2006. Retrieved 19 March 2014.
  10. ^ "Railway Budget : 2006–2007" (PDF). Indian Railways. Railway Board. p. 11. Retrieved 19 March 2014.
  11. ^ "Extension of routes of 37 trains". The Hindu. New Delhi. 25 February 2006. Retrieved 19 March 2014.
  12. ^ "'Track-doubling work ignored in rail budget'". The Hindu. Mysore. 26 February 2006. Retrieved 19 March 2014.
  13. ^ "Express train extended to Mayiladuthurai". The Hindu. Bengaluru. 19 May 2006. Retrieved 19 March 2014.
  14. ^ "Train to be extended to Mayiladuturai". The Hindu. Mayiladuthurai. 17 June 2006. Retrieved 19 March 2014.
  15. ^ "Four new trains to be introduced, some others to be extended". The Hindu. Hubli. 3 July 2006. Retrieved 19 March 2014.
  16. ^ "Railways to Switch to 'Five' – Digit System for Numbering all its Passenger Carrying Trains from December 2010". Press Information Bureau. 23 September 2010. Retrieved 19 March 2014.
  17. ^ "Railways migrate to 5-digit number scheme to monitor trains". The Times of India. New Delhi. 20 December 2010. Retrieved 19 March 2014.
  18. ^ "Train Time Table for MV-MYS (Mysore Exp.)" (PDF). Indian Railways. Railway Board. p. 2. Retrieved 15 February 2023.
  19. ^ "Train Time Table for MYS-MV (Mayiladuthurai Exp.)" (PDF). Indian Railways. Railway Board. p. 2. Retrieved 15 February 2023.

External links edit

  • South Western Railway - Official website

mysuru, mayiladuthurai, express, mysore, mayiladuthurai, express, overnight, regional, rail, service, connecting, mayiladuthurai, junction, tamil, nadu, with, mysore, junction, karnataka, bangalore, city, erode, junction, tiruchchirappalli, junction, thanjavur. Mysore Mayiladuthurai Express is a overnight regional rail service connecting Mayiladuthurai Junction in Tamil Nadu with Mysore Junction in Karnataka via Bangalore City Erode Junction Tiruchchirappalli Junction and Thanjavur Junction Mysore Mayiladuthurai ExpressMayiladuthurai Mysuru Thanjavur Express Is At Thanjavur Junction Railway Station With S R 37600 RPM WAP 7OverviewService typeMail ExpressStatusActiveLocaleKarnataka amp Tamil NaduFirst service1989 35 years ago 1989 Current operator s South Western Railway zoneFormer operator s Indian RailwaysRidershipMail ExpressAnnual ridershipMail ExpressWebsitewww indianrailways gov inRouteTerminiMysore Junction MYS Mayiladuthurai Junction MV Stops21Distance travelled667 km 414 mi Average journey time14 Hours 05 MinutesService frequencyDailyTrain number s 16231 UP 16232 DOWN Line s usedMV TPJ Trichy Thanjavur Villupuram Main Line TPJ ED Trichy Coimbatore Main Line ED SA Coimbatore Jolarpettai Katpadi Main Line SA MYS Salem Bangalore Mysore Main LineOn board servicesClass es 1 2nd A C II Tire A 5 3rd A C III Tire B 11 Sleeper SL 2 Unreserved GS 2 End On Generator EOG Disabled accessSeating arrangementsCorridor coach unreserved Sleeping arrangementsCouchette carAuto rack arrangementsNoCatering facilitiesNoObservation facilitiesWindows in all carriagesEntertainment facilitiesNoBaggage facilitiesOverhead racks Baggage carriageOther facilitiesCCTV Camera s In All CoachesTechnicalRolling stockMV TPJ WAP 7 Locomotive From Electric Loco Shed Royapuram Erode WAP 4 Locomotive From Electric Loco Shed Erode Arakkonam TPJ ED WAP 7 Locomotive From Electric Loco Shed Royapuram Erode WAP 4 Locomotive From Electric Loco Shed Erode Arakkonam ED MYS WAP 7 Locomotive From Electric Loco Shed Royapuram Erode KrishnarajapuramTrack gauge1 676 mm 5 ft 6 in Electrification25 kV AC 50 Hz Overhead Electric Traction Operating speed65 kilometres per hour 40 mph Average length21 