fbpx
Wikipedia

Kickapoo Turnpike

The Kickapoo Turnpike is a 19.6-mile (31.5 km) controlled-access toll road in the U.S. state of Oklahoma. The northern section from US 62 to I-44 (Turner Turnpike) opened to traffic on October 13, 2020. The southern segment from I-40 to US 62 opened to traffic on January 5, 2021.[2] It was signed as Interstate 335 (I-335) in Spring 2024, although a connection with I-35 will not be made until the southern extension of the turnpike to Purcell is built.

Kickapoo Turnpike

The Kickapoo Turnpike highlighted in red
Route information
Maintained by the Oklahoma Turnpike Authority
Length19.6 mi[1] (31.5 km)
ExistedOctober 13, 2020–present
Component
highways
Major junctions
South endSE 89th Street in Oklahoma City
Major intersections
North end I-44 / Turner Turnpike in Luther
Location
CountryUnited States
StateOklahoma
Highway system
  • Oklahoma State Highway System

Route description edit

The turnpike begins just east of Luther Road, at an at-grade intersection with SE 89th Street, on the OklahomaCleveland county line. It heads north and features a southbound-only interchange with I-40 a half-mile (800 m) later.[3] There are four other interchanges between its termini: SE 29th Street, Reno Avenue, NE 23rd Street (US-62), and Britton Road.[1] A toll plaza is on the turnpike in the vicinity of Hefner Road and NE 122nd Street.[4] The Kickapoo Turnpike ends at a trumpet interchange with I-44 (Turner Turnpike) in Luther, just east of I-44 exit 146 (the Luther/Jones interchange).[3]

History edit

The turnpike project originally was given the name "Northeast Oklahoma County Loop." The road itself was proposed on October 29, 2015, by Gov. Mary Fallin, as part of the state's Driving Forward initiative.[5] On June 6, 2016, the tollway was approved by the Oklahoma Department of Transportation, under the working title Eastern Oklahoma County Turnpike.[6] In September 2019, "Kickapoo Turnpike" was announced as the tollway's official name.[7]

Construction edit

The first piece of the turnpike to be constructed is the interchange with I-44, at the northern end of the route. Construction on this interchange began in January 2018.[8] Phase 1, which stretches from the Turner Turnpike to US 62 (23rd Street) in Harrah, opened on October 13, 2020. Phase 2, which opened on January 5, 2021,[9] connects the rest of the Turnpike to Interstate 40, linking I-40 directly to Interstate 44 on the eastern side of the Oklahoma City metro. The cost of constructing the Kickapoo Turnpike has been estimated to be more than $440 million (2018 dollars).[4]

Opposition edit

In January 2016, a group calling itself Citizens Opposed to the Eastern Oklahoma County Loop-Turnpike-Interstate was reported to have created a Facebook page in opposition to the proposed turnpike.[10] Following months of meetings and protests, Neal McCaleb, interim director for the Oklahoma Turnpike Authority (OTA), released a statement saying that, because of public input and the work of engineering professionals, the estimated number of homes that would eventually be lost to construction had been reduced by 22 percent, from 103 houses to 80.

In August 2016, a lawsuit was filed against the OTA, claiming that the agency, in issuing $900 million in bonds to be used for multiple toll road projects, was in violation of the Oklahoma Constitution, which stipulates that laws passed may address only one subject.[11] On December 13, 2016, the Oklahoma Supreme Court ruled in favor of the OTA, stating that the agency had properly authorized the bond issue and given "valid notice of this application."[12]

Interstate designation edit

On August 2, 2021, the Oklahoma Transportation Commission approved the designation of the Kickapoo Turnpike as part of an extension of Interstate 240, forming a beltway around Oklahoma City. ODOT Director Tim Gatz stated in the Transportation Commission meeting that the numbering change was primarily to aid in navigation using digital mapping and routing applications. Gatz also said, "If you look at the Interstate 240 designation on the loop around the Oklahoma City metropolitan area, we are finally to the point where we have a truly contiguous route there that can shoulder the burden of some of that transportation need in a loop format. That's common practice across the country, and you'll see that in many of the metropolitan areas, and that update will really be beneficial as far as everything from signage to how do you describe that route on a green-and-white sign." The designation must be approved by the American Association of State Highway and Transportation Officials (AASHTO) and the Federal Highway Administration (FHWA) to take effect.[13]

