The Maeslantkering ("Maeslant barrier" in Dutch) is a storm surge barrier on the Nieuwe Waterweg, in South Holland, Netherlands.[1] It was constructed from 1991 to 1997. As part of the Delta Works the barrier responds to water level predictions calculated by a centralized computer system called BOS. It automatically closes when Rotterdam (especially the Port of Rotterdam) is threatened by floods.[2]

Maeslantkering has two 210-metre long barrier gates, with two 237-metre long steel trusses holding each. When closed, the barrier will protect the entire width (360 metres) of the Nieuwe Waterweg, the main waterway of Port of Rotterdam. It is one of the largest moving structures on Earth, rivalling the Green Bank Telescope in the United States and the Bagger 288 excavator in Germany.

The Maeslant Barrier edit

The initial plan edit

The construction of the Maeslantkering was a part of the Europoortkering project which, in turn, was the final stage of the Delta Works. The main objective of this Europoortkering-project was to improve the safety against flooding of the Rotterdam harbour, of which the Europoort is an important part, and the surrounding towns and agricultural areas. To achieve this, the initial plan was to reinforce existing dikes as far as 50 kilometres inland. During the 1980s, it became clear that this project would take at least 30 years and would cost a huge amount of money. It would also mean that historic town centres, in some cases over four centuries old, would have to be broken down and rebuilt behind renewed, larger dikes.

Therefore, the initial plan was put aside and the Ministry of Waterways and Public Works organised a competition in which construction companies could make plans for the construction of a reliable yet relatively cheap storm surge barrier.

The storm surge barrier edit

This storm surge barrier had to be located in the waterway (Nieuwe Maas – the Scheur – Nieuwe Waterweg) that connects Rotterdam with the North Sea. This played an important role in the planning stage of the construction, as this waterway is the main route to the port of Rotterdam, at that time the world's largest port. Therefore, a barrier like the Dutch Oosterscheldekering and the Thames Barrier could not be constructed, as such a barrier would block the shipping route.

The winning plan called for two large floating gates on both dikes of the waterway. A major advantage of this plan was that construction of the storm surge barrier could take place under dry conditions, in dry docks. Other advantages were that no vital parts of the barrier had to be placed under water, and maintenance of the barrier would be easy because of the dry docks. Finally, there would be almost no inconvenience for passing ships. The winning plan was put forward by the BMK consortium (Bouwcombinatie Maeslantkering). This consortium included the contractors HBG (now BAM), Volker Stevin and Hollandia Kloos. The storm surge barrier project was one of the first large Design and Construct projects for which the contractor also prepares the design.

Construction of the barrier edit

The construction of the barrier started in 1991. First, the dry docks were constructed on both shores and a sill was constructed at the bottom of the Nieuwe Waterweg. Then, the two 22-metre high and 210-metre long steel gates were built. After this, 237-metre long steel trusses were welded to the gates. The arms weigh 6,800 tonnes each.[3] The main purpose of the arms is transmitting the immense forces, exerted on the gates while closed, to one single joint at the rear of each gate. During the closing or opening process, this ball-shaped joint gives the gate the opportunity to move freely under the influences of water, wind, and waves. It acts like a ball and socket joint, such as in the human shoulder or hip. The joints were made in the Czech Republic at Škoda Works. The ball-shaped joint is the largest in the world, with a diameter of 10 metres, and weighing 680 tonnes. The construction of the barrier cost 450 million euro. The total Europoortkering-project had cost 660 million euros.

A working 1:250 scale version of the barrier was constructed in the Madurodam miniature village. Its construction took six months. It took six years to construct the real barrier.

