fbpx
Wikipedia

Hrazdan Thermal Power Plant

Hrazdan Thermal Power Plant (Hrazdan TPP, Armenian: Հրազդանի ջերմաէլեկտրակայան) is a natural gas-fired power plant in the northwestern part of Hrazdan city, generating electricity in Armenia. It is one of the largest power plants in Armenia. This power plant was built in 1963–1974, and the first unit became operational in 1966. In 2013, a new unit was added. Four older units of the plant are owned and operated by the Hrazdan Power Company, a subsidiary of Tashir Capital owned by the family of Samvel Karapetyan. The new fifth unit is owned and operated by Gazprom Armenia.

Hrazdan Thermal Power Plant
Hrazdan TPP view
Official nameՀրազդանի պետական շրջանային էլեկտրակայան
CountryArmenia
LocationHrazdan
Coordinates40°33′56″N 44°45′03″E / 40.56556°N 44.75083°E / 40.56556; 44.75083
StatusOperational
Construction began1963
Commission date1966
Owner(s)Hrazdan Power Company (units 1–4), owned by family of Samvel Karapetyan
Gazprom Armenia (unit 5)
Operator(s)Hrazdan Power Company (units 1–4)
Gazprom Armenia (unit 5)
Thermal power station
Primary fuelNatural gas
Secondary fuelFuel oil
Cooling sourceHrazdan River
Cogeneration?Yes
Power generation
Units operational2 X 50 MW (unit 1)
2 X 100 MW (unit 2)
3 X 200 MW (unit 3)
1 X 210 MW (unit 4)
1 X 480 MW (unit 5)
Make and modelEPC: Teploenergostroymontaj
Units cancelled3 X 300 MW
Nameplate capacity1,110 MW (units 1-4)
480 MW (unit 5)
External links
Websitewww.raztes.am/eng/
CommonsRelated media on Commons

History edit

HTPP was envisioned as a power plant to serve the entire South Caucasus, including Armenia. Construction began in 1963, and the plant became functional in 1966, with two turbines with a total capacity up to 100 MW. By 1969 two PT-100-130 type turbines of type "T-100-130" of the unit 2 started to operate, increasing heat distribution to 560 kcal/h (650 MW) and overall capacity to up to 300 MW. In 1974, the first block was combined with a second in close proximity, which had a capacity of 810 MW in four condensing power-generating units. The new Hrazdan State Regional Power Plant (SRPP) became, with 1110 MW total power, the most powerful power plant of Armenia of those times.

During its peak in the 1980s, the HTPP generated 6.85 TWh annually, with 7,300 hours (83%) clocked at total capacity. Between 1963 and the end of 2004, it produced 143 TWh electricity, but 12.3 Gcal/h energy in the form of heat.

In 2003, the HTPP was passed to Russian Federation to pay off the Armenian debt which was approximately US$31 million. The shares of the Hrazdan Energy Company went to the Federal Agency for State Property Management of Russia. In July 2009, all stocks minus one share were acquired by the RUssian state-owned holding company Rosneftegaz. In May 2011, all shares were bought by Inter RAO UES.[1] In 2015, Inter RAO UES sold the Hrazdan Energy Company to Cyprus-registered Liormand Holdings Limited, a part of Tashir Group owned by Samvel Karapetyan.[2][3] The deal will become fully in force in 2017.[4]

In 1986, the plan of construction of four additional units (units 5–8) with a power generation capacity of 300 MW each was announced. Construction started in 1987, however, due to the dissolution of the Soviet Union the construction works were halted. In 2006, the assets of the incomplete unit 5 was sold to Armrosgazprom (now: Gazprom Armenia).[5] The unit 5 as an independent power plant started operating in a pilot mode in January 2012, and since December 2013, it is in the commercial operation.[6]

Technical description (units 1–4) edit

Located 1,715–1,730 metres (5,627–5,676 ft) above sea level close to the junction of the Hrazdan River and Marmarik River, the power plant was built to accommodate inconstant and severe climate conditions.

