fbpx
Wikipedia

Hartford Line

The Hartford Line[3] is a commuter rail service between New Haven, Connecticut, and Springfield, Massachusetts, using the Amtrak-owned New Haven–Springfield Line. The project is a joint venture between the states of Connecticut and Massachusetts, with support from the federal government as well. CT Rail-branded trains provide service along the corridor, and riders can use Hartford Line tickets to travel on board most Amtrak trains along the corridor at the same prices. The service launched on June 16, 2018.[4][5][6]

Hartford Line
A Hartford Line train in Hartford on opening day, June 16, 2018.
Overview
Service typeCommuter rail
StatusOperating
LocaleConnecticut and Massachusetts
First serviceJune 16, 2018
Current operator(s)CTrail (TransitAmerica Services/ Alternate Concepts Inc.)
Ridership2,000 (weekday average)[1]
Websitewww.hartfordline.com
Route
TerminiNew Haven Union Station
Springfield Union Station
Stops9 (initial service)
13 (future)
Distance travelled62 mi (100 km)
Average journey time81 minutes
Service frequency17 weekday round trips
12–13 weekend round trips
Line(s) usedNew Haven–Springfield Line
Technical
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Operating speed80 mph (130 km/h) (CTrail)
110 mph (180 km/h) (Amtrak)[2]
Track owner(s)Amtrak
Route map
62.0 mi
99.8 km
Springfield
Enfield (future)
47.4 mi
76.3 km
Windsor Locks
42.9 mi
69 km
Windsor
36.7 mi
59.1 km
Hartford
West Hartford (future)
Newington (future)
26.1 mi
42 km
Berlin
18.7 mi
30.1 km
Meriden
13.0 mi
20.9 km
Wallingford
North Haven (future)
0.6 mi
1 km
New Haven State Street
0.0 mi
0 km
New Haven Union Station

Operation edit

Fares and service edit

 
Test train at Hartford Union Station in June 2018

The Connecticut Department of Transportation (ConnDOT) provides commuter train service on the line under its new CTrail branding; these trains are currently operated by TransitAmerica Services and Alternate Concepts Inc., operating as a joint venture, under a 5-year, $45 million contract.[7] Amtrak also operates intercity rail trains on this corridor; Amtrak fares along the corridor are equal to their CTrail equivalents, and passengers can use CTrail tickets to ride Amtrak’s Hartford Line trains.[8][9] (The only Amtrak train on the corridor that does not participate is the once-daily Vermonter).[10]

Tickets from New Haven to Hartford are $8 and from New Haven to Springfield $12.75, both roughly half as much as what Amtrak's fares were before Hartford Line service began in June 2018. Discounts for bulk purchases of tickets and commuter passes are also offered.[11] CTrail tickets can be purchased at ticket vending machines (TVMs) at all stations. Alternatively for Amtrak operated trains, local tickets at the same price as CTrail can be purchased from Amtrak’s ticket windows at New Haven, Hartford, and Springfield or online. Passengers boarding an Amtrak Hartford Line train at Windsor must pre-purchase an Amtrak ticket before boarding over the phone or online on a smart phone or mobile device to avoid an onboard surcharge.[12] The ticket machine at Windsor Locks was installed by November 2018, with Windsor installed in 2019.[13]

Nine round-trips on weekdays are operated under the CTrail brand, with four New Haven–Hartford round-trips, and five New Haven–Springfield round-trips. Amtrak provides an additional eight New Haven-Springfield round-trips, two of which were added to the schedule upon launch of the Hartford Line in June 2018. Amtrak’s eight round-trips include all of their local 400 series Hartford Line trains and their Northeast Regional through trains that terminate in Springfield. This makes for a total of seventeen round-trips between New Haven and Hartford, thirteen of which operate the full line to Springfield. On weekends and holidays, CTrail operates two New Haven–Hartford round-trips and four New Haven–Springfield round-trips; along with Amtrak's pre-existing schedule, making for a total of twelve-thirteen round-trips offered on weekends and holidays.[14]

On September 14, 2020, Amtrak began requiring reserved tickets for Springfield-terminating Northeast Regional trains as part of a new policy requiring reservations for all Northeast Regional trips. Fares for these trips remained the same as other Hartford Line trains.[15]

Ridership edit

On June 18, 2018, Connecticut Governor Dannel Malloy announced that the line carried 21,850 riders over opening weekend, with 10,300 on Saturday, June 16, and 11,550 on Sunday.[16] On June 26, it was announced that 10,719 customers rode the line during the first full week of operation, June 18 to 24.[17] Average daily ridership has exceeded initial projections, with an estimated 2,400 daily passengers on weekdays and 1,200 on weekends. The line carried its millionth passenger during the Thanksgiving holiday in November 2019.

Connecting services edit

Connecting bus service is available to CT Transit regional buses at New Haven and Hartford stations and to Pioneer Valley Transit Authority buses at Springfield. Shuttle bus service is also available between Hartford station and Bradley International Airport. Although Windsor Locks station is geographically the closest Hartford Line station to the airport, Hartford station is the official connection point for rail-bus-airport transfers due to the limited facilities and low level platform at Windsor Locks.[18]

Rolling stock edit

 
A typical Hartford Line train with a GP40-3H and four MBB coaches at New Haven

In December 2017, Connecticut signed an agreement to lease 16 MBB coaches from the Massachusetts Bay Transportation Authority for three years, at a cost of $4.54 million, with options to extend the lease for up to three more years.[19] The 16 cars were operated in four-car consists in a push-pull configuration with GP40-3H locomotives transferred over from Shore Line East.[20] The railcars required significant repair and repainting before entering service, leading the Connecticut DOT to request $2.3 million from the state legislature in April 2018.[19]

Mafersa coaches largely replaced the MBB coaches on the line in 2022, after M8 cars replaced the Mafersa coaches on Shore Line East.[21] The MBB coaches were completely withdrawn from service in early 2023. In August 2023, CTDOT approved a contract with Alstom for 60 single-level passenger cars, which will replace the Mafersa coaches in Hartford Line service (as well as Shoreliner cars on other lines) beginning in 2026.[22][23]

Roster edit

Builder Model Photo Active Road numbers Year built Year acquired Year rebuilt Notes
Locomotives
GE P40DC   12 6700-6711 1993 2005, 2015 2018-2024 Ex-Amtrak.
EMD GP40-3H   6[24] 6694-6699 1967, 1971[24] 1996[24] 2017-2019[24] Two units are currently on lease to Metro-North Railroad.
Coaches
Mafersa Coaches   33 1701–1719 (cab cars, odd numbers only)

1730–1774 (coach cars, even numbers only)

1991–1992 2004 Ex-Virginia Railway Express.

Stations edit

All stations are ADA-compliant.

