The Berlin–Dresden railway is a double track, electrified main line railway in the German states of Berlin, Brandenburg and Saxony, which was originally built and operated by the Berlin-Dresden Railway Company (Berlin-Dresdener Eisenbahn-Gesellschaft). It runs from Berlin through the southern Teltow countryside and then between Lower Lusatia and Fläming Heath through Elsterwerda and the Großenhainer Pflege countryside to Dresden.

Berlin–Dresden railway
Overview
Line number
  • 6135 (Bln. Südkreuz–Elsterwerda)
  • 6248 (Elsterwerda–Dr.-Friedrichst.)
LocaleBerlin, Brandenburg and Saxony
Termini
Service
Route number
  • 200.2 (Yorckstraße–Blankenfelde)
  • 203 0 (Glasower Damm–Elsterwerda)
  • 225 0 (Elsterwerda–Dresden Hbf)
  • 240 0 (all traffic)
Technical
Line length174.2 km (108.2 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification15 kV/16.7 Hz AC overhead catenary
Operating speed160 km/h (99.4 mph) (maximum)
Route map

Berlin Dresdner Bahnhof
1.600
Yorckstraße
3.500
Berlin Südkreuz (Papestraße until 2006)
Ringbahn
Berlin-Tempelhof freight yard
5.100
Berlin Priesterweg
6.700
Attilastraße
(formerly Mariendorf)
6.800
Berlin-Mariendorf junction
freight line from Ring line
Kamenzer Damm
(planned)
9.400
Berlin-Marienfelde
11.000
Buckower Chaussee
to GAR
from GAR
12.300
Schichauweg
13.800
Lichtenrade
BerlinBrandenburg state border
16.800
Mahlow
19.100
Glasower Damm Süd junction
from BAR
19.400
20.800
Dahlewitz
24.300
Rangsdorf
30.700
Dabendorf
31.200
Zossen Zoa junction
32.700
Zossen
37 m
Notte Canal
36.000
Zossen Lager
39.100
Wünsdorf-Waldstadt
50 m
42.100
Neuhof (b Zossen)
51.500
Baruth/Mark
55 m
56.100
Klasdorf
61.800
Golßen (Niederl)
62 m
68.600
Drahnsdorf
65 m
from Dahme
76.000
Luckau-Uckro
84 m
Falkenberg (Elster)–Beeskow
81.100
Gehren (Kr Luckau)
85.500
Walddrehna
115 m
93.700
Brenitz-Sonnewalde
99 m
100.000
Doberlug-Kirchhain Nord junction
to Cottbus
102.900
108.900
Rückersdorf (Niederl)
116.500
Hohenleipisch
121.700
Biehla
122.800
Elsterwerda
93 m
124.600
50.400
Route no. change 6135 / 6248
48.120
Prösen Ost
93 m
BrandenburgSaxony state border
43.450
Frauenhain
110 m
39.530
Zabeltitz
113 m
33.520
Großenhain Berlin station
(passenger station to 2002) 118 m
27.900
Röder new cut
0
Kottewitz junction
Böhla
(passenger station until 2002)
144 m
17.480
Weinböhla
(passenger station until 2002)
143 m
13.310
Neucoswig
(until 2002)
123 m
11.800
Az junction (Bk)
11.946
10.950
Radebeul-Naundorf junction (Bk)
10.800
Radebeul-Naundorf
111 m
Elbe bridge, Niederwartha (354 m)
8.970
Niederwartha
112 m
Niederwartha pumped-storage plant siding
6.784
Cossebaude
110 m
5.350
Dresden-Stetzsch
110 m
3.890
Dresden-Kemnitz
108 m
2.220
Dresden-Cotta
116 m
from Dresden port (freight line)
0.230
Dresden-Friedrichstadt
marshalling yard
114 m
0.000
(start of line)
Source: German railway atlas[1]

Upgrades completed in December 2017 enabled maximum speeds of 160 km/h (99 mph). By 2020 new signalling should allow speeds of 200 km/h (120 mph).

