Ilijan Combined-Cycle Power Plant is a dual-fuel power station in Ilijan, Batangas City. It is primarily a natural gas plant and uses distillate oil as a secondary back-up fuel source. With the nameplate capacity of 1200 MW, it is the largest natural gas facility in the Philippines. The plant is designed to draw natural gas from the Malampaya gas field.[2]
The plant is the first power facility in the country to use the 500 kV switchyard system and reverse osmosis system.[2] The Ilijan plant's construction began in March 1999 and was commissioned in June 2000.[1]
References
^ ab"Philippines:Ilijan / Gas combined cycle IPP". Kyushu Electric Power Co. Inc. Retrieved April 30, 2015.
^ ab"Our Assets - Ilijan Combined-Cycle Power Plant". Kepco Philippines. Retrieved April 30, 2015.
March 30, 2023
ilijan, combined, cycle, power, plant, dual, fuel, power, station, ilijan, batangas, city, primarily, natural, plant, uses, distillate, secondary, back, fuel, source, with, nameplate, capacity, 1200, largest, natural, facility, philippines, plant, designed, dr. Ilijan Combined Cycle Power Plant is a dual fuel power station in Ilijan Batangas City It is primarily a natural gas plant and uses distillate oil as a secondary back up fuel source With the nameplate capacity of 1200 MW it is the largest natural gas facility in the Philippines The plant is designed to draw natural gas from the Malampaya gas field 2 Ilijan Combined Cycle Power PlantCountryPhilippinesLocationIlijan Batangas CityCoordinates13 37 19 N 121 04 47 E 13 6219 N 121 0796 E 13 6219 121 0796 Coordinates 13 37 19 N 121 04 47 E 13 6219 N 121 0796 E 13 6219 121 0796StatusOperationalConstruction beganMarch 1999 1999 03 Commission dateJuly 2000 2000 07 Construction costest US 700 Million 1 Operator s KEPCO Ilijan CorporationThermal power stationPrimary fuelNatural gasSecondary fuelDistillate oil No 2Combined cycle YesPower generationNameplate capacity1200 MWExternal linksWebsitewww wbr kepcophilippines wbr com edit on Wikidata The plant is the first power facility in the country to use the 500 kV switchyard system and reverse osmosis system 2 The Ilijan plant s construction began in March 1999 and was commissioned in June 2000 1 References Edit a b Philippines Ilijan Gas combined cycle IPP Kyushu Electric Power Co Inc Retrieved April 30 2015 a b Our Assets Ilijan Combined Cycle Power Plant Kepco Philippines Retrieved April 30 2015 Retrieved from https en wikipedia org w index php title Ilijan Combined Cycle Power Plant amp oldid 1142638352, wikipedia, wiki, book, books, library,