CoachesTrack owner s Indian RailwaysTimetable number s 69 69ARake maintenanceTiruchchirappalli JunctionRake sharing16233 16234 Tiruchchirappalli Mayiladuthurai Express Contents 1 History 2 Extensions 3 Coach composition 4 Schedule 5 See also 6 Notes 7 References 8 External linksHistory edit nbsp Initially numbered as 31 32 this service had 4 slip coaches linked with Island Express at Erode 1 Later C K Jaffer Sharief the then Minister of Railways introduced an exclusive full service between Bengaluru and Trichy as Train No 6531 6532 operated by Bengaluru railway division of Southern Railway zone before the formation of South Western Railway zone 2 Extensions edit nbsp Few coaches of the train were amalgamated and bifurcated at Karur for Madurai numbered as 6531A 6532A After changing the train number from 6531 6532 to 6231 6232 it was first extended to Mysore then to Thanjavur and to Nagore 3 On 29 June 2002 the train number was changed from 6231 6232 to 6831 6832 as the service was transferred from Mysore railway division to Tiruchirappalli Railway Division with stoppage at Maddur was cancelled 4 The Tiruchi Nagore service was trimmed for the execution of gauge conversion in the Tiruchi Nagore section sanctioned in 1995 1996 Railway Budget 5 As the Tiruchi Thanjavur part was completed in 1998 the service again extended back to Thanjavur 3 After the completion of gauge conversion Thanjavur Kumbakonam section in Chennai Egmore Thanjavur line Lalu Prasad Yadav the then Railway Minister extended the service up to Kumbakonam 6 7 which was effected since 9 January 2006 along with change in train number from 6831 6832 to 6231 6232 8 9 Further the service was extended up to Mayiladuthurai Junction 10 11 12 13 and was effected since 17 June 2006 14 15 The train number was changed from 6231 6232 to 16231 16232 since December 2010 onwards as a part of train management system over the entire Indian Railways network 16 17 There is a constant demand from delta people to divert this train through Salem Namakkal Karur line for reduce the travel time and also the fare Coach composition edit nbsp The train runs consists of 21 carriages Loco 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 nbsp EOG UR UR S11 S10 S9 S8 S7 S6 S5 S4 S3 S2 S1 B5 B4 B3 B2 B1 A1 EOGSchedule editSome of the prominent stoppages include Dharmapuri Thanjavur Junction Tiruchchirappalli Junction Erode Junction Salem Junction Hosur Bangalore City and Kengeri This daily train numbered 16231 departs Mayiladuthurai Junction every evening as Mysore Express reverses loco twice at Tiruchirappalli Junction and Erode Junction arrives Mysore Junction next morning 18 In the return journey the train departs Mysore Junction as Mayiladuthurai Express numbered 16232 during late noon follows the same route and reverses loco twice at Erode Junction and Tiruchirappalli Junction arrives Mayiladuthurai Junction next morning 19 a nbsp 16231 Mayiladuthurai Mysuru Mysuru Express Station Junction Name Station Code Arrival Departure Day Mayiladuthurai Junction SOURCE MV 17 55 1 Kutralam KTM 18 07 18 08 1 Aduthurai ADT 18 20 18 21 1 Kumbakonam KMU 18 33 18 35 1 Papanasam PML 18 46 18 47 1 Thanjavur Junction TJ 19 08 19 10 1 Budalur BAL 19 27 19 28 1 Thiruverumbur TRB 19 45 19 46 1 Tiruchchirappalli Junction TPJ 20 25 20 35 1 Tiruchchirappalli Fort TP 20 43 20 45 1 Kulithalai KLT 21 19 21 20 1 Karur Junction KRR 21 58 22 00 1 Pugalur PGR 22 19 22 20 1 Erode Junction ED 23 20 23 30 1 Salem Junction SA 00 17 00 20 2 Dharmapuri DPJ 02 14 02 15 2 Hosur HSRA 03 48 03 50 2 Karmelaram CRLM 