The line was constructed as part of the Bavarian Maximilian Railway (German:Bayerische Maximiliansbahn), named after Maximilian II, king of Bavaria from 1848 to 1864. In 1851, it was decided to build a line connecting the German states and Italy via the Brenner Pass and via Salzburg towards Vienna and the Semmering Pass. It promised good traffic flows to and from the AustrianAdriatic port at Trieste. Appropriate conventions were agreed with the Kingdom of Württemberg and with the Austrian government in 1851. The Munich–Augsburg line, which had been opened by the Munich–Augsburg Railway Company (München-Augsburger Eisenbahn-Gesellschaft) in 1839 and 1840 and nationalised in 1846 was included in the new line.
The 83.7 km line from Augsburg to Ulm was opened in four sections:
1 May 1854 – Mitte Donaubrücke Ulm–Neu-Ulm, 1.3 km.
26 September 1853 – Neu-Ulm–Burgau, 38.1 km.
1 May 1854 – Burgau–Dinkelscherben, 17.9 km.
26 September 1853 – Dinkelscherben–Augsburg, 26.4 km.
The line todayedit
The line is a major traffic axis. Every hour or two Intercity-Express and InterCity trains run from Munich via Augsburg and Ulm to Stuttgart and from there to various other destinations.
^Eisenbahnatlas Deutschland (German railway atlas). Schweers + Wall. 2009. pp. 105–6, 163. ISBN978-3-89494-139-0.
Referencesedit
Ücker, Bernhard, 150 Jahre Eisenbahn in Bayern, Fürstenfeldbruck 1985 (in German)
Wolfgang Klee/Ludwig v. Welser, Bayern-Report, volumes 1–5, Fürstenfeldbruck, 1993–1995. (in German)
Dt. Reichsbahn, Die deutschen Eisenbahnen in ihrer Entwicklung 1835–1935, Berlin, 1935. (in German)
External linksedit
NBS/ABS Augsburg-Olching-München project at Deutsche Bahn(in German)
February 18, 2024
augsburg, railway, augsburg, line, german, railway, line, constructed, part, bavarian, maximilian, railway, built, royal, bavarian, state, railways, part, east, west, connection, between, west, augsburg, munich, rosenheim, austrian, border, kufstein, salzburg,. The Ulm Augsburg line is a German railway line It was constructed as part of the Bavarian Maximilian s Railway It was built for the Royal Bavarian State Railways as part of the east west connection between Neu Ulm in the west via Augsburg Munich and Rosenheim to the Austrian border at Kufstein and Salzburg in the east Augsburg Ulm railwayOverviewOwnerDB NetzLine number5302ServiceRoute number980TechnicalLine length85 0 km 52 8 mi Number of tracks2Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification15 kV 16 7 Hz AC catenaryOperating speed200 km h 125 mph Route mapLegendfrom Munich and from Ingolstadtfrom Buchloe0 0 Augsburg HauptbahnhofAugsburg Local RailwayWertach2 0 Augsburg Oberhausento Gleisbauhof and Weldento NurembergAugsburg Nuremberg railway4 4 Augsburg Hirblinger Strasse6 3 Neusassto WeldenAugsburg Welden railway old from Oberhausen and Gleisbauhof7 9 Westheim Schwab 12 4 Diedorf Schwab 16 6 GessertshausenSchmutterto Turkheim19 4 Kutzenhausenfrom Thannhausen27 8 DinkelscherbenZusam33 3 Gabelbach37 7 Freihalden42 5 JettingenA 845 7 Burgau Schwab 49 4 Mindelaltheim53 2 Offingenfrom Ingolstadt55 9 Neuoffingen61 4 Gunzburg61 8 Gunz62 0 to Mindelheim66 5 LeipheimDanube Bridge Leipheim A 869 4 Biber71 0 Unterfahlheim72 2 Roth74 2 Nersingen75 4 LeibiA 778 4 Burlafingen81 1 EvoBus sidingfrom MemmingenNeu Ulm Ost cut and cover 200 m 83 8 Neu UlmNeu Ulm West cut and cover 250 m 85 0 Danube BavariaBaden Wurttemberg stateborderfrom Friedrichshafen94 0 Ulm Hauptbahnhofto Sigmaringento Aalento StuttgartSource German railway atlas 1 Contents 1 History 1 1 Construction 2 The line today 2 1 Ulm Augsburg upgraded line 3 Notes 4 References 5 External linksHistory editMain article Bavarian Maximilian s Railway The line was constructed as part of the Bavarian Maximilian Railway German Bayerische Maximiliansbahn named after Maximilian II king of Bavaria from 1848 to 1864 In 1851 it was decided to build a line connecting the German states and Italy via the Brenner Pass and via Salzburg towards Vienna and the Semmering Pass It promised good traffic flows to and from the Austrian Adriatic port at Trieste Appropriate conventions were agreed with the Kingdom of Wurttemberg and with the Austrian government in 1851 The Munich Augsburg line which had been opened by the Munich Augsburg Railway Company Munchen Augsburger Eisenbahn Gesellschaft in 1839 and 1840 and nationalised in 1846 was included in the new line The line connected to the Wurttemberg Southern Railway in Ulm and ran for 84 kilometers to Augsburg Construction edit The 83 7 km line from Augsburg to Ulm was opened in four sections 1 May 1854 Mitte Donaubrucke Ulm Neu Ulm 1 3 km 26 September 1853 Neu Ulm Burgau 38 1 km 1 May 1854 Burgau Dinkelscherben 17 9 km 26 September 1853 Dinkelscherben Augsburg 26 4 km The line today editThe line is a major traffic axis Every hour or two Intercity Express and InterCity trains run from Munich via Augsburg and Ulm to Stuttgart and from there to various other destinations Ulm Augsburg upgraded line edit The line between Ulm and Augsburg is part of the Stuttgart Augsburg new and upgraded line project Eventually this line should be part of the Magistrale for Europe from Paris via Strasbourg Stuttgart and Ulm to Munich Salzburg and Vienna Notes edit Eisenbahnatlas Deutschland German railway atlas Schweers Wall 2009 pp 105 6 163 ISBN 978 3 89494 139 0 References editUcker Bernhard 150 Jahre Eisenbahn in Bayern Furstenfeldbruck 1985 in German Wolfgang Klee Ludwig v Welser Bayern Report volumes 1 5 Furstenfeldbruck 1993 1995 in German Dt Reichsbahn Die deutschen Eisenbahnen in ihrer Entwicklung 1835 1935 Berlin 1935 in German External links editNBS ABS Augsburg Olching Munchen project at Deutsche Bahn in German Retrieved from https en wikipedia org w index php title Ulm Augsburg railway amp oldid 1178746394, wikipedia, wiki, book, books, library,