fbpx
Wikipedia

Beachmont station

Beachmont is an elevated rapid transit station in Revere, Massachusetts. It serves the MBTA Blue Line, and is located above Winthrop Avenue in the Beachmont neighborhood. Beachmont station is fully accessible, with elevators from the lobby to the platforms.

Beachmont
An outbound train at Beachmont station in 2018
General information
Location630 Winthrop Avenue at 1 Bennington Street
Revere, Massachusetts
Coordinates42°23′51″N 70°59′32″W / 42.3975°N 70.9922°W / 42.3975; -70.9922Coordinates: 42°23′51″N 70°59′32″W / 42.3975°N 70.9922°W / 42.3975; -70.9922
Line(s)Revere Extension
Platforms2 side platforms
Tracks2
Connections MBTA bus: 119
Construction
Parking430 spaces ($5.00 fee)
Bicycle facilities6 spaces
Disabled accessYes
History
OpenedJune 19, 1954[1]
RebuiltJune 24, 1995[2]
Passengers
FY20193,139 boardings (weekday average)[3]
Services
Preceding station MBTA Following station
Suffolk Downs
toward Bowdoin
Blue Line Revere Beach
toward Wonderland
Location

History

BRB&L

 
Beachmont station on an early postcard

The narrow gauge Boston, Revere Beach and Lynn Railroad (BRB&L) opened from East Boston to Lynn on July 28, 1875. Among the original stations was Orient (also called Orient Heights) at Winthrop Avenue.[4][5] (At that time, Beachmont was considered part of Orient Heights.[6]) The Boston Land Company, affiliated with the BRB&L, used the station to sell land on Beachmont.[6] The BRB&L built the Beachmont hotel near the station in 1876.[7] The station was renamed Beachmont by the 1880s, with a station building located southeast of the crossing.[8][9]

Ocean Pier station was open for several years at Dolphin Avenue 0.3 miles (0.48 km) to the north in the 1880s, likely to compete with a competitor – the Eastern Railroad-backed Boston, Winthrop and Shore Railroad – which operated in 1884 and 1885.[10][8]

By 1928 the line was electrified, with pre-pay stations - more a rapid transit line than a conventional railroad.[11] However, due to the Great Depression, the BRB&L shut down on January 27, 1940.[12]

Rapid transit

 
A 1954 isometric drawing of the station

In 1941, the Boston Elevated Railway bought the BRB&L right of way from Day Square to Revere Beach for use as a high-speed trolley line similar to the Ashmont-Mattapan High Speed Line; these plans were delayed by the onset of World War II.[13] However, the 1926 Report on Improved Transportation Facilities and 1945–47 Coolidge Commission Report recommended that the East Boston Tunnel line, which had been converted to rapid transit from streetcars in 1924, be extended to Lynn via the BBRB&L route rather than using it for a trolley line.[14][15]

In 1947, the newly formed Metropolitan Transit Authority (M.T.A.) decided to build to Lynn as a rapid transit line, and construction began in October 1948.[13] The first part of the Revere Extension opened to Orient Heights in January 1952 and Suffolk Downs in April 1952; the second phase (cut short due to limited funds) opened to Wonderland on January 19, 1954 with intermediate stations at Beachmont and Revere Beach.[13][1] Unlike its predecessor, this Beachmont station was elevated to eliminate the grade crossing of Winthrop Avenue.

Renovations

 
Aerial view of the 1995-built Beachmont station

The station was closed for approximately one year starting on June 25, 1994, as the station was rebuilt along with the Suffolk Downs, Revere Beach and Wonderland stations as part of the Blue Line Modernization Program. Blue Line service temporarily ended at Orient Heights and buses served the closed stations during the project.[2][16] Beachmont station was completely rebuilt at a cost of $27 million; it reopened along with the other stations on June 24, 1995.[17]

The station was closed while additional platform repair work was performed from September 8 through November 25, 2008.[2][18] On June 1-2, 2019, the 1995-added radio tower was demolished.[19][20]

The redevelopment of the Suffolk Downs site is expected to substantially increase ridership to Suffolk Downs and Beachmont stations. The developer has committed $20 million for transit projects, including modifications to both stations.[21][22] The MBTA plans to construct a bus transfer facility at the station to replace or supplement Wonderland for North Shore bus routes.[23]

