fbpx
Wikipedia

Askern branch line

The Askern branch line is a railway line which runs in North, South and West Yorkshire in England. The stretch of track runs from Shaftholme Junction north of Doncaster (on the East Coast Main Line between Doncaster and York), via Askern, Norton and Womersley to Knottingley, where it joins the Pontefract Line.

Askern branch line
Class 66 locomotive, no. 66162, passing Walden Stubbs on the Askern branch line with a coal train
Overview
OwnerNetwork Rail
LocaleYorkshire and the Humber
Doncaster
South Yorkshire
North Yorkshire
West Yorkshire
Termini
Stations3
Service
Operator(s)Freightliner
DB Cargo UK
GB Railfreight
Grand Central
London North Eastern Railway
Rolling stockClass 66
Class 180
Class 43
History
Opened1848 - Present
Technical
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Operating speed20–50 mph (32–80 km/h)
Route map

(Click to expand)
Askern Branch Line

History edit

It was opened by the Lancashire & Yorkshire Railway on 6 June 1848 and running powers were granted to the Great Northern Railway (with which it made an end-on junction at Askern) giving the latter company its initial access to Leeds (using part of the current Pontefract Line) and the former to Doncaster. The line subsequently became part of the newly established East Coast Main Line with the opening of a branch from Knottingley to Burton Salmon in 1850, which gave access to the York & North Midland Railway's line from Normanton to York.

The opening of a direct line from Shaftholme Junction to York via Selby in January 1871 saw the end of regular express trains using the route, but it remained busy with goods traffic, mainly coal from various collieries along its length and continued to carry a local stopping service from Wakefield to Doncaster until closure to passengers on 27 September 1948.[1]

Modern use edit

The line remains open to freight traffic, and passenger trains diverted when either the ECML or Doncaster – Leeds line is closed for engineering work.

After a more than 70-year hiatus, regular scheduled passenger services were restarted by open-access operator Grand Central from the May 2010 timetable change, with the first services running as planned on 23 May 2010.[2]

These trains run between London King's Cross and Bradford Interchange via Doncaster, Knottingley, then on via Pontefract Monkhill, Wakefield Kirkgate, Mirfield, Brighouse and Halifax. The necessary track access rights (for an initial three trains per day each way) were awarded to Grand Central by the ORR in January 2009.[3]

For the December 2011 timetable change, the company announced that it wished to remove the stops at Pontefract and divert its remaining services via Adwick to significantly reduce journey times, but permission for this from the ORR was not forthcoming. In December 2013 Grand Central services started to serve Mirfield, and a fourth return service via this route.[4]

Infrastructure operator Network Rail carried out upgrade works at the southern end of the line between 2012 and 2014. A new flyover was constructed that permits freight services from the ex-West Riding and Grimsby Railway route between Hatfield and Stainforth and Adwick to bridge the ECML and join the line just north of Askern Junction.[5][6] This allows coal trains from the deep water import terminal at Port of Immingham to run directly to the Aire valley power stations without needing to join the ECML at Joan Croft Junction and use a 15-mile (24 km) section from there towards York, thus freeing up capacity on a busy section of the route. The new flyover known as Doncaster North Chord, was opened in June 2014.[7]

Incidents edit

Askern level crossing edit

On Monday 3 December 1849, a rear collision with a vehicle resulted in a derailment. Four people were injured.

Haywood level crossing edit

This level crossing is a CCTV level crossing controlled by Norton Signal Box. On Thursday 26 February 2009, at around 1 pm, an HGV lorry smashed into the barriers, causing delays to freight services.

Norton level crossing edit

Norton level crossing is right next to Norton signal box which controls most of the level crossings on the Askern branch line. On Thursday 21 June 2012, a Land Rover smashed through the barriers after fleeing from a burglary, and smashed into two waiting cars at the other side of the crossing. This resulting in a full road closure, major delays to the freight services and to the London King's Cross to Bradford Interchange service. Four barriers were totally wrecked, so Network Rail replaced them. Further investigation of the level crossing crash is still underway.

References edit

  1. ^ Body 1988, p. 154.
  2. ^ "West Riding Timetable". Grand Central Rail. Retrieved 24 May 2010.
  3. ^ "ORR Track Access Applications Decision for the ECML 28 January 2009" (PDF). ORR. Archived from the original (PDF) on 24 March 2009. Retrieved 29 January 2009.
  4. ^ Grand Central. "Grand Central on Track to Deliver Extra Service in Yorkshire" (Press release). Retrieved 14 October 2013.
  5. ^ "Updated plans to improve journeys for thousands of passengers to go on display in Askern, Doncaster". railnetwork.info. Retrieved 14 October 2013.
  6. ^ . National Infrastructure Planning. Archived from the original on 14 October 2013. Retrieved 14 October 2013.
  7. ^ "Doncaster North Chord grade separation completed". Railway Gazette. 3 June 2014. Retrieved 29 December 2018.
  • Body, G. (1988). PSL Field Guides – Railways of the Eastern Region Volume 2. Wellingborough: Patrick Stephens Ltd. ISBN 1-85260-072-1.

