Monte Generoso railway

The Monte Generoso Railway or Ferrovia Monte Generoso (MG) is a mountain railway line in the Italian speaking canton of Ticino, in south-east Switzerland. The line runs from Capolago, on Lake Lugano, to a terminus near the summit of Monte Generoso. It is the highest railway in Ticino. The summit (1,701 m or 5,581 ft) offers extensive views over the Lombardy Plain, part of the Po Valley, and towards the Alps.[1][2][3]

Monte Generoso Railway.
Train at the summit station
Overview
StatusOpen
OwnerMigros supermarket chain
LocaleTicino, Switzerland
History
OpenedJune 5, 1890
Technical
Line length9 kilometres (5.6 mi)
Rack systemAbt
Track gauge800 mm (2 ft 7+12 in)
Electrification850 V, DC, overhead
Highest elevation1,605 m (5,266 ft)
Maximum incline22%
Route map
The track descending from the summit, with the Lombardy Plain in the background.
Bellavista station and restaurant, with passing trains.
Trains waiting to depart from the Capolago-Riva San Vitale station.
Capolago: the terminus of Monte Generoso railway near Capolago Lago landing on the shore of Lake Lugano. The mainline railway is behind the hedge to the right.
Diesel railcars at the summit prior to electrification: Bhm 1/2 (left), Bhm 2/4 (right).

Whilst the railway lies entirely within Switzerland, the summit station is only a few metres from the international border with the Italian region of Lombardy. The line is owned by the Migros group, better known for operating supermarkets throughout Switzerland.[2]

History edit

 
Share of the Societa della Ferrovia del Monto Generosa, issued 1. January 1890

In 1867, Doctor Carlo Pasta built a hotel on Monte Generoso, near to the current location of the Bellavista station on the Monte Generoso railway. In 1886, a concession was granted to the Monte Generoso SA for the construction of a narrow gauge and cog railway to the summit. The line opened on the June 5, 1890, and was originally operated with steam locomotives. The following year, the Tramway Bellavista was opened to link the railway to Doctor Pasta's hotel.[4][5]

However the owning company encountered financial difficulties at various times during the first half of the 20th century. In the 1939, the then owners approached Gottlieb Duttweiler, the founder of the Migros group, for assistance, and in 1941 the railway became part of that group.[4][5]

In 1954, two diesel locomotives (Hm 2/3 1 and 2) were built on the frames of older steam locomotives, followed, in 1957, by two four-axle diesel railcars (Bhm 2/4 3 and 4), which allowed a more economical operation. In 1968, two smaller two-axle railcars (Bhm 1/2 5 and 6) were introduced. In 1982 the line was electrified and four twin-unit railcars (Bhe 4/8 11 to 14) were supplied by SLM in 1981-2.[4][5][6]

At the end of the season in 2013, the line closed for the winter as normal. It was then announced that it would not reopen to passengers until 2015, in order to facilitate the rebuilding of the hotel and restaurant at the summit. The closure was extended twice, and eventually the new building, designed by Mario Botta, opened on 8 April 2017. In the meantime, the railway was used for the transport of construction materials and workers.[7][8][9][10][11]

Route edit

The line commences at Capolago Lago station, where trains connect with boat services of the Società Navigazione del Lago di Lugano on Lake Lugano. However most trains start 300 m (984 ft) up the line at Capolago-Riva San Vitale station, at an altitude of 274 m (899 ft), where they connect with Swiss Federal Railways trains on the line from Lugano to Milan via Chiasso. The line's car shed and workshop are both situated on the line between the two Capolago stops.[1]

At Capolago-Riva San Vitale station, the line serves a stop on the street in front of the station building, before climbing a ramp to cross a bridge over the throat of the mainline station. From here it climbs the flank of the mountain as far as San Nicolao station, at an altitude of 707 m (2,320 ft). Bellavista station, at 1,222 m (4,009 ft), follows, and with its station buffet and access to various walks is a destination in its own right. Both San Nicolao and Bellavista stations have passing loops, but the latter is the normal passing place for ascending and descending trains.[1]

