Interlocking

In railway signalling, an interlocking is an arrangement of signal apparatus that prevents conflicting movements through an arrangement of tracks such as junctions or crossings. In North America, a set of signalling appliances and tracks interlocked together are sometimes collectively referred to as an interlocking plant or just as an interlocking. An interlocking system is designed so that it is impossible to display a signal to proceed unless the route to be used is proven safe.

The tower and tracks at Deval interlocking, Des Plaines, Illinois, in 1993

Interlocking is a safety measure designed to prevent signals and points/switches from being changed in an improper sequence. For example, interlocking would prevent a signal from being changed to indicate a diverging route, unless the corresponding points/switches had been changed first. In North America, the official railroad definition of interlocking is: "An arrangement of signals and signal appliances so interconnected that their movements must succeed each other in proper sequence".[1]

Configuration and use edit

 
A model board and lever machine

A minimal interlocking consists of signals, but usually includes additional appliances such as points and Facing Point locks (US: switches) and derails, and may include crossings at grade and movable bridges. Some of the fundamental principles of interlocking include:

  • Signals may not be operated to permit conflicting train movements to take place at the same time on set route.
  • Switches and other appliances in the route must be properly 'set' (in position) before a signal may allow train movements to enter that route.
  • Once a route is set and a train is given a signal to proceed over that route, all switches and other movable appliances in the route are locked in position until either
    • the train passes out of the portion of the route affected, or
    • the signal to proceed is withdrawn and sufficient time has passed to ensure that a train approaching that route has had opportunity to come to a stop before passing the signal.

History edit

Railway interlocking is of British origin, where numerous patents were granted. In June 1856, John Saxby received the first patent for interlocking switches and signals.[2][3]: 23–24  In 1868, Saxby (of Saxby & Farmer)[4] was awarded a patent for what is known today in North America as “preliminary latch locking”.[5][6] Preliminary latch locking became so successful that by 1873, 13,000 mechanical locking levers were employed on the London and North Western Railway alone.[6][7]

The first experiment with mechanical interlocking in the United States took place in 1875 by J. M. Toucey and William Buchanan at Spuyten Duyvil Junction in New York on the New York Central and Hudson River Railroad (NYC&HRR).[6][7][8] At the time, Toucey was General Superintendent and Buchanan was Superintendent of Machinery on the NYC&HRR. Toucey and Buchanan formed the Toucey and Buchanan Interlocking Switch and Signal Company in Harrisburg, Pennsylvania in 1878. The first important installations of their mechanism were on the switches and signals of the Manhattan Elevated Railroad Company and the New York Elevated Railroad Company in 1877–78.[6] Compared to Saxby's design, Toucey and Buchanans' interlocking mechanism was more cumbersome and less sophisticated, and so was not implemented very widely.[8] Union Switch & Signal bought their company in 1882.[8]

As technology advanced the railway signaling industry looked to incorporate these new technologies into interlockings to increase the speed of route setting, the number of appliances controlled from a single point and to expand the distance that those same appliances could be operated from the point of control. The challenge facing the signal industry was achieving the same level of safety and reliability that was inherent to purely mechanical systems. An experimental hydro-pneumatic[9] interlocking was installed at the Bound Brook, New Jersey junction of the Philadelphia and Reading Railroad and the Lehigh Valley Railroad in 1884.[6][7] By 1891, there were 18 hydro-pneumatic plants, on six railroads, operating a total of 482 levers.[6] The installations worked, but there were serious defects in the design, and little saving of labour was achieved.

The inventors of the hydro-pneumatic system moved forward to an electro-pneumatic system in 1891 and this system, best identified with the Union Switch & Signal Company, was first installed on the Chicago and Northern Pacific Railroad at its drawbridge across the Chicago River.[7] By 1900, 54 electro-pneumatic interlocking plants, controlling a total of 1,864 interlocking levers, were in use on 13 North American railroads. This type of system would remain one of two viable competing systems into the future, although it did have the disadvantage of needing extra single-use equipment and requiring high maintenance.[7]