Five oil and gas boilers are used to power four co-generation turbines, two of model PT-50-130/7 and two of model T-100-130. T-100-130 turbines have a capacity twice as big as of model PT-50-130/7, 100 MW of capacity. The plant boasts five evaporative cooling towers and six feed pumps.

The block part of the power plant consists of four power generator units, model TFM-104C gas and oil boilers with capacity of 670 t/h. TDC-250000/220 transformers connect two turbo-generators (TGV-200-2MUZ (Block No. 1) and TGV-200M (Blocks No. 2, 3, 4)) of 15.75 kV of voltage to 220 kV voltage circuit. The overall capacity is 810 MW.

The HTPP is considered[by whom?] as one of the most environmentally friendly non-nuclear TPPs in Armenia. In the aim of excluding any possibility of water loss connected with evaporation, specially devised cooling system is used for cooling condensers in the four blocks. The cooling system, which was developed in Hungary by the firm MVM EGI, has closed water circuit which gives an opportunity to use little natural water.

At the time when the coolers were being constructed, aluminum radiators were used as heat exchangers to cool down the circulating water which heats up in the condensers. The key part which enables the usage of resources is the placement of the radiators, which are located along the edge of the 120-metre (390 ft) cooling towers. Natural traction brings cooling air to the four towers. Heat loss is minimized by the use of chemically desalinated water in the closed circuit of cooling, which enables the usage of mixing condensers instead of surface condensers. This also reduces maintenance.

Since 1993, the HTTP has used natural gas as its primary fuel, relying on oil as a reserve, a reversal of its earlier pattern. A gas distributing station and gas grid carry gas to gas control points throughout the plant.

Technical description (unit 5) edit

The fifth block's construction was directly connected to the Iran–Armenia gas pipeline construction, which has a vital strategic importance for Armenia. Particularly, according to the agreement, the energy produced in Hrazdan Thermal Power Plant's 5th energy block is exported to Iranian energy system and serves as a means of paying for natural gas imported from Iran.

Total of $465.2 million were spent for the construction and modernization of fifth energy block. For the construction of Hrazdan-5 different types of turbines were used, which work with steam and gas. The use of this technology enables the block to have a power of 480 MW. The new technology of production enables the use of 278 gram of gas to produce 1 kWh energy, which reduces the cost of production. The construction was done by Gazprom Armenia.

Role edit

80% of the electricity in Armenia is produced by four major energy producing companies, the Metsamor NPP, the Hrazdan TPP, the Sevan–Hrazdan Cascade, and the Vorotan Cascade. The HTPP is a balancing station providing energy in the case of deficit or shut down of the Metsamor nuclear facility, which is the primary source of power in Armenia. It closes for two to three months each year for maintenance and refueling, and HTPP steps in to meet consumer needs. The HTPP has also a big role in the export of electricity.

See also edit

References edit

  1. ^ "Armenian Regulators Approve Transfer Of Hrazdan Power Plant To Inter". Interfax. 2011-05-11. from the original on 2015-12-22. Retrieved 2015-12-12.
  2. ^ "PSRC approves sale of Hrazdan power plant". PanARMENIAN.Net. 2015-10-09. from the original on 2015-12-22. Retrieved 2015-12-11.
  3. ^ "Tashir Group to Acquire Hrazdan Power Plant in Armenia". Asbarez. ARKA. 2015-10-06. from the original on 2016-02-03. Retrieved 2015-12-11.
  4. ^ "Zhamanak: ENA Company sold completely on contract". Panorama.am. 2015-12-04. from the original on 2015-12-12. Retrieved 2015-12-12.
  5. ^ "Modernization of Hrazdan Thermal Power Plant Unit No.5 with Installation of Gas Turbine Unit(S) in Armenia". Armrosgazprom. 2007-09-18. Retrieved 2015-12-12.
  6. ^ "ArmRusgasprom becomes Gazprom Armenia". Armenpress. 2014-01-17. from the original on 2015-12-22. Retrieved 2015-12-12.