Maeslantkering in operation edit

On 10 May 1997, after six years of construction, Queen Beatrix opened the Maeslantkering. The barrier is connected to a computer system which is linked to weather and sea level data. Under normal weather conditions, the two doors themselves are well protected in their dry docks and a 360-metre wide gap in the waterway gives ships enough space to pass without any inconvenience. But when a storm surge of 3 metres above normal sea level is anticipated in Rotterdam, the barrier will be closed automatically. Four hours before the actual closing procedure begins, incoming and outgoing ships are warned. Two hours before closing, the traffic at the Nieuwe Waterweg comes to a standstill. Thirty minutes before closing, the dry docks that contain the gates are flooded. After this, the gates start to float and two so-called "locomobiles" move the gates towards each other. When the gap between the gates is about 1.5 metres wide, water is let inside the hollows of the gates, so that they submerge to the bottom of the waterway. The bottom has been elaborately dug and then laid with layers of broken stone, so that the gates are able to form a relatively watertight fit when submerged. In cases where the gates have to be shut for a prolonged period, which would cause the waters of the Rhine to rise behind them, the gate hollows are partly emptied and floated, so that excess river water runs out to sea, before they are submerged again. The decision-making algorithm that sequences storm surge-triggered events in the Maeslantkering is run entirely by computer.

The Maeslantkering is expected to be closed once every ten years due to storm surge. With the rise in sea levels, the storm surge barrier will need to close more frequently in 50 years time, namely once every five years. In its first 10 years of operation, the barrier was never closed due to a storm.[4] There was one incident when a storm surge of 3 metres was predicted and the protective sequence was initiated. However, during the course of the storm, predictions were revised to a 2.99 m surge and the computer cancelled closure.[citation needed] Eventually, the surge passed harmlessly and the waterway remained open. During the evening of 8 November 2007, the barrier was closed due to a storm surge for the first time.[5] The barrier is closed for testing once a year, usually at the end of September or the beginning of October, just before the beginning of the storm season in mid-October. Activities are held during the closing for the visiting public. The information center publishes information about the closing time and activities on its website.

The Caland canal [nl], located just south of the Nieuwe Waterweg and the Scheuer, visible in some images on this page, is protected by the much smaller Hartelkering storm surge barrier. This barrier is constructed some 5 kilometres further inland.

The software that drives it is written in C++ and consists of 200,000 lines of code for the operational system and 250,000 lines of code for the simulation systems.[6]

The barrier is designed to withstand a storm that has an occurrence of only once in 10,000 years (based on the climate at the time, but this may have to be adjusted for climate change).

8 November 2007 storm edit

In order to test the barrier in actual stormy conditions, the water level threshold at which the computer system would start the closing procedure was lowered from 3.0 m over NAP to 2.6 m, for the duration of the 2007 storm season. On 8 November 2007, a storm from the northwest hit the Dutch coast. A storm surge, high enough to start the barrier's closing procedure, occurred. The barrier was closed due to a storm surge for the first time since its construction.[7] As the Oosterscheldekering and Hartelkering storm surge barriers were also closed, the entire Dutch coast was protected against flooding for the first time since 1976. At 22:00 local time (CET), Dutch TV brought the news that maritime traffic on the Nieuwe Waterweg was shut off. The closing procedure of the Maeslantkering started at 23:10. The barrier was completely closed at 01:00 and was reopened on 9 November around 17:00.

21 December 2023 storm edit

On December 21, 2023 the Maeslantkering was closed automatically at the 300 cm threshold for the first time in history. During the day a forecast had been made that the water level in Rotterdam would reach critical height of 300 cm above NAP at around 23:30. There were discussions to close the Maeslantkering manually before that time, and the Port of Rotterdam started reducing traffic at 16:00. Around 18:00 the traffic across the Nieuwe Waterweg came to a complete standstill. Before the decision was actually made to manually close the Maeslantkering, the computer systems intervened and had begun the automatic closing procedure. Closing started at 20:15, a process which takes about 2 hours. The next day at 4:45 the gates were opened again.[8]

Het Keringhuis, Publiekscentrum Water edit

At the site of the Maeslantkering, there is a visitor center where more background information on water management and the technical details of the barrier itself can be found.

In popular culture edit

  • The barrier was featured on the American television program Extreme Engineering (season 1, episode 8: Holland's Barriers to the Sea).
  • The barrier served as a major plot point for the children's book Mission Hurricane of the 39 Clues series.
  • The barrier was also featured on the History Channel television program Modern Marvels during Levees Education (2006).
  • The barrier was featured in the 2021 Neal Stephenson novel Termination Shock.