Interlockings using electric motors for moving switches and signals became viable in 1894, when Siemens in Austria installed the first such interlocking at Přerov (now in the Czech Republic).[10] Another interlocking of this type was installed in Westend near Berlin in 1896.[11] In North America, the first installation of an interlocking plant using electric switch machines was at Eau Claire, Wisconsin on the Chicago, St. Paul, Minneapolis and Omaha Railway in 1901, by General Railway Signal Company (GRS, now a unit of Alstom, headquartered in Levallois-Perret, near Paris).[7] By 1913, this type system had been installed on 83 railroads in 35 US States and Canadian Provinces, in 440 interlocking plants using 21,370 levers.[6]

Interlocking types edit

Interlockings can be categorized as mechanical, electrical (electro-mechanical or relay-based), or electronic/computer-based.

Mechanical interlocking edit

 
A view of the locking bed inside Deval Tower, Des Plaines, Illinois

In mechanical interlocking plants, a locking bed is constructed, consisting of steel bars forming a grid. The levers that operate switches, derails, signals or other appliances are connected to the bars running in one direction. The bars are constructed so that if the function controlled by a given lever conflicts with that controlled by another lever, mechanical interference is set up in the cross locking between the two bars, in turn preventing the conflicting lever movement from being made.

In purely mechanical plants, the levers operate the field devices, such as signals, directly via a mechanical rodding or wire connection. The levers are about shoulder height since they must supply a mechanical advantage for the operator. Cross locking of levers was effected such that the extra leverage could not defeat the locking (preliminary latch lock).

The first mechanical interlocking was installed in 1843 at Bricklayers Arms Junction, England.[12]: 7 

Electro-mechanical interlocking edit

Power interlockings may also use mechanical locking to ensure the proper sequencing of levers, but the levers are considerably smaller as they themselves do not directly control the field devices. If the lever is free to move based on the locking bed, contacts on the levers actuate the switches and signals which are operated electrically or electro-pneumatically. Before a control lever may be moved into a position which would release other levers, a signal must be received from the field element that it has actually moved into the position requested. The locking bed shown is for a GRS power interlocking machine.

Relay interlocking edit

 
Part of a relay interlocking using miniature plug-in relays

Interlockings effected purely electrically (sometimes referred to as all-electric) consist of complex circuitry made up of relays in an arrangement of relay logic that ascertain the state or position of each signal appliance. As appliances are operated, their change of position opens some circuits that lock out other appliances that would conflict with the new position. Similarly, other circuits are closed when the appliances they control become safe to operate. Equipment used for railroad signalling tends to be expensive because of its specialized nature and fail-safe design.

Interlockings operated solely by electrical circuitry may be operated locally or remotely, with the large mechanical levers of previous systems being replaced by buttons, switches or toggles on a panel or video interface. Such an interlocking may also be designed to operate without a human operator. These arrangements are termed automatic interlockings, and the approach of a train sets its own route automatically, provided no conflicting movements are in progress.

GRS manufactured the first all-relay interlocking system in 1929. It was installed in Lincoln, Nebraska on the Chicago, Burlington and Quincy Railroad.[12]: 18 

 
Control panel for a US&S relay interlocking

Entrance-Exit Interlocking (NX) was the original brand name of the first generation relay-based centralized traffic control (CTC) interlocking system introduced in 1936 by GRS[13] (represented in Europe by Metropolitan-Vickers). The advent of all electric interlocking technology allowed for more automated route setting procedures as opposed to having an operator line each part of the route manually. The NX system allowed an operator looking at the diagram of a complicated junction to simply push a button on the known entrance track and another button on the desired exit track. The logic circuitry handled all the necessary actions of commanding the underlying relay interlocking to set signals and throw switches in the proper sequence, as required to provide valid route through the interlocking plant. The first NX installation was in 1937 at Brunswick on the Cheshire Lines, UK. The first US installation was on the New York Central Railroad (NYCRR) at Girard Junction, Ohio in 1937.[12]: 18  Another NYCRR installation was on the main line between Utica, New York and Rochester, New York, and this was quickly followed up by three installations on the New York City Subway's IND Fulton Street Line in 1948.[14][15]

