Bhira Hydroelectric Project

Bhira Hydroelectric Project is an electricity generating complex in Bhira, Maharashtra state, India. It generates power using water from the nearby Mulshi Dam. Bhira lies approximately 150 km from Mumbai.[1] Its construction was completed in 1927.

Bhira Hydroelectric Project
Hydroelectric Project
Bhira Hydroelectric Project
Location in Maharashtra, India
Bhira Hydroelectric Project
Bhira Hydroelectric Project (Maharashtra)
Coordinates: 18°27.29′N 73°23.4′E / 18.45483°N 73.3900°E / 18.45483; 73.3900
Country India
StateMaharashtra
Languages
 • OfficialMarathi
Time zoneUTC+5:30 (IST)

Specifications edit

The plant's maximum output capacity is nominally 300 MW, generated by six 25 MW Pelton turbines and a 150 MW pumped storage generator added in 1997. In 2014 two 10 kW microturbine units were added to generate further power from the tailrace after the main turbines.

Awards edit

In 2007 the Central Electricity Authority (CEA) awarded a Silver Shield to the Bhira facility's operators, Tata Power, as the second best performing power station in the country.[2] The plant received a further Silver Shield in the following year.[3]

Location edit

Bhira's rural location makes it a leisure destination for Mumbai residents.[4]

Climate edit

The following climate data is for Bhira village in which the plant is located.

Climate data for Bhira, India 1981-2010
Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Year
Record high °C (°F) 39.2
(102.6)
47.5
(117.5)
46.2
(115.2)
49.0
(120.2)
47.5
(117.5)
44.0
(111.2)
37.1
(98.8)
37.9
(100.2)
40.0
(104.0)
42.1
(107.8)
42.1
(107.8)
40.0
(104.0)
49.0
(120.2)
Mean daily maximum °C (°F) 33.2
(91.8)
35.3
(95.5)
38.3
(100.9)
39.5
(103.1)
38.4
(101.1)
32.1
(89.8)
28.0
(82.4)
27.3
(81.1)
30.0
(86.0)
33.7
(92.7)
34.2
(93.6)
33.1
(91.6)
33.6
(92.5)
Daily mean °C (°F) 24.8
(76.6)
26.0
(78.8)
28.9
(84.0)
31.2
(88.2)
31.9
(89.4)
28.5
(83.3)
25.8
(78.4)
25.3
(77.5)
26.6
(79.9)
27.9
(82.2)
26.8
(80.2)
25.6
(78.1)
27.4
(81.4)
Mean daily minimum °C (°F) 16.5
(61.7)
16.7
(62.1)
19.6
(67.3)
22.9
(73.2)
25.5
(77.9)
24.9
(76.8)
23.7
(74.7)
23.3
(73.9)
23.3
(73.9)
22.1
(71.8)
19.5
(67.1)
18.1
(64.6)
21.3
(70.4)
Record low °C (°F) 6.3
(43.3)
5.1
(41.2)
12.0
(53.6)
14.1
(57.4)
17.6
(63.7)
16.1
(61.0)
15.2
(59.4)
15.1
(59.2)
15.0
(59.0)
11.0
(51.8)
9.1
(48.4)
6.8
(44.2)
5.1
(41.2)
Average rainfall mm (inches) 1.6
(0.06)
0.0
(0.0)
0.2
(0.01)
3.5
(0.14)
20.0
(0.79)
813.1
(32.01)
1,805.7
(71.09)
1,462.9
(57.59)
544.1
(21.42)
153.6
(6.05)
20.9
(0.82)
3.3
(0.13)
4,828.9
(190.11)
Average rainy days 0.2 0.0 0.1 0.4 1.4 18.3 27.7 27.2 18.1 6.2 1.2 0.3 101.1
Average relative humidity (%) (at 17:30 IST) 45 37 37 42 50 81 92 92 85 70 66 60 63
Source: India Meteorological Department[5]

Bhira has a tropical monsoon climate (Am) with little to no rainfall from November to May and extremely heavy rainfall from June to September when it is affected by the Arabian Sea branch of the South-west monsoon with moderately heavy rainfall in October.

References edit

  1. ^ "Bhira Pumped Storage Hydro Power Plant India - GEO". globalenergyobservatory.org. Retrieved 14 December 2014.
  2. ^ "Tata Power Bhira hydro plant bags Silver Shield Award from the Central Electricity Authority, Mumbai". tata.in. Tata Sons Ltd. Archived from the original on 18 December 2013. Retrieved 14 December 2014.
  3. ^ . tata.in. Tata Sons Ltd. Archived from the original on 4 March 2016. Retrieved 14 December 2014.
  4. ^ . mustseeindia.com. Roam Space Travel Solutions Pvt Ltd. Archived from the original on 14 December 2014. Retrieved 14 December 2014.
  5. ^ (PDF). India Meteorological Department. July 2020. pp. 135–136. Archived from the original (PDF) on 5 February 2020. Retrieved 9 July 2020.