State Station Milepost (km) Service began Connections / notes
MA Springfield Union Station 62.0 mi (99.8 km) June 16, 2018[25] Amtrak: Hartford Line, Lake Shore Limited, Northeast Regional, Valley Flyer, Vermonter
Pioneer Valley Transit Authority, Greyhound Lines, Peter Pan Bus Lines
CT Enfield 54.1 mi (87.1 km) 2027 (planned)[26]
Windsor Locks 47.4 mi (76.3 km) June 16, 2018[25] Amtrak: Hartford Line, Northeast Regional, Valley Flyer, Vermonter
Windsor 42.9 mi (69.0 km) June 16, 2018[25] Amtrak: Hartford Line, Northeast Regional, Valley Flyer
Hartford 36.7 mi (59.1 km) June 16, 2018[25] Amtrak: Hartford Line, Northeast Regional, Valley Flyer, Vermonter
CTfastrak, CTtransit, Greyhound Lines, Peter Pan Bus Lines, FlixBus
West Hartford 33.4 mi (53.8 km) Future station[27]
Newington 31.8 mi (51.2 km) Future station[27]
Berlin 26.1 mi (42.0 km) June 16, 2018[25] Amtrak: Hartford Line, Northeast Regional, Valley Flyer
CTtransit
Meriden 18.7 mi (30.1 km) June 16, 2018[25] Amtrak: Hartford Line, Northeast Regional, Valley Flyer, Vermonter
CTtransit, Middletown Area Transit
Wallingford 13.0 mi (20.9 km) June 16, 2018[25] Amtrak: Hartford Line, Northeast Regional, Valley Flyer
CTtransit
North Haven 6.4 mi (10.3 km) 2025 (planned)[28]
New Haven State Street 0.6 mi (0.97 km) June 16, 2018[25] Amtrak: Hartford Line, Northeast Regional, Valley Flyer
Metro-North Railroad: New Haven Line
CTrail: Shore Line East
CTtransit
New Haven Union Station 0.0 mi (0 km) June 16, 2018[25] Amtrak: Acela, Hartford Line, Northeast Regional, Valley Flyer, Vermonter
Metro-North Railroad: New Haven Line
CTrail: Shore Line East
CTtransit, Greyhound Lines, Peter Pan Bus Lines, FlixBus

History edit

Background edit

During the mid-1980s, due to the high cost of operating the New Haven–Springfield Line and the competing newly-constructed expressways, Amtrak removed 25 miles (40 km) of track, turning the line from a double-track line to a line with a single track with passing sidings.[29][30] Of the 62 miles (100 km) between New Haven and Springfield, 23.3 miles (37.5 km) of double track and 38.7 miles (62.3 km) of single track were left.[31]

In 1994, the Connecticut Department of Transportation (ConnDOT) conducted a feasibility study for a New Haven–Hartford service which envisaged three trips in the morning and three in the afternoon. It estimated that capital costs would be $4.4 million and that it would require an annual subsidy of $2.5 million. Ridership was projected at 1,000 per day. A revised and expanded proposal in 2001 contemplated service to Springfield and hourly service, with half-hourly service during peak periods. This would require $249 million in capital costs, both for rolling stock and to restore double tracking to the line. The service would require a yearly subsidy of $13 million but would carry 1,800–2,000 passengers daily.[32]

Various delays initially prevented the service. One source was a lack of widespread support in the New Haven region. Although reestablishing service was briefly mentioned in the South Central Regional Council of Government's January 2001 Long Range Mobility Plan,[33] it was not until 2003 that the commuter service provision began to be consistently listed among key transportation priorities in the annual Greater New Haven Chamber of Commerce Legislative Agenda.[34]

The New Haven–Hartford–Springfield Commuter Rail Implementation Study, released in 2005 by ConnDOT, recommended half-hour peak service, with new stations at North Haven/Hamden, Newington, and Enfield. No action was taken following the study, as proposed schedules did not link well with those of the New Haven Line and ridership projections were low (particularly for northbound morning and southbound evening trips).[35]

Plan edit

The plan called for the improvement of existing stations and the construction of new stations along the line. To facilitate frequent and bi-directional service, the line incorporates newly installed double track totaling 27 miles (43 km)[36] as well as 2 miles (3.2 km) of new passing sidings. Five new interlockings were built and new signal systems were installed, including the installation of Positive Train Control. Bridges and culverts on the line have been repaired, rehabilitated or replaced.[20]

Funding edit

In January 2010, $40 million of stimulus funds were approved to double-track 10.5 miles (16.9 km) of the corridor under the American Recovery & Reinvestment Act.[37][38] In July 2010, Governor Jodi Rell asked the Connecticut State Bond Commission to authorize borrowing $260 million in an effort to attract additional federal matching funds, to double-track the remainder of the corridor, construct freight sidings, and improve signaling. These upgrades, together with new rolling stock, should allow for two-way service during peak hours at speeds of up to 110 miles per hour (180 km/h).[39] On August 17, 2010, Connecticut lawmakers authorized borrowing the $260 million.[40]

On October 25, 2010, Governor Rell announced that Connecticut received an additional $120.9 million in funds from the federal government to fund the double tracking of the remainder of the line south of Hartford as well as station improvements in Wallingford, Meriden, Berlin and Hartford.[41]

 
Construction of pedestrian bridge and new platforms at Berlin station in December 2015

As of April 2011, Connecticut State officials had applied for $227 million from the federal government that would complete track improvements between Hartford and Springfield, Massachusetts. ConnDOT applied for the money to the Federal Railroad Administration, part of $2.4 billion that Florida governor Rick Scott rejected because of the spending it would require from his budget.[42] In May 2011, Connecticut was awarded $30 million for track improvements in Hartford.

On August 15, 2012, the Federal Railroad Administration (FRA) granted a Finding of No Significant Impact (FONSI) on the line's environmental assessment, a major step towards the obligation of $121 million in federal funding for the line.[43]

In February 2017, the state approved an additional $50 million in bonded funds for the project. The money will support design of the rebuilt Windsor and Windsor Locks stations and of the new stations at North Haven, Newington, West Hartford, and Enfield. It will also complete funding for four miles (6.4 km) of double track being added north of Hartford, and pay for design and environmental permitting for an additional 7.5 miles (12.1 km) of double track between Hartford and Enfield.[44][45] If further funding is found to build these additional miles, it would complete the double-tracking of the line except for downtown Hartford and the aging Warehouse Point railroad bridge.[46] The station in Newington was originally going to be located at Newington Junction, but due to local opposition, it will be located at Cedar St in Newington instead, within walking distance to the Cedar St CTfastrak stop.[47]

The state intends to seek FRA funds to pay for construction of the new and rebuilt stations, the replacement of the Warehouse Point bridge, and a layover yard near Springfield.[29][48]

The budgeted funds for the Connecticut portion to date total $769.1 million, of which $204 million has come from the Federal sources ($190.9 million from the FRA, $13.9 million from the Federal Transit Administration) and the balance from the state of Connecticut.[49]