Other NX style systems were implemented by other railroad signal providers. For example, Union Route (UR) was the brand name of their Entrance-Exit system supplied by Union Switch & Signal Co. (US&S), and introduced in 1951.[16] NX type systems and their costly pre-solid state control logic only tended to be installed in the busier or more complicated terminal areas where it could increase capacity and reduce staffing requirements. In a move that was popular in Europe, the signalling for an entire area was condensed into a single large power signal box with a control panel in the operator's area and the equivalent of a telephone exchange in the floors below that combined the vital relay based interlocking logic and non-vital control logic in one place. Such advanced schemes would also include train describer and train tracking technologies. Away from complex terminals unit lever control systems remained popular until the 1980s when solid state interlocking and control systems began to replace the older relay plants of all types.

Electronic interlocking edit

 
Computer-based controls for a modern electronic interlocking

Modern interlockings (those installed since the late 1980s) are generally solid state, where the wired networks of relays are replaced by software logic running on special-purpose control hardware.[3]: 84  The fact that the logic is implemented by software rather than hard-wired circuitry greatly facilitates the ability to make modifications when needed by reprogramming rather than rewiring. In many implementations, this vital logic is stored as firmware or in ROM that cannot be easily altered to both resist unsafe modification and meet regulatory safety testing requirements. As display technology improved, the hard wired physical devices could be updated with visual display units (computer monitors), which allowed changes in field equipment be represented to the signaller without any hardware modifications.

"Solid State Interlocking" (SSI) is the brand name in trade of work of the first generation microprocessor-based interlocking developed in the 1980s by British Rail, GEC-General Signal and Westinghouse Signals Ltd in the UK. Second generation processor-based interlockings are known by the term "Computer Based Interlocking" (CBI),[17] of which VPI (trademark of General Railway Signal, now Alstom), MicroLok (trademark of Union Switch & Signal, now Hitachi Rail STS), Westlock and Westrace (trademarks of Invensys Rail, now Siemens), and [Smartlock[18]] (trademark of Alstom), and EBI Lock (trademark of Bombardier) are examples.

Defined forms of locking edit

Electric locking
"The combination of one or more electric locks or controlling circuits by means of which levers in an interlocking machine, or switches or other devices operated in connection with signalling and interlocking, are secured against operation under certain conditions."[19]
Section locking
"Electric locking effective while a train occupies a given section of a route and adapted to prevent manipulation of levers that would endanger the train while it is within that section."[19]
Route locking
"Electric locking taking effect when a train passes a signal and adapted to prevent manipulation of levers that would endanger the train while it is within the limits of the route entered."[19]
Sectional route locking
"Route locking so arranged that a train, in clearing each section of the route, releases the locking affecting that section."[19]
Approach locking
"Electric locking effective while a train is approaching a signal that has been set for it to proceed and adapted to prevent manipulation of levers or devices that would endanger that train."[19]
Stick locking
"Electric locking taking effect upon the setting of a signal for a train to proceed, released by a passing train, and adapted to prevent manipulation of levers that would endanger an approaching train."[19]
Indication locking
"Electric locking adapted to prevent any manipulation of levers that would bring about an unsafe condition in case a signal, switch, or other operated device fails to make a movement corresponding with that of the operating lever; or adapted directly to prevent the operation of one device in case another device, to be operated first, fails to make the required movement."[19]
Check locking or traffic locking
"Electric locking that enforces cooperation between the Operators at two adjacent plants in such a manner that prevents opposing signals governing the same track from being set to proceed at the same time. In addition, after a signal has been cleared and accepted by a train, check locking prevents an opposing signal at the adjacent interlocking plant from being cleared until the train has passed through that plant."[19]

Complete and incomplete interlockings (U.S. terminology) edit

Interlockings allow trains to cross from one track to another using a turnout and a series of switches. Railroad terminology defines the following types of interlockings as either complete or incomplete depending on the movements available. Although timetables generally do not identify an interlocking as one or the other, and rule books do not define the terms, the terms below are generally agreed upon by system crews and rules officials.

Complete interlockings
allow continuous movements from any track on one side of the interlocking to any track on the opposite side without the use of a reverse move within the limits of the interlocking. This is true even if there are differing numbers of tracks on opposing sides, or if the interlocking has multiple sides.
Incomplete interlockings
do not allow such movements as described above. Movements in an incomplete interlocking may be limited and may even require reverse movements to achieve the desired route.

