fbpx
Wikipedia

Caldecott Tunnel

The Caldecott Tunnel is an east–west highway tunnel through the Berkeley Hills between Oakland and Orinda, California. Its four bores carry California State Route 24. Named after Thomas E. Caldecott, former mayor of Berkeley, it opened in 1937 as a two-bore tunnel. The third bore opened in 1964 and the fourth bore in 2013. Currently, the two oldest bores carry eastbound traffic and the two newest bores carry westbound traffic.

Caldecott Tunnel
The western end of the Caldecott Tunnel in 2019
Overview
LocationOakland / Contra Costa County, California
Coordinates37°51′17″N 122°13′00″W / 37.8548°N 122.2166°W / 37.8548; -122.2166
Route SR 24 (William Byron Rumford Freeway)
CrossesBerkeley Hills
Operation
OpenedBores 1 & 2: 1937
Bore 3: 1964
Bore 4: 2013
OperatorCaltrans
Technical
LengthBores 1 & 2: 3,610 ft (1,100 m)
Bore 3: 3,771 ft (1,149 m)
Bore 4: 3,389 ft (1,033 m)
No. of lanes2 per bore
Tunnel clearanceBore 1: 14.58 feet (4.44 m)
Bore 2: 14.5 feet (4.4 m)
Bore 3: 15.5 feet (4.7 m)
Bore 4: 15.5 feet (4.7 m)
Route map
Designated1980
Reference no.32

Description

The east–west tunnel is signed as a part of California State Route 24 and connects Oakland to central Contra Costa County. It is named after Thomas E. Caldecott (1878–1951), who was mayor of Berkeley in 1930–1932, a member of the Alameda County Board of Supervisors in 1933–1945, and president of Joint Highway District 13, which built the first two bores.

Bore 1 (the southernmost bore) and Bore 2 were completed in 1937; they are 3,610 ft (1,100 m) in length and carry two lanes each of eastbound traffic. Bore 3, completed in 1964, is 3,771 ft (1,149 m) in length. Bore 4 (the northernmost bore), completed in 2013, is 3,389 ft (1,033 m) in length. Bores 3 and 4 carry two lanes each of westbound traffic.

The active Hayward Fault runs just west of the western portals of the tunnel.[1]

History

 
Traffic patterns in 1937

In the 19th century, traffic over the Berkeley Hills in this area went up Harwood Canyon, now known as Claremont Canyon (behind the Claremont Hotel). The road leading up the canyon from the west was initially called Harwood's Road, later changed to Telegraph Road, and finally, Claremont. The road on the other side of the hills became known as Fish Ranch Road, its current name, some time after 1870, the year the Oakland Trout Company incorporated its fish and frog farm in the vicinity.[2] An inn and stage coach stop called the Summit House once existed at the summit.

The idea of a tunnel through the hills began as early as 1860. In that year, the idea was proposed and rejected by the citizens of Alameda and Contra Costa Counties. It was revived in 1871 with a proposal which described a route running from the end of Broadway, similar to the actual routing of today's Caldecott Tunnel although it is not clear from the description exactly which canyon was being referred to. The proposed tunnel would be only some 500 feet long and would have its outlet in the San Pablo Creek watershed with a road leading into Lafayette. A franchise was granted to a group of developers who passed the franchise onto another group. The proposal languished until the turn of the century.[3][4]

In 1903, a tunnel was finally built above the present location of the Caldecott Tunnel, near the top of Temescal Canyon, the next canyon south of Claremont Canyon. This tunnel was approached by a new road dubbed "Tunnel Road" which started at the top of Ashby Avenue in Berkeley. The west end of the tunnel was at about 37°51′22″N 122°12′49″W / 37.8561°N 122.2137°W / 37.8561; -122.2137 while the east end of the tunnel is now in private property owned by the East Bay Regional Park District, on the former site of the Canary Cafe. This tunnel was dedicated as the "Inter-County Tunnel", later called the "Kennedy Tunnel".[5] The tunnel was very narrow and arched, such that two tall buggies could not pass each other.[6] A system of lighting a small fire with a newspaper was used to control this one-way traffic. The tunnel height was increased in 1915 by 3 feet to accommodate larger vehicles.[7] When the new Caldecott tunnel was completed, the Kennedy tunnel was used mostly by pedestrians until it was sealed in 1947.[5]