Construction edit

 
Second platform at State Street under construction in December 2016

In 2015, major construction commenced at the four stations in Berlin, Meriden, Wallingford, and Hartford.[50] On August 3, 2015, Amtrak began busing its weekday morning and evening New Haven–Springfield Shuttle trains to allow double tracking work to begin.[51]

In December 2015, the state announced that the cost of construction had increased by $135 million for a total of $570 million, and that service would not begin until January 2018.[52]

In July 2016, work began at the New Haven State Street station on a new high-level platform.[53] In August 2016, a new 260-foot (79 m) high-level platform was put into service at Hartford.[53] The platform was constructed on the existing low-level platform.[50]

On October 11, 2016, a 17-car track-laying train began work to build the second track on the southern half of the line. The train laid track from North Haven to Meriden in October 2016, and returned for Meriden to Newington in 2017.[54] In 2017, the start date was pushed to May 2018 to accommodate construction of the new double track north of Hartford.[55][7]

The new Wallingford station replaced the old station on November 6, 2017.[56] The rebuilt Meriden station opened on November 19, 2017,[57] though final construction continued through December 18, 2017.[36]

The Amtrak portion of the program, including three new weekday New Haven–Springfield round trips and general alterations to the Amtrak schedule on the line took effect on June 9, 2018, with the new lower fares taking effect on the CTrail launch date on June 16.[10] Hartford Line service commenced on June 16, 2018, with free weekend service being offered on June 16 and 17. Full service commenced on June 18.[58]

The connection between a new double track section from Hartford to Windsor and an existing section from north of Windsor to south of Windsor Locks was completed on September 25, 2018, leaving less than twelve miles (19 km) of single track on the line.[59][60] The new section was not expected to allow additional service, but to increase reliability.[59] The state was awarded up to $105 million in Infrastructure Investment and Jobs Act funds in November 2023 for further work including additional double tracking along 6.2 miles (10.0 km) of the line in Enfield, between Windsor Locks and Windsor, and between Hartford and West Hartford.[61] The state will contribute $42 million in matching funds.[62][63] The project is expected to allow for an increase in service from 35 to 44 trains each day. Work on the project is expected to take place between August 2024 and November 2027.[64]

Most service was replaced by buses from July 18 to September 9, 2022, during canopy roof replacement at Hartford Union Station and slope stabilization work in Windsor.[65][needs update]