bhira, hydroelectric, project, electricity, generating, complex, bhira, maharashtra, state, india, generates, power, using, water, from, nearby, mulshi, bhira, lies, approximately, from, mumbai, construction, completed, 1927, hydroelectric, projectlocation, ma. Bhira Hydroelectric Project is an electricity generating complex in Bhira Maharashtra state India It generates power using water from the nearby Mulshi Dam Bhira lies approximately 150 km from Mumbai 1 Its construction was completed in 1927 Bhira Hydroelectric ProjectHydroelectric ProjectBhira Hydroelectric ProjectLocation in Maharashtra IndiaShow map of IndiaBhira Hydroelectric ProjectBhira Hydroelectric Project Maharashtra Show map of MaharashtraCoordinates 18 27 29 N 73 23 4 E 18 45483 N 73 3900 E 18 45483 73 3900Country IndiaStateMaharashtraLanguages OfficialMarathiTime zoneUTC 5 30 IST Contents 1 Specifications 2 Awards 3 Location 4 Climate 5 ReferencesSpecifications editThe plant s maximum output capacity is nominally 300 MW generated by six 25 MW Pelton turbines and a 150 MW pumped storage generator added in 1997 In 2014 two 10 kW microturbine units were added to generate further power from the tailrace after the main turbines Awards editIn 2007 the Central Electricity Authority CEA awarded a Silver Shield to the Bhira facility s operators Tata Power as the second best performing power station in the country 2 The plant received a further Silver Shield in the following year 3 Location editBhira s rural location makes it a leisure destination for Mumbai residents 4 Climate editThe following climate data is for Bhira village in which the plant is located Climate data for Bhira India 1981 2010 Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Year Record high C F 39 2 102 6 47 5 117 5 46 2 115 2 49 0 120 2 47 5 117 5 44 0 111 2 37 1 98 8 37 9 100 2 40 0 104 0 42 1 107 8 42 1 107 8 40 0 104 0 49 0 120 2 Mean daily maximum C F 33 2 91 8 35 3 95 5 38 3 100 9 39 5 103 1 38 4 101 1 32 1 89 8 28 0 82 4 27 3 81 1 30 0 86 0 33 7 92 7 34 2 93 6 33 1 91 6 33 6 92 5 Daily mean C F 24 8 76 6 26 0 78 8 28 9 84 0 31 2 88 2 31 9 89 4 28 5 83 3 25 8 78 4 25 3 77 5 26 6 79 9 27 9 82 2 26 8 80 2 25 6 78 1 27 4 81 4 Mean daily minimum C F 16 5 61 7 16 7 62 1 19 6 67 3 22 9 73 2 25 5 77 9 24 9 76 8 23 7 74 7 23 3 73 9 23 3 73 9 22 1 71 8 19 5 67 1 18 1 64 6 21 3 70 4 Record low C F 6 3 43 3 5 1 41 2 12 0 53 6 14 1 57 4 17 6 63 7 16 1 61 0 15 2 59 4 15 1 59 2 15 0 59 0 11 0 51 8 9 1 48 4 6 8 44 2 5 1 41 2 Average rainfall mm inches 1 6 0 06 0 0 0 0 0 2 0 01 3 5 0 14 20 0 0 79 813 1 32 01 1 805 7 71 09 1 462 9 57 59 544 1 21 42 153 6 6 05 20 9 0 82 3 3 0 13 4 828 9 190 11 Average rainy days 0 2 0 0 0 1 0 4 1 4 18 3 27 7 27 2 18 1 6 2 1 2 0 3 101 1 Average relative humidity at 17 30 IST 45 37 37 42 50 81 92 92 85 70 66 60 63 Source India Meteorological Department 5 Bhira has a tropical monsoon climate Am with little to no rainfall from November to May and extremely heavy rainfall from June to September when it is affected by the Arabian Sea branch of the South west monsoon with moderately heavy rainfall in October References edit Bhira Pumped Storage Hydro Power Plant India GEO globalenergyobservatory org Retrieved 14 December 2014 Tata Power Bhira hydro plant bags Silver Shield Award from the Central Electricity Authority Mumbai tata in Tata Sons Ltd Archived from the original on 18 December 2013 Retrieved 14 December 2014 Tata Power s Bhira Hydro Plant awarded the Silver Shield award by Ministry of Power and Central Electricity Authority tata in Tata Sons Ltd Archived from the original on 4 March 2016 Retrieved 14 December 2014 Kolad Bhira Dam Tata Powerhouse Dam Kolad Tourist Places to Visit for Dam mustseeindia com Roam Space Travel Solutions Pvt Ltd Archived from the original on 14 December 2014 Retrieved 14 December 2014 Climatological Normals 1981 2010 PDF India Meteorological Department July 2020 pp 135 136 Archived from the original PDF on 5 February 2020 Retrieved 9 July 2020 nbsp India portal nbsp Water portal nbsp Renewable energy portal Retrieved from https en wikipedia org w index php title Bhira Hydroelectric Project amp oldid 1176811102, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.