Hornsdale Wind Farm

The Hornsdale Wind Farm is an electricity generator in the locality of Hornsdale in the south-west of the Narien Range, north of Jamestown, South Australia. It consists of 99 wind turbines with a generation capacity of 315 megawatts (422,000 hp).[2] The plant is owned and operated by Neoen, a French renewable energy company.

Hornsdale Wind Farm
CountryAustralia
LocationSouth Australia
Coordinates33°03′29″S 138°32′38″E / 33.058°S 138.544°E / -33.058; 138.544
StatusOperational
Construction costA$89 million
Owner(s)Neoen Australia
Operator(s)
Nuclear power station
Reactor supplier
Wind farm
TypeOnshore
Hub height92.5 metres (303 ft)[1]
Rotor diameter110 metres (360 ft)
Power generation
Units operational99
Nameplate capacity315 MW
External links
WebsiteOfficial website

The electricity generated by Hornsdale Wind Farm is contracted to be supplied to the Australian Capital Territory.[3]

Construction edit

The "Balance of Plant" civil engineering and site works for the wind farm was performed by Catcon for all three stages of construction.[4] The wind turbine generators were imported from Denmark, and the towers from Vietnam.[5] They were commissioned by Siemens Australia.[6] Before the whole wind farm was commissioned, Hornsdale was generating 86 MW immediately prior to the 2016 South Australian blackout in September 2016.[7]

Operation edit

The wind farm supplies 1 TWh/year to the 275 kV grid from 3.2 MW direct-drive turbines (no gearbox). The 100 MW Phase 2 tested supplying 6 out of 8 grid services between August 2017 and February 2018.[8][9][10]

Artwork edit

Two of the towers feature paintings by people from the indigenous peoples of the region. Jessica Turner is a Nukunu woman whose artwork represents the story of the serpent's role in forming aspects of the landscape, particularly waterholes. Chris Angrave and Louise Brown are Ngadjuri people who depicted how the Mungiura were found in hilly country, peering over the top of windbreaks before a storm, and blowing hard, which caused a whirly wind.[11]

Hornsdale Power Reserve edit

 
Diagram of power and duration of the two sections of battery

The Hornsdale Power Reserve is a grid-connected battery complex co-located with the Hornsdale Wind Farm. It was built by Tesla, Inc. for a cost to Tesla of about US$50 million.[12][13]

It is owned[14] and operated by Neoen, with the government having the right to call on the stored power under certain circumstances.[15] It provides a total of 129 megawatt-hours (460 GJ) of storage capable of discharge at 100 megawatts (130,000 hp) into the power grid. It provides several services to the grid:[16]

The battery construction was completed and testing began on 25 November 2017. It was connected to the grid on 1 December 2017.[22] This easily beat Elon Musk's wager of "100 days from contract signature",[13][23][24] which started when a grid connection agreement was signed with ElectraNet on 29 September 2017.[12] Tesla had already begun construction, and some units were already operational by the time the contract was signed.[18] Due to the project's success and the area's demand for stable electricity output, the project was expanded by 50% in November 2019. The upgraded system is capable of discharge at 150 megawatts (200,000 hp) into the power grid.[25]