History Edit

Up to 1945 Edit

In 1848 the Berlin-Anhalt Railway Company opened the Jüterbog–Röderau line, connecting with the Leipzig–Dresden line and creating the first direct rail link between Berlin and Dresden. In 1872 the Berlin-Dresden Railway Company was founded to build a competing a line via Elsterwerda that was 12 km (7.5 mi) shorter. This route was opened on 17 June 1875. Long-distance traffic between Berlin and Dresden was divided between the two routes until the end of World War II.

1 October 1877 management of the line was taken over by Prussian state railways. On 24 January 1887 Saxony and Prussia contracted a treaty, under which ownership of the company passed to Prussia from 1 April 1887. This treaty also provided that the Elsterwerda–Dresden section was resold to the Saxon government on 1 April 1888, when it became part of the Royal Saxon State Railways.

 
Original Berlin station in Dresden
 
Former Berlin station in Dresden, now part of a goods yard
 
Elsterwerda station
 
Elbe bridge in Niederwartha

At both ends of the line new stations were built, the Dresdner Bahnhof (Dresden station) in Berlin and Berliner Bahnhof (Berlin station) in Dresden. Both stations were used only briefly. In 1882 the Dresden station in Berlin (located on the site of the present-day Gleisdreieck U-Bahn station and the former postal station in Luckenwalder Strasse) was closed for passenger traffic. The line’s Berlin terminus was moved a little further north to the Anhalter Bahnhof (Anhalt station). A little later, the Berlin train station in Dresden was abandoned as part of the redevelopment of the Dresden railway node. In its place the Dresden-Friedrichstadt station was built, which has been used since 1894 for freight and regional services. Since that time, long distance services have turned off towards Radebeul-Zitzschewig on the Leipzig–Dresden line and Dresden-Neustadt to Dresden Hauptbahnhof. In contrast, freight trains to and from Leipzig use the Berlin–Dresden railway from Radebeul-Naundorf station to Friedrichstadt.

From 1875 until World War I the Prussian military railway ran parallel with the line from Berlin to Zossen. This line was dismantled in 1919. Between 1901 and 1904 high-speed trials were carried out with electric locomotives and railcars and speeds of up to 210.8 km/h (131.0 mph) were achieved. A new railway bridge on the Dresden line had to be built south of the S-Bahn station at Mariendorf (now Attilastraße) as a result of the construction of the Teltow canal in 1905.

In 1936 a high-speed express service commenced between Berlin and Dresden using the Henschel-Wegmann Train, taking 100 minutes. The Berlin suburb train operations were electrified in 1939 and 1940. Berlin S-Bahn services commenced on 15 May 1939 between Priesterweg and Mahlow and on 6 October 1940 the S-Bahn was extended to Rangsdorf. The S-Bahn shared tracks in southern Berlin with long-distance passenger and freight trains. At the end of the 1930s work began on the new track to separate the S-Bahn and long-distance tracks, but by the beginning of the Second World War this work was not completed.

In April 1945, S-Bahn services ceased as a result of the war.[2]

Reopening in 1945 Edit

After the end of the war in 1945 the railway line was seriously damaged by the allies. In addition the bridges over the Teltow Canal in Berlin were blown up in the last days of the war by the German army. Later the line’s second track was dismantled to provide reparations to the Soviet Union. Only two tracks have been restored on these bridges. Services resumed between August and October 1945. Between Mariendorf and Marienfelde stations S-Bahn services and the remaining passenger and freight services ran on a common two-track section. Between Rangsdorf and Wünsdorf steam suburban trains operated to connect with the S-Bahn.

The division of Germany and Berlin also affected the traffic on the Berlin-Dresden line. In 1951, a connecting curve was built in an easterly direction from the line linking with the newly established Berlin outer ring. Long-distance trains from Dresden used it to avoid West Berlin. The terminal stations on West Berlin territory were closed, including the Anhalt station on 18 May 1952. Afterwards regional services used the outer ring to reach the East Berlin stations of Schöneweide, Lichtenberg or Ostbahnhof. Only the S-Bahn service from Rangsdorf ran over the border into West Berlin. Freight services continued to operate in West Berlin from the north to Marienfelde station (including to the gas works at Mariendorf and the Daimler factory at Marienfelde). The remaining long-distance tracks south of Marienfelde station was partially dismantled or became overgrown in the following decades.