See also edit

References edit

  1. ^ "Hartford Line: Year One Report" (PDF). Connecticut Department of Transportation. June 17, 2019. p. 4.
  2. ^ Kinney, Jim (September 26, 2018). "ConnDOT finishes Hartford Line track project". MassLive. Retrieved December 17, 2023.
  3. ^ "Gov. Malloy Announced Three New Train Stations as Part of NHHS Rail Program" (Press release). Hartford, Connecticut: State of Connecticut, Office of Governor Dannel P. Malloy. October 24, 2014. Retrieved October 25, 2014.
  4. ^ Kinney, Jim (June 17, 2018). "Hundreds head to Hartford to celebrate new Springfield-to-New Haven CTrail line: 9 takeaways from the launch". MassLive. Retrieved June 15, 2018.
  5. ^ Porter, Mikaela; Owens, David (June 17, 2018). "Thousands Take A Free Ride On Hartford Line's Inaugural Run". Retrieved June 17, 2018.
  6. ^ Rondinone, Nicholas (June 15, 2018). "Connecticut, Massachusetts Officials Cut Ribbon On Hartford Line". Hartford Courant. Retrieved June 17, 2018.
  7. ^ a b "Gov. Malloy Announces TransitAmerica Services and Alternate Concepts Selected as Service Provider for the Hartford Line" (Press release). The Office of Governor Dannel P. Malloy. Retrieved July 24, 2017.
  8. ^ New Haven – Hartford – Springfield Rail Program [@NHHSRail] (April 3, 2018). "1 of 2: CTDOT has received confirmation that Amtrak will accept Hartford Line tickets onboard all Amtrak trains between New Haven and Springfield upon service launch, with the exception of the Vermonter. Tickets sold by Amtrak will be at Amtrak fare rates" (Tweet). Retrieved April 11, 2018 – via Twitter.
  9. ^ "CTrail Hartford Line Rail Service Scheduled to Launch June 16th!". Facebook. April 24, 2018. At the Meriden Ribbon Cutting Event, it was announced that Amtrak would be lowering one-way fares to match Hartford Line fares.
  10. ^ a b "Connecticut DOT gears up for Hartford Line testing". Progressive Railroading. June 6, 2018. Retrieved June 6, 2018.
  11. ^ "$8 To New Haven: DOT Announces Proposed Fares For Hartford Line". Hartford Courant. October 23, 2017. Retrieved April 6, 2018.
  12. ^ New Haven – Hartford – Springfield Rail Program [@NHHSRail] (April 3, 2018). "2 of 2: Tickets at Hartford Line fare rates will only be sold at TVMs at Hartford Line stations, except for Windsor and Windsor Locks, and on board CTrail Hartford Line trains. Passengers boarding at Windsor/Windsor Locks do not pay the on board surcharge" (Tweet). Retrieved April 11, 2018 – via Twitter.
  13. ^ "CTDOT Announces Installation of Ticket Vending Machine at the Windsor Locks Hartford Line Station" (Press release). Connecticut Department of Transportation. November 16, 2018. Retrieved February 19, 2019.
  14. ^ "CTrail Hartford Line Schedule: Effective November 27, 2023" (PDF). Hartford Line. November 27, 2023. Retrieved December 7, 2023.
  15. ^ "Hartford Line News and Notices". Hartford Line.
  16. ^ "Gov. Malloy: Newly Launched Hartford Line Attracted 21,850 Riders on its Opening, Free Travel Weekend" (Press release). The Office of Governor Dannel P. Malloy. June 18, 2018. Retrieved June 27, 2018.
  17. ^ "Gov. Malloy: Hartford Line Ridership Tops 10,000 in First Full Week of Regular Operations" (Press release). The Office of Governor Dannel P. Malloy. June 26, 2018. Retrieved June 27, 2018.
  18. ^ "30-Kennedy Road (Bradley Flyer) | CTtransit - Connecticut DOT-owned bus service". www.cttransit.com.
  19. ^ a b "Rail Car Repairs, Leasing Issues Put Hartford Line Start Date in Doubt". Hartford Courant. April 4, 2018. Retrieved April 6, 2018.
  20. ^ a b "What the Hartford Line Brings to Customers". Hartford Line. 2018. Retrieved May 19, 2018.
  21. ^ Hartley, Scott A. (May 24, 2022). "Connecticut replaces diesel Shore Line East trains with electric multiple-unit equipment". Trains magazine.
  22. ^ "Alstom to supply 60 single-level coach cars to the Connecticut Department of Transportation for its statewide rail system" (Press release). Alstom. August 9, 2023.
  23. ^ "Governor Lamont Announces Purchase of 60 New Rail Cars to Modernize Commuter Rail Lines" (Press release). Connecticut Department of Transportation. August 9, 2023.
  24. ^ a b c d . Trains Magazine. March 20, 2017. Archived from the original on April 10, 2018. Retrieved April 10, 2018.
  25. ^ a b c d e f g h i "CTrail Hartford Line Rail Service Scheduled to Launch June 16; Commemorative Inaugural Event to be Held Friday, June 15" (Press release). Connecticut Department of Transportation. April 17, 2018. Retrieved April 17, 2018.
  26. ^ State Project 320-0005 Proposed Railroad Station in Enfield. Connecticut Department of Transportation. October 4, 2023. 30 minutes in. Retrieved March 21, 2024.
  27. ^ a b "Transportation Infrastructure Capital Plan Spreadsheet (2021-2025)" (PDF). Connecticut Dept. of Transportation. February 4, 2021. p. 28.
  28. ^ "Project Information Appendix" (PDF). Northeast Corridor Capital Investment Plan Fiscal Years 2022-2026 (Report). Northeast Corridor Commission. October 2021. p. A3-78.
  29. ^ a b "Objectives & Scope". New Haven–Hartford–Springfield Rail Program. Connecticut Department of Transportation. Retrieved January 26, 2017.
  30. ^ Karr, Ronald Dale (1995). The Rail Lines of Southern New England. Branch Line Press. p. 78. ISBN 0942147022.
  31. ^ "Connecticut: New Travel Options for the Northeast Region" (PDF). SPEEDLINES. No. 23. High-Speed Intercity Passenger Rail Committee. June 2018. p. 20. Retrieved June 27, 2018.
  32. ^ Fazzalaro, James J. (January 16, 2001). . Connecticut Department of Transportation. Archived from the original on September 27, 2006. Retrieved October 25, 2014.
  33. ^ South Central Regional Council of Governments Mobility, A Transportation Plan for the Year 2020 page 8
  34. ^ Greater New Haven Chamber of Commerce Legislative Agenda booklets 1997 p. 7, 1999 p.7, 2000 pp. 9,10, 2002 p. 14, 2003 p.6, 2004 p. 6, 2006 p. 2
  35. ^ Wilbur Smith Associates (2005). "Recommended Action" (PDF). New Haven Hartford Springfield Commuter Rail Implementation Study. Connecticut Department of Transportation. Retrieved November 3, 2014.
  36. ^ a b "Winter 2018 Newsletter" (PDF). NHHS Rail Program. January 17, 2018. Retrieved January 17, 2018.
  37. ^ . Hartford Courant. January 31, 2010. Archived from the original on February 3, 2010. Retrieved February 15, 2010.
  38. ^ "HSIPR Funding by Region". Federal Railroad Administration. Retrieved April 2, 2018.
  39. ^ "Gov. M. Jodi Rell seeks state OK to borrow $260 million to push high-speed rail". Stamford Advocate. July 27, 2010.
  40. ^ "State OKs $260 Million To Pay For Commuter Rail System". The Hartford Courant. Archived from the original on January 20, 2013.
  41. ^ "Governor Rell: Connecticut Wins $120 Million for New Haven-Hartford-Springfield Rail Project" (Press release). Office of Governor Jodi Rell. October 25, 2010. Retrieved March 23, 2018.
  42. ^ Stannard, Ed (April 6, 2011). "Conn. seeks funds for rail work on Hartford-to-Springfield line (document)". New Haven Register.
  43. ^ "Environmental Assessment". NHHS Rail Program. Retrieved August 21, 2012.
  44. ^ "CTDOT Announces $50 Million In Additional Funding For NHHS Rail Program" (Press release). Connecticut Department of Transportation. February 20, 2017.
  45. ^ Stacom, Don (February 21, 2017). "Hartford Line From Hartford To Springfield, Mass. Gets $50 Million In Bonding". Hartford Courant. Retrieved March 21, 2017.
  46. ^ "Appendix 6: New Haven-Hartford-Springfield Rail Program Track Chart" (PDF). Connecticut Department of Transportation. January 2012.
  47. ^ . Hartford Business Journal. Archived from the original on October 27, 2018. Retrieved October 28, 2018.
  48. ^ Stacom, Don (February 18, 2017). "Hartford Rail Line On Track Despite Connecticut Budget Crisis". Hartford Courant. Retrieved February 18, 2017.
  49. ^ "Objectives & Scope: Funding". NHHS Rail Program. Connecticut DOT. Retrieved October 17, 2017.
  50. ^ a b "New Haven–Hartford–Springfield Rail Program Stations Factsheet" (PDF). NHHS Rail Program. November 29, 2016. Retrieved January 26, 2017.
  51. ^ "Amtrak Begins Substitute Bus Operation to Facilitate Construction on Hartford Line" (Press release). Connecticut Department of Transportation. July 31, 2015. Retrieved August 3, 2015.
  52. ^ Stacom, Don (December 4, 2015). "Springfield-To-New Haven Commuter Rail Cost Increases, Service Begins In 2018". Hartford Courant. Retrieved December 4, 2015.
  53. ^ a b "Fall 2016 Newsletter" (PDF). NHHS Rail Program. November 29, 2016. Retrieved January 26, 2017.
  54. ^ Stacom, Don (October 11, 2016). "17-Car Construction Train Works Its Way North, Laying Track On Hartford Line". Hartford Courant. Retrieved October 12, 2016.
  55. ^ "Summer 2017 Newsletter" (PDF). NHHS Rail Program. Summer 2017. p. 2.
  56. ^ "Gov. Malloy Announces Opening of New Train Station in Wallingford That Will Serve the Hartford Line" (Press release). Office of Governor Dannel P. Malloy. November 6, 2017.
  57. ^ "CTrail Hartford Line Meriden Station Opens Platforms and Pedestrian Bridge" (Press release). Connecticut Department of Transportation. November 19, 2017. Retrieved November 26, 2017.
  58. ^ "Hartford Line commuter rail to launch in June". Progressive Railroading. April 18, 2018. Retrieved June 1, 2018.
  59. ^ a b Lurye, Rebecca (June 12, 2018). "Despite New Commuter Line, Rail Upgrades Lag North Of Hartford". Hartford Courant. Retrieved June 13, 2018.
  60. ^ "CTDOT ANNOUNCES COMPLETION OF A SECOND RAIL TRACK ON THE CTrail HARTFORD LINE BETWEEN HARTFORD AND WINDSOR" (Press release). Connecticut Department of Transportation. September 25, 2018.
  61. ^ "FY22-23 Federal-State Partnership (NEC) Grant Program Selections" (PDF). railroads.dot.gov. Federal Railroad Administration. November 7, 2023. Retrieved November 9, 2023.
  62. ^ "FY 2022-2023 Federal-State Partnership for Intercity Passenger Rail Program for the Northeast Corridor (FSP-NEC) Selections: Project Summaries" (PDF). Federal Railroad Administration. November 6, 2023.
  63. ^ "FACT SHEET: President Biden Advances Vision for World Class Passenger Rail by Delivering Billions in New Funding" (Press release). The White House. November 6, 2023.
  64. ^ DiSalvo, Emily (November 7, 2023). "Hartford Line gets $105M in federal funding to add tracks for more trains, improve signals". CT Insider. Retrieved November 9, 2023.
  65. ^ "Safety and Track Improvement Projects on the Hartford Line Result in Two Month Service Changes" (Press release). Connecticut Department of Transportation. June 24, 2022.

