Bairabi–Sairang line

The Bairabi–Sairang line is a 51 kilometres (32 mi) long railway line from Bairabi to Sairang under the Northeast Frontier Railway zone of Indian Railways.[2]

Bairabi–Sairang line
Overview
StatusUnder construction
OwnerIndian Railways
LocaleMizoram, India
Termini
Stations4
WebsiteIndian Railway Website
History
Planned openingMarch 2023 (Expected)
Technical
Line length51.38[1] km (31.93 mi)
Number of tracksSingle diesel line
Track gauge5 ft 6 in (1,676 mm)
ElectrificationNo

Details

The cost of construction from Bairabi to Sairang is estimated at INR 2384 crores, which was later revised at INR 5021.45 crores.[3] Bairabi-Sairang rail line entails 130 bridges, 23 tunnels and four stations namely Hortoki, Kawnpui, Mualkhang and Sairang, and 28 hectares (69 acres) land was acquired for the construction.[2][4]

Further extension

South spur to Kyauktau railhead to Sittwe in Myanmar

  • Zochachhuah (Zorinpui)-Kyaukhtu line: is 200 km planned railway line.
  • Sittwe–Kyaukhtu line in Myanmar, 90 km (56 mi) – exists and operational: This route has been operational since 2011. To integrate with other routes-network in Myanmar, it will be further extended 311 km by 2021–22, from Kyaukhtu in north to Ann in south and then south-east to Minbu where it will connect to Myanmar rail network as well as 1,215 km (755 mi) long Kyaukpyu port–Minbu–Kunming high-speed railway being planned by China.[7]

East spur to Kalemyo railhead in Myanmar

  • Aizawl-Zokhawthar line future spur, from where it will then be extended to the existing railhead at Kalay (also called Kale and Kalemyo) in Myanmar to form part of the ambitious Trans-Asian Railway.
  • Imphal-Moreh line future spur which will be extended to the existing railhead at Kalay.
  • Kalemyo-Shwebo line, a new link connecting the existing railheads at Kalemyo and Shwebo for a shorter direct route to Mandalay and beyond.

Current status

  • Aug 2019: 65% work was complete.
  • Feb 2020: Railway Board Chairman inspected the 51.38 km long Bairabi-Sairang rail line project, which is nearing completion.[1]
  • Feb 2021: Due to the COVID-19 pandemic, which caused several delays in construction work, and due to lockdowns and lack of labour, the revised deadline of the rail line to Sairang, and the final extension till Mizoram's capital Aizawl, is likely to be completed by March 2023.[8]

References

  1. ^ a b "Boost for North-East! Indian Railways Jiribam-Imphal rail line project set for completion soon". 24 February 2020.
  2. ^ a b PTI. "Broad gauge track project in Mizoram". CNN IBN Live. Archived from the original on 26 January 2013. Retrieved 13 August 2012.
  3. ^ "Bairabi-Sairang rêl kawng siam March 2020-ah zawh tum a ni". Vanglaini.org (in Hindi). Retrieved 10 March 2017.
  4. ^ RC Acharya (21 March 2016). . Archived from the original on 1 April 2016. Retrieved 21 March 2016.
  5. ^ Kashyap, Samudra Gupta; Halliday, Adam (22 July 2016). "Massive push to railway infrastructure under way in Northeast". Indian Express.
  6. ^ . PowerUpConstruction.Com. 18 June 2017. Archived from the original on 27 November 2018.
  7. ^ Myanmar in China’s Push into the Indian Ocean, Joshy M Paul, March 14, 2016, retrieved 20 January 2017
  8. ^ Indian Railways to complete Bairabi–Sairang railway line project by 2023, railway-technology.com, 15 Feb 2021.

