Line 12 of the Beijing Subway (Chinese: 北京地铁12号线; pinyin: běijīng dìtiě shí'èr hàoxiàn) is rapid transit line under construction in Beijing.[4] The line is 29.6 km (18.4 mi) with 20 stations. It is fully underground.[3] The line between Sijiqing and Dongfeng will be opened in 2023, due to planning adjustments east of Dongfeng.[1][2]

Line 12
Construction site of Changchunqiao station in July 2022
Overview
Other name(s)M12 (planned name)
StatusUnder Construction
Termini
  • Sijiqing
  • Dongfeng
Stations20
Service
TypeRapid transit
SystemBeijing Subway
Rolling stock8-car Type A
History
Planned opening2023 (planned)[1][2]
Technical
Line length29.6 km (18.4 mi)
CharacterUnderground[3]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h (50 mph)
Route map

Tiancun yard
Yongding River diversion canal
Sijiqing
Yuandalu
Changchunqiao
outer – inner
Jingmi diversion canal
Suzhouqiao
Renmin Daxue (Renmin Univ.)
Dazhongsi
Jingzhang ICR Qinghuayuan tunnel
Xiaoyue river
Jimenqiao
Beitaipingzhuang
Madian
Anhuaqiao
Anzhenqiao
Heping Xiqiao
Guangximen
Dongtucheng ditch
Ba river
Xibahe
Line 17 (opens 2023)
Jiahuihu – Future Science Park North
connects line 17
Capital Airport Express Beixinqiao
line 10 inner
Sanyuanqiao
line 10 outer
Capital Airport Express Terminal 3
Ba river
Fangyuanli
Gaojiayuan
Jiuxianqiao
CR Track Test Center
(Beijing circular railway)
Beigangzi
Dongba depot
Dongfeng
Beixiao river
Caogezhuangbei
Dongbabeijie

Stations

Station Name Connections Distance
km
English Chinese
Haidian Wuluju (proposed southern extension) 海淀五路居  6 
Sijiqing 四季青
Yuandalu 远大路
Changchunqiao 长春桥  10 
Suzhouqiao 苏州桥  16 
Renmin Daxue (Renmin Univ.) 人民大学  4 
Dazhongsi 大钟寺  13 
Jimenqiao 蓟门桥  Changping 
Beitaipingzhuang 北太平庄  19 
Madian 马甸
Anhuaqiao 安华桥  8 
Anzhenqiao 安贞桥
Heping Xiqiao 和平西桥  5 
Guangximen 光熙门  13 
Xibahe 西坝河  17 
Sanyuanqiao 三元桥  10   Capital Airport 
Fangyuanli 芳园里
Gaojiayuan 高家园  14 
Jiuxianqiao 酒仙桥      
Beigangzi 北岗子
Dongfeng 东风  3 
Dongbabeijie (under planning) 东坝北街

Rolling stock

 
A CRRC Changchun CCD5049 before delivery to Line 12

The line will use 8-car Type A rolling stock.

History

Line 12's route has undergone substantial changes on the planners' drawing board. In the late 1990s, one draft of the subway plan showed Line 12 running from the Beijing South railway station to Huangcun.[5] The Beijing South railway station was then built with subway platforms for only Lines 4 and 14. The old plan of Line 12 is cancelled now.

A new plan of Line 12 was announced at January 2012.[6] In June 2012, there were several media reports listing the planned stations of the line. The final planning of the line started from Sijiqing in Haidian District east to Guanzhuangluxikou in Chaoyang District, following the northern Third Ring Road.[7] The entire line has 21 stations,[4] of which 15 will have transfers with other lines.[8] The line will provide relief for the northern arc of the congested Line 10 loop line.[4]

References

  1. ^ a b "建议加快推进3,12,16,17号线进度". 2021-11-16.
  2. ^ a b "请问北京地铁12号线何时开通". 2021-06-10.
  3. ^ a b . People's Daily. 2018-01-12. Archived from the original on 2019-02-03.
  4. ^ a b c 北京:贯通北三环12号线开建-新华网. news.xinhuanet.com. Retrieved 2017-12-28.
  5. ^ (Chinese) 新闻行业资讯正文精彩关注北京地铁规划一览 2010-11-20 at the Wayback Machine Feb. 2, 2004
  6. ^ (Chinese) "2015年轨道交通长度达708公里 4条“增强版”地铁线2012年开建" 《北京日报》 2017-09-20 at the Wayback Machine 2012-01-13
  7. ^ (Chinese) "北京将再增3条新地铁" 《新京报》 2012-06-16
  8. ^ "北京地铁12号线预计2021年通车 换乘站达15座--财经--人民网". People's Daily. Retrieved 2018-02-10.