Original twin bores

In November 1926, the Counties of Alameda and Contra Costa, and the City of Oakland agreed to the construction of a new tunnel through the Berkeley Hills to replace the old, decrepit and increasingly inadequate existing tunnel.[8] In 1929, Alameda and Contra Costa County formed Joint Highway District 13 to accomplish this goal.[9] Surveys and preliminary work on the approaches began in 1931.[10][11]

On June 17, 1934, construction of the first two bores of the Caldecott Tunnel began.[12] They were completed in 1937, and opened to traffic on December 5 of that year.[13] They were originally known as the Broadway Low Level Tunnel (commonly shortened to Broadway Tunnel), since the approach was from the top of Broadway in Oakland, and was below the portal of the old tunnel. However, access from Ashby Avenue was retained as it was designated the connecting thoroughfare from the Eastshore Highway (now Freeway) and the San Francisco–Oakland Bay Bridge, and dubbed State Highway 24. The approach to the east portal on the other side of the Berkeley Hills was via Mount Diablo Boulevard, also at that time part of State Highway 24.

In 1960, the Broadway Low Level Tunnel was renamed, becoming the Caldecott Tunnel.[14]

Third bore and traffic reversal

 
The Caldecott Tunnel prior to the construction of the fourth bore as seen from the western end. From left to right: Bores 3, 2, and 1.

By 1960, the Division of Highways had upgraded the eastern approach to the tunnel into a modern freeway. With Contra Costa County accessible by freeway, its change from an agricultural community into a major suburb accelerated.

The Division of Highways purchased sufficient right-of-way to the north of the existing twin bores to build another pair of bores. Given the traffic counts and the expense of tunnel construction, the construction of two additional bores would have been seen as unnecessary and extravagant. However, with the traffic count exceeding 50,000 vehicles per day, the state embarked on a project to build a third bore at the Caldecott Tunnel.[15]

The project broke ground in 1960 and was opened to traffic in October 1964. When the third bore was opened, the other bores were closed one at a time for maintenance, including the installation of a continuous row of fluorescent lights. Eventually the new third bore made it possible to reverse the traffic flow of the middle bore, providing four lanes to accommodate the heavier commute-direction traffic.

The third bore also brought new technology to the tunnel with the installation of the "pop-up" lane control. Plastic lane delineators were set in tubes within the pavement. With the touch of a button, water would fill tubes to cause the delineators to pop up from the pavement; the middle bore was closed to one direction of travel, while opening it to another. During the week, the middle bore of the Caldecott was reversed between 2:00 am and 5:00 am to favor westbound traffic, and then switched again sometime between 11:30 am and noon to favor eastbound traffic. Ballgames, concerts and other events made balancing weekend traffic through the tunnel very difficult. It was not uncommon to reverse the middle bore six times on a Saturday or Sunday. The pop-up system still required substantial manpower to implement. While it did eliminate the need to set down individual cones to separate traffic, Caltrans maintenance workers had to direct traffic out of the closing lanes to prevent vehicles from getting caught on the wrong side of the pop-up delineators.[16]

A portion of the material excavated for the third bore was used in the construction of embankments for the MacArthur Freeway project between the MacArthur Maze and Broadway in Oakland.[17]

In the late 1960s, the Grove-Shafter Freeway was completed and replaced Broadway as the main route to the Caldecott Tunnel from Oakland as well as replacing Ashby for traffic coming from San Francisco. Ashby Avenue and Tunnel Road were redesignated State Highway 13 and aligned with the new Warren Freeway through the Montclair District of Oakland. The Grove-Shafter Freeway was then designated State Highway 24. In 1980, the freeway was renamed after William Byron Rumford.