See also edit

References edit

  1. ^ Josserand, Peter; Forman, Harry Willard (1957). Rights of Trains (5th ed.). New York: Simmons-Boardman Publishing Corporation. p. 5. OCLC 221677266. Definitions.
  2. ^ "Death of John Saxby". Railway Age Gazette. Simmons-Boardman Publishing Corporation. 54 (20): 1102. 26 May 1913. OCLC 15110423.
  3. ^ a b Solomon, Brian (2003). Railroad Signaling. St Paul, Minnesota: MBI Publishing Company. ISBN 978-0-7603-1360-2. OCLC 52464704.
  4. ^ The first manufacturer of signal equipment, the predecessor of Westinghouse Brake and Signal Company Ltd, and today’s Westinghouse Rail Systems, Ltd. (headquartered in Chippenham, Wiltshire)
  5. ^ US patent 80878, John Saxby & John Stinson Farmer, "Improved Switch and Signal", issued 11 August 1868 
  6. ^ a b c d e f g "Landmarks in Signaling History". Railway Age Gazette. Simmons-Boardman Publishing Corporation. 61 (4): 161. 28 July 1916.
  7. ^ a b c d e f General Railway Signal Company (1913). Sperry, Henry M. (ed.). Electric Interlocking Handbook. Rochester, New York: General Railway Signal Company. pp. 5–12. OCLC 3527846.
  8. ^ a b c Calvert, J. B. "Toucey and Buchanan Interlocking". Railways: History, Signalling, Engineering. from the original on 23 April 2012. Retrieved 28 December 2011.
  9. ^ A system whereby compressed water and air are used to transmit action from one end of a long tube to the other end. It can be effective, but it still qualifies as a mechanical system since the pressure is pre-loaded, and requires human action of the same sort that a pure mechanical system requires.
  10. ^ Lexikon der gesamten Technik, entry "Stellwerke"
  11. ^ "Berliner Stellwerke". from the original on 28 November 2012. Retrieved 24 November 2012.
  12. ^ a b c Alstom Signaling Incorporated (2004). (PDF). West Henrietta, New York: Alstom. Archived from the original (PDF) on 2 October 2011. Retrieved 27 December 2011.
  13. ^ General Railway Signal Company (1936). The NX System of Electric Interlocking (PDF). Rochester, New York. OCLC 184909207. (PDF) from the original on 2010-11-28.{{cite book}}: CS1 maint: location missing publisher (link)
  14. ^ "Signaling and Interlocking On New Line of New York Subways". Railway Signaling and Communications. Simmons-Boardman Publishing Corporation.: 578–583 September 1949. Retrieved 27 December 2016.
  15. ^ "Buttons to Speed Travel in Subway: $2,000,000 System of Signals Soon to Be in Operation on Brooklyn IND Division" (PDF). The New York Times. November 12, 1948. Retrieved 27 December 2016.[dead link]
  16. ^ US patent 2567887, Ronald A. McCann, "Entrance-exit route interlocking control apparatus", issued 11 September 1951, assigned to The Union Switch and Signal Company 
  17. ^ Woolford, Paul (April 2004). (PDF) (Report). Railway Group Guidance Note GK/GN0802. London: Rail Safety and Standards Board. Archived from the original (PDF) on 8 May 2016. Retrieved 20 April 2016.
  18. ^ "Smartlock Interlocking". www.alstom.com. from the original on 8 October 2017. Retrieved 4 May 2018.
  19. ^ a b c d e f g h Defined by the Railway Signal Association, which today is the Railway Signal Committee of the Association of American Railroads.
  • Elliott, W.H. (1896). Block and Interlocking Signals. New York: Locomotive Engineering. pp. 143ff.
  • Ganguly, Sri Subhasis. "History of Railway Signalling." Accessed 2011-05-06.
  • Solomon, Brian (2010). Railroad Signaling. Minneapolis, Minnesota: Voyageur Press. pp. 23ff. ISBN 978-0-7603-3881-0.