Future edit

A southern extension of the Turnpike to I-35 is planned.[14] As a result, AASHTO approved an application from ODOT to assign it the interstate designation I-335 in November 2023.[15] In March 2024, the OTA announced that it would be updating signage for the turnpike over the next two months. The current turnpike logo would be removed and replaced with I-335 shields along with the yellow "TOLL" banner. I-240 will not be part of the turnpike and the future interstate will not connect to its parent route until the southern extension is completed.[16]

Tolls edit

On March 1, 2016, toll rates on all turnpikes in Oklahoma increased for the first time since June 2009. The rate hike was implemented to help fund the Driving Forward initiative, which includes improvements and/or extensions to five other Oklahoma toll roads, as well as the construction of the Kickapoo Turnpike from scratch.[17]

As of January 25, 2022, it costs $3.95 with PlatePay ($1.90 with Pikepass) to drive the entire length of the turnpike.[18]

Exit list edit

Exit numbers branch off of I-44's mileage markers.

CountyLocationmi[1]kmExitDestinationsNotes
McClainPurcell  I-35Proposed interchange;[19] future southern terminus of I-335; South Extension Turnpike continues beyond I-35 towards SH-74
Canadian RiverBridge
Cleveland  US 77Proposed interchange[19]
NobleNorman lineEtowah RoadProposed interchange[19]
Norman  SH-9Proposed interchange[19]
Alameda DriveProposed interchange[19]
East-West Connector westProposed interchange;[19] proposed northern terminus of South Extension Turnpike
Oklahoma CityS. Choctaw RoadProposed interchange[20]
S. Peebly RoadProposed interchange[20]
ClevelandOklahoma
county line
0.000.00SE 89th StreetCurrent southern terminus; at-grade intersection
Oklahoma0.5–
1.3
0.80–
2.1
130  I-40 (US 270 / SH-3) – Oklahoma City, Fort SmithSouthbound exit and northbound entrance; full interchange to be constructed in future; signed as exits 140B (east) and 140A (west); I-40 exit 170; proposed eastern terminus of East-West Connector[20]
Harrah3.96.3134SE 29th Street – McLoud
6.09.7136E. Reno Avenue
8.213.2138  US 62 (NE 23rd Street) – Choctaw, Harrah
13.221.2144E. Britton Road – Jones
Toll plaza
Luther19.0–
19.6
30.6–
31.5
149  I-44 (Turner Turnpike) – Tulsa, Oklahoma CityNorthern terminus; signed as exits 149A (west) and 149B (east); I-44 exit 149
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References edit