Tunnel fire

On April 7, 1982, an accident involving a gasoline tanker truck in the third (then-northernmost) bore set off the Caldecott Tunnel fire.[18] The accident caused major damage and the bore was closed to traffic for several months while repairs were made, with traffic temporarily reverting to the pre-third-bore configuration. During the fire, the tunnel acted as a natural chimney, venting the smoke, flames and heat uphill towards the eastern entrance to the tunnel. The accident and fire killed seven people, most of whom were overcome by toxic smoke. The fire occurred shortly after midnight when there were few cars in the tunnel; had it occurred during normal commute hours, hundreds could have died. As a result of the fire, it is now illegal to transport hazardous material in a tanker truck through the tunnel, except between the light-traffic hours of 3:00 am and 5:00 am.[19]

Oakland firestorm

On October 20, 1991, the catastrophic Oakland firestorm started on the ridge north of the Caldecott Tunnel. The fire spread quickly west down both sides of the west portal of the tunnel and jumped the freeway, eventually killing 25 people and destroying over 3,000 homes, apartments and condominiums.

Awards

The Caldecott Tunnel was designated a City of Oakland Landmark in 1980, and received a Preservation Award from the Art Deco Society of California in 1993.

Fourth bore

To relieve traffic congestion in the reverse commute direction, the California Department of Transportation began planning for a fourth bore in 2000. In 2007, the California Transportation Commission approved the final funding needed to build the fourth bore.[20] Construction started in 2010.[21] Commencement of the project was stalled as a result of the financial crisis of 2007–2008, but was quickly back on track as a beneficiary of President Obama's American Recovery and Reinvestment Act of 2009 (ARRA).[22][23] Construction got underway until completion in 2013.[24][25][26] Much of the excavated material from the bore was trucked to Treasure Island for use in soil augmentation and remediation during the subsequent redevelopment of the island.[27]

The fourth bore contains a roadway with two 12-foot-wide (3.7 m) traffic lanes, one 10-foot-wide (3.0 m) shoulder, and one 2-foot-wide (0.6 m) shoulder,[28] ventilation, air and traffic monitoring systems, traffic lights, and electronic message boards.[29] There are emergency exits to the third bore. When the fourth bore was opened to traffic, the need for the daily traffic reversal was eliminated; two bores (four lanes) serve each direction at all times, although individual bores may be closed during periods of light use for maintenance purposes.[30]

Weather phenomena

Weather conditions can vary greatly from one end of the tunnel to the other. In summer, for example, motorists may enter the tunnel from the east where it is sunny and warm, and emerge on the west end into fog and cold. In winter, during spells of inland tule fog, the reverse can occur.[31][32]

In popular culture

  • The Caldecott Tunnel appears in many of Rick Riordan's books, acting as an entrance to Camp Jupiter. In The Tyrant's Tomb, it is the site of the final battle between the protagonists Apollo and Frank Zhang and the Roman emperors Commodus and Caligula.

See also

  • Berkeley Hills TunnelBART rail transit tunnel, running approximately parallel to, and north of, the Caldecott Tunnel.
  • Solon, Mary; McCosker, Mary (2014). Building the Caldecott Tunnel. Images of America. Charleston, South Carolina: Arcadia Publishing. ISBN 978-1-4671-3181-0.