External links edit

  • Calvert, J.B.
  • Interlocking (1927 New Zealand article by A. S. Henderson)
  • Kleinstadt.zip "Full free version of an interlocking plant based on German Relay Principles" (English, German, Dutch, French languages)
  • Director of S&T Engineering, West Midlands Project Group "Mechanical Interlocking."

interlocking, term, music, hocket, electronics, computing, interlock, engineering, railway, signalling, interlocking, arrangement, signal, apparatus, that, prevents, conflicting, movements, through, arrangement, tracks, such, junctions, crossings, north, ameri. For use of the term in music see Hocket For use in electronics and computing see Interlock engineering In railway signalling an interlocking is an arrangement of signal apparatus that prevents conflicting movements through an arrangement of tracks such as junctions or crossings In North America a set of signalling appliances and tracks interlocked together are sometimes collectively referred to as an interlocking plant or just as an interlocking An interlocking system is designed so that it is impossible to display a signal to proceed unless the route to be used is proven safe The tower and tracks at Deval interlocking Des Plaines Illinois in 1993Interlocking is a safety measure designed to prevent signals and points switches from being changed in an improper sequence For example interlocking would prevent a signal from being changed to indicate a diverging route unless the corresponding points switches had been changed first In North America the official railroad definition of interlocking is An arrangement of signals and signal appliances so interconnected that their movements must succeed each other in proper sequence 1 Contents 1 Configuration and use 2 History 3 Interlocking types 3 1 Mechanical interlocking 3 2 Electro mechanical interlocking 3 3 Relay interlocking 3 4 Electronic interlocking 4 Defined forms of locking 5 Complete and incomplete interlockings U S terminology 6 See also 7 References 8 External linksConfiguration and use edit nbsp A model board and lever machineA minimal interlocking consists of signals but usually includes additional appliances such as points and Facing Point locks US switches and derails and may include crossings at grade and movable bridges Some of the fundamental principles of interlocking include Signals may not be operated to permit conflicting train movements to take place at the same time on set route Switches and other appliances in the route must be properly set in position before a signal may allow train movements to enter that route Once a route is set and a train is given a signal to proceed over that route all switches and other movable appliances in the route are locked in position until either the train passes out of the portion of the route affected or the signal to proceed is withdrawn and sufficient time has passed to ensure that a train approaching that route has had opportunity to come to a stop before passing the signal History editRailway interlocking is of British origin where numerous patents were granted In June 1856 John Saxby received the first patent for interlocking switches and signals 2 3 23 24 In 1868 Saxby of Saxby amp Farmer 4 was awarded a patent for what is known today in North America as preliminary latch locking 5 6 Preliminary latch locking became so successful that by 1873 13 000 mechanical locking levers were employed on the London and North Western Railway alone 6 7 The first experiment with mechanical interlocking in the United States took place in 1875 by J M Toucey and William Buchanan at Spuyten Duyvil Junction in New York on the New York Central and Hudson River Railroad NYC amp HRR 6 7 8 At the time Toucey was General Superintendent and Buchanan was Superintendent of Machinery on the NYC amp HRR Toucey and Buchanan formed the Toucey and Buchanan Interlocking Switch and Signal Company in Harrisburg Pennsylvania in 1878 The first important installations of their mechanism were on the switches and signals of the Manhattan Elevated Railroad Company and the New York Elevated Railroad Company in 1877 78 6 Compared to Saxby s design Toucey and Buchanans interlocking mechanism was more cumbersome and less sophisticated and so was not implemented very widely 8 Union Switch amp Signal bought their company in 1882 8 As technology advanced the railway signaling industry looked to incorporate these new technologies into interlockings to increase the speed of route setting the number of appliances controlled from a single point and to expand the distance that those same appliances could be operated from the point of control The challenge facing the signal industry was achieving the same level of safety and reliability that was inherent to purely mechanical systems An experimental hydro pneumatic 9 interlocking was installed at the Bound Brook New Jersey junction of the Philadelphia and Reading Railroad and the Lehigh Valley Railroad in 1884 6 7 By 1891 there were 18 hydro pneumatic plants on six railroads operating a total of 482 levers 6 The installations worked but there were