After the building of the Berlin Wall on 13 August 1961, S-Bahn-operations between Lichtenrade and Mahlow were abandoned. S-Bahn services initially operated a shuttle service between Mahlow and Rangsdorf, but this was discontinued on 9 October 1961 due to the lack of repair and storage facilities. Commuter trains from Wünsdorf ran to Schönefeld Airport station. From 1962 there was an S-Bahn service to Berlin. As of 26 May 1963 a shuttle train consisting of a class VT 2.09 railbus (known as the "piglet taxi") ran between Mahlow and Blankenfelde, connecting to services on the outer ring.

Upgrading of the line since the 1960s Edit

The low capacity of the single-track line and the poor condition of the track had long caused operational problems. The high density of freight on the line left only a small number of paths for fast passenger trains. An improvement occurred in 1972, after the whole line was duplicated. In the 1960s work began on the raising of maximum speeds on the line to 160 km/h (99 mph). The stations from Baruth/Mark to Brenitz-Sonnewalde were converted for high speed with the relocation of platforms onto sidings. For various reasons, trains could still only operate at 120 km/h (75 mph). The section from Dresden-Friedrichstadt to Radebeul-Naundorf was electrified on 28 September 1969. The rest of the line to the Berlin outer ring including the two connecting curves on the ring was electrified in several sections between 1979 and 1983. Services on the West Berlin section of the S-Bahn between Marienfelde and Lichtenrade, which had been closed in September 1980 following a strike, were restored in 1988. The line had only one track.

The line had a dense express traffic to Czechoslovakia, Hungary, Romania and Austria and to southern East Germany. Regional services ran every hour between Schönefeld and Wünsdorf, some continued to Baruth. Further south local traffic was low: between Baruth and Elsterwerda for many years there were only four passenger trains a day. South of Elsterwerda there were a few more services.

Upgrades since 1990 Edit

After the fall of the Berlin Wall a single-track of the S-Bahn was rebuilt between Lichtenrade and Mahlow and services were restored to Blankenfelde on 31 August 1992. Occasionally freight trains ran on the S-Bahn tracks to the south, including trains carrying refuse. Between January and May 1992 extensive renovation was carried out on the track. The speed limit was raised to 160 km/h (99 mph) in May 1992. This reduced long-distance journey times by 35 minutes. In August 2019, the travel time between Dresden-Neustadt and Berlin-Südkreuz was 102 minutes.[3]

Further upgrading of the line Edit

 
Restoration at Doberlug-Kirchhain

Under an agreement signed on 7 June 1995 the Berlin–PragueVienna line is being upgraded, including the raising of maximum speeds to 200 km/h (120 mph) between Berlin and Dresden. In addition, the Böhla–Neucoswig section of the line is being upgraded as part of German Unity Transport Project No 9, which covers the upgrading of the Leipzig–Dresden line. The Weissig–Böhla connecting curve will in future link the Leipzig–Dresden line to Böhla so that long-distance passenger and fast freight trains can use the Berlin–Dresden line to and from Leipzig, allowing the better separation of traffic at the Dresden railway node.

Restoration of the Dresden railway in Berlin Edit

 
Level crossing at the Lichtenrade station in Berlin. It is still in dispute if this level crossing is to be replaced by putting the street under the railway, or the railway under the street

Since May 2006, most long-distance and regional trains operating on the line run from the new Berlin Hauptbahnhof by the new line under the Tiergarten and join the old Anhalt line from Anhalt station to Dresden near Gleisdreieck. Until the restoration of the line between Südkreuz and the southern outer ring, trains run from near Priesterweg S-Bahn station on a detour along the Anhalt line to a recently built connecting curve at Genshagener Berlin on to the outer ring. At Glasower Damm junction trains leave the outer ring and rejoin the Dresden railway at the 19.0 km (11.8 mi) mark.