Further reading edit

  • Connecticut Department of Transportation (March 2011). New Haven-Hartford-Springfield Rail Project: Service Development Plan (PDF) (Report). Connecticut Department of Transportation.
  • Wilburn Smith Associates (June 2005). (PDF) (Report). Connecticut Department of Transportation. Archived from the original (PDF) on February 2, 2016.

External links edit

  • Official website
  • New Haven–Hartford–Springfield Rail Program

hartford, line, intercity, rail, service, same, name, operated, amtrak, amtrak, valley, flyer, service, operating, part, program, continuing, greenfield, valley, flyer, amtrak, train, commuter, rail, service, between, haven, connecticut, springfield, massachus. For the intercity rail service of the same name operated by Amtrak see Hartford Line Amtrak For the Valley Flyer service operating as part of the Hartford Line program but continuing to Greenfield MA see Valley Flyer Amtrak train The Hartford Line 3 is a commuter rail service between New Haven Connecticut and Springfield Massachusetts using the Amtrak owned New Haven Springfield Line The project is a joint venture between the states of Connecticut and Massachusetts with support from the federal government as well CT Rail branded trains provide service along the corridor and riders can use Hartford Line tickets to travel on board most Amtrak trains along the corridor at the same prices The service launched on June 16 2018 4 5 6 Hartford LineA Hartford Line train in Hartford on opening day June 16 2018 OverviewService typeCommuter railStatusOperatingLocaleConnecticut and MassachusettsFirst serviceJune 16 2018Current operator s CTrail TransitAmerica Services Alternate Concepts Inc Ridership2 000 weekday average 1 Websitewww wbr hartfordline wbr comRouteTerminiNew Haven Union StationSpringfield Union StationStops9 initial service 13 future Distance travelled62 mi 100 km Average journey time81 minutesService frequency17 weekday round trips12 13 weekend round tripsLine s usedNew Haven Springfield LineTechnicalTrack gauge4 ft 8 1 2 in 1 435 mm standard gaugeOperating speed80 mph 130 km h CTrail 110 mph 180 km h Amtrak 2 Track owner s AmtrakRoute mapLegend Vermonter to St AlbansValley Flyer to Greenfield Lake Shore Limited 62 0 mi99 8 km Springfield MassachusettsConnecticut Enfield future 47 4 mi76 3 km Windsor Locks 42 9 mi69 km Windsor 36 7 mi59 1 km Hartford West Hartford future Newington future CTfastrak to Downtown New Britain 26 1 mi42 km Berlin 18 7 mi30 1 km Meriden 13 0 mi20 9 km Wallingford North Haven future Shore Line East NEC to Old Saybrook 0 6 mi1 km New Haven State Street 0 0 mi0 km New Haven Union Station New Haven NEC to Grand Central This diagram viewtalkedit Contents 1 Operation 1 1 Fares and service 1 2 Ridership 1 3 Connecting services 1 4 Rolling stock 1 4 1 Roster 2 Stations 3 History 3 1 Background 3 2 Plan 3 3 Funding 3 4 Construction 4 See also 5 References 6 Further reading 7 External linksOperation editFares and service edit nbsp Test train at Hartford Union Station in June 2018 The Connecticut Department of Transportation ConnDOT provides commuter train service on the line under its new CTrail branding these trains are currently operated by TransitAmerica Services and Alternate Concepts Inc operating as a joint venture under a 5 year 45 million contract 7 Amtrak also operates intercity rail trains on this corridor Amtrak fares along the corridor are equal to their CTrail equivalents and passengers can use CTrail tickets to ride Amtrak s Hartford Line trains 8 9 The only Amtrak train on the corridor that does not participate is the once daily Vermonter 10 Tickets from New Haven to Hartford are 8 and from New Haven to Springfield 12 75 both roughly half as much as what Amtrak s fares were before Hartford Line service began in June 2018 Discounts for bulk purchases of tickets and commuter passes are also offered 11 CTrail tickets can be purchased at ticket vending machines TVMs at all stations Alternatively for Amtrak operated trains local tickets at the same price as CTrail can be purchased from Amtrak s ticket windows at New Haven Hartford and Springfield or online Passengers boarding an Amtrak Hartford Line train at Windsor must pre purchase an Amtrak ticket before boarding over the phone or online on a smart phone or mobile device to avoid an onboard surcharge 12 The ticket machine at Windsor Locks was installed by November 2018 with Windsor installed in 2019 13 Nine round trips on weekdays are operated under the CTrail brand with four New Haven Hartford round trips and five New Haven Springfield round trips Amtrak provides an additional eight New Haven Springfield round trips two of which were added to the schedule upon launch of the Hartford Line in June 2018 Amtrak s eight round trips include all of their local 400 series Hartford Line trains and their Northeast Regional through trains that terminate in Springfield This makes for a total of seventeen round trips between New Haven and Hartford thirteen of which operate the full line to Springfield On weekends and holidays CTrail operates two New Haven Hartford round trips and four New Haven Springfield round trips along with Amtrak s pre existing schedule making for a total of twelve thirteen round trips offered on weekends and holidays 14 On September 14 2020 Amtrak began requiring reserved tickets for Springfield terminating Northeast Regional trains as part of a new policy requiring reservations for all Northeast Regional trips Fares for these trips remained the same as other Hartford Line trains 15 Ridership edit On June 18 2018 Connecticut Governor Dannel Malloy announced that the line carried 21 850 riders over opening weekend with 10 300 on Saturday June 16 and 11 550 on Sunday 16 On June 26 it was announced that 10 719 customers rode the line during the first full week of operation June 18 to 24 17 Average daily ridership has exceeded initial projections with an estimated 2 400 daily passengers on weekdays and 1 200 on weekends The line carried its millionth passenger during the Thanksgiving holiday in November 2019 Connecting services edit Connecting bus service is available to CT Transit regional buses at New Haven and Hartford stations and to Pioneer Valley Transit Authority buses at Springfield Shuttle bus service is also available between Hartford station and Bradley International Airport Although Windsor Locks station is geographically the closest Hartford Line station to the airport Hartford station is the official connection point for rail bus airport transfers due to the limited facilities and low level platform at Windsor Locks 18 Rolling stock edit nbsp A typical Hartford Line train with a GP40 3H and four MBB coaches at New Haven In December 2017 Connecticut signed an agreement to lease 16 MBB coaches from the Massachusetts Bay Transportation Authority for three years at a cost of 4 54 million with options to extend the lease for up to three more years 19 The 16 cars were operated in four car consists in a push pull configuration with GP40 3H locomotives transferred over from Shore Line East 20 The