References

  1. ^ "Digital Map of Recently Active Traces of the Hayward Fault, California". earthquake.usgs.gov. US Geological Survey. Retrieved November 26, 2016.
  2. ^ Sacramento Daily Union, 2 January 1871, p.2
  3. ^ History of Contra Costa County, California. W.A. Slocum and Company. 1882. p. 135.
  4. ^ "Old Road That Ruined Three Pioneers To Be Completed", San Francisco Call, November 14, 1902, p.9
  5. ^ a b Rafkin, Louise (October 1, 2011). . Bay Citizen. Archived from the original on January 3, 2012. Retrieved October 8, 2013.
  6. ^ "Image: Tunnel 1903". Contra Costa County Historical Society. 1903. Retrieved October 8, 2013.
  7. ^ . Lafayette Historical Society. Archived from the original on September 28, 2013. Retrieved October 8, 2013.
  8. ^ California Highways and Public Works, Official Journal of the Division of Highways, Department of Public Works, State of California, May, 1934, p.16
  9. ^ California Highways and Public Works, Official Journal of the Division of Highways, Department of Public Works, State of California, Jul-August, 1960, p.31
  10. ^ California Highways and Public Works, Official Journal of the Division of Highways, Department of Public Works, State of California, December, 1937, p.12
  11. ^ California Highways and Public Works, Official Journal of the Division of Highways, Department of Public Works, State of California, May, 1934, p.15
  12. ^ California Highways and Public Works, Official Journal of the Division of Highways, Department of Public Works, State of California, July, 1934, p.16
  13. ^ California Highways and Public Works, Official Journal of the Division of Highways, Department of Public Works, State of California, December, 1937, p.4
  14. ^ California Highways and Public Works, Official Journal of the Division of Highways, Department of Public Works, State of California, Vol.39, Nos.9-10, September-October, 1960, p.60
  15. ^ California Highways and Public Works, Official Journal of the Division of Highways, Department of Public Works, State of California, Vol.39, Nos.7-8, July-August, 1960, p.31
  16. ^ . The Caldecott Tunnel Fourth Bore Project. Archived from the original on February 2, 2014. Retrieved October 8, 2013.
  17. ^ California Highways and Public Works, March-April, 1960, p.9
  18. ^ Martin, Murilee (April 16, 2007). "25 Years Since The Great Caldecott Tunnel Fire". Jalopnik. Retrieved January 23, 2010.
  19. ^ "Vehicle Code Section 31301 - Caldecott Tunnel Restriction". California Department of Motor Vehicles. September 20, 1982. Retrieved January 23, 2010.
  20. ^ (PDF). Metropolitan Transportation Commission. Archived from the original (PDF) on January 23, 2014. Retrieved January 20, 2014.
  21. ^ Cabanatuan, Michael (January 23, 2010). "Work begins on Caldecott Tunnel's 4th bore". San Francisco Chronicle. Retrieved January 20, 2014.
  22. ^ "Tunneling Begins on $420 Million Caldecott Tunnel Fourth Bore Project | Metropolitan Transportation Commission".
  23. ^ "Press Release: Recovery Act-Funded Excavation Begins on Caldecott Tunnel's Fourth Bore, 8/9/2010 | Press Releases | Federal Highway Administration".
  24. ^ Cabanatuan, Michael (December 1, 2011). "Breakthrough for Caldecott Tunnel's new 4th bore". San Francisco Chronicle. Retrieved January 20, 2014.
  25. ^ Cabanatuan, Michael (August 13, 2012). "Caldecott tunnel excavation completed". San Francisco Chronicle. Retrieved October 8, 2013.
  26. ^ Cabanatuan, Michael (November 16, 2013). "Caldecott Tunnel fourth bore opens". San Francisco Chronicle. Retrieved January 20, 2014.
  27. ^ Cuff, Denis (November 13, 2013). "Caldecott Tunnel forth bore to ease traffic backups during reverse commute". Mercury News. Retrieved December 29, 2018.
  28. ^ "Project Fact Sheet" (PDF). mtc.ca.gov. April 2010. Retrieved December 4, 2021.
  29. ^ Cardno, Catherine A. (February 2014). "Safe passage". Civil Engineering. American Society of Civil Engineers: 60–65.
  30. ^ . The Caldecott Tunnel Fourth Bore Project. Archived from the original on February 2, 2014. Retrieved October 8, 2013.
  31. ^ . Archived from the original on November 26, 2016. Retrieved November 26, 2016.
  32. ^ Weather of the San Francisco Bay Area, by Harold Gilliam, University of California Press, 1962

External links

  • California Department of Transportation website on the Caldecott Improvement Project
  • Construction Photo (1936) of the West Portal, Contra Costa Historical Society
  • Aerial View (1936) Showing Old and New Tunnels, Contra Costa Historical Society