bairabi, sairang, line, kilometres, long, railway, line, from, bairabi, sairang, under, northeast, frontier, railway, zone, indian, railways, overviewstatusunder, constructionownerindian, railwayslocalemizoram, indiaterminibairabisairangstations4websiteindian,. The Bairabi Sairang line is a 51 kilometres 32 mi long railway line from Bairabi to Sairang under the Northeast Frontier Railway zone of Indian Railways 2 Bairabi Sairang lineOverviewStatusUnder constructionOwnerIndian RailwaysLocaleMizoram IndiaTerminiBairabiSairangStations4WebsiteIndian Railway WebsiteHistoryPlanned openingMarch 2023 Expected TechnicalLine length51 38 1 km 31 93 mi Number of tracksSingle diesel lineTrack gauge5 ft 6 in 1 676 mm ElectrificationNo Contents 1 Details 2 Further extension 2 1 South spur to Kyauktau railhead to Sittwe in Myanmar 2 2 East spur to Kalemyo railhead in Myanmar 3 Current status 4 ReferencesDetails EditThe cost of construction from Bairabi to Sairang is estimated at INR 2384 crores which was later revised at INR 5021 45 crores 3 Bairabi Sairang rail line entails 130 bridges 23 tunnels and four stations namely Hortoki Kawnpui Mualkhang and Sairang and 28 hectares 69 acres land was acquired for the construction 2 4 Further extension EditSouth spur to Kyauktau railhead to Sittwe in Myanmar Edit Zochachhuah Zorinpui Sairang line In August 2015 Indian Railways completed a survey for a new route extension from Sairang to Hmawngbuchhuah Zorinpui on Mizoram s southern tip on India Myanmar border which will provide rail connectivity to Kaladan Multi Modal Transit Transport Project KMMTTP 5 In August 2017 survey for this line was completed 6 Zochachhuah Zorinpui Kyaukhtu line is 200 km planned railway line Sittwe Kyaukhtu line in Myanmar 90 km 56 mi exists and operational This route has been operational since 2011 To integrate with other routes network in Myanmar it will be further extended 311 km by 2021 22 from Kyaukhtu in north to Ann in south and then south east to Minbu where it will connect to Myanmar rail network as well as 1 215 km 755 mi long Kyaukpyu port Minbu Kunming high speed railway being planned by China 7 East spur to Kalemyo railhead in Myanmar Edit Aizawl Zokhawthar line future spur from where it will then be extended to the existing railhead at Kalay also called Kale and Kalemyo in Myanmar to form part of the ambitious Trans Asian Railway Imphal Moreh line future spur which will be extended to the existing railhead at Kalay Kalemyo Shwebo line a new link connecting the existing railheads at Kalemyo and Shwebo for a shorter direct route to Mandalay and beyond Current status EditAug 2019 65 work was complete Feb 2020 Railway Board Chairman inspected the 51 38 km long Bairabi Sairang rail line project which is nearing completion 1 Feb 2021 Due to the COVID 19 pandemic which caused several delays in construction work and due to lockdowns and lack of labour the revised deadline of the rail line to Sairang and the final extension till Mizoram s capital Aizawl is likely to be completed by March 2023 8 References Edit a b Boost for North East Indian Railways Jiribam Imphal rail line project set for completion soon 24 February 2020 a b PTI Broad gauge track project in Mizoram CNN IBN Live Archived from the original on 26 January 2013 Retrieved 13 August 2012 Bairabi Sairang rel kawng siam March 2020 ah zawh tum a ni Vanglaini org in Hindi Retrieved 10 March 2017 RC Acharya 21 March 2016 Binding India with ribbons of steel Archived from the original on 1 April 2016 Retrieved 21 March 2016 Kashyap Samudra Gupta Halliday Adam 22 July 2016 Massive push to railway infrastructure under way in Northeast Indian Express India s north east opened up PowerUpConstruction Com 18 June 2017 Archived from the original on 27 November 2018 Myanmar in China s Push into the Indian Ocean Joshy M Paul March 14 2016 retrieved 20 January 2017 Indian Railways to complete Bairabi Sairang railway line project by 2023 railway technology com 15 Feb 2021 Retrieved from https en wikipedia org w index php title Bairabi Sairang line amp oldid 1044198460, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.