After leaving Bellavista, the line leaves the heavily forested lower slopes and runs through more open meadows before reaching the Generoso Vetta terminus, at 1,592 m (5,223 ft). The station is located a short walk from the mountain summit, and has a buffet, restaurant and rooftop viewing gallery.[1][11]

Operation edit

The line is 9 km (5.6 mi) long and is of 800 mm (2 ft 7+12 in) gauge. It is a rack railway, with a maximum gradient of 22%, using the Abt design. The line is electrified using an 850 V DC overhead line, and is principally operated by the four two-car electric trains built in 1981-2.[1][12][13]

The line operates from mid-March to early November, with trains running hourly during daylight hours. If traffic requires it, the hourly departure may be operated as multiple trains running in convoy. A late evening train operates on Fridays and Saturdays only. Only one train a day runs through to Capolago Lago, in order to connect with a boat service from Lugano.[14]

One steam locomotive still exists, as does one of the original coaches, and two diesel locomotives. The remaining steam and diesel locomotives operate occasional services. One of the Bhm 1/2 diesel railcars is preserved in the Museo Europeo dei Trasporti Ogliari in Ranco on the Italian shore of Lake Maggiore.[15][16][17][18]

See also edit

References edit

  1. ^ a b c d e Eisenbahnatlas Schweiz. 2012. pp. 58–59.
  2. ^ a b map.geo.admin.ch (Map). Swiss Confederation. Retrieved 3 July 2012.
  3. ^ . Monte Generoso Railway. Archived from the original on 17 July 2012. Retrieved 3 July 2012.
  4. ^ a b c . Monte Generoso Railway. Archived from the original on 11 June 2012. Retrieved 3 July 2012.
  5. ^ a b c Wikipedia article Ferrovia_Monte_Generoso_SA (in German). Last updated 2005-02-02 at 14:11.
  6. ^ "Cog railway twin motor coaches". Monte Generoso Railway. Retrieved 2 July 2012.
  7. ^ "Monte Generoso". Monte Generoso Railway. from the original on 31 March 2017. Retrieved 31 March 2017.
  8. ^ . Monte Generoso Railway. Archived from the original on 26 March 2014. Retrieved 5 March 2016.
  9. ^ . Monte Generoso Railway. Archived from the original on 10 February 2015. Retrieved 5 March 2016.
  10. ^ "In 2'500 sul Monte Generoso" [2,500 on Monte Generoso] (in Italian). ticinonews.ch. 9 April 2017. from the original on 1 June 2017. Retrieved 1 June 2017.
  11. ^ a b Detterer, Gabriele (12 April 2017). "Fiore di Pietra – über dem Felsengrund ins Licht und zum Himmel" [Fiore di Pietra - above the rocky bottom in the light and the sky] (in German). Neue Zürcher Zeitung. from the original on 1 June 2017. Retrieved 1 June 2017.
  12. ^ "Technical data on electric line". Monte Generoso Railway. Retrieved 2 July 2012.
  13. ^ "Vintage trains". Monte Generoso Railway. Retrieved 2 July 2012.
  14. ^ "Timetable 2012". Monte Generoso Railway. Retrieved 2 July 2012.
  15. ^ [Steam locomotive] (in Italian). Monte Generoso Railway. Archived from the original on 25 April 2013. Retrieved 18 October 2012.
  16. ^ [Tractor D1] (in Italian). Monte Generoso Railway. Archived from the original on 26 April 2013. Retrieved 18 October 2012.
  17. ^ [Tractor D7] (in Italian). Monte Generoso Railway. Archived from the original on 26 April 2013. Retrieved 18 October 2012.
  18. ^ [Wagon V1] (in Italian). Monte Generoso Railway. Archived from the original on 19 September 2012. Retrieved 18 October 2012.