Coordinates: 37°51′17″N 122°13′00″W / 37.8548°N 122.2166°W / 37.8548; -122.2166

caldecott, tunnel, this, article, about, road, tunnel, rail, tunnel, berkeley, hills, tunnel, east, west, highway, tunnel, through, berkeley, hills, between, oakland, orinda, california, four, bores, carry, california, state, route, named, after, thomas, calde. This article is about the road tunnel For the rail tunnel see Berkeley Hills Tunnel The Caldecott Tunnel is an east west highway tunnel through the Berkeley Hills between Oakland and Orinda California Its four bores carry California State Route 24 Named after Thomas E Caldecott former mayor of Berkeley it opened in 1937 as a two bore tunnel The third bore opened in 1964 and the fourth bore in 2013 Currently the two oldest bores carry eastbound traffic and the two newest bores carry westbound traffic Caldecott TunnelThe western end of the Caldecott Tunnel in 2019OverviewLocationOakland Contra Costa County CaliforniaCoordinates37 51 17 N 122 13 00 W 37 8548 N 122 2166 W 37 8548 122 2166RouteSR 24 William Byron Rumford Freeway CrossesBerkeley HillsOperationOpenedBores 1 amp 2 1937Bore 3 1964Bore 4 2013OperatorCaltransTechnicalLengthBores 1 amp 2 3 610 ft 1 100 m Bore 3 3 771 ft 1 149 m Bore 4 3 389 ft 1 033 m No of lanes2 per boreTunnel clearanceBore 1 14 58 feet 4 44 m Bore 2 14 5 feet 4 4 m Bore 3 15 5 feet 4 7 m Bore 4 15 5 feet 4 7 m Route mapOakland Designated LandmarkDesignated1980Reference no 32 Contents 1 Description 2 History 2 1 Original twin bores 2 2 Third bore and traffic reversal 2 3 Tunnel fire 2 4 Oakland firestorm 2 5 Awards 2 6 Fourth bore 3 Weather phenomena 4 In popular culture 5 See also 6 References 7 External linksDescription EditThe east west tunnel is signed as a part of California State Route 24 and connects Oakland to central Contra Costa County It is named after Thomas E Caldecott 1878 1951 who was mayor of Berkeley in 1930 1932 a member of the Alameda County Board of Supervisors in 1933 1945 and president of Joint Highway District 13 which built the first two bores Bore 1 the southernmost bore and Bore 2 were completed in 1937 they are 3 610 ft 1 100 m in length and carry two lanes each of eastbound traffic Bore 3 completed in 1964 is 3 771 ft 1 149 m in length Bore 4 the northernmost bore completed in 2013 is 3 389 ft 1 033 m in length Bores 3 and 4 carry two lanes each of westbound traffic The active Hayward Fault runs just west of the western portals of the tunnel 1 History Edit Traffic patterns in 1937 In the 19th century traffic over the Berkeley Hills in this area went up Harwood Canyon now known as Claremont Canyon behind the Claremont Hotel The road leading up the canyon from the west was initially called Harwood s Road later changed to Telegraph Road and finally Claremont The road on the other side of the hills became known as Fish Ranch Road its current name some time after 1870 the year the Oakland Trout Company incorporated its fish and frog farm in the vicinity 2 An inn and stage coach stop called the Summit House once existed at the summit The idea of a tunnel through the hills began as early as 1860 In that year the idea was proposed and rejected by the citizens of Alameda and Contra Costa Counties It was revived in 1871 with a proposal which described a route running from the end of Broadway similar to the actual routing of today s Caldecott Tunnel although it is not clear from the description exactly which canyon was being referred to The proposed tunnel would be only some 500 feet long and would have its outlet in the San Pablo Creek watershed with a road leading into Lafayette A franchise was granted to a group of developers who passed the franchise onto another group The proposal languished until the turn of the century 3 4 In 1903 a tunnel was finally built above the present location of the Caldecott Tunnel near the top of Temescal Canyon the next canyon south of Claremont Canyon This tunnel was approached by a new road dubbed Tunnel Road which started at the top of Ashby Avenue in Berkeley The west end of the tunnel was at about 37 51 22 N 122 12 49 W 37 8561 N 122 2137 W 37 8561 122 2137 while the east end of the tunnel is now in private property owned by the East Bay Regional Park District on the former site of the Canary