railcars required significant repair and repainting before entering service leading the Connecticut DOT to request 2 3 million from the state legislature in April 2018 19 Mafersa coaches largely replaced the MBB coaches on the line in 2022 after M8 cars replaced the Mafersa coaches on Shore Line East 21 The MBB coaches were completely withdrawn from service in early 2023 In August 2023 CTDOT approved a contract with Alstom for 60 single level passenger cars which will replace the Mafersa coaches in Hartford Line service as well as Shoreliner cars on other lines beginning in 2026 22 23 Roster edit Builder Model Photo Active Road numbers Year built Year acquired Year rebuilt Notes Locomotives GE P40DC nbsp 12 6700 6711 1993 2005 2015 2018 2024 Ex Amtrak EMD GP40 3H nbsp 6 24 6694 6699 1967 1971 24 1996 24 2017 2019 24 Two units are currently on lease to Metro North Railroad Coaches Mafersa Coaches nbsp 33 1701 1719 cab cars odd numbers only 1730 1774 coach cars even numbers only 1991 1992 2004 Ex Virginia Railway Express Stations editAll stations are ADA compliant State Station Milepost km Service began Connections notes MA Springfield Union Station 62 0 mi 99 8 km June 16 2018 25 Amtrak Hartford Line Lake Shore Limited Northeast Regional Valley Flyer VermonterPioneer Valley Transit Authority Greyhound Lines Peter Pan Bus Lines CT Enfield 54 1 mi 87 1 km 2027 planned 26 Windsor Locks 47 4 mi 76 3 km June 16 2018 25 Amtrak Hartford Line Northeast Regional Valley Flyer Vermonter Windsor 42 9 mi 69 0 km June 16 2018 25 Amtrak Hartford Line Northeast Regional Valley Flyer Hartford 36 7 mi 59 1 km June 16 2018 25 Amtrak Hartford Line Northeast Regional Valley Flyer VermonterCTfastrak CTtransit Greyhound Lines Peter Pan Bus Lines FlixBus West Hartford 33 4 mi 53 8 km Future station 27 Newington 31 8 mi 51 2 km Future station 27 Berlin 26 1 mi 42 0 km June 16 2018 25 Amtrak Hartford Line Northeast Regional Valley FlyerCTtransit Meriden 18 7 mi 30 1 km June 16 2018 25 Amtrak Hartford Line Northeast Regional Valley Flyer VermonterCTtransit Middletown Area Transit Wallingford 13 0 mi 20 9 km June 16 2018 25 Amtrak Hartford Line Northeast Regional Valley FlyerCTtransit North Haven 6 4 mi 10 3 km 2025 planned 28 New Haven State Street 0 6 mi 0 97 km June 16 2018 25 Amtrak Hartford Line Northeast Regional Valley FlyerMetro North Railroad New Haven LineCTrail Shore Line EastCTtransit New Haven Union Station 0 0 mi 0 km June 16 2018 25 Amtrak Acela Hartford Line Northeast Regional Valley Flyer VermonterMetro North Railroad New Haven LineCTrail Shore Line EastCTtransit Greyhound Lines Peter Pan Bus Lines FlixBusHistory editBackground edit Main article New Haven Springfield Line History During the mid 1980s due to the high cost of operating the New Haven Springfield Line and the competing newly constructed expressways Amtrak removed 25 miles 40 km of track turning the line from a double track line to a line with a single track with passing sidings 29 30 Of the 62 miles 100 km between New Haven and Springfield 23 3 miles 37 5 km of double track and 38 7 miles 62 3 km of single track were left 31 In 1994 the Connecticut Department of Transportation ConnDOT conducted a feasibility study for a New Haven Hartford service which envisaged three trips in the morning and three in the afternoon It estimated that capital costs would be 4 4 million and that it would require an annual subsidy of 2 5 million Ridership was projected at 1 000 per day A revised and expanded proposal in 2001 contemplated service to Springfield and hourly service with half hourly service during peak periods This would require 249 million in capital costs both for rolling stock and to restore double tracking to the line The service would require a yearly subsidy of 13 million but would carry 1 800 2 000 passengers daily 32 Various delays initially prevented the service One source was a lack of widespread support in the New Haven region Although reestablishing service was briefly mentioned in the South Central Regional Council of Government s January 2001 Long Range Mobility Plan 33 it was not until 2003 that the commuter service provision began to be consistently listed among key transportation priorities in the annual Greater New Haven Chamber of Commerce Legislative Agenda 34 The New Haven Hartford Springfield Commuter Rail Implementation Study released in 2005 by ConnDOT recommended half hour peak service with new stations at North Haven Hamden Newington and Enfield No action was taken following the study as proposed schedules did not link well with those of the New Haven Line and ridership projections were low particularly for northbound morning and southbound evening trips 35 Plan edit The plan called for the improvement of existing stations and the construction of new stations along the line To facilitate frequent and bi directional service the line incorporates newly installed double track totaling 27 miles 43 km 36 as well as 2 miles 3 2 km of new passing sidings Five new interlockings were built and new signal systems were installed including the installation of Positive Train Control Bridges and culverts on the line have been repaired rehabilitated or replaced 20 Funding edit In January 2010 40 million of stimulus funds were approved to double track 10 5 miles 16 9 km of the corridor under the American Recovery amp Reinvestment Act 37 38 In July 2010 Governor Jodi Rell asked the Connecticut State Bond Commission to authorize borrowing 260 million in an effort to attract additional federal matching funds to double track the remainder of the corridor construct freight sidings and improve signaling These upgrades together with new rolling stock should allow for two way service during peak hours at speeds of up to 110 miles per hour 180 km h 39 On August 17 2010 Connecticut lawmakers authorized borrowing the 260 million 40 On October 25 2010 Governor Rell announced that Connecticut received an additional 120 9 million in funds from the federal government to fund the double tracking of the remainder of the line south of Hartford as well as station improvements in Wallingford Meriden Berlin and Hartford 41 nbsp Construction of pedestrian bridge and new platforms at Berlin station in December 2015 As of April 2011 Connecticut State officials had applied for 227 million from the federal government that would complete track improvements between Hartford and Springfield Massachusetts ConnDOT applied for the money to the Federal Railroad Administration part of 2 4 billion that Florida governor Rick Scott rejected because of the spending it would require from his budget 42 In May 2011 Connecticut was awarded 30 million for track improvements in Hartford On August 15 2012 the Federal Railroad Administration FRA granted a Finding of No Significant Impact FONSI on the line s environmental assessment a major step towards the obligation of 121 million in federal funding for the line 43 In February 2017 the state approved an additional 50 million in bonded funds for the project The money will support design of the rebuilt Windsor and Windsor Locks stations and of