Since 2019 direct connection of the Berlin–Dresden line between the southern outer ring at Blankenfelde and Südkreuz is being restored.[4] This line is important in the development of a fast connection to Berlin-Brandenburg International Airport for Airport Express trains serving Berlin Brandenburg airport train station. It is estimated that the new section will shorten travel time for passenger trains by about ten minutes.

Notes Edit

  1. ^ Eisenbahnatlas Deutschland (German railway atlas). Schweers + Wall. 2009. pp. 36, 47, 59, 72–3, 127–8. ISBN 978-3-89494-139-0.
  2. ^ Bley, Peter (1993). Berlin S-Bahn (in German). Düsseldorf: publication Alba. p. 26.
  3. ^ "Timetable for EuroCity 378". Deutsche Bahn. Archived from the original on 2019-08-07.
  4. ^ "Baubeginn für Dresdner Bahn im Süden Berlins". www.deutschebahn.com (in German). Retrieved 2019-02-11.

References Edit

  • Bley, Peter (1999). 125 Jahre Berlin–Dresdener Eisenbahn (125 years of the Berlin-Dresden railway) (in German). Düsseldorf: Alba Publikation. ISBN 3-87094-360-2.
  • Kaiß, Kurt; Hengst, Matthias (1994). Dresdens Eisenbahn (Dresden Railway): 1894–1994 (in German). Düsseldorf: Alba Publikation. ISBN 3-87094-350-5.
  • "Dresdener Bahn" (in German). beefland. Retrieved 23 May 2010.

