fbpx
Wikipedia

Aqua Line (Pune Metro)

Aqua Line of the Pune Metro is the second line of the city's mass transit network. It runs from Ramwadi to Vanaz via Mangalwar Peth and Deccan Gymkhana. The section from Vanaz to Garware College was inaugurated on 6 March 2022 by Prime Minister Narendra Modi. The section from Garware College to Ruby Hall Clinic was inaugurated on 1 August 2023, while the remaining stretch upto Ramwadi was opened on 6 March 2024.[1]

Aqua Line
Pune Aqua line
Overview
StatusOperational
LocalePune
Termini
Stations16 (Operational)
Service
TypeRapid Transit
SystemPune Metro
Operator(s)MahaMetro
Rolling stockTitagarh Firema
History
Opened6 March 2022; 2 years ago (2022-03-06)
Completed6 March 2024 (2024-03-06)
Technical
Line length14.66 km (Operational)
CharacterElevated
Route map

Route edit

The elevated line covers a distance of 14.66 km (9.11 mi) and will have 16 stations. It connects with the Purple Line and Line 3 at the Civil Court interchange station. The maintenance depot for the Aqua Line is located near the Vanaz station on the former garbage depot land.[2][3]

List of stations edit

Following is a list of stations on this route-

Aqua Line
# Station name Opening Connections Layout
English Marathi
1 Vanaz वनाझ 6 March 2022 None Elevated
2 Anand Nagar आनंदनगर 6 March 2022 None Elevated
3 Ideal Colony आयडियल कॉलनी 6 March 2022 None Elevated
4 Nal Stop नळ स्टॉप 6 March 2022 None Elevated
5 Garware College गरवारे महाविद्यालय 6 March 2022 None Elevated
6 Deccan Gymkhana डेक्कन जिमखाना 1 August 2023 None Elevated
7 Chhatrapati Sambhaji Udyan छत्रपती संभाजी उद्यान 1 August 2023 None Elevated
8 PMC Bhavan पुणे महानगरपालिका भवन 1 August 2023 None Elevated
9 Civil Court दिवाणी न्यायालय 1 August 2023 Purple Line &  Line 3  Elevated
10 Mangalwar Peth मंगळवार पेठ 1 August 2023 None Elevated
11 Pune Railway Station पुणे रेल्वे स्टेशन 1 August 2023 Pune Junction railway station Elevated
12 Ruby Hall Clinic रुबी हॉल क्लिनिक 1 August 2023 None Elevated
13 Bund Garden बंड गार्डन 6 March 2024 None Elevated
14 Yerwada येरवडा 6 March 2024 Rainbow BRTS Elevated
15 Kalyani Nagar कल्याणी नगर 6 March 2024 Rainbow BRTS Elevated
16 Ramwadi रामवाडी 6 March 2024 Rainbow BRTS Elevated

Infrastructure edit

Signalling edit

The Aqua Line utilises the Alstom Urbalis 400 communications-based train control (CBTC) signalling system. Alstom was awarded a EUR90 million contract to supply the signalling and telecommunications systems for the Aqua and Purple Lines, as well as Mumbai Metro Line 2 and Line 7.[4][5]

References edit

  1. ^ "Comfortable, convenient & economic: Citizens on Metro launch till Ramwadi". The Times of India. 7 March 2024. ISSN 0971-8257. Retrieved 7 March 2024.
  2. ^ "MahaMetro takes possession of 35 hectares of land for project". The Times of India. 27 April 2018. Retrieved 4 May 2018.
  3. ^ "MahaMetro gets land for depot and multi-modal hub". The Times of India. 17 March 2018. Retrieved 4 May 2018.
  4. ^ "Alstom to provide state-of-the-art signalling system for Mumbai Metro and Pune Metro". Financialexpress. 1 April 2019. Retrieved 9 July 2023.
  5. ^ "Alstom bags Rs 700 crore contracts from Mumbai, Pune metros". Construction Week. Retrieved 9 July 2023.

