fbpx
Wikipedia

Masaka Inland Container Depot

The Masaka Inland Container Depot (MICD), is a dry port, in Kigali, the capital city and largest city of Rwanda.[1]

Masaka Inland Container Depot
Click on the map for a fullscreen view
Location
CountryRwanda
LocationMasaka, Kigali, Rwanda
Coordinates02°00′49″S 30°12′09″E / 2.01361°S 30.20250°E / -2.01361; 30.20250
Details
OpenedJanuary 2019 (Expected)
Land area30 hectares (74 acres)

Location edit

The facility is located in the neighborhood of Masaka, in the city of Kigali, approximately 17.5 kilometres (11 mi) east of the city's central business district.[2]

Overview edit

In January 2016, the government of Rwanda signed an agreement with Dubai Ports World (DP World) to construct what is officially referred to as the Kigali Logistics Platform (KLP). DP World would then manage and operate the dry depot for 25 years from the date of completion.[3]

The development sits on 30 hectares (74 acres) of real estate. Onsite services include customs inspection and clearance services, revenue service, maintenance and repair facilities, banking facilities and IT facilities.[3]

The dry port will provide for loading and unloading from transport trucks, warehousing, and cold storage. Imports from overseas can also be distributed through the logistics chain to neighboring, Goma and Bukavu cities in D.R Congo's North and South Kivu provinces. The facility is linked to the Port of Dar es Salaam the main entrance point for the Central Corridor.[4]

Construction edit

The first phase of the inland port was constructed between 2016 and 2018, on 13 hectares (32 acres) at a budgeted cost of US$35 million.[4]

The second phase, which is expected to follow the first, includes the construction of modern cold storage facilities on 7 hectares (17 acres). The cost of both phases is budgeted at US$80 million.[4]

See also edit

References edit

  1. ^ Mwai, Collins (15 August 2018). "Construction works of inland cargo handling facility near completion". New Times (Rwanda). Kigali. Retrieved 19 November 2018.
  2. ^ Globefeed.com (19 November 2018). "Distance between Central Kigali, Rwanda and Masaka, Kigali, Rwanda". Globefeed.com. Retrieved 19 November 2018.
  3. ^ a b Tuyishime, Denyse (16 October 2017). "Rwanda's $80M Inland Port Due Next Year". KTPress Rwanda. Kigali. Retrieved 19 November 2018.
  4. ^ a b c Mugisha, Ivan (18 November 2018). "Masaka ICD to open in January, cutting time and cost of imports to the region". The EastAfrican. Nairobi. Retrieved 19 November 2018.

External links edit

  • Kigali cargo hub plans face hurdles As of 7 July 2018.

masaka, inland, container, depot, micd, port, kigali, capital, city, largest, city, rwanda, click, fullscreen, viewlocationcountryrwandalocationmasaka, kigali, rwandacoordinates02, 01361, 20250, 01361, 20250detailsopenedjanuary, 2019, expected, land, area30, h. The Masaka Inland Container Depot MICD is a dry port in Kigali the capital city and largest city of Rwanda 1 Masaka Inland Container DepotClick on the map for a fullscreen viewLocationCountryRwandaLocationMasaka Kigali RwandaCoordinates02 00 49 S 30 12 09 E 2 01361 S 30 20250 E 2 01361 30 20250DetailsOpenedJanuary 2019 Expected Land area30 hectares 74 acres Contents 1 Location 2 Overview 3 Construction 4 See also 5 References 6 External linksLocation editThe facility is located in the neighborhood of Masaka in the city of Kigali approximately 17 5 kilometres 11 mi east of the city s central business district 2 Overview editIn January 2016 the government of Rwanda signed an agreement with Dubai Ports World DP World to construct what is officially referred to as the Kigali Logistics Platform KLP DP World would then manage and operate the dry depot for 25 years from the date of completion 3 The development sits on 30 hectares 74 acres of real estate Onsite services include customs inspection and clearance services revenue service maintenance and repair facilities banking facilities and IT facilities 3 The dry port will provide for loading and unloading from transport trucks warehousing and cold storage Imports from overseas can also be distributed through the logistics chain to neighboring Goma and Bukavu cities in D R Congo s North and South Kivu provinces The facility is linked to the Port of Dar es Salaam the main entrance point for the Central Corridor 4 Construction editThe first phase of the inland port was constructed between 2016 and 2018 on 13 hectares 32 acres at a budgeted cost of US 35 million 4 The second phase which is expected to follow the first includes the construction of modern cold storage facilities on 7 hectares 17 acres The cost of both phases is budgeted at US 80 million 4 See also editIsaka Kigali Standard Gauge Railway Rwanda Standard Gauge RailwayReferences edit Mwai Collins 15 August 2018 Construction works of inland cargo handling facility near completion New Times Rwanda Kigali Retrieved 19 November 2018 Globefeed com 19 November 2018 Distance between Central Kigali Rwanda and Masaka Kigali Rwanda Globefeed com Retrieved 19 November 2018 a b Tuyishime Denyse 16 October 2017 Rwanda s 80M Inland Port Due Next Year KTPress Rwanda Kigali Retrieved 19 November 2018 a b c Mugisha Ivan 18 November 2018 Masaka ICD to open in January cutting time and cost of imports to the region The EastAfrican Nairobi Retrieved 19 November 2018 External links editKigali cargo hub plans face hurdles As of 7 July 2018 Retrieved from https en wikipedia org w index php title Masaka Inland Container Depot amp oldid 1169683483, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.