 
Panorama of the Maeslantkering

See also edit

References edit

  1. ^ Rekenkracht in macht 2017-10-13 at the Wayback Machine, dekennisvannu.nl (in Dutch), 12/5/2012.
  2. ^ "Deltawerken - Parts". www.deltawerken.com. from the original on 2021-01-22. Retrieved 2021-07-24.
  3. ^ "Maeslant Barrier". Structurae. from the original on 2015-12-27. Retrieved 2015-12-26.
  4. ^ Michael Kimmelman. (2017-06-15). The Dutch Have Solutions to Rising Seas. The World Is Watching. 2017-06-15 at the Wayback Machine. New York Times. Retrieved 2017-06-17.
  5. ^ "North Sea flood tide fears recede". November 9, 2007. from the original on November 9, 2007. Retrieved November 8, 2007 – via news.bbc.co.uk.
  6. ^ Jan Tretmans. (2000-10-22). Software Engineering with Formal Methods: The Development of a Storm Surge Barrier Control System 2015-04-02 at the Wayback Machine. Telematica Instituut. Retrieved 2008-04-14.
  7. ^ "BBC NEWS - Europe - North Sea flood tide fears recede". news.bbc.co.uk. from the original on 2007-11-09. Retrieved 2007-11-08.
  8. ^ "Maeslantkering weer open na unieke sluiting, overstromingen in regio voorkomen" (in Dutch). AD.nl. Retrieved 2023-12-22.

External links edit

  • keringhuis.nl - Comprehensive home page of the Maeslant Barrier, with a lot of interesting flash movies and visiting hours of the storm surge barrier.
  • deltaWorks.org 2007-09-27 at the Wayback Machine - DeltaWorks Online reports on Maeslantbarrier. Includes video, virtual tour and flash animations
  • Storm Surge Warning Service - homepage of the Dutch storm surge warning service
  • Maeslantkering YouTube