  1. ^ a b c Knittle, Andrew (April 14, 2016). "Eastern Oklahoma County residents find out final route for disputed turnpike". The Oklahoman. Oklahoma City, OK: Oklahoma Publishing Company. Retrieved April 12, 2013.
  2. ^ Oklahoma Turnpike Authority celebrates opening of Kickapoo Turnpike with virtual ceremony, Fox 25 Oklahoma City, Oct 14, 2020
  3. ^ a b Gatz, Tim J. (September 25, 2017). "Re: Infrastructure for Rebuilding America (INFRA) funding for Interstate 40 / Douglas Interchange and related interstate widening in Oklahoma County" (PDF). Letter to The Hon. Elaine Chao, Secretary of Transportation. Retrieved April 12, 2018.
  4. ^ a b "Eastern OK County Corridor" (PDF). Driving Forward OK. Oklahoma Turnpike Authority. March 30, 2018. Retrieved April 12, 2018.
  5. ^ Greco, Jonathan (October 29, 2015). "Gov. Mary Fallin, OTA announce launch of 'Driving Forward' turnpike plan". KOCO. Hearst Television, Inc. Retrieved April 13, 2018.
  6. ^ "ODOT Greenlights EOC Turnpike". Luther Register. June 8, 2016. Retrieved April 13, 2018.
  7. ^ "The Kickapoo Turnpike Honors Oklahoma Native American Tribe". Shawnee News-Star. GateHouse Media. September 26, 2019. Retrieved September 28, 2019.
  8. ^ "Turnpike Construction Begins". Luther Register. January 18, 2018. Retrieved April 13, 2018.
  9. ^ "Southern portion of Kickapoo Turnpike opens". The Oklahoma 100. January 5, 2021. Retrieved March 12, 2022.
  10. ^ Adger, Patrina. "Luther residents speaking out against proposed turnpike". KOCO. Hearst Television, Inc. Retrieved April 13, 2018.
  11. ^ Horton, Ryan (August 24, 2016). "Lawsuit filed over turnpike". Choctaw Times. p. 1.
  12. ^ "The Turnpike Wins at the State Supreme Court". Luther Register. December 13, 2016. Retrieved April 13, 2018.
  13. ^ Oklahoma Transportation Commission (August 2, 2021). "ODOT Commission Meeting". Retrieved August 2, 2021.
  14. ^ Griffin, David. "Proposed Turnpike Extension Causes Concern For Some Norman Residents". www.news9.com. Retrieved June 23, 2022.
  15. ^ Special Committee on U.S. Route Numbering (November 2023). "2023 Fall Meeting Report to the Council on Highways and Streets" (PDF) (Report). Washington, DC: American Association of State Highway and Transportation Officials. p. 5. (PDF) from the original on December 5, 2023. Retrieved January 22, 2024.
  16. ^ Humphrey, Spencer (March 7, 2024). "Multiple OKC-area highways, turnpikes to be designated as interstates in coming month". KFOR.com Oklahoma City. Retrieved March 10, 2024.
  17. ^ Staff Reports (February 22, 2017). "Turnpike toll increase takes effect March 1". Tulsa World. BH Media Group. Retrieved April 13, 2018.
  18. ^ "Toll Rates". Oklahoma Turnpike Authority.
  19. ^ a b c d e f "South Extension Turnpike". Access Oklahoma. Oklahoma Turnpike Authority. 2022. Retrieved April 15, 2024.
  20. ^ a b c "Outer Loop: East-West Connector". Access Oklahoma. Oklahoma Turnpike Authority. 2022. Retrieved April 15, 2024.