External links Edit

  •   Media related to Berlin–Dresden railway line at Wikimedia Commons

berlin, dresden, railway, this, article, includes, list, general, references, lacks, sufficient, corresponding, inline, citations, please, help, improve, this, article, introducing, more, precise, citations, march, 2017, learn, when, remove, this, template, me. This article includes a list of general references but it lacks sufficient corresponding inline citations Please help to improve this article by introducing more precise citations March 2017 Learn how and when to remove this template message The Berlin Dresden railway is a double track electrified main line railway in the German states of Berlin Brandenburg and Saxony which was originally built and operated by the Berlin Dresden Railway Company Berlin Dresdener Eisenbahn Gesellschaft It runs from Berlin through the southern Teltow countryside and then between Lower Lusatia and Flaming Heath through Elsterwerda and the Grossenhainer Pflege countryside to Dresden Berlin Dresden railwayRegionalBahn train in DresdenOverviewLine number6135 Bln Sudkreuz Elsterwerda 6248 Elsterwerda Dr Friedrichst LocaleBerlin Brandenburg and SaxonyTerminiBerlin Dresdner BahnhofDresden Friedrichstadt yardServiceRoute number200 2 Yorckstrasse Blankenfelde 203 0 Glasower Damm Elsterwerda 225 0 Elsterwerda Dresden Hbf 240 0 all traffic TechnicalLine length174 2 km 108 2 mi Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification15 kV 16 7 Hz AC overhead catenaryOperating speed160 km h 99 4 mph maximum Route mapLegendBerlin Dresdner Bahnhoffrom Potsdamer Platzfrom Berlin Hbf1 600 Yorckstrasse3 500 Berlin Sudkreuz Papestrasse until 2006 Ringbahnfrom RingbahnBerlin Tempelhof freight yard5 100 Berlin Priesterwegto Teltow6 700 Attilastrasse formerly Mariendorf 6 800 Berlin Mariendorf junctionfreight line from Ring lineTeltow CanalKamenzer Damm planned 9 400 Berlin Marienfelde11 000 Buckower Chausseeto GARold freight ring GAR from GAR12 300 Schichauweg13 800 LichtenradeBerlin Brandenburg state border16 800 Mahlowouter ring BAR 19 100 Glasower Damm Sud junction from BAR19 400 Blankenfelde Teltow Flaming district terminus of20 800 Dahlewitz24 300 Rangsdorf30 700 Dabendorf31 200 Zossen Zoa junction from Mittenwalde32 700 Zossen 37 mto JuterbogNotte Canal36 000 Zossen Lager39 100 Wunsdorf Waldstadt 50 m42 100 Neuhof b Zossen 51 500 Baruth Mark 55 m56 100 Klasdorf61 800 Golssen Niederl 62 m68 600 Drahnsdorf 65 mfrom Dahme76 000 Luckau Uckro 84 mFalkenberg Elster Beeskow81 100 Gehren Kr Luckau 85 500 Walddrehna 115 m93 700 Brenitz Sonnewalde 99 m100 000 Doberlug Kirchhain Nord junction to Cottbusto Falkenberg102 900 Doberlug KirchhainHalle Cottbus line108 900 Ruckersdorf Niederl 116 500 Hohenleipisch121 700 BiehlaWegliniec Rosslaufrom Elsterwerda Biehla122 800 Elsterwerda 93 mSchwarze ElsterPulsnitzto Riesa124 60050 400 Route no change 6135 624848 120 Prosen Ost 93 mBrandenburg Saxony state border43 450 Frauenhain 110 m39 530 Zabeltitz 113 mConnecting line to Grossenhain Cottbuser station33 520 Grossenhain Berlin station passenger station to 2002 118 mGrosse Roder27 900 Grossenhain Priestewitz lineRoder new cut0 Weissig Bohla curveKottewitz junctionBohla passenger station until 2002 144 m17 480 Weinbohla passenger station until 2002 143 m13 310 Neucoswig until 2002 123 m11 800 Az junction Bk 11 946 to Dresden NeustadtLeipzig Dresdenfrom Coswig10 950 Radebeul Naundorf junction Bk 10 800 Radebeul Naundorf 111 mElbe bridge Niederwartha 354 m 8 970 Niederwartha 112 mNiederwartha pumped storage plant siding6 784 Cossebaude 110 m5 350 Dresden Stetzsch 110 m3 890 Dresden Kemnitz 108 m2 220 Dresden Cotta 116 mfrom Dresden port freight line 0 230 Dresden Friedrichstadtmarshalling yard 114 m0 000 start of line to Dresden Neustadtto Werdau Bogendreieckto Dresden Hbf DecinSource German railway atlas 1 Upgrades completed in December 2017 enabled maximum speeds of 160 km h 99 mph By 2020 new signalling should allow speeds of 200 km h 120 mph Contents 1 History 1 1 Up to 1945 1 2 Reopening in 1945 1 3 Upgrading of the line since the 1960s 1 4 Upgrades since 1990 2 Further upgrading of the line 2 1 Restoration of the Dresden railway in Berlin 3 Notes 4 References 5 External linksHistory EditUp to 1945 Edit In 1848 the Berlin Anhalt Railway Company opened the Juterbog Roderau line connecting with the Leipzig Dresden line and creating the first direct rail link between Berlin and Dresden In 1872 the Berlin Dresden Railway Company was founded to build a competing a line via Elsterwerda that was 12 km 7 5 mi shorter This route was opened on 17 June 1875 Long distance traffic between Berlin and Dresden was divided between the two routes until the end of World War II 1 October 1877 management of the line was taken over by Prussian