maeslantkering, this, section, needs, additional, citations, verification, please, help, improve, this, article, adding, citations, reliable, sources, this, section, unsourced, material, challenged, removed, june, 2009, learn, when, remove, this, template, mes. This section needs additional citations for verification Please help improve this article by adding citations to reliable sources in this section Unsourced material may be challenged and removed June 2009 Learn how and when to remove this template message 51 57 19 N 4 9 50 E 51 95528 N 4 16389 E 51 95528 4 16389 The Maeslant Barrier seen from the northLocation of the Maeslant BarrierA ship passing the barrierModel no longer present The Maeslantkering closedThe Maeslantkering Maeslant barrier in Dutch is a storm surge barrier on the Nieuwe Waterweg in South Holland Netherlands 1 It was constructed from 1991 to 1997 As part of the Delta Works the barrier responds to water level predictions calculated by a centralized computer system called BOS It automatically closes when Rotterdam especially the Port of Rotterdam is threatened by floods 2 Maeslantkering has two 210 metre long barrier gates with two 237 metre long steel trusses holding each When closed the barrier will protect the entire width 360 metres of the Nieuwe Waterweg the main waterway of Port of Rotterdam It is one of the largest moving structures on Earth rivalling the Green Bank Telescope in the United States and the Bagger 288 excavator in Germany Contents 1 The Maeslant Barrier 1 1 The initial plan 1 2 The storm surge barrier 1 3 Construction of the barrier 1 4 Maeslantkering in operation 1 5 8 November 2007 storm 1 6 21 December 2023 storm 2 Het Keringhuis Publiekscentrum Water 3 In popular culture 4 See also 5 References 6 External linksThe Maeslant Barrier editThe initial plan edit The construction of the Maeslantkering was a part of the Europoortkering project which in turn was the final stage of the Delta Works The main objective of this Europoortkering project was to improve the safety against flooding of the Rotterdam harbour of which the Europoort is an important part and the surrounding towns and agricultural areas To achieve this the initial plan was to reinforce existing dikes as far as 50 kilometres inland During the 1980s it became clear that this project would take at least 30 years and would cost a huge amount of money It would also mean that historic town centres in some cases over four centuries old would have to be broken down and rebuilt behind renewed larger dikes Therefore the initial plan was put aside and the Ministry of Waterways and Public Works organised a competition in which construction companies could make plans for the construction of a reliable yet relatively cheap storm surge barrier The storm surge barrier edit This storm surge barrier had to be located in the waterway Nieuwe Maas the Scheur Nieuwe Waterweg that connects Rotterdam with the North Sea This played an important role in the planning stage of the construction as this waterway is the main route to the port of Rotterdam at that time the world s largest port Therefore a barrier like the Dutch Oosterscheldekering and the Thames Barrier could not be constructed as such a barrier would block the shipping route The winning plan called for two large floating gates on both dikes of the waterway A major advantage of this plan was that construction of the storm surge barrier could take place under dry conditions in dry docks Other advantages were that no vital parts of the barrier had to be placed under water and maintenance of the barrier would be easy because of the dry docks Finally there would be almost no inconvenience for passing ships The winning plan was put forward by the BMK consortium Bouwcombinatie Maeslantkering This consortium included the contractors HBG now BAM Volker Stevin and Hollandia Kloos The storm surge barrier project was one of the first large Design and Construct projects for which the contractor also prepares the design Construction of the barrier edit The construction of the barrier started in 1991 First the dry docks were constructed on both shores and a sill was constructed at the bottom of the Nieuwe Waterweg Then the two 22 metre high and 210 metre long steel gates were built After this 237 metre long steel trusses were welded to the gates The arms weigh 6 800 tonnes each 3 The main purpose of the arms is transmitting the immense forces exerted on the gates while closed to one single joint at the rear of each gate During the closing or opening process this ball shaped joint gives the gate the opportunity to move freely under the influences of water wind and waves It acts like a ball and socket joint such as in the human shoulder or hip The joints were made in the Czech Republic at Skoda Works The ball shaped joint is the largest in the world with a diameter of 10 metres and weighing 680 tonnes The construction of the barrier cost 450 million euro The total Europoortkering project had cost 660 million euros A working 1 250 scale version of the barrier was constructed in the Madurodam miniature village Its construction took six months It took six years to construct the real barrier Maeslantkering in operation edit On 10 May 1997 after six years of construction Queen Beatrix opened the Maeslantkering The barrier is connected to a computer system which is linked to weather and sea level data Under normal weather conditions the two doors themselves are well protected in their dry docks and a 360 metre wide gap in the waterway gives ships enough space to pass without any inconvenience But when a storm surge of 3 metres above normal sea level is anticipated in Rotterdam the barrier will be closed automatically Four hours before the actual closing procedure begins incoming and outgoing ships are warned Two hours before closing the traffic at the Nieuwe Waterweg comes to a standstill Thirty minutes before closing the dry docks that contain the gates are flooded After this the gates start to float and two so called locomobiles move the gates towards each other When the gap between the gates is about 1 5 metres wide water is let inside the hollows of the gates so that they submerge to the bottom of the waterway The bottom has