serious defects in the design and little saving of labour was achieved The inventors of the hydro pneumatic system moved forward to an electro pneumatic system in 1891 and this system best identified with the Union Switch amp Signal Company was first installed on the Chicago and Northern Pacific Railroad at its drawbridge across the Chicago River 7 By 1900 54 electro pneumatic interlocking plants controlling a total of 1 864 interlocking levers were in use on 13 North American railroads This type of system would remain one of two viable competing systems into the future although it did have the disadvantage of needing extra single use equipment and requiring high maintenance 7 Interlockings using electric motors for moving switches and signals became viable in 1894 when Siemens in Austria installed the first such interlocking at Prerov now in the Czech Republic 10 Another interlocking of this type was installed in Westend near Berlin in 1896 11 In North America the first installation of an interlocking plant using electric switch machines was at Eau Claire Wisconsin on the Chicago St Paul Minneapolis and Omaha Railway in 1901 by General Railway Signal Company GRS now a unit of Alstom headquartered in Levallois Perret near Paris 7 By 1913 this type system had been installed on 83 railroads in 35 US States and Canadian Provinces in 440 interlocking plants using 21 370 levers 6 Interlocking types editInterlockings can be categorized as mechanical electrical electro mechanical or relay based or electronic computer based Mechanical interlocking edit See also Lever frame nbsp A view of the locking bed inside Deval Tower Des Plaines IllinoisIn mechanical interlocking plants a locking bed is constructed consisting of steel bars forming a grid The levers that operate switches derails signals or other appliances are connected to the bars running in one direction The bars are constructed so that if the function controlled by a given lever conflicts with that controlled by another lever mechanical interference is set up in the cross locking between the two bars in turn preventing the conflicting lever movement from being made In purely mechanical plants the levers operate the field devices such as signals directly via a mechanical rodding or wire connection The levers are about shoulder height since they must supply a mechanical advantage for the operator Cross locking of levers was effected such that the extra leverage could not defeat the locking preliminary latch lock The first mechanical interlocking was installed in 1843 at Bricklayers Arms Junction England 12 7 Electro mechanical interlocking edit Power interlockings may also use mechanical locking to ensure the proper sequencing of levers but the levers are considerably smaller as they themselves do not directly control the field devices If the lever is free to move based on the locking bed contacts on the levers actuate the switches and signals which are operated electrically or electro pneumatically Before a control lever may be moved into a position which would release other levers a signal must be received from the field element that it has actually moved into the position requested The locking bed shown is for a GRS power interlocking machine Relay interlocking edit nbsp Part of a relay interlocking using miniature plug in relaysInterlockings effected purely electrically sometimes referred to as all electric consist of complex circuitry made up of relays in an arrangement of relay logic that ascertain the state or position of each signal appliance As appliances are operated their change of position opens some circuits that lock out other appliances that would conflict with the new position Similarly other circuits are closed when the appliances they control become safe to operate Equipment used for railroad signalling tends to be expensive because of its specialized nature and fail safe design Interlockings operated solely by electrical circuitry may be operated locally or remotely with the large mechanical levers of previous systems being replaced by buttons switches or toggles on a panel or video interface Such an interlocking may also be designed to operate without a human operator These arrangements are termed automatic interlockings and the approach of a train sets its own route automatically provided no conflicting movements are in progress GRS manufactured the first all relay interlocking system in 1929 It was installed in Lincoln Nebraska on the Chicago Burlington and Quincy Railroad 12 18 nbsp Control panel for a US amp S relay interlockingEntrance Exit Interlocking NX was the original brand name of the first generation relay based centralized traffic control CTC interlocking system introduced in 1936 by GRS 13 represented in Europe by Metropolitan Vickers The advent of all electric interlocking technology allowed for more automated route setting procedures as opposed to having an operator line each part of the route manually The NX system allowed an operator looking at the diagram of a complicated junction to simply push a button on the known entrance track and another