state railways On 24 January 1887 Saxony and Prussia contracted a treaty under which ownership of the company passed to Prussia from 1 April 1887 This treaty also provided that the Elsterwerda Dresden section was resold to the Saxon government on 1 April 1888 when it became part of the Royal Saxon State Railways nbsp Original Berlin station in Dresden nbsp Former Berlin station in Dresden now part of a goods yard nbsp Elsterwerda station nbsp Elbe bridge in NiederwarthaAt both ends of the line new stations were built the Dresdner Bahnhof Dresden station in Berlin and Berliner Bahnhof Berlin station in Dresden Both stations were used only briefly In 1882 the Dresden station in Berlin located on the site of the present day Gleisdreieck U Bahn station and the former postal station in Luckenwalder Strasse was closed for passenger traffic The line s Berlin terminus was moved a little further north to the Anhalter Bahnhof Anhalt station A little later the Berlin train station in Dresden was abandoned as part of the redevelopment of the Dresden railway node In its place the Dresden Friedrichstadt station was built which has been used since 1894 for freight and regional services Since that time long distance services have turned off towards Radebeul Zitzschewig on the Leipzig Dresden line and Dresden Neustadt to Dresden Hauptbahnhof In contrast freight trains to and from Leipzig use the Berlin Dresden railway from Radebeul Naundorf station to Friedrichstadt From 1875 until World War I the Prussian military railway ran parallel with the line from Berlin to Zossen This line was dismantled in 1919 Between 1901 and 1904 high speed trials were carried out with electric locomotives and railcars and speeds of up to 210 8 km h 131 0 mph were achieved A new railway bridge on the Dresden line had to be built south of the S Bahn station at Mariendorf now Attilastrasse as a result of the construction of the Teltow canal in 1905 In 1936 a high speed express service commenced between Berlin and Dresden using the Henschel Wegmann Train taking 100 minutes The Berlin suburb train operations were electrified in 1939 and 1940 Berlin S Bahn services commenced on 15 May 1939 between Priesterweg and Mahlow and on 6 October 1940 the S Bahn was extended to Rangsdorf The S Bahn shared tracks in southern Berlin with long distance passenger and freight trains At the end of the 1930s work began on the new track to separate the S Bahn and long distance tracks but by the beginning of the Second World War this work was not completed In April 1945 S Bahn services ceased as a result of the war 2 Reopening in 1945 Edit After the end of the war in 1945 the railway line was seriously damaged by the allies In addition the bridges over the Teltow Canal in Berlin were blown up in the last days of the war by the German army Later the line s second track was dismantled to provide reparations to the Soviet Union Only two tracks have been restored on these bridges Services resumed between August and October 1945 Between Mariendorf and Marienfelde stations S Bahn services and the remaining passenger and freight services ran on a common two track section Between Rangsdorf and Wunsdorf steam suburban trains operated to connect with the S Bahn The division of Germany and Berlin also affected the traffic on the Berlin Dresden line In 1951 a connecting curve was built in an easterly direction from the line linking with the newly established Berlin outer ring Long distance trains from Dresden used it to avoid West Berlin The terminal stations on West Berlin territory were closed including the Anhalt station on 18 May 1952 Afterwards regional services used the outer ring to reach the East Berlin stations of Schoneweide Lichtenberg or Ostbahnhof Only the S Bahn service from Rangsdorf ran over the border into West Berlin Freight services continued to operate in West Berlin from the north to Marienfelde station including to the gas works at Mariendorf and the Daimler factory at Marienfelde The remaining long distance tracks south of Marienfelde station was partially dismantled or became overgrown in the following decades After the building of the Berlin Wall on 13 August 1961 S Bahn operations between Lichtenrade and Mahlow were abandoned S Bahn services initially operated a shuttle service between Mahlow and Rangsdorf but this was discontinued on 9 October 1961 due to the lack of repair and storage facilities Commuter trains from Wunsdorf ran to Schonefeld Airport station From 1962 there was an S Bahn service to Berlin As of 26 May 1963 a shuttle train consisting of a class VT 2 09 railbus known as the piglet taxi ran between Mahlow and Blankenfelde connecting to services on the outer ring Upgrading of the line since the 1960s Edit The low capacity of the single track line and the poor