External links edit

KML is not from Wikidata
  • Oklahoma Turnpike Authority

kickapoo, turnpike, mile, controlled, access, toll, road, state, oklahoma, northern, section, from, turner, turnpike, opened, traffic, october, 2020, southern, segment, from, opened, traffic, january, 2021, signed, interstate, spring, 2024, although, connectio. The Kickapoo Turnpike is a 19 6 mile 31 5 km controlled access toll road in the U S state of Oklahoma The northern section from US 62 to I 44 Turner Turnpike opened to traffic on October 13 2020 The southern segment from I 40 to US 62 opened to traffic on January 5 2021 2 It was signed as Interstate 335 I 335 in Spring 2024 although a connection with I 35 will not be made until the southern extension of the turnpike to Purcell is built Kickapoo TurnpikeThe Kickapoo Turnpike highlighted in redRoute informationMaintained by the Oklahoma Turnpike AuthorityLength19 6 mi 1 31 5 km ExistedOctober 13 2020 presentComponenthighwaysI 335 Toll MainlineMajor junctionsSouth endSE 89th Street in Oklahoma CityMajor intersectionsI 40 US 270 in Oklahoma City US 62 in HarrahNorth endI 44 Turner Turnpike in LutherLocationCountryUnited StatesStateOklahomaHighway systemOklahoma State Highway System Interstate US State Turnpikes Indian Nation Turnpike Kilpatrick Turnpike Contents 1 Route description 2 History 2 1 Construction 2 2 Opposition 2 3 Interstate designation 3 Future 4 Tolls 5 Exit list 6 References 7 External linksRoute description editThe turnpike begins just east of Luther Road at an at grade intersection with SE 89th Street on the Oklahoma Cleveland county line It heads north and features a southbound only interchange with I 40 a half mile 800 m later 3 There are four other interchanges between its termini SE 29th Street Reno Avenue NE 23rd Street US 62 and Britton Road 1 A toll plaza is on the turnpike in the vicinity of Hefner Road and NE 122nd Street 4 The Kickapoo Turnpike ends at a trumpet interchange with I 44 Turner Turnpike in Luther just east of I 44 exit 146 the Luther Jones interchange 3 History editThe turnpike project originally was given the name Northeast Oklahoma County Loop The road itself was proposed on October 29 2015 by Gov Mary Fallin as part of the state s Driving Forward initiative 5 On June 6 2016 the tollway was approved by the Oklahoma Department of Transportation under the working title Eastern Oklahoma County Turnpike 6 In September 2019 Kickapoo Turnpike was announced as the tollway s official name 7 Construction edit The first piece of the turnpike to be constructed is the interchange with I 44 at the northern end of the route Construction on this interchange began in January 2018 8 Phase 1 which stretches from the Turner Turnpike to US 62 23rd Street in Harrah opened on October 13 2020 Phase 2 which opened on January 5 2021 9 connects the rest of the Turnpike to Interstate 40 linking I 40 directly to Interstate 44 on the eastern side of the Oklahoma City metro The cost of constructing the Kickapoo Turnpike has been estimated to be more than 440 million 2018 dollars 4 Opposition edit In January 2016 a group calling itself Citizens Opposed to the Eastern Oklahoma County Loop Turnpike Interstate was reported to have created a Facebook page in opposition to the proposed turnpike 10 Following months of meetings and protests Neal McCaleb interim director for the Oklahoma Turnpike Authority OTA released a statement saying that because of public input and the work of engineering professionals the estimated number of homes that would eventually be lost to construction had been reduced by 22 percent from 103 houses to 80 In August 2016 a lawsuit was filed against the OTA claiming that the agency in issuing 900 million in bonds to be used for multiple toll road projects was in violation of the Oklahoma Constitution which stipulates that laws passed may address only one subject 11 On December 13 2016 the Oklahoma Supreme Court ruled in favor of the OTA stating that the agency had properly authorized the bond issue and given valid notice of this application 12 Interstate designation edit On August 2 2021 the Oklahoma Transportation Commission approved the designation of the Kickapoo Turnpike as part of an extension of Interstate 240 forming a beltway around Oklahoma City ODOT Director Tim Gatz stated in the Transportation Commission meeting that the numbering change was primarily to aid in navigation using digital mapping and routing applications Gatz also said If you look at the Interstate 240 designation on the loop around the Oklahoma City metropolitan area we are finally to the point where we have a truly contiguous route there that can shoulder the burden of some of that transportation need in a loop format That s common practice across the country and you ll see that in many of the metropolitan areas and that update will really be beneficial as far as everything from signage to how do you describe that route on a green and white sign The designation must be approved by the American Association of State Highway and Transportation Officials AASHTO and the Federal Highway Administration FHWA to take effect 13 Future editA southern extension of the Turnpike to I 35 is planned 14 As a result AASHTO approved