button on the desired exit track The logic circuitry handled all the necessary actions of commanding the underlying relay interlocking to set signals and throw switches in the proper sequence as required to provide valid route through the interlocking plant The first NX installation was in 1937 at Brunswick on the Cheshire Lines UK The first US installation was on the New York Central Railroad NYCRR at Girard Junction Ohio in 1937 12 18 Another NYCRR installation was on the main line between Utica New York and Rochester New York and this was quickly followed up by three installations on the New York City Subway s IND Fulton Street Line in 1948 14 15 Other NX style systems were implemented by other railroad signal providers For example Union Route UR was the brand name of their Entrance Exit system supplied by Union Switch amp Signal Co US amp S and introduced in 1951 16 NX type systems and their costly pre solid state control logic only tended to be installed in the busier or more complicated terminal areas where it could increase capacity and reduce staffing requirements In a move that was popular in Europe the signalling for an entire area was condensed into a single large power signal box with a control panel in the operator s area and the equivalent of a telephone exchange in the floors below that combined the vital relay based interlocking logic and non vital control logic in one place Such advanced schemes would also include train describer and train tracking technologies Away from complex terminals unit lever control systems remained popular until the 1980s when solid state interlocking and control systems began to replace the older relay plants of all types Electronic interlocking edit nbsp Computer based controls for a modern electronic interlockingModern interlockings those installed since the late 1980s are generally solid state where the wired networks of relays are replaced by software logic running on special purpose control hardware 3 84 The fact that the logic is implemented by software rather than hard wired circuitry greatly facilitates the ability to make modifications when needed by reprogramming rather than rewiring In many implementations this vital logic is stored as firmware or in ROM that cannot be easily altered to both resist unsafe modification and meet regulatory safety testing requirements As display technology improved the hard wired physical devices could be updated with visual display units computer monitors which allowed changes in field equipment be represented to the signaller without any hardware modifications Solid State Interlocking SSI is the brand name in trade of work of the first generation microprocessor based interlocking developed in the 1980s by British Rail GEC General Signal and Westinghouse Signals Ltd in the UK Second generation processor based interlockings are known by the term Computer Based Interlocking CBI 17 of which VPI trademark of General Railway Signal now Alstom MicroLok trademark of Union Switch amp Signal now Hitachi Rail STS Westlock and Westrace trademarks of Invensys Rail now Siemens and Smartlock 18 trademark of Alstom and EBI Lock trademark of Bombardier are examples Defined forms of locking editElectric locking The combination of one or more electric locks or controlling circuits by means of which levers in an interlocking machine or switches or other devices operated in connection with signalling and interlocking are secured against operation under certain conditions 19 Section locking Electric locking effective while a train occupies a given section of a route and adapted to prevent manipulation of levers that would endanger the train while it is within that section 19 Route locking Electric locking taking effect when a train passes a signal and adapted to prevent manipulation of levers that would endanger the train while it is within the limits of the route entered 19 Sectional route locking Route locking so arranged that a train in clearing each section of the route releases the locking affecting that section 19 Approach locking Electric locking effective while a train is approaching a signal that has been set for it to proceed and adapted to prevent manipulation of levers or devices that would endanger that train 19 Stick locking Electric locking taking effect upon the setting of a signal for a train to proceed released by a passing train and adapted to prevent manipulation of levers that would endanger an approaching train 19 Indication locking Electric locking adapted to prevent any manipulation of levers that would bring about an unsafe condition in case a signal switch or other operated device fails to make a movement corresponding with that of the operating lever or adapted directly to prevent the operation of one device in case another device to be operated first fails to make the required movement 19 Check locking or traffic locking Electric locking that enforces cooperation between the Operators at two adjacent plants in such a manner that prevents opposing signals governing the same track from being set to proceed at the same time In addition after a