References

  1. ^ a b "Rapid Transit Line to Revere to Open June 19". Boston Globe. June 9, 1954. p. 9 – via Newspapers.com.
  2. ^ a b c Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  3. ^ "A Guide to Ridership Data". MassDOT/MBTA Office of Performance Management and Innovation. June 22, 2020. p. 8.
  4. ^ Bradlee, Francis Boardman Crowninshield (1921). The Boston, Revere Beach and Lynn Narrow Gauge Railroad. Essex Institute. pp. 4–5 – via Google Books.
  5. ^ "The New Road to Lynn". Boston Globe. July 21, 1875. p. 5 – via Newspapers.com.
  6. ^ a b "The Inauguration Sale by the Boston Land Company at Orient Heights". Boston Globe. August 24, 1875. p. 5 – via Newspapers.com.
  7. ^ "Suburban Notes". Boston Globe. May 10, 1876. p. 7 – via Newspapers.com.
  8. ^ a b "Plate O". Atlas of the City of Chelsea and the Towns of Revere and Winthrop. G.W. Bromley and Co. 1886.
  9. ^ "A Locomotive and Team Collide". Boston Globe. August 14, 1882. p. 2 – via Newspapers.com.
  10. ^ Stanley, Robert C. (1980). Narrow Gauge: The Story of the Boston, Revere Beach & Lynn Railroad. Boston Street Railway Association.
  11. ^ ""Narrow Gage" Electrified for Economy". Electric Railway Journal. 72 (23): 991–998. 8 December 1928. Retrieved 24 December 2015 – via Internet Archive.
  12. ^ Karr, Ronald Dale (2017). The Rail Lines of Southern New England (2 ed.). Branch Line Press. ISBN 9780942147124.
  13. ^ a b c Cheney, Frank (2003). Boston's Blue Line. Arcadia Publishing. pp. 8, 83. ISBN 9780738535760.
  14. ^ Central Transportation Planning Staff (15 November 1993). . National Transportation Library. Archived from the original on 9 April 2019. Retrieved 3 July 2012.
  15. ^ Boston Elevated Railway and Boston Department of Public Utilities (1945), Boston Rapid Transit System & Proposed Extensions 1945 - Metropolitan Transit Recess Commission Air View
  16. ^ Blake, Andrew (March 20, 1994). "MBTA to begin $467 million Blue Line project". Boston Globe – via Newspapers.com. (second page)  
  17. ^ Blake, Andrew (June 18, 1995). "Blue Line stations set to reopen after $467m upgrade". Boston Globe – via Newspapers.com. (second page)  
  18. ^ "Blue Line Rehab Project To Begin" (Press release). Massachusetts Bay Transportation Authority. June 18, 2008.
  19. ^ . Massachusetts Bay Transportation Authority. May 23, 2019. Archived from the original on June 2, 2019.
  20. ^ . Massachusetts Bay Transportation Authority. 2019. Archived from the original on September 25, 2019.
  21. ^ HYM Investment Group (September 16, 2019). "Suffolk Downs Redevelopment: Additional Information Document". Boston Planning and Development Authority. p. 14.
  22. ^ "Suffolk Downs Redevelopment: Boston Zoning Commission Hearing". Boston Planning and Development Authority. October 21, 2020. p. 29.
  23. ^ Stoothoff, Erik (January 25, 2021). "Blue Line Update" (PDF). Massachusetts Bay Transportation Authority. p. 10.