References edit

  1. ^ "Hornsdale Wind Farm". Siemens Australia. Retrieved 12 July 2017.
  2. ^ "Generation information page". Australian Energy Market Operator. 2 November 2018. Retrieved 12 November 2018.
  3. ^ . Investment Attraction South Australia, Department of State Development, Government of South Australia. Archived from the original on 16 September 2017. Retrieved 12 July 2017.
  4. ^ "Hornsdale Wind Farm". Catcon. Retrieved 12 July 2017.
  5. ^ "Hornsdale Wind Farm Construction Update Stage 3 Issue No 3". May 2017. Retrieved 12 July 2017.
  6. ^ "Hornsdale Wind Farm". Siemens Australia. Retrieved 12 July 2017.
  7. ^ Washington, David; Siebert, Bension (5 October 2016). "Blackout report leaves renewables debate dangling in the breeze". InDaily. Retrieved 5 October 2016.
  8. ^ Parkinson, Giles (13 March 2018). "Wind farm proves it can provide cheaper, more precise grid security than gas generators". RenewEconomy. from the original on 20 January 2020.
  9. ^ Patel, Sonal (1 September 2018). "A Wind Experiment: The Hornsdale Wind Farm". POWER Magazine. from the original on 11 October 2020.
  10. ^ "Neoen Hornsdale Wind Farm FCAS Trial Report - Australian Renewable Energy Agency (ARENA)". Australian Renewable Energy Agency.
  11. ^ "Hornsdale's arty installation". The Northern Argus. 8 February 2017. Retrieved 13 July 2017.
  12. ^ a b "Tesla completes its giant Australian Powerpack battery on time". Engadget. Retrieved 7 August 2018.
  13. ^ a b @elonmusk (10 March 2017). "Tesla will get the system installed and working 100 days from contract signature or it is free. That serious enough for you?" (Tweet) – via Twitter.
  14. ^ "Hornsdale power reserve: about us". Retrieved 12 April 2018. Neoen, the owner of the Hornsdale Power Reserve,...
  15. ^ Harmsen, Nick (24 November 2017). "Elon Musk's giant lithium ion battery completed by Tesla in SA's Mid North". ABC News.
  16. ^ "Initial operation of the Hornsdale Power Reserve Battery Energy Storage System" (PDF). Australian Energy Market Operator. 5 April 2018.
  17. ^ Parkinson, Giles (19 December 2017). "Tesla big battery outsmarts lumbering coal units after Loy Yang trips". RenewEconomy. Retrieved 19 December 2017. But in reality, the response from the Tesla big battery was even quicker than that – in milliseconds – but too fast for the AEMO data to record. Importantly, by the time that the contracted Gladstone coal unit had gotten out of bed and put its socks on so it can inject more into the grid – it is paid to respond in six seconds – the fall in frequency had already been arrested and was being reversed.
  18. ^ a b Harmsen, Nick (29 September 2017). "Elon Musk: Tesla reaches halfway point of construction on 'world's biggest' battery". ABC News. Australian Broadcasting Corporation. Retrieved 29 September 2017.
  19. ^ Parkinson, Giles (14 December 2017). "Tesla big battery goes the full discharge – 100MW – for first time". RenewEconomy. RenewEconomy. Retrieved 19 December 2017.
  20. ^ Lambert, Fred. "Tesla's giant battery in Australia reduced grid service cost by 90%". Electrek. 9to5 network. Retrieved 11 May 2018.
  21. ^ "Explainer: What the Tesla big battery can and cannot do". RenewEconomy. 10 July 2017. Retrieved 12 October 2017.
  22. ^ "Tesla's Giant Battery Farm Ready to Flick the Switch". The urban developer. 29 November 2017. Retrieved 30 November 2017.
  23. ^ Scopelianos, Sarah; Fedorowytsch, Tom; Garcia, Sara (7 July 2017). "Elon Musk's Tesla to build world's biggest lithium ion battery to secure power for South Australia". ABC News. Retrieved 12 July 2017.
  24. ^ Harmsen, Nick (7 July 2017). "What is Tesla's SA battery and how will it be used?". ABC News. Retrieved 9 October 2017.
  25. ^ "Tesla battery in Hornsdale, Australia to undergo a 50 MW expansion". Power Engineering International. 20 November 2019.