signal has been cleared and accepted by a train check locking prevents an opposing signal at the adjacent interlocking plant from being cleared until the train has passed through that plant 19 Complete and incomplete interlockings U S terminology editInterlockings allow trains to cross from one track to another using a turnout and a series of switches Railroad terminology defines the following types of interlockings as either complete or incomplete depending on the movements available Although timetables generally do not identify an interlocking as one or the other and rule books do not define the terms the terms below are generally agreed upon by system crews and rules officials Complete interlockings allow continuous movements from any track on one side of the interlocking to any track on the opposite side without the use of a reverse move within the limits of the interlocking This is true even if there are differing numbers of tracks on opposing sides or if the interlocking has multiple sides Incomplete interlockings do not allow such movements as described above Movements in an incomplete interlocking may be limited and may even require reverse movements to achieve the desired route See also editBreath alcohol ignition interlock device Fail safe Interlock Engineering Lockout tagout Safety instrumented system Signalling controlReferences edit Josserand Peter Forman Harry Willard 1957 Rights of Trains 5th ed New York Simmons Boardman Publishing Corporation p 5 OCLC 221677266 Definitions Death of John Saxby Railway Age Gazette Simmons Boardman Publishing Corporation 54 20 1102 26 May 1913 OCLC 15110423 a b Solomon Brian 2003 Railroad Signaling St Paul Minnesota MBI Publishing Company ISBN 978 0 7603 1360 2 OCLC 52464704 The first manufacturer of signal equipment the predecessor of Westinghouse Brake and Signal Company Ltd and today s Westinghouse Rail Systems Ltd headquartered in Chippenham Wiltshire US patent 80878 John Saxby amp John Stinson Farmer Improved Switch and Signal issued 11 August 1868 a b c d e f g Landmarks in Signaling History Railway Age Gazette Simmons Boardman Publishing Corporation 61 4 161 28 July 1916 a b c d e f General Railway Signal Company 1913 Sperry Henry M ed Electric Interlocking Handbook Rochester New York General Railway Signal Company pp 5 12 OCLC 3527846 a b c Calvert J B Toucey and Buchanan Interlocking Railways History Signalling Engineering Archived from the original on 23 April 2012 Retrieved 28 December 2011 A system whereby compressed water and air are used to transmit action from one end of a long tube to the other end It can be effective but it still qualifies as a mechanical system since the pressure is pre loaded and requires human action of the same sort that a pure mechanical system requires Lexikon der gesamten Technik entry Stellwerke Berliner Stellwerke Archived from the original on 28 November 2012 Retrieved 24 November 2012 a b c Alstom Signaling Incorporated 2004 A Centennial History of Alstom Signaling Inc PDF West Henrietta New York Alstom Archived from the original PDF on 2 October 2011 Retrieved 27 December 2011 General Railway Signal Company 1936 The NX System of Electric Interlocking PDF Rochester New York OCLC 184909207 Archived PDF from the original on 2010 11 28 a href Template Cite book html title Template Cite book cite book a CS1 maint location missing publisher link Signaling and Interlocking On New Line of New York Subways Railway Signaling and Communications Simmons Boardman Publishing Corporation 578 583 September 1949 Retrieved 27 December 2016 Buttons to Speed Travel in Subway 2 000 000 System of Signals Soon to Be in Operation on Brooklyn IND Division PDF The New York Times November 12 1948 Retrieved 27 December 2016 dead link US patent 2567887 Ronald A McCann Entrance exit route interlocking control apparatus issued 11 September 1951 assigned to The Union Switch and Signal Company Woolford Paul April 2004 Glossary of Signalling Terms PDF Report Railway Group Guidance Note GK GN0802 London Rail Safety and Standards Board Archived from the original PDF on 8 May 2016 Retrieved 20 April 2016 Smartlock Interlocking www alstom com Archived from the original on 8 October 2017 Retrieved 4 May 2018 a b c d e f g h Defined by the Railway Signal Association which today is the Railway Signal Committee of the Association of American Railroads Elliott W H 1896 Block and Interlocking Signals New York Locomotive Engineering pp 143ff Ganguly Sri Subhasis History of Railway Signalling Accessed 2011 05 06 Solomon Brian 2010 Railroad Signaling Minneapolis Minnesota Voyageur Press pp 23ff ISBN 978 0 7603 3881 0 External links editCalvert J B Principles of Interlocking Interlocking 1927 New Zealand article by A S Henderson Kleinstadt zip Full free version of an interlocking plant based on German Relay Principles English German Dutch French languages Director of S amp T Engineering West Midlands Project Group Mechanical Interlocking Retrieved from https en wikipedia org w index php title Interlocking amp oldid 1174598454 Mechanical interlocking, wikipedia, wiki, book, books, library,