fbpx
Wikipedia

Bangalore–Mysore Infrastructure Corridor

The Nandi Infrastructure Corridor Enterprises Road, commonly known as NICE Road, is a partially implemented and largely scrapped 4 to 6 lane private tolled expressway in Karnataka,[1] that was intended to connect the two important cities Bengaluru and Mysuru in the Indian state of Karnataka. It will not be implemented, as Bengaluru-Mysuru access-controlled Highway part of NH 275 is going to replace it as a section of the new Bengaluru-Mangaluru Industrial Corridor (EC-34).

Bengaluru–Mysuru Infrastructure Corridor
Nandi Infrastructure Corridor Enterprises Road
NICE Peripheral Ring Road
NICE road at Mallasandra
Route information
Maintained by Nandi Infrastructure Corridor Enterprises Road
Length40 km (25 mi)
Existed1996–present
Major junctions
North endBengaluru
Major intersections
South endMysuru
Location
CountryIndia
StatesKarnataka
Highway system

As of May 2017, around 800,000 vehicles use the road daily on its presently operational section from Electronic City on Hosur Road to Tumakuru Road.[2]

There has been accusation of irregularities in the execution of the Bengaluru Mysore Infrastructure Corridor (BMIC) by the Nandi Infrastructure Corridor Enterprise (NICE).[3]

History edit

 
NICE Road toll plaza

In conjunction with a 1995 Trade Mission to India sponsored by the then Governor of Massachusetts, William Weld, a memorandum of understanding was signed by Consortium members, Indian officials, including then Karnataka Chief Minister, H.D. Deve Gowda, and U.S. officials, which set the stage for launching the Bangalore Mysore Infrastructure Corridor project. The Consortium, Nandi Infrastructure Corridor Enterprises (NICE), comprises the Kalyani Group of Companies, VHB International LTD. and SAB International LTD. to develop the Bangalore Mysore Infrastructure Corridor.

The project has been in controversy since the day of planning. In October 2012, the Karnataka Lokayukta ordered a probe into several former chief ministers in matters relating to irregularities in land acquisition for the project.[4]

Status updates edit

  • Mar 2019: 4 km of