Cafe This tunnel was dedicated as the Inter County Tunnel later called the Kennedy Tunnel 5 The tunnel was very narrow and arched such that two tall buggies could not pass each other 6 A system of lighting a small fire with a newspaper was used to control this one way traffic The tunnel height was increased in 1915 by 3 feet to accommodate larger vehicles 7 When the new Caldecott tunnel was completed the Kennedy tunnel was used mostly by pedestrians until it was sealed in 1947 5 Original twin bores Edit In November 1926 the Counties of Alameda and Contra Costa and the City of Oakland agreed to the construction of a new tunnel through the Berkeley Hills to replace the old decrepit and increasingly inadequate existing tunnel 8 In 1929 Alameda and Contra Costa County formed Joint Highway District 13 to accomplish this goal 9 Surveys and preliminary work on the approaches began in 1931 10 11 On June 17 1934 construction of the first two bores of the Caldecott Tunnel began 12 They were completed in 1937 and opened to traffic on December 5 of that year 13 They were originally known as the Broadway Low Level Tunnel commonly shortened to Broadway Tunnel since the approach was from the top of Broadway in Oakland and was below the portal of the old tunnel However access from Ashby Avenue was retained as it was designated the connecting thoroughfare from the Eastshore Highway now Freeway and the San Francisco Oakland Bay Bridge and dubbed State Highway 24 The approach to the east portal on the other side of the Berkeley Hills was via Mount Diablo Boulevard also at that time part of State Highway 24 In 1960 the Broadway Low Level Tunnel was renamed becoming the Caldecott Tunnel 14 Third bore and traffic reversal Edit The Caldecott Tunnel prior to the construction of the fourth bore as seen from the western end From left to right Bores 3 2 and 1 By 1960 the Division of Highways had upgraded the eastern approach to the tunnel into a modern freeway With Contra Costa County accessible by freeway its change from an agricultural community into a major suburb accelerated The Division of Highways purchased sufficient right of way to the north of the existing twin bores to build another pair of bores Given the traffic counts and the expense of tunnel construction the construction of two additional bores would have been seen as unnecessary and extravagant However with the traffic count exceeding 50 000 vehicles per day the state embarked on a project to build a third bore at the Caldecott Tunnel 15 The project broke ground in 1960 and was opened to traffic in October 1964 When the third bore was opened the other bores were closed one at a time for maintenance including the installation of a continuous row of fluorescent lights Eventually the new third bore made it possible to reverse the traffic flow of the middle bore providing four lanes to accommodate the heavier commute direction traffic The third bore also brought new technology to the tunnel with the installation of the pop up lane control Plastic lane delineators were set in tubes within the pavement With the touch of a button water would fill tubes to cause the delineators to pop up from the pavement the middle bore was closed to one direction of travel while opening it to another During the week the middle bore of the Caldecott was reversed between 2 00 am and 5 00 am to favor westbound traffic and then switched again sometime between 11 30 am and noon to favor eastbound traffic Ballgames concerts and other events made balancing weekend traffic through the tunnel very difficult It was not uncommon to reverse the middle bore six times on a Saturday or Sunday The pop up system still required substantial manpower to implement While it did eliminate the need to set down individual cones to separate traffic Caltrans maintenance workers had to direct traffic out of the closing lanes to prevent vehicles from getting caught on the wrong side of the pop up delineators 16 A portion of the material excavated for the third bore was used in the construction of embankments for the MacArthur Freeway project between the MacArthur Maze and Broadway in Oakland 17 In the late 1960s the Grove Shafter Freeway was completed and replaced Broadway as the main route to the Caldecott Tunnel from Oakland