the new stations at North Haven Newington West Hartford and Enfield It will also complete funding for four miles 6 4 km of double track being added north of Hartford and pay for design and environmental permitting for an additional 7 5 miles 12 1 km of double track between Hartford and Enfield 44 45 If further funding is found to build these additional miles it would complete the double tracking of the line except for downtown Hartford and the aging Warehouse Point railroad bridge 46 The station in Newington was originally going to be located at Newington Junction but due to local opposition it will be located at Cedar St in Newington instead within walking distance to the Cedar St CTfastrak stop 47 The state intends to seek FRA funds to pay for construction of the new and rebuilt stations the replacement of the Warehouse Point bridge and a layover yard near Springfield 29 48 The budgeted funds for the Connecticut portion to date total 769 1 million of which 204 million has come from the Federal sources 190 9 million from the FRA 13 9 million from the Federal Transit Administration and the balance from the state of Connecticut 49 Construction edit nbsp Second platform at State Street under construction in December 2016 In 2015 major construction commenced at the four stations in Berlin Meriden Wallingford and Hartford 50 On August 3 2015 Amtrak began busing its weekday morning and evening New Haven Springfield Shuttle trains to allow double tracking work to begin 51 In December 2015 the state announced that the cost of construction had increased by 135 million for a total of 570 million and that service would not begin until January 2018 52 In July 2016 work began at the New Haven State Street station on a new high level platform 53 In August 2016 a new 260 foot 79 m high level platform was put into service at Hartford 53 The platform was constructed on the existing low level platform 50 On October 11 2016 a 17 car track laying train began work to build the second track on the southern half of the line The train laid track from North Haven to Meriden in October 2016 and returned for Meriden to Newington in 2017 54 In 2017 the start date was pushed to May 2018 to accommodate construction of the new double track north of Hartford 55 7 The new Wallingford station replaced the old station on November 6 2017 56 The rebuilt Meriden station opened on November 19 2017 57 though final construction continued through December 18 2017 36 The Amtrak portion of the program including three new weekday New Haven Springfield round trips and general alterations to the Amtrak schedule on the line took effect on June 9 2018 with the new lower fares taking effect on the CTrail launch date on June 16 10 Hartford Line service commenced on June 16 2018 with free weekend service being offered on June 16 and 17 Full service commenced on June 18 58 The connection between a new double track section from Hartford to Windsor and an existing section from north of Windsor to south of Windsor Locks was completed on September 25 2018 leaving less than twelve miles 19 km of single track on the line 59 60 The new section was not expected to allow additional service but to increase reliability 59 The state was awarded up to 105 million in Infrastructure Investment and Jobs Act funds in November 2023 for further work including additional double tracking along 6 2 miles 10 0 km of the line in Enfield between Windsor Locks and Windsor and between Hartford and West Hartford 61 The state will contribute 42 million in matching funds 62 63 The project is expected to allow for an increase in service from 35 to 44 trains each day Work on the project is expected to take place between August 2024 and November 2027 64 Most service was replaced by buses from July 18 to September 9 2022 during canopy roof replacement at Hartford Union Station and slope stabilization work in Windsor 65 needs update See also editConnecticut Commuter Rail CouncilReferences edit Hartford Line Year One Report PDF Connecticut Department of Transportation June 17 2019 p 4 Kinney Jim September 26 2018 ConnDOT finishes Hartford Line track project MassLive Retrieved December 17 2023 Gov Malloy Announced Three New Train Stations as Part of NHHS Rail Program Press release Hartford Connecticut State of Connecticut Office of Governor Dannel P Malloy October 24 2014 Retrieved October 25 2014 Kinney Jim June 17 2018 Hundreds head to Hartford to celebrate new Springfield to New Haven CTrail line 9 takeaways from the launch MassLive Retrieved June 15 2018 Porter Mikaela Owens David June 17 2018 Thousands Take A Free Ride On Hartford Line s Inaugural Run Retrieved June 17 2018 Rondinone Nicholas June 15 2018 Connecticut Massachusetts Officials Cut Ribbon On Hartford Line Hartford Courant Retrieved June 17 2018 a b Gov Malloy Announces TransitAmerica Services and Alternate Concepts Selected as Service Provider for the Hartford Line Press release The Office of Governor Dannel P Malloy Retrieved July 24 2017 New Haven Hartford Springfield Rail Program NHHSRail April 3 2018 1 of 2 CTDOT has received confirmation that Amtrak will accept Hartford Line tickets onboard all Amtrak trains between New Haven and Springfield upon service launch with the exception of the Vermonter Tickets sold by Amtrak will be at Amtrak fare rates Tweet Retrieved April 11 2018 via Twitter CTrail Hartford Line Rail Service Scheduled to Launch June 16th Facebook April 24 2018 At the Meriden Ribbon Cutting Event it was announced that Amtrak would be lowering one way fares to match Hartford Line fares a b Connecticut DOT gears up for Hartford Line testing Progressive Railroading June 6 2018 Retrieved June 6 2018 8 To New Haven DOT Announces Proposed Fares For Hartford Line Hartford Courant October 23 2017 Retrieved April 6 2018 New Haven Hartford Springfield Rail Program NHHSRail April 3 2018 2 of 2 Tickets at Hartford Line fare rates will only be sold at TVMs at Hartford Line stations except for Windsor and Windsor Locks and on board CTrail Hartford Line trains Passengers boarding at Windsor Windsor Locks do not pay the on board surcharge Tweet Retrieved April 11 2018 via Twitter CTDOT Announces Installation of Ticket Vending Machine at the Windsor Locks Hartford Line Station Press release Connecticut Department of Transportation November 16 2018 Retrieved February 19 2019 CTrail Hartford Line Schedule Effective November 27 2023 PDF Hartford Line November 27 2023 Retrieved December 7 2023 Hartford Line News and Notices Hartford Line Gov Malloy Newly Launched Hartford Line Attracted 21 850 Riders on its Opening Free Travel Weekend Press release The Office of Governor Dannel P Malloy June 18 2018 Retrieved June 27 2018 Gov Malloy Hartford Line Ridership Tops 10 000 in First Full Week of Regular Operations Press release The Office of Governor Dannel P Malloy June 26 2018 Retrieved June 27 2018 30 Kennedy Road Bradley Flyer CTtransit Connecticut DOT owned bus service www cttransit com a b Rail Car Repairs Leasing Issues Put Hartford Line Start Date in Doubt Hartford Courant April 4 2018 Retrieved April 6 2018 a b What the