External links

  • MBTA - Beachmont
  • Winthrop Avenue entrance from Google Maps Street View

beachmont, station, beachmont, elevated, rapid, transit, station, revere, massachusetts, serves, mbta, blue, line, located, above, winthrop, avenue, beachmont, neighborhood, fully, accessible, with, elevators, from, lobby, platforms, beachmontan, outbound, tra. Beachmont is an elevated rapid transit station in Revere Massachusetts It serves the MBTA Blue Line and is located above Winthrop Avenue in the Beachmont neighborhood Beachmont station is fully accessible with elevators from the lobby to the platforms BeachmontAn outbound train at Beachmont station in 2018General informationLocation630 Winthrop Avenue at 1 Bennington StreetRevere MassachusettsCoordinates42 23 51 N 70 59 32 W 42 3975 N 70 9922 W 42 3975 70 9922 Coordinates 42 23 51 N 70 59 32 W 42 3975 N 70 9922 W 42 3975 70 9922Line s Revere ExtensionPlatforms2 side platformsTracks2ConnectionsMBTA bus 119ConstructionParking430 spaces 5 00 fee Bicycle facilities6 spacesDisabled accessYesHistoryOpenedJune 19 1954 1 RebuiltJune 24 1995 2 PassengersFY20193 139 boardings weekday average 3 ServicesPreceding station MBTA Following stationSuffolk Downstoward Bowdoin Blue Line Revere Beachtoward WonderlandLocation Contents 1 History 1 1 BRB amp L 1 2 Rapid transit 1 3 Renovations 2 References 3 External linksHistory EditBRB amp L Edit Beachmont station on an early postcard The narrow gauge Boston Revere Beach and Lynn Railroad BRB amp L opened from East Boston to Lynn on July 28 1875 Among the original stations was Orient also called Orient Heights at Winthrop Avenue 4 5 At that time Beachmont was considered part of Orient Heights 6 The Boston Land Company affiliated with the BRB amp L used the station to sell land on Beachmont 6 The BRB amp L built the Beachmont hotel near the station in 1876 7 The station was renamed Beachmont by the 1880s with a station building located southeast of the crossing 8 9 Ocean Pier station was open for several years at Dolphin Avenue 0 3 miles 0 48 km to the north in the 1880s likely to compete with a competitor the Eastern Railroad backed Boston Winthrop and Shore Railroad which operated in 1884 and 1885 10 8 By 1928 the line was electrified with pre pay stations more a rapid transit line than a conventional railroad 11 However due to the Great Depression the BRB amp L shut down on January 27 1940 12 Rapid transit Edit A 1954 isometric drawing of the station In 1941 the Boston Elevated Railway bought the BRB amp L right of way from Day Square to Revere Beach for use as a high speed trolley line similar to the Ashmont Mattapan High Speed Line these plans were delayed by the onset of World War II 13 However the 1926 Report on Improved Transportation Facilities and 1945 47 Coolidge Commission Report recommended that the East Boston Tunnel line which had been converted to rapid transit from streetcars in 1924 be extended to Lynn via the BBRB amp L route rather than using it for a trolley line 14 15 In 1947 the newly formed Metropolitan Transit Authority M T A decided to build to Lynn as a rapid transit line and construction began in October 1948 13 The first part of the Revere Extension opened to Orient Heights in January 1952 and Suffolk Downs in April 1952 the second phase cut short due to limited funds opened to Wonderland on January 19 1954 with intermediate stations at Beachmont and Revere Beach 13 1 Unlike its predecessor this Beachmont station was elevated to eliminate the grade crossing of Winthrop Avenue Renovations Edit Aerial view of the 1995 built Beachmont station The station was closed for approximately one year starting on June 25 1994 as the station was rebuilt along with the Suffolk Downs Revere Beach and Wonderland stations as part of the Blue Line Modernization Program Blue Line service temporarily ended at Orient Heights and buses served the closed stations during the project 2 16 Beachmont station was completely rebuilt at a cost of 27 million it reopened along with the other stations on June 24 1995 17 The station was closed while additional platform repair work was performed from September 8 through November 25 2008 2 18 On June 1 2 2019 the 1995 added radio tower was demolished 19 20 The redevelopment of the Suffolk Downs site is expected to substantially increase ridership to Suffolk Downs and Beachmont stations The developer has committed 20 million for transit projects including modifications to both stations 21 22 The MBTA plans to construct a bus transfer facility at the station to replace or supplement Wonderland for North Shore bus routes 23 References Edit a b Rapid Transit Line to Revere to Open June 19 Boston Globe June 9 1954 p 9 via Newspapers com a b c Belcher Jonathan Changes to Transit Service in the MBTA district PDF Boston Street Railway Association A Guide to Ridership Data MassDOT MBTA Office of Performance Management and Innovation June 22 2020 p 8 Bradlee Francis Boardman Crowninshield 1921 The Boston Revere Beach and Lynn Narrow Gauge Railroad Essex Institute pp 4 5 via Google Books The New Road to Lynn Boston Globe July 21 1875 p 5 via Newspapers com a b The Inauguration Sale by the Boston Land Company at Orient Heights Boston Globe August 24 1875 p 5 via Newspapers com Suburban Notes Boston Globe May 10 1876 p 7 via Newspapers com a b Plate O Atlas of the City of Chelsea and the Towns of Revere and Winthrop G W Bromley and Co 1886 A Locomotive and Team Collide Boston Globe August 14 1882 p 2 via Newspapers com Stanley Robert C 1980 Narrow Gauge The Story of the Boston Revere Beach amp Lynn Railroad Boston Street Railway Association Narrow Gage Electrified for Economy Electric Railway Journal 72 23 991 998 8 December 1928 Retrieved 24 December 2015 via Internet Archive Karr Ronald Dale 2017 The Rail Lines of Southern New England 2 ed Branch Line Press ISBN 9780942147124 a b c Cheney Frank 2003 Boston s Blue Line Arcadia Publishing pp 8 83 ISBN 9780738535760 Central Transportation Planning Staff 15 November 1993 The Transportation Plan for the Boston Region Volume 2 National Transportation Library Archived from the original on 9 April 2019 Retrieved 3 July 2012 Boston Elevated Railway and Boston Department of Public Utilities 1945 Boston Rapid Transit System amp Proposed Extensions 1945 Metropolitan Transit Recess Commission Air View Blake Andrew March 20 1994 MBTA to begin 467 million Blue Line project Boston Globe via Newspapers com second page Blake Andrew June 18 1995 Blue Line stations set to reopen after 467m upgrade Boston Globe via Newspapers com second page Blue Line Rehab Project To Begin Press release Massachusetts Bay Transportation Authority June 18 2008 Alerts Subway Massachusetts Bay Transportation Authority May 23 2019 Archived from the original on June 2 2019 Beachmont Improvements Massachusetts Bay Transportation Authority 2019 Archived from the original on September 25 2019 HYM Investment Group September 16 2019 Suffolk Downs Redevelopment Additional Information Document Boston Planning and Development Authority p 14 Suffolk Downs Redevelopment Boston Zoning Commission Hearing Boston Planning and Development Authority October 21 2020 p 29 Stoothoff Erik January 25 2021 Blue Line Update PDF Massachusetts Bay Transportation Authority p 10 External links Edit Wikimedia Commons has media related to Beachmont station MBTA Beachmont Winthrop Avenue entrance from Google Maps Street View Retrieved from https en wikipedia org w index php title Beachmont station amp oldid 1138676100, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.