an application from ODOT to assign it the interstate designation I 335 in November 2023 15 In March 2024 the OTA announced that it would be updating signage for the turnpike over the next two months The current turnpike logo would be removed and replaced with I 335 shields along with the yellow TOLL banner I 240 will not be part of the turnpike and the future interstate will not connect to its parent route until the southern extension is completed 16 Tolls editOn March 1 2016 toll rates on all turnpikes in Oklahoma increased for the first time since June 2009 The rate hike was implemented to help fund the Driving Forward initiative which includes improvements and or extensions to five other Oklahoma toll roads as well as the construction of the Kickapoo Turnpike from scratch 17 As of January 25 2022 update it costs 3 95 with PlatePay 1 90 with Pikepass to drive the entire length of the turnpike 18 Exit list editExit numbers branch off of I 44 s mileage markers CountyLocationmi 1 kmExitDestinationsNotes McClainPurcell nbsp I 35Proposed interchange 19 future southern terminus of I 335 South Extension Turnpike continues beyond I 35 towards SH 74 Canadian RiverBridge Cleveland nbsp US 77Proposed interchange 19 Noble Norman lineEtowah RoadProposed interchange 19 Norman nbsp SH 9Proposed interchange 19 Alameda DriveProposed interchange 19 East West Connector westProposed interchange 19 proposed northern terminus of South Extension Turnpike Oklahoma CityS Choctaw RoadProposed interchange 20 S Peebly RoadProposed interchange 20 Cleveland Oklahomacounty line0 000 00SE 89th StreetCurrent southern terminus at grade intersection Oklahoma0 5 1 30 80 2 1130 nbsp I 40 US 270 SH 3 Oklahoma City Fort SmithSouthbound exit and northbound entrance full interchange to be constructed in future signed as exits 140B east and 140A west I 40 exit 170 proposed eastern terminus of East West Connector 20 Harrah3 96 3134SE 29th Street McLoud 6 09 7136E Reno Avenue 8 213 2138 nbsp US 62 NE 23rd Street Choctaw Harrah 13 221 2144E Britton Road Jones Toll plaza Luther19 0 19 630 6 31 5149 nbsp I 44 Turner Turnpike Tulsa Oklahoma CityNorthern terminus signed as exits 149A west and 149B east I 44 exit 149 1 000 mi 1 609 km 1 000 km 0 621 mi Electronic toll collection Incomplete access ProposedReferences edit a b c Knittle Andrew April 14 2016 Eastern Oklahoma County residents find out final route for disputed turnpike The Oklahoman Oklahoma City OK Oklahoma Publishing Company Retrieved April 12 2013 Oklahoma Turnpike Authority celebrates opening of Kickapoo Turnpike with virtual ceremony Fox 25 Oklahoma City Oct 14 2020 a b Gatz Tim J September 25 2017 Re Infrastructure for Rebuilding America INFRA funding for Interstate 40 Douglas Interchange and related interstate widening in Oklahoma County PDF Letter to The Hon Elaine Chao Secretary of Transportation Retrieved April 12 2018 a b Eastern OK County Corridor PDF Driving Forward OK Oklahoma Turnpike Authority March 30 2018 Retrieved April 12 2018 Greco Jonathan October 29 2015 Gov Mary Fallin OTA announce launch of Driving Forward turnpike plan KOCO Hearst Television Inc Retrieved April 13 2018 ODOT Greenlights EOC Turnpike Luther Register June 8 2016 Retrieved April 13 2018 The Kickapoo Turnpike Honors Oklahoma Native American Tribe Shawnee News Star GateHouse Media September 26 2019 Retrieved September 28 2019 Turnpike Construction Begins Luther Register January 18 2018 Retrieved April 13 2018 Southern portion of Kickapoo Turnpike opens The Oklahoma 100 January 5 2021 Retrieved March 12 2022 Adger Patrina Luther residents speaking out against proposed turnpike KOCO Hearst Television Inc Retrieved April 13 2018 Horton Ryan August 24 2016 Lawsuit filed over turnpike Choctaw Times p 1 The Turnpike Wins at the State Supreme Court Luther Register December 13 2016 Retrieved April 13 2018 Oklahoma Transportation Commission August 2 2021 ODOT Commission Meeting Retrieved August 2 2021 Griffin David Proposed Turnpike Extension Causes Concern For Some Norman Residents www news9 com Retrieved June 23 2022 Special Committee on U S Route Numbering November 2023 2023 Fall Meeting Report to the Council on Highways and Streets PDF Report Washington DC American Association of State Highway and Transportation Officials p 5 Archived PDF from the original on December 5 2023 Retrieved January 22 2024 Humphrey Spencer March 7 2024 Multiple OKC area highways turnpikes to be designated as interstates in coming month KFOR com Oklahoma City Retrieved March 10 2024 Staff Reports February 22 2017 Turnpike toll increase takes effect March 1 Tulsa World BH Media Group Retrieved April 13 2018 Toll Rates Oklahoma Turnpike Authority a b c d e f South Extension Turnpike Access Oklahoma Oklahoma Turnpike Authority 2022 Retrieved April 15 2024 a b c Outer Loop East West Connector Access Oklahoma Oklahoma Turnpike Authority 2022 Retrieved April 15 2024 External links editKML file edit help Template Attached KML Kickapoo TurnpikeKML is not from Wikidata Oklahoma Turnpike Authority nbsp Oklahoma portal nbsp U S Roads portal Retrieved from https en wikipedia org w index php title Kickapoo Turnpike amp oldid 1221388230, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.