Hartford Line Brings to Customers Hartford Line 2018 Retrieved May 19 2018 Hartley Scott A May 24 2022 Connecticut replaces diesel Shore Line East trains with electric multiple unit equipment Trains magazine Alstom to supply 60 single level coach cars to the Connecticut Department of Transportation for its statewide rail system Press release Alstom August 9 2023 Governor Lamont Announces Purchase of 60 New Rail Cars to Modernize Commuter Rail Lines Press release Connecticut Department of Transportation August 9 2023 a b c d NRE to overhaul Connecticut DOT commuter rail locomotives Trains Magazine March 20 2017 Archived from the original on April 10 2018 Retrieved April 10 2018 a b c d e f g h i CTrail Hartford Line Rail Service Scheduled to Launch June 16 Commemorative Inaugural Event to be Held Friday June 15 Press release Connecticut Department of Transportation April 17 2018 Retrieved April 17 2018 State Project 320 0005 Proposed Railroad Station in Enfield Connecticut Department of Transportation October 4 2023 30 minutes in Retrieved March 21 2024 a b Transportation Infrastructure Capital Plan Spreadsheet 2021 2025 PDF Connecticut Dept of Transportation February 4 2021 p 28 Project Information Appendix PDF Northeast Corridor Capital Investment Plan Fiscal Years 2022 2026 Report Northeast Corridor Commission October 2021 p A3 78 a b Objectives amp Scope New Haven Hartford Springfield Rail Program Connecticut Department of Transportation Retrieved January 26 2017 Karr Ronald Dale 1995 The Rail Lines of Southern New England Branch Line Press p 78 ISBN 0942147022 Connecticut New Travel Options for the Northeast Region PDF SPEEDLINES No 23 High Speed Intercity Passenger Rail Committee June 2018 p 20 Retrieved June 27 2018 Fazzalaro James J January 16 2001 New Haven Hartford and Waterbury Hartford Rail Service Proposals Connecticut Department of Transportation Archived from the original on September 27 2006 Retrieved October 25 2014 South Central Regional Council of Governments Mobility A Transportation Plan for the Year 2020 page 8 Greater New Haven Chamber of Commerce Legislative Agenda booklets 1997 p 7 1999 p 7 2000 pp 9 10 2002 p 14 2003 p 6 2004 p 6 2006 p 2 Wilbur Smith Associates 2005 Recommended Action PDF New Haven Hartford Springfield Commuter Rail Implementation Study Connecticut Department of Transportation Retrieved November 3 2014 a b Winter 2018 Newsletter PDF NHHS Rail Program January 17 2018 Retrieved January 17 2018 After Feds Put Connecticut Rail Plan On Slow Track State Will Seek More Funds Hartford Courant January 31 2010 Archived from the original on February 3 2010 Retrieved February 15 2010 HSIPR Funding by Region Federal Railroad Administration Retrieved April 2 2018 Gov M Jodi Rell seeks state OK to borrow 260 million to push high speed rail Stamford Advocate July 27 2010 State OKs 260 Million To Pay For Commuter Rail System The Hartford Courant Archived from the original on January 20 2013 Governor Rell Connecticut Wins 120 Million for New Haven Hartford Springfield Rail Project Press release Office of Governor Jodi Rell October 25 2010 Retrieved March 23 2018 Stannard Ed April 6 2011 Conn seeks funds for rail work on Hartford to Springfield line document New Haven Register Environmental Assessment NHHS Rail Program Retrieved August 21 2012 CTDOT Announces 50 Million In Additional Funding For NHHS Rail Program Press release Connecticut Department of Transportation February 20 2017 Stacom Don February 21 2017 Hartford Line From Hartford To Springfield Mass Gets 50 Million In Bonding Hartford Courant Retrieved March 21 2017 Appendix 6 New Haven Hartford Springfield Rail Program Track Chart PDF Connecticut Department of Transportation January 2012 Rail station hotel housing fill Newington s bucket list Hartford Business Journal Archived from the original on October 27 2018 Retrieved October 28 2018 Stacom Don February 18 2017 Hartford Rail Line On Track Despite Connecticut Budget Crisis Hartford Courant Retrieved February 18 2017 Objectives amp Scope Funding NHHS Rail Program Connecticut DOT Retrieved October 17 2017 a b New Haven Hartford Springfield Rail Program Stations Factsheet PDF NHHS Rail Program November 29 2016 Retrieved January 26 2017 Amtrak Begins Substitute Bus Operation to Facilitate Construction on Hartford Line Press release Connecticut Department of Transportation July 31 2015 Retrieved August 3 2015 Stacom Don December 4 2015 Springfield To New Haven Commuter Rail Cost Increases Service Begins In 2018 Hartford Courant Retrieved December 4 2015 a b Fall 2016 Newsletter PDF NHHS Rail Program November 29 2016 Retrieved January 26 2017 Stacom Don October 11 2016 17 Car Construction Train Works Its Way North Laying Track On Hartford Line Hartford Courant Retrieved October 12 2016 Summer 2017 Newsletter PDF NHHS Rail Program Summer 2017 p 2 Gov Malloy Announces Opening of New Train Station in Wallingford That Will Serve the Hartford Line Press release Office of Governor Dannel P Malloy November 6 2017 CTrail Hartford Line Meriden Station Opens Platforms and Pedestrian Bridge Press release Connecticut Department of Transportation November 19 2017 Retrieved November 26 2017 Hartford Line commuter rail to launch in June Progressive Railroading April 18 2018 Retrieved June 1 2018 a b Lurye Rebecca June 12 2018 Despite New Commuter Line Rail Upgrades Lag North Of Hartford Hartford Courant Retrieved June 13 2018 CTDOT ANNOUNCES COMPLETION OF A SECOND RAIL TRACK ON THE CTrail HARTFORD LINE BETWEEN HARTFORD AND WINDSOR Press release Connecticut Department of Transportation September 25 2018 FY22 23 Federal State Partnership NEC Grant Program Selections PDF railroads dot gov Federal Railroad Administration November 7 2023 Retrieved November 9 2023 FY 2022 2023 Federal State Partnership for Intercity Passenger Rail Program for the Northeast Corridor FSP NEC Selections Project Summaries PDF Federal Railroad Administration November 6 2023 FACT SHEET President Biden Advances Vision for World Class Passenger Rail by Delivering Billions in New Funding Press release The White House November 6 2023 DiSalvo Emily November 7 2023 Hartford Line gets 105M in federal funding to add tracks for more trains improve signals CT Insider Retrieved November 9 2023 Safety and Track Improvement Projects on the Hartford Line Result in Two Month Service Changes Press release Connecticut Department of Transportation June 24 2022 Further reading editConnecticut Department of Transportation March 2011 New Haven Hartford Springfield Rail Project Service Development Plan PDF Report Connecticut Department of Transportation Wilburn Smith Associates June 2005 New Haven Hartford Springfield Commuter Rail Implementation Study PDF Report Connecticut Department of Transportation Archived from the original PDF on February 2 2016 External links edit nbsp Wikimedia Commons has media related to Hartford Line Official website New Haven Hartford Springfield Rail Program Retrieved from https en wikipedia org w index php title Hartford Line amp oldid 1219965588, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.