aqua, line, pune, metro, aqua, line, pune, metro, second, line, city, mass, transit, network, runs, from, ramwadi, vanaz, mangalwar, peth, deccan, gymkhana, section, from, vanaz, garware, college, inaugurated, march, 2022, prime, minister, narendra, modi, sect. Aqua Line of the Pune Metro is the second line of the city s mass transit network It runs from Ramwadi to Vanaz via Mangalwar Peth and Deccan Gymkhana The section from Vanaz to Garware College was inaugurated on 6 March 2022 by Prime Minister Narendra Modi The section from Garware College to Ruby Hall Clinic was inaugurated on 1 August 2023 while the remaining stretch upto Ramwadi was opened on 6 March 2024 1 Aqua LinePune Aqua lineOverviewStatusOperationalLocalePuneTerminiVanazRamwadiStations16 Operational ServiceTypeRapid TransitSystemPune MetroOperator s MahaMetroRolling stockTitagarh FiremaHistoryOpened6 March 2022 2 years ago 2022 03 06 Completed6 March 2024 2024 03 06 TechnicalLine length14 66 km Operational CharacterElevatedRoute mapLegend Vanaz Vanaz Depot Anand Nagar Ideal Colony Nal Stop Garware College Deccan Gymkhana Chhatrapati Sambhaji Udyan PMC Bhavan Civil Court Purple Line Line 3 Mangalwar Peth Pune Railway Station Ruby Hall Clinic Bund Garden Yerwada Kalyani Nagar Ramwadi Contents 1 Route 2 List of stations 3 Infrastructure 3 1 Signalling 4 ReferencesRoute editThe elevated line covers a distance of 14 66 km 9 11 mi and will have 16 stations It connects with the Purple Line and Line 3 at the Civil Court interchange station The maintenance depot for the Aqua Line is located near the Vanaz station on the former garbage depot land 2 3 List of stations editFollowing is a list of stations on this route Aqua Line Station name Opening Connections Layout English Marathi 1 Vanaz वन झ 6 March 2022 None Elevated 2 Anand Nagar आन दनगर 6 March 2022 None Elevated 3 Ideal Colony आयड यल क लन 6 March 2022 None Elevated 4 Nal Stop नळ स ट प 6 March 2022 None Elevated 5 Garware College गरव र मह व द य लय 6 March 2022 None Elevated 6 Deccan Gymkhana ड क कन ज मख न 1 August 2023 None Elevated 7 Chhatrapati Sambhaji Udyan छत रपत स भ ज उद य न 1 August 2023 None Elevated 8 PMC Bhavan प ण मह नगरप ल क भवन 1 August 2023 None Elevated 9 Civil Court द व ण न य य लय 1 August 2023 Purple Line amp Line 3 Elevated 10 Mangalwar Peth म गळव र प ठ 1 August 2023 None Elevated 11 Pune Railway Station प ण र ल व स ट शन 1 August 2023 Pune Junction railway station Elevated 12 Ruby Hall Clinic र ब ह ल क ल न क 1 August 2023 None Elevated 13 Bund Garden ब ड ग र डन 6 March 2024 None Elevated 14 Yerwada य रवड 6 March 2024 Rainbow BRTS Elevated 15 Kalyani Nagar कल य ण नगर 6 March 2024 Rainbow BRTS Elevated 16 Ramwadi र मव ड 6 March 2024 Rainbow BRTS ElevatedInfrastructure editSignalling edit The Aqua Line utilises the Alstom Urbalis 400 communications based train control CBTC signalling system Alstom was awarded a EUR90 million contract to supply the signalling and telecommunications systems for the Aqua and Purple Lines as well as Mumbai Metro Line 2 and Line 7 4 5 References edit Comfortable convenient amp economic Citizens on Metro launch till Ramwadi The Times of India 7 March 2024 ISSN 0971 8257 Retrieved 7 March 2024 MahaMetro takes possession of 35 hectares of land for project The Times of India 27 April 2018 Retrieved 4 May 2018 MahaMetro gets land for depot and multi modal hub The Times of India 17 March 2018 Retrieved 4 May 2018 Alstom to provide state of the art signalling system for Mumbai Metro and Pune Metro Financialexpress 1 April 2019 Retrieved 9 July 2023 Alstom bags Rs 700 crore contracts from Mumbai Pune metros Construction Week Retrieved 9 July 2023 Retrieved from https en wikipedia org w index php title Aqua Line Pune Metro amp oldid 1212511190, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.