External links edit

  • RazTES webpage
  • MVM EGI

hrazdan, thermal, power, plant, this, article, needs, additional, citations, verification, please, help, improve, this, article, adding, citations, reliable, sources, unsourced, material, challenged, removed, find, sources, news, newspapers, books, scholar, js. This article needs additional citations for verification Please help improve this article by adding citations to reliable sources Unsourced material may be challenged and removed Find sources Hrazdan Thermal Power Plant news newspapers books scholar JSTOR December 2015 Learn how and when to remove this template message Hrazdan Thermal Power Plant Hrazdan TPP Armenian Հրազդանի ջերմաէլեկտրակայան is a natural gas fired power plant in the northwestern part of Hrazdan city generating electricity in Armenia It is one of the largest power plants in Armenia This power plant was built in 1963 1974 and the first unit became operational in 1966 In 2013 a new unit was added Four older units of the plant are owned and operated by the Hrazdan Power Company a subsidiary of Tashir Capital owned by the family of Samvel Karapetyan The new fifth unit is owned and operated by Gazprom Armenia Hrazdan Thermal Power PlantHrazdan TPP viewOfficial nameՀրազդանի պետական շրջանային էլեկտրակայանCountryArmeniaLocationHrazdanCoordinates40 33 56 N 44 45 03 E 40 56556 N 44 75083 E 40 56556 44 75083StatusOperationalConstruction began1963Commission date1966Owner s Hrazdan Power Company units 1 4 owned by family of Samvel KarapetyanGazprom Armenia unit 5 Operator s Hrazdan Power Company units 1 4 Gazprom Armenia unit 5 Thermal power stationPrimary fuelNatural gasSecondary fuelFuel oilCooling sourceHrazdan RiverCogeneration YesPower generationUnits operational2 X 50 MW unit 1 2 X 100 MW unit 2 3 X 200 MW unit 3 1 X 210 MW unit 4 1 X 480 MW unit 5 Make and modelEPC TeploenergostroymontajUnits cancelled3 X 300 MWNameplate capacity1 110 MW units 1 4 480 MW unit 5 External linksWebsitewww wbr raztes wbr am wbr eng wbr CommonsRelated media on Commons edit on Wikidata Contents 1 History 2 Technical description units 1 4 3 Technical description unit 5 4 Role 5 See also 6 References 7 External linksHistory editHTPP was envisioned as a power plant to serve the entire South Caucasus including Armenia Construction began in 1963 and the plant became functional in 1966 with two turbines with a total capacity up to 100 MW By 1969 two PT 100 130 type turbines of type T 100 130 of the unit 2 started to operate increasing heat distribution to 560 kcal h 650 MW and overall capacity to up to 300 MW In 1974 the first block was combined with a second in close proximity which had a capacity of 810 MW in four condensing power generating units The new Hrazdan State Regional Power Plant SRPP became with 1110 MW total power the most powerful power plant of Armenia of those times During its peak in the 1980s the HTPP generated 6 85 TWh annually with 7 300 hours 83 clocked at total capacity Between 1963 and the end of 2004 it produced 143 TWh electricity but 12 3 Gcal h energy in the form of heat In 2003 the HTPP was passed to Russian Federation to pay off the Armenian debt which was approximately US 31 million The shares of the Hrazdan Energy Company went to the Federal Agency for State Property Management of Russia In July 2009 all stocks minus one share were acquired by the RUssian state owned holding company Rosneftegaz In May 2011 all shares were bought by Inter RAO UES 1 In 2015 Inter RAO UES sold the Hrazdan Energy Company to Cyprus registered Liormand Holdings Limited a part of Tashir Group owned by Samvel Karapetyan 2 3 The deal will become fully in force in 2017 4 In 1986 the plan of construction of four additional units units 5 8 with a power generation capacity of 300 MW each was announced Construction started in 1987 however due to the dissolution of the Soviet Union the construction works were halted In 2006 the assets of the incomplete unit 5 was sold to Armrosgazprom now Gazprom Armenia 5 The unit 5 as an independent power plant started operating in a pilot mode in January 2012 and since December 2013 it is in the commercial operation 6 Technical description units 1 4 editLocated 1 715 1 730 metres 5 627 5 676 ft above sea level close to the junction of the Hrazdan River and Marmarik River the power plant was built to accommodate inconstant and