condition of the track had long caused operational problems The high density of freight on the line left only a small number of paths for fast passenger trains An improvement occurred in 1972 after the whole line was duplicated In the 1960s work began on the raising of maximum speeds on the line to 160 km h 99 mph The stations from Baruth Mark to Brenitz Sonnewalde were converted for high speed with the relocation of platforms onto sidings For various reasons trains could still only operate at 120 km h 75 mph The section from Dresden Friedrichstadt to Radebeul Naundorf was electrified on 28 September 1969 The rest of the line to the Berlin outer ring including the two connecting curves on the ring was electrified in several sections between 1979 and 1983 Services on the West Berlin section of the S Bahn between Marienfelde and Lichtenrade which had been closed in September 1980 following a strike were restored in 1988 The line had only one track The line had a dense express traffic to Czechoslovakia Hungary Romania and Austria and to southern East Germany Regional services ran every hour between Schonefeld and Wunsdorf some continued to Baruth Further south local traffic was low between Baruth and Elsterwerda for many years there were only four passenger trains a day South of Elsterwerda there were a few more services Upgrades since 1990 Edit After the fall of the Berlin Wall a single track of the S Bahn was rebuilt between Lichtenrade and Mahlow and services were restored to Blankenfelde on 31 August 1992 Occasionally freight trains ran on the S Bahn tracks to the south including trains carrying refuse Between January and May 1992 extensive renovation was carried out on the track The speed limit was raised to 160 km h 99 mph in May 1992 This reduced long distance journey times by 35 minutes In August 2019 the travel time between Dresden Neustadt and Berlin Sudkreuz was 102 minutes 3 Further upgrading of the line Edit nbsp Restoration at Doberlug KirchhainUnder an agreement signed on 7 June 1995 the Berlin Prague Vienna line is being upgraded including the raising of maximum speeds to 200 km h 120 mph between Berlin and Dresden In addition the Bohla Neucoswig section of the line is being upgraded as part of German Unity Transport Project No 9 which covers the upgrading of the Leipzig Dresden line The Weissig Bohla connecting curve will in future link the Leipzig Dresden line to Bohla so that long distance passenger and fast freight trains can use the Berlin Dresden line to and from Leipzig allowing the better separation of traffic at the Dresden railway node Restoration of the Dresden railway in Berlin Edit nbsp Level crossing at the Lichtenrade station in Berlin It is still in dispute if this level crossing is to be replaced by putting the street under the railway or the railway under the streetSince May 2006 most long distance and regional trains operating on the line run from the new Berlin Hauptbahnhof by the new line under the Tiergarten and join the old Anhalt line from Anhalt station to Dresden near Gleisdreieck Until the restoration of the line between Sudkreuz and the southern outer ring trains run from near Priesterweg S Bahn station on a detour along the Anhalt line to a recently built connecting curve at Genshagener Berlin on to the outer ring At Glasower Damm junction trains leave the outer ring and rejoin the Dresden railway at the 19 0 km 11 8 mi mark Since 2019 direct connection of the Berlin Dresden line between the southern outer ring at Blankenfelde and Sudkreuz is being restored 4 This line is important in the development of a fast connection to Berlin Brandenburg International Airport for Airport Express trains serving Berlin Brandenburg airport train station It is estimated that the new section will shorten travel time for passenger trains by about ten minutes Notes Edit Eisenbahnatlas Deutschland German railway atlas Schweers Wall 2009 pp 36 47 59 72 3 127 8 ISBN 978 3 89494 139 0 Bley Peter 1993 Berlin S Bahn in German Dusseldorf publication Alba p 26 Timetable for EuroCity 378 Deutsche Bahn Archived from the original on 2019 08 07 Baubeginn fur Dresdner Bahn im Suden Berlins www deutschebahn com in German Retrieved 2019 02 11 References EditBley Peter 1999 125 Jahre Berlin Dresdener Eisenbahn 125 years of the Berlin Dresden railway in German Dusseldorf Alba Publikation ISBN 3 87094 360 2 Kaiss Kurt Hengst Matthias 1994 Dresdens Eisenbahn Dresden Railway 1894 1994 in German Dusseldorf Alba Publikation ISBN 3 87094 350 5 Dresdener Bahn in German beefland Retrieved 23 May 2010 External links Edit nbsp Media related to Berlin Dresden railway line at Wikimedia Commons Retrieved from https en wikipedia org w index php title Berlin Dresden railway amp oldid 1050760332, wikipedia, wiki, book, books, library,