Bibliography edit

External links edit

  •   Media related to Monte Generoso Railway at Wikimedia Commons
  • Ferrovia Monte Generoso website

monte, generoso, railway, monte, generoso, railway, ferrovia, monte, generoso, mountain, railway, line, italian, speaking, canton, ticino, south, east, switzerland, line, runs, from, capolago, lake, lugano, terminus, near, summit, monte, generoso, highest, rai. The Monte Generoso Railway or Ferrovia Monte Generoso MG is a mountain railway line in the Italian speaking canton of Ticino in south east Switzerland The line runs from Capolago on Lake Lugano to a terminus near the summit of Monte Generoso It is the highest railway in Ticino The summit 1 701 m or 5 581 ft offers extensive views over the Lombardy Plain part of the Po Valley and towards the Alps 1 2 3 Monte Generoso Railway Train at the summit stationOverviewStatusOpenOwnerMigros supermarket chainLocaleTicino SwitzerlandHistoryOpenedJune 5 1890TechnicalLine length9 kilometres 5 6 mi Rack systemAbtTrack gauge800 mm 2 ft 7 1 2 in Electrification850 V DC overheadHighest elevation1 605 m 5 266 ft Maximum incline22 Route mapThe track descending from the summit with the Lombardy Plain in the background Bellavista station and restaurant with passing trains Trains waiting to depart from the Capolago Riva San Vitale station Capolago the terminus of Monte Generoso railway near Capolago Lago landing on the shore of Lake Lugano The mainline railway is behind the hedge to the right Diesel railcars at the summit prior to electrification Bhm 1 2 left Bhm 2 4 right Whilst the railway lies entirely within Switzerland the summit station is only a few metres from the international border with the Italian region of Lombardy The line is owned by the Migros group better known for operating supermarkets throughout Switzerland 2 Contents 1 History 2 Route 3 Operation 4 See also 5 References 6 Bibliography 7 External linksHistory edit nbsp Share of the Societa della Ferrovia del Monto Generosa issued 1 January 1890In 1867 Doctor Carlo Pasta built a hotel on Monte Generoso near to the current location of the Bellavista station on the Monte Generoso railway In 1886 a concession was granted to the Monte Generoso SA for the construction of a narrow gauge and cog railway to the summit The line opened on the June 5 1890 and was originally operated with steam locomotives The following year the Tramway Bellavista was opened to link the railway to Doctor Pasta s hotel 4 5 However the owning company encountered financial difficulties at various times during the first half of the 20th century In the 1939 the then owners approached Gottlieb Duttweiler the founder of the Migros group for assistance and in 1941 the railway became part of that group 4 5 In 1954 two diesel locomotives Hm 2 3 1 and 2 were built on the frames of older steam locomotives followed in 1957 by two four axle diesel railcars Bhm 2 4 3 and 4 which allowed a more economical operation In 1968 two smaller two axle railcars Bhm 1 2 5 and 6 were introduced In 1982 the line was electrified and four twin unit railcars Bhe 4 8 11 to 14 were supplied by SLM in 1981 2 4 5 6 At the end of the season in 2013 the line closed for the winter as normal It was then announced that it would not reopen to passengers until 2015 in order to facilitate the rebuilding of the hotel and restaurant at the summit The closure was extended twice and eventually the new building designed by Mario Botta opened on 8 April 2017 In the meantime the railway was used for the transport of construction materials and workers 7 8 9 10 11 Route editThe line commences at Capolago Lago station where trains connect with boat services of the Societa Navigazione del Lago di Lugano on Lake Lugano However most trains start 300 m 984 ft up the line at Capolago Riva San Vitale station at an altitude of 274 m 899 ft where they connect with Swiss Federal Railways trains on the line from Lugano to Milan via Chiasso The line s car shed and workshop are both situated on the line between the two Capolago stops 1 At Capolago Riva San Vitale station the line serves a stop on the street in front of the station building before climbing a ramp to cross a bridge over the throat of the mainline station From here it climbs the flank of the