severe climate conditions Five oil and gas boilers are used to power four co generation turbines two of model PT 50 130 7 and two of model T 100 130 T 100 130 turbines have a capacity twice as big as of model PT 50 130 7 100 MW of capacity The plant boasts five evaporative cooling towers and six feed pumps The block part of the power plant consists of four power generator units model TFM 104C gas and oil boilers with capacity of 670 t h TDC 250000 220 transformers connect two turbo generators TGV 200 2MUZ Block No 1 and TGV 200M Blocks No 2 3 4 of 15 75 kV of voltage to 220 kV voltage circuit The overall capacity is 810 MW The HTPP is considered by whom as one of the most environmentally friendly non nuclear TPPs in Armenia In the aim of excluding any possibility of water loss connected with evaporation specially devised cooling system is used for cooling condensers in the four blocks The cooling system which was developed in Hungary by the firm MVM EGI has closed water circuit which gives an opportunity to use little natural water At the time when the coolers were being constructed aluminum radiators were used as heat exchangers to cool down the circulating water which heats up in the condensers The key part which enables the usage of resources is the placement of the radiators which are located along the edge of the 120 metre 390 ft cooling towers Natural traction brings cooling air to the four towers Heat loss is minimized by the use of chemically desalinated water in the closed circuit of cooling which enables the usage of mixing condensers instead of surface condensers This also reduces maintenance Since 1993 the HTTP has used natural gas as its primary fuel relying on oil as a reserve a reversal of its earlier pattern A gas distributing station and gas grid carry gas to gas control points throughout the plant Technical description unit 5 editThe fifth block s construction was directly connected to the Iran Armenia gas pipeline construction which has a vital strategic importance for Armenia Particularly according to the agreement the energy produced in Hrazdan Thermal Power Plant s 5th energy block is exported to Iranian energy system and serves as a means of paying for natural gas imported from Iran Total of 465 2 million were spent for the construction and modernization of fifth energy block For the construction of Hrazdan 5 different types of turbines were used which work with steam and gas The use of this technology enables the block to have a power of 480 MW The new technology of production enables the use of 278 gram of gas to produce 1 kWh energy which reduces the cost of production The construction was done by Gazprom Armenia Role edit80 of the electricity in Armenia is produced by four major energy producing companies the Metsamor NPP the Hrazdan TPP the Sevan Hrazdan Cascade and the Vorotan Cascade The HTPP is a balancing station providing energy in the case of deficit or shut down of the Metsamor nuclear facility which is the primary source of power in Armenia It closes for two to three months each year for maintenance and refueling and HTPP steps in to meet consumer needs The HTPP has also a big role in the export of electricity See also edit nbsp Energy portal nbsp Wikimedia Commons has media related to Hrazdan thermal power plant Energy in ArmeniaReferences edit Armenian Regulators Approve Transfer Of Hrazdan Power Plant To Inter Interfax 2011 05 11 Archived from the original on 2015 12 22 Retrieved 2015 12 12 PSRC approves sale of Hrazdan power plant PanARMENIAN Net 2015 10 09 Archived from the original on 2015 12 22 Retrieved 2015 12 11 Tashir Group to Acquire Hrazdan Power Plant in Armenia Asbarez ARKA 2015 10 06 Archived from the original on 2016 02 03 Retrieved 2015 12 11 Zhamanak ENA Company sold completely on contract Panorama am 2015 12 04 Archived from the original on 2015 12 12 Retrieved 2015 12 12 Modernization of Hrazdan Thermal Power Plant Unit No 5 with Installation of Gas Turbine Unit S in Armenia Armrosgazprom 2007 09 18 Retrieved 2015 12 12 ArmRusgasprom becomes Gazprom Armenia Armenpress 2014 01 17 Archived from the original on 2015 12 22 Retrieved 2015 12 12 External links editRazTES webpage MVM EGI Vorotan Cascade Retrieved from https en wikipedia org w index php title Hrazdan Thermal Power Plant amp oldid 1163610328, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.