askern, branch, line, railway, line, which, runs, north, south, west, yorkshire, england, stretch, track, runs, from, shaftholme, junction, north, doncaster, east, coast, main, line, between, doncaster, york, askern, norton, womersley, knottingley, where, join. The Askern branch line is a railway line which runs in North South and West Yorkshire in England The stretch of track runs from Shaftholme Junction north of Doncaster on the East Coast Main Line between Doncaster and York via Askern Norton and Womersley to Knottingley where it joins the Pontefract Line Askern branch lineClass 66 locomotive no 66162 passing Walden Stubbs on the Askern branch line with a coal trainOverviewOwnerNetwork RailLocaleYorkshire and the HumberDoncasterSouth YorkshireNorth YorkshireWest YorkshireTerminiShaftholmeKnottingleyStations3ServiceOperator s FreightlinerDB Cargo UKGB RailfreightGrand CentralLondon North Eastern RailwayRolling stockClass 66Class 180Class 43HistoryOpened1848 PresentTechnicalTrack gauge4 ft 8 1 2 in 1 435 mm standard gaugeOperating speed20 50 mph 32 80 km h Route map Click to expand vteAskern Branch LineLegendPontefract LineKnottingleyWomersleyHull and Barnsley RailwayNortonAskernEast Coast Main Lineto West Riding and Grimsby RailwayWest Riding and Grimsby RailwayArkseyDoncasterEast Coast Main Line Contents 1 History 2 Modern use 3 Incidents 3 1 Askern level crossing 3 2 Haywood level crossing 3 3 Norton level crossing 4 ReferencesHistory editIt was opened by the Lancashire amp Yorkshire Railway on 6 June 1848 and running powers were granted to the Great Northern Railway with which it made an end on junction at Askern giving the latter company its initial access to Leeds using part of the current Pontefract Line and the former to Doncaster The line subsequently became part of the newly established East Coast Main Line with the opening of a branch from Knottingley to Burton Salmon in 1850 which gave access to the York amp North Midland Railway s line from Normanton to York The opening of a direct line from Shaftholme Junction to York via Selby in January 1871 saw the end of regular express trains using the route but it remained busy with goods traffic mainly coal from various collieries along its length and continued to carry a local stopping service from Wakefield to Doncaster until closure to passengers on 27 September 1948 1 Modern use editThe line remains open to freight traffic and passenger trains diverted when either the ECML or Doncaster Leeds line is closed for engineering work After a more than 70 year hiatus regular scheduled passenger services were restarted by open access operator Grand Central from the May 2010 timetable change with the first services running as planned on 23 May 2010 2 These trains run between London King s Cross and Bradford Interchange via Doncaster Knottingley then on via Pontefract Monkhill Wakefield Kirkgate Mirfield Brighouse and Halifax The necessary track access rights for an initial three trains per day each way were awarded to Grand Central by the ORR in January 2009 3 For the December 2011 timetable change the company announced that it wished to remove the stops at Pontefract and divert its remaining services via Adwick to significantly reduce journey times but permission for this from the ORR was not forthcoming In December 2013 Grand Central services started to serve Mirfield and a fourth return service via this route 4 Infrastructure operator Network Rail carried out upgrade works at the southern end of the line between 2012 and 2014 A new flyover was constructed that permits freight services from the ex West Riding and Grimsby Railway route between Hatfield and Stainforth and Adwick to bridge the ECML and join the line just north of Askern Junction 5 6 This allows coal trains from the deep water import terminal at Port of Immingham to run directly to the Aire valley power stations without needing to join the ECML at Joan Croft Junction and use a 15 mile 24 km section from there towards York thus freeing up capacity on a busy section of the route The new flyover known as Doncaster North Chord was opened in June 2014 7 Incidents editAskern level crossing edit On Monday 3 December 1849 a rear collision with a vehicle resulted in a derailment Four people were injured Haywood level crossing edit This level crossing is a CCTV level crossing controlled by Norton Signal Box On Thursday 26 February 2009 at around 1 pm an HGV lorry smashed into the barriers causing delays to freight services Norton level crossing edit Norton level crossing is right next to Norton signal box which controls most of the level crossings on the Askern branch line On Thursday 21 June 2012 a Land Rover smashed through the barriers after fleeing from a burglary and smashed into two waiting cars at the other side of the crossing This resulting in a full road closure major delays to the freight services and to the London King s Cross to Bradford Interchange service Four barriers were totally wrecked so Network Rail replaced them Further investigation of the level crossing crash is still underway References edit Body 1988 p 154 West Riding Timetable Grand Central Rail Retrieved 24 May 2010 ORR Track Access Applications Decision for the ECML 28 January 2009 PDF ORR Archived from the original PDF on 24 March 2009 Retrieved 29 January 2009 Grand Central Grand Central on Track to Deliver Extra Service in Yorkshire Press release Retrieved 14 October 2013 Updated plans to improve journeys for thousands of passengers to go on display in Askern Doncaster railnetwork info Retrieved 14 October 2013 North Doncaster Rail Chord National Infrastructure Planning Archived from the original on 14 October 2013 Retrieved 14 October 2013 Doncaster North Chord grade separation completed Railway Gazette 3 June 2014 Retrieved 29 December 2018 Body G 1988 PSL Field Guides Railways of the Eastern Region Volume 2 Wellingborough Patrick Stephens Ltd ISBN 1 85260 072 1 Retrieved from https en wikipedia org w index php title Askern branch line amp oldid 1149661352, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.