been elaborately dug and then laid with layers of broken stone so that the gates are able to form a relatively watertight fit when submerged In cases where the gates have to be shut for a prolonged period which would cause the waters of the Rhine to rise behind them the gate hollows are partly emptied and floated so that excess river water runs out to sea before they are submerged again The decision making algorithm that sequences storm surge triggered events in the Maeslantkering is run entirely by computer The Maeslantkering is expected to be closed once every ten years due to storm surge With the rise in sea levels the storm surge barrier will need to close more frequently in 50 years time namely once every five years In its first 10 years of operation the barrier was never closed due to a storm 4 There was one incident when a storm surge of 3 metres was predicted and the protective sequence was initiated However during the course of the storm predictions were revised to a 2 99 m surge and the computer cancelled closure citation needed Eventually the surge passed harmlessly and the waterway remained open During the evening of 8 November 2007 the barrier was closed due to a storm surge for the first time 5 The barrier is closed for testing once a year usually at the end of September or the beginning of October just before the beginning of the storm season in mid October Activities are held during the closing for the visiting public The information center publishes information about the closing time and activities on its website The Caland canal nl located just south of the Nieuwe Waterweg and the Scheuer visible in some images on this page is protected by the much smaller Hartelkering storm surge barrier This barrier is constructed some 5 kilometres further inland The software that drives it is written in C and consists of 200 000 lines of code for the operational system and 250 000 lines of code for the simulation systems 6 The barrier is designed to withstand a storm that has an occurrence of only once in 10 000 years based on the climate at the time but this may have to be adjusted for climate change 8 November 2007 storm edit In order to test the barrier in actual stormy conditions the water level threshold at which the computer system would start the closing procedure was lowered from 3 0 m over NAP to 2 6 m for the duration of the 2007 storm season On 8 November 2007 a storm from the northwest hit the Dutch coast A storm surge high enough to start the barrier s closing procedure occurred The barrier was closed due to a storm surge for the first time since its construction 7 As the Oosterscheldekering and Hartelkering storm surge barriers were also closed the entire Dutch coast was protected against flooding for the first time since 1976 At 22 00 local time CET Dutch TV brought the news that maritime traffic on the Nieuwe Waterweg was shut off The closing procedure of the Maeslantkering started at 23 10 The barrier was completely closed at 01 00 and was reopened on 9 November around 17 00 21 December 2023 storm edit On December 21 2023 the Maeslantkering was closed automatically at the 300 cm threshold for the first time in history During the day a forecast had been made that the water level in Rotterdam would reach critical height of 300 cm above NAP at around 23 30 There were discussions to close the Maeslantkering manually before that time and the Port of Rotterdam started reducing traffic at 16 00 Around 18 00 the traffic across the Nieuwe Waterweg came to a complete standstill Before the decision was actually made to manually close the Maeslantkering the computer systems intervened and had begun the automatic closing procedure Closing started at 20 15 a process which takes about 2 hours The next day at 4 45 the gates were opened again 8 Het Keringhuis Publiekscentrum Water editAt the site of the Maeslantkering there is a visitor center where more background information on water management and the technical details of the barrier itself can be found In popular culture editThe barrier was featured on the American television program Extreme Engineering season 1 episode 8 Holland s Barriers to the Sea The barrier served as a major plot point for the children s book Mission Hurricane of the 39 Clues series The barrier was also featured on the History Channel television program Modern Marvels during Levees Education 2006 The barrier was featured in the 2021 Neal Stephenson novel Termination Shock nbsp Panorama of the MaeslantkeringSee also editNavigation Pass S 1 of Saint Petersburg DamReferences edit Rekenkracht in macht Archived 2017 10 13 at the Wayback Machine dekennisvannu nl in Dutch 12 5 2012 Deltawerken Parts www deltawerken com Archived from the original on 2021 01 22 Retrieved 2021 07 24 Maeslant Barrier Structurae Archived from the original on 2015 12 27 Retrieved 2015 12 26 Michael Kimmelman 2017 06 15 The Dutch Have Solutions to Rising Seas The World Is Watching Archived 2017 06 15 at the Wayback Machine New York Times Retrieved 2017 06 17 North Sea flood tide fears recede November 9 2007 Archived from the original on November 9 2007 Retrieved November 8 2007 via news bbc co uk Jan Tretmans 2000 10 22 Software Engineering with Formal Methods The Development of a Storm Surge Barrier Control System Archived 2015 04 02 at the Wayback Machine Telematica Instituut Retrieved 2008 04 14 BBC NEWS Europe North Sea flood tide fears recede news bbc co uk Archived from the original on 2007 11 09 Retrieved 2007 11 08 Maeslantkering weer open na unieke sluiting overstromingen in regio voorkomen in Dutch AD nl Retrieved 2023 12 22 External links edit nbsp Wikimedia Commons has media related to Maeslantkering keringhuis nl Comprehensive home page of the Maeslant Barrier with a lot of interesting flash movies and visiting hours of the storm surge barrier deltaWorks org Archived 2007 09 27 at the Wayback Machine DeltaWorks Online reports on Maeslantbarrier Includes video virtual tour and flash animations Storm Surge Warning Service homepage of the Dutch storm surge warning service Maeslantkering YouTube Retrieved from https en wikipedia org w index php title Maeslantkering amp oldid 1191346759, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.