External links edit

  • Current wind conditions

hornsdale, wind, farm, electricity, generator, locality, hornsdale, south, west, narien, range, north, jamestown, south, australia, consists, wind, turbines, with, generation, capacity, megawatts, plant, owned, operated, neoen, french, renewable, energy, compa. The Hornsdale Wind Farm is an electricity generator in the locality of Hornsdale in the south west of the Narien Range north of Jamestown South Australia It consists of 99 wind turbines with a generation capacity of 315 megawatts 422 000 hp 2 The plant is owned and operated by Neoen a French renewable energy company Hornsdale Wind FarmCountryAustraliaLocationSouth AustraliaCoordinates33 03 29 S 138 32 38 E 33 058 S 138 544 E 33 058 138 544StatusOperationalConstruction costA 89 millionOwner s Neoen AustraliaOperator s NeoenNuclear power stationReactor supplierSiemensWind farmTypeOnshoreHub height92 5 metres 303 ft 1 Rotor diameter110 metres 360 ft Power generationUnits operational99Nameplate capacity315 MWExternal linksWebsiteOfficial website edit on Wikidata The electricity generated by Hornsdale Wind Farm is contracted to be supplied to the Australian Capital Territory 3 Contents 1 Construction 2 Operation 3 Artwork 4 Hornsdale Power Reserve 5 References 6 External linksConstruction editThe Balance of Plant civil engineering and site works for the wind farm was performed by Catcon for all three stages of construction 4 The wind turbine generators were imported from Denmark and the towers from Vietnam 5 They were commissioned by Siemens Australia 6 Before the whole wind farm was commissioned Hornsdale was generating 86 MW immediately prior to the 2016 South Australian blackout in September 2016 7 Operation editThe wind farm supplies 1 TWh year to the 275 kV grid from 3 2 MW direct drive turbines no gearbox The 100 MW Phase 2 tested supplying 6 out of 8 grid services between August 2017 and February 2018 8 9 10 Artwork editTwo of the towers feature paintings by people from the indigenous peoples of the region Jessica Turner is a Nukunu woman whose artwork represents the story of the serpent s role in forming aspects of the landscape particularly waterholes Chris Angrave and Louise Brown are Ngadjuri people who depicted how the Mungiura were found in hilly country peering over the top of windbreaks before a storm and blowing hard which caused a whirly wind 11 Hornsdale Power Reserve editMain article Hornsdale Power Reserve nbsp Diagram of power and duration of the two sections of battery The Hornsdale Power Reserve is a grid connected battery complex co located with the Hornsdale Wind Farm It was built by Tesla Inc for a cost to Tesla of about US 50 million 12 13 It is owned 14 and operated by Neoen with the government having the right to call on the stored power under certain circumstances 15 It provides a total of 129 megawatt hours 460 GJ of storage capable of discharge at 100 megawatts 130 000 hp into the power grid It provides several services to the grid 16 70 MW running for 10 minutes 11 7 MWh is contracted to the government to provide stability to the grid grid services 17 and prevent load shedding blackouts 18 19 while other generators are started in the event of sudden drops in wind or other network issues This service has reduced the cost of grid services to the Australian Energy Market Operator by 90 20 30 MW for 3 hours 90 MWh is used by Neoen for load management to store energy when prices are low and sell it when demand is high 21 The battery construction was completed and testing began on 25 November 2017 It was connected to the grid on 1 December 2017 22 This easily beat Elon Musk s wager of 100 days from contract signature 13 23 24 which started when a grid connection agreement was signed with ElectraNet on 29 September 2017 12 Tesla had already begun construction and some units were already operational by the time the contract was signed 18 Due to the project s success and the area s demand for stable electricity output the project was expanded by 50 in November 2019 The upgraded system is capable of discharge at 150 megawatts 200 000 hp into the power grid 25 References edit Hornsdale Wind Farm Siemens Australia Retrieved 12 July 2017 Generation information page Australian Energy Market Operator 2 November 2018 Retrieved 12 November 2018 Neoen Hornsdale Wind Farm Investment Attraction South Australia Department of State Development Government of South Australia Archived from the original on 16 September 2017 Retrieved 12 July 2017 Hornsdale Wind Farm Catcon Retrieved 12 July 2017 Hornsdale Wind Farm Construction Update Stage 3 Issue No 3 May 2017 Retrieved 12 July 2017 Hornsdale Wind Farm Siemens Australia Retrieved 12 July 2017 Washington David Siebert Bension 5 October 2016 Blackout report leaves renewables debate dangling in the breeze InDaily Retrieved 5 October 2016 Parkinson Giles 13 March 2018 Wind farm proves it can provide cheaper more precise grid security than gas generators RenewEconomy Archived from the original on 20 January 2020 Patel Sonal 1 September 2018 A Wind Experiment The Hornsdale Wind Farm POWER Magazine Archived from the original on 11 October 2020 Neoen Hornsdale Wind Farm FCAS Trial Report Australian Renewable Energy Agency ARENA Australian Renewable Energy Agency Hornsdale s arty installation The Northern Argus 8 February 2017 Retrieved 13 July 2017 a b Tesla completes its giant Australian Powerpack battery on time Engadget Retrieved 7 August 2018 a b elonmusk 10 March 2017 Tesla will get the system installed and working 100 days from contract signature or it is free That serious enough for you Tweet via Twitter Hornsdale power reserve about us Retrieved 12 April 2018 Neoen the owner of the Hornsdale Power Reserve Harmsen Nick 24 November 2017 Elon Musk s giant lithium ion battery completed by Tesla in SA s Mid North ABC News Initial operation of the Hornsdale Power Reserve Battery Energy Storage System PDF Australian Energy Market Operator 5 April 2018 Parkinson Giles 19 December 2017 Tesla big battery outsmarts lumbering coal units after Loy Yang trips RenewEconomy Retrieved 19 December 2017 But in reality the response from the Tesla big battery was even quicker than that in milliseconds but too fast for the AEMO data to record Importantly by the time that the contracted Gladstone coal unit had gotten out of bed and put its socks on so it can inject more into the grid it is paid to respond in six seconds the fall in frequency had already been arrested and was being reversed a b Harmsen Nick 29 September 2017 Elon Musk Tesla reaches halfway point of construction on world s biggest battery ABC News Australian Broadcasting Corporation Retrieved 29 September 2017 Parkinson Giles 14 December 2017 Tesla big battery goes the full discharge 100MW for first time RenewEconomy RenewEconomy Retrieved 19 December 2017 Lambert Fred Tesla s giant battery in Australia reduced grid service cost by 90 Electrek 9to5 network Retrieved 11 May 2018 Explainer What the Tesla big battery can and cannot do RenewEconomy 10 July 2017 Retrieved 12 October 2017 Tesla s Giant Battery Farm Ready to Flick the Switch The urban developer 29 November 2017 Retrieved 30 November 2017 Scopelianos Sarah Fedorowytsch Tom Garcia Sara 7 July 2017 Elon Musk s Tesla to build world s biggest lithium ion battery to secure power for South Australia ABC News Retrieved 12 July 2017 Harmsen Nick 7 July 2017 What is Tesla s SA battery and how will it be used ABC News Retrieved 9 October 2017 Tesla battery in Hornsdale Australia to undergo a 50 MW expansion Power Engineering International 20 November 2019 External links editCurrent wind conditions Retrieved from https en wikipedia org w index php title Hornsdale Wind Farm amp oldid 1159334411, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.