as well as replacing Ashby for traffic coming from San Francisco Ashby Avenue and Tunnel Road were redesignated State Highway 13 and aligned with the new Warren Freeway through the Montclair District of Oakland The Grove Shafter Freeway was then designated State Highway 24 In 1980 the freeway was renamed after William Byron Rumford Tunnel fire Edit Main article Caldecott Tunnel fire On April 7 1982 an accident involving a gasoline tanker truck in the third then northernmost bore set off the Caldecott Tunnel fire 18 The accident caused major damage and the bore was closed to traffic for several months while repairs were made with traffic temporarily reverting to the pre third bore configuration During the fire the tunnel acted as a natural chimney venting the smoke flames and heat uphill towards the eastern entrance to the tunnel The accident and fire killed seven people most of whom were overcome by toxic smoke The fire occurred shortly after midnight when there were few cars in the tunnel had it occurred during normal commute hours hundreds could have died As a result of the fire it is now illegal to transport hazardous material in a tanker truck through the tunnel except between the light traffic hours of 3 00 am and 5 00 am 19 Oakland firestorm Edit On October 20 1991 the catastrophic Oakland firestorm started on the ridge north of the Caldecott Tunnel The fire spread quickly west down both sides of the west portal of the tunnel and jumped the freeway eventually killing 25 people and destroying over 3 000 homes apartments and condominiums Awards Edit The Caldecott Tunnel was designated a City of Oakland Landmark in 1980 and received a Preservation Award from the Art Deco Society of California in 1993 Fourth bore Edit To relieve traffic congestion in the reverse commute direction the California Department of Transportation began planning for a fourth bore in 2000 In 2007 the California Transportation Commission approved the final funding needed to build the fourth bore 20 Construction started in 2010 21 Commencement of the project was stalled as a result of the financial crisis of 2007 2008 but was quickly back on track as a beneficiary of President Obama s American Recovery and Reinvestment Act of 2009 ARRA 22 23 Construction got underway until completion in 2013 24 25 26 Much of the excavated material from the bore was trucked to Treasure Island for use in soil augmentation and remediation during the subsequent redevelopment of the island 27 The fourth bore contains a roadway with two 12 foot wide 3 7 m traffic lanes one 10 foot wide 3 0 m shoulder and one 2 foot wide 0 6 m shoulder 28 ventilation air and traffic monitoring systems traffic lights and electronic message boards 29 There are emergency exits to the third bore When the fourth bore was opened to traffic the need for the daily traffic reversal was eliminated two bores four lanes serve each direction at all times although individual bores may be closed during periods of light use for maintenance purposes 30 Weather phenomena EditWeather conditions can vary greatly from one end of the tunnel to the other In summer for example motorists may enter the tunnel from the east where it is sunny and warm and emerge on the west end into fog and cold In winter during spells of inland tule fog the reverse can occur 31 32 In popular culture EditThe Caldecott Tunnel appears in many of Rick Riordan s books acting as an entrance to Camp Jupiter In The Tyrant s Tomb it is the site of the final battle between the protagonists Apollo and Frank Zhang and the Roman emperors Commodus and Caligula See also Edit San Francisco Bay Area portalBerkeley Hills Tunnel BART rail transit tunnel running approximately parallel to and north of the Caldecott Tunnel Solon Mary McCosker Mary 2014 Building the Caldecott Tunnel Images of America Charleston South Carolina Arcadia Publishing ISBN 978 1 4671 3181 0 References Edit Digital Map of Recently Active Traces of the Hayward Fault California earthquake usgs gov US Geological Survey Retrieved November 26 2016 Sacramento Daily Union 2 January 1871 p 2 History of Contra Costa County California W A Slocum and Company 1882 p 135 Old Road That Ruined Three Pioneers To Be Completed San Francisco Call November 14 1902 p 9 a b Rafkin