mountain as far as San Nicolao station at an altitude of 707 m 2 320 ft Bellavista station at 1 222 m 4 009 ft follows and with its station buffet and access to various walks is a destination in its own right Both San Nicolao and Bellavista stations have passing loops but the latter is the normal passing place for ascending and descending trains 1 After leaving Bellavista the line leaves the heavily forested lower slopes and runs through more open meadows before reaching the Generoso Vetta terminus at 1 592 m 5 223 ft The station is located a short walk from the mountain summit and has a buffet restaurant and rooftop viewing gallery 1 11 Operation editThe line is 9 km 5 6 mi long and is of 800 mm 2 ft 7 1 2 in gauge It is a rack railway with a maximum gradient of 22 using the Abt design The line is electrified using an 850 V DC overhead line and is principally operated by the four two car electric trains built in 1981 2 1 12 13 The line operates from mid March to early November with trains running hourly during daylight hours If traffic requires it the hourly departure may be operated as multiple trains running in convoy A late evening train operates on Fridays and Saturdays only Only one train a day runs through to Capolago Lago in order to connect with a boat service from Lugano 14 One steam locomotive still exists as does one of the original coaches and two diesel locomotives The remaining steam and diesel locomotives operate occasional services One of the Bhm 1 2 diesel railcars is preserved in the Museo Europeo dei Trasporti Ogliari in Ranco on the Italian shore of Lake Maggiore 15 16 17 18 See also editList of mountain railways in Switzerland List of narrow gauge railways in SwitzerlandReferences edit a b c d e Eisenbahnatlas Schweiz 2012 pp 58 59 a b map geo admin ch Map Swiss Confederation Retrieved 3 July 2012 Monte Generoso Monte Generoso Railway Archived from the original on 17 July 2012 Retrieved 3 July 2012 a b c 120 years of railway history on Monte Generoso Monte Generoso Railway Archived from the original on 11 June 2012 Retrieved 3 July 2012 a b c Wikipedia article Ferrovia Monte Generoso SA in German Last updated 2005 02 02 at 14 11 Cog railway twin motor coaches Monte Generoso Railway Retrieved 2 July 2012 Monte Generoso Monte Generoso Railway Archived from the original on 31 March 2017 Retrieved 31 March 2017 Monte Generoso Monte Generoso Railway Archived from the original on 26 March 2014 Retrieved 5 March 2016 Monte Generoso Monte Generoso Railway Archived from the original on 10 February 2015 Retrieved 5 March 2016 In 2 500 sul Monte Generoso 2 500 on Monte Generoso in Italian ticinonews ch 9 April 2017 Archived from the original on 1 June 2017 Retrieved 1 June 2017 a b Detterer Gabriele 12 April 2017 Fiore di Pietra uber dem Felsengrund ins Licht und zum Himmel Fiore di Pietra above the rocky bottom in the light and the sky in German Neue Zurcher Zeitung Archived from the original on 1 June 2017 Retrieved 1 June 2017 Technical data on electric line Monte Generoso Railway Retrieved 2 July 2012 Vintage trains Monte Generoso Railway Retrieved 2 July 2012 Timetable 2012 Monte Generoso Railway Retrieved 2 July 2012 Locomotiva a vapore Steam locomotive in Italian Monte Generoso Railway Archived from the original on 25 April 2013 Retrieved 18 October 2012 Trattore D1 Tractor D1 in Italian Monte Generoso Railway Archived from the original on 26 April 2013 Retrieved 18 October 2012 Trattore D7 Tractor D7 in Italian Monte Generoso Railway Archived from the original on 26 April 2013 Retrieved 18 October 2012 Vagone V1 Wagon V1 in Italian Monte Generoso Railway Archived from the original on 19 September 2012 Retrieved 18 October 2012 Bibliography editBuckley R J 1984 Tramways and Light Railways of Switzerland and Austria Light Rail Transit Association ISBN 0 900433 96 5 Dougherty Hugh March April 2005 The Full Monte Narrow Gauge World Atlantic Publishers Eisenbahnatlas Schweiz Verlag Schweers Wall GmbH 2012 ISBN 978 3 89494 130 7 External links edit nbsp Media related to Monte Generoso Railway at Wikimedia Commons Ferrovia Monte Generoso website Retrieved from https en wikipedia org w index php title Monte Generoso railway amp oldid 1026825135, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.