line, beijing, subway, line, beijing, subway, chinese, 北京地铁12号线, pinyin, běijīng, dìtiě, shí, hàoxiàn, rapid, transit, line, under, construction, beijing, line, with, stations, fully, underground, line, between, sijiqing, dongfeng, will, opened, 2023, planning. Line 12 of the Beijing Subway Chinese 北京地铁12号线 pinyin beijing ditie shi er haoxian is rapid transit line under construction in Beijing 4 The line is 29 6 km 18 4 mi with 20 stations It is fully underground 3 The line between Sijiqing and Dongfeng will be opened in 2023 due to planning adjustments east of Dongfeng 1 2 Line 12Construction site of Changchunqiao station in July 2022OverviewOther name s M12 planned name StatusUnder ConstructionTerminiSijiqingDongfengStations20ServiceTypeRapid transitSystemBeijing SubwayRolling stock8 car Type AHistoryPlanned opening2023 planned 1 2 TechnicalLine length29 6 km 18 4 mi CharacterUnderground 3 Track gauge1 435 mm 4 ft 8 1 2 in Operating speed80 km h 50 mph Route mapLegendTiancun yardYongding River diversion canalSijiqingYuandaluChangchunqiaoLine 10outer innerJingmi diversion canalSuzhouqiao Line 16Wanpingcheng Bei anheRenmin Daxue Renmin Univ Line 4Tiangongyuan AnheqiaobeiDazhongsiLine 13Xizhimen DongzhimenJingzhang ICR Qinghuayuan tunnelXiaoyue riverJimenqiao Changping lineGuogongzhuang Changping XishankouBeitaipingzhuang Line 19Xingong MudanyuanMadianAnhuaqiao Line 8Yinghai ZhuxinzhuangAnzhenqiaoHeping XiqiaoLine 5Songjiazhuang TiantongyuanbeiGuangximenLine 13Dongzhimen XizhimenDongtucheng ditchBa riverXibahe Line 17 opens 2023 Jiahuihu Future Science Park Northconnects line 17Capital Airport Express Beixinqiaoline 10 innerSanyuanqiao Line 10 and Capital Airport Expressline 10 outerCapital Airport Express Terminal 3Ba riverFangyuanliGaojiayuan Line 14Zhangguozhuang ShangezhuangJiuxianqiaoShuangsha railway and Jingshen HSRCR Track Test Center Beijing circular railway BeigangziDongba depotDongsi ShitiaoDongfeng Line 3Beixiao riverCaogezhuangbeiDongbabeijievte Contents 1 Stations 2 Rolling stock 3 History 4 ReferencesStations EditStation Name Connections DistancekmEnglish ChineseHaidian Wuluju proposed southern extension 海淀五路居 6 Sijiqing 四季青Yuandalu 远大路Changchunqiao 长春桥 10 Suzhouqiao 苏州桥 16 Renmin Daxue Renmin Univ 人民大学 4 Dazhongsi 大钟寺 13 Jimenqiao 蓟门桥 Changping Beitaipingzhuang 北太平庄 19 Madian 马甸Anhuaqiao 安华桥 8 Anzhenqiao 安贞桥Heping Xiqiao 和平西桥 5 Guangximen 光熙门 13 Xibahe 西坝河 17 Sanyuanqiao 三元桥 10 Capital Airport Fangyuanli 芳园里Gaojiayuan 高家园 14 Jiuxianqiao 酒仙桥 Beigangzi 北岗子Dongfeng 东风 3 Dongbabeijie under planning 东坝北街Rolling stock Edit A CRRC Changchun CCD5049 before delivery to Line 12 The line will use 8 car Type A rolling stock History EditLine 12 s route has undergone substantial changes on the planners drawing board In the late 1990s one draft of the subway plan showed Line 12 running from the Beijing South railway station to Huangcun 5 The Beijing South railway station was then built with subway platforms for only Lines 4 and 14 The old plan of Line 12 is cancelled now A new plan of Line 12 was announced at January 2012 6 In June 2012 there were several media reports listing the planned stations of the line The final planning of the line started from Sijiqing in Haidian District east to Guanzhuangluxikou in Chaoyang District following the northern Third Ring Road 7 The entire line has 21 stations 4 of which 15 will have transfers with other lines 8 The line will provide relief for the northern arc of the congested Line 10 loop line 4 References Edit a b 建议加快推进3 12 16 17号线进度 2021 11 16 a b 请问北京地铁12号线何时开通 2021 06 10 a b 北京地铁12号线预计2021年开通 将可换乘10余条地铁线 People s Daily 2018 01 12 Archived from the original on 2019 02 03 a b c 北京 贯通北三环12号线开建 新华网 news xinhuanet com Retrieved 2017 12 28 Chinese 新闻行业资讯正文精彩关注北京地铁规划一览 Archived 2010 11 20 at the Wayback Machine Feb 2 2004 Chinese 2015年轨道交通长度达708公里 4条 增强版 地铁线2012年开建 北京日报 Archived 2017 09 20 at the Wayback Machine 2012 01 13 Chinese 北京将再增3条新地铁 新京报 2012 06 16 北京地铁12号线预计2021年通车 换乘站达15座 财经 人民网 People s Daily Retrieved 2018 02 10 Retrieved from https en wikipedia org w index php title Line 12 Beijing Subway amp oldid 1131713318, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.