Louise October 1 2011 Local Intelligence Kennedy Tunnel Bay Citizen Archived from the original on January 3 2012 Retrieved October 8 2013 Image Tunnel 1903 Contra Costa County Historical Society 1903 Retrieved October 8 2013 Lafayette A Pictorial History Lafayette Historical Society Archived from the original on September 28 2013 Retrieved October 8 2013 California Highways and Public Works Official Journal of the Division of Highways Department of Public Works State of California May 1934 p 16 California Highways and Public Works Official Journal of the Division of Highways Department of Public Works State of California Jul August 1960 p 31 California Highways and Public Works Official Journal of the Division of Highways Department of Public Works State of California December 1937 p 12 California Highways and Public Works Official Journal of the Division of Highways Department of Public Works State of California May 1934 p 15 California Highways and Public Works Official Journal of the Division of Highways Department of Public Works State of California July 1934 p 16 California Highways and Public Works Official Journal of the Division of Highways Department of Public Works State of California December 1937 p 4 California Highways and Public Works Official Journal of the Division of Highways Department of Public Works State of California Vol 39 Nos 9 10 September October 1960 p 60 California Highways and Public Works Official Journal of the Division of Highways Department of Public Works State of California Vol 39 Nos 7 8 July August 1960 p 31 History of the Caldecott The Caldecott Tunnel Fourth Bore Project Archived from the original on February 2 2014 Retrieved October 8 2013 California Highways and Public Works March April 1960 p 9 Martin Murilee April 16 2007 25 Years Since The Great Caldecott Tunnel Fire Jalopnik Retrieved January 23 2010 Vehicle Code Section 31301 Caldecott Tunnel Restriction California Department of Motor Vehicles September 20 1982 Retrieved January 23 2010 Corridor Mobility Improvement Account CMIA as adopted by California Transportation Commission CTC February 28 2007 San Francisco Bay Area Projects PDF Metropolitan Transportation Commission Archived from the original PDF on January 23 2014 Retrieved January 20 2014 Cabanatuan Michael January 23 2010 Work begins on Caldecott Tunnel s 4th bore San Francisco Chronicle Retrieved January 20 2014 Tunneling Begins on 420 Million Caldecott Tunnel Fourth Bore Project Metropolitan Transportation Commission Press Release Recovery Act Funded Excavation Begins on Caldecott Tunnel s Fourth Bore 8 9 2010 Press Releases Federal Highway Administration Cabanatuan Michael December 1 2011 Breakthrough for Caldecott Tunnel s new 4th bore San Francisco Chronicle Retrieved January 20 2014 Cabanatuan Michael August 13 2012 Caldecott tunnel excavation completed San Francisco Chronicle Retrieved October 8 2013 Cabanatuan Michael November 16 2013 Caldecott Tunnel fourth bore opens San Francisco Chronicle Retrieved January 20 2014 Cuff Denis November 13 2013 Caldecott Tunnel forth bore to ease traffic backups during reverse commute Mercury News Retrieved December 29 2018 Project Fact Sheet PDF mtc ca gov April 2010 Retrieved December 4 2021 Cardno Catherine A February 2014 Safe passage Civil Engineering American Society of Civil Engineers 60 65 Caldecott Tunnel Fourth Bore Project Schedule The Caldecott Tunnel Fourth Bore Project Archived from the original on February 2 2014 Retrieved October 8 2013 Oakland Beautiful Point Of Interest Caldecott Tunnel Eric Saltmarsh March 10 2015 Keep Oakland Beautiful Keep America Beautiful Affiliate Archived from the original on November 26 2016 Retrieved November 26 2016 Weather of the San Francisco Bay Area by Harold Gilliam University of California Press 1962External links EditCalifornia Department of Transportation website on the Caldecott Improvement Project Construction Photo 1936 of the West Portal Contra Costa Historical Society Aerial View 1936 Showing Old and New Tunnels Contra Costa Historical SocietyCoordinates 37 51 17 N 122 13 00 W 37 8548 N 122 2166 W 37 8548 122 2166 Retrieved from https en wikipedia org w index php title Caldecott Tunnel amp oldid 1130640317, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.