04 23 04 23 2 Bangalore East BNCE 04 56 04 58 2 Bangalore Cantonment BNC 05 03 05 05 2 KSR Bengaluru City Junction SBC 05 40 05 45 2 Kengeri KGI 06 04 06 05 2 Mandya MAY 07 04 07 05 2 Mysore Junction MYS 08 00 DEST 2 16232 Mysuru Mayiladuthurai Mayiladuthurai Express Mysore Junction MV SOURCE 16 15 1 Mandya MAY 16 55 16 56 1 Maddur MAD 17 13 17 14 1 Kengeri KGI 18 04 18 05 1 KSR Bengaluru City Junction SBC 18 50 19 00 1 Bangalore Cantonment BNC 19 10 19 12 1 Karmelaram CRLM 19 46 19 47 1 Hosur HSRA 20 12 20 14 1 Dharmapuri DPJ 21 56 21 58 1 Salem Junction SA 23 42 23 45 1 Erode Junction ED 00 50 01 00 2 Pugalur PGR 01 39 01 40 2 Karur Junction KRR 01 58 02 00 2 Kulithalai KLT 02 34 02 35 2 Tiruchchirappalli Junction TPJ 04 00 04 10 2 Thiruverumbur TRB 04 28 04 29 2 Budalur BAL 04 44 04 45 2 Thanjavur Junction TJ 05 03 05 05 2 Papanasam PML 05 27 05 28 2 Kumbakonam KMU 05 38 05 40 2 Aduthurai ADT 05 50 05 51 2 Kutralam KTM 06 02 06 03 2 Mayiladuthurai Junction MV 07 00 DEST 2See also editMysore Thoothukudi Express Velankanni Vasco da Gama Express Pearl City Muthunagar Superfast Express Chendur Superfast Express Pothigai Superfast Express Kanniyakumari Superfast Express Nellai Superfast Express Karnataka Express Tippu Express Tambaram Nagercoil Antyodaya ExpressNotes edit The schedule and route are subject to change References edit Aravind 29 October 1990 Trichy Madras Central via Erode IRFCA Retrieved 19 March 2014 Contribution to Karnataka ckjaffersharief com Archived from the original on 19 March 2014 Retrieved 19 March 2014 a b Syed Muthahar Saqaf 5 June 2008 No change in train origin The Hindu Tiruchi Retrieved 19 March 2014 Four new trains from Bengaluru soon The Hindu Bengaluru 29 June 2002 Retrieved 19 March 2014 Railway Budget 1995 1996 PDF Indian Railways Railway Board p 11 Retrieved 19 March 2014 Speech Railway Budget 2005 06 Press Information Bureau Government of India 26 February 2005 Retrieved 19 March 2014 28 trains extended The Hindu New Delhi 27 February 2005 Retrieved 19 March 2014 Revised Train Timings of South Western Railways Deccan Herald Hubli 29 June 2005 Retrieved 19 March 2014 Express train to be extended up to Kumbakonam The Hindu Tiruchi 6 January 2006 Retrieved 19 March 2014 Railway Budget 2006 2007 PDF Indian Railways Railway Board p 11 Retrieved 19 March 2014 Extension of routes of 37 trains The Hindu New Delhi 25 February 2006 Retrieved 19 March 2014 Track doubling work ignored in rail budget The Hindu Mysore 26 February 2006 Retrieved 19 March 2014 Express train extended to Mayiladuthurai The Hindu Bengaluru 19 May 2006 Retrieved 19 March 2014 Train to be extended to Mayiladuturai The Hindu Mayiladuthurai 17 June 2006 Retrieved 19 March 2014 Four new trains to be introduced some others to be extended The Hindu Hubli 3 July 2006 Retrieved 19 March 2014 Railways to Switch to Five Digit System for Numbering all its Passenger Carrying Trains from December 2010 Press Information Bureau 23 September 2010 Retrieved 19 March 2014 Railways migrate to 5 digit number scheme to monitor trains The Times of India New Delhi 20 December 2010 Retrieved 19 March 2014 Train Time Table for MV MYS Mysore Exp PDF Indian Railways Railway Board p 2 Retrieved 15 February 2023 Train Time Table for MYS MV Mayiladuthurai Exp PDF Indian Railways Railway Board p 2 Retrieved 15 February 2023 External links editSouth Western Railway Official website Retrieved from https en wikipedia org w index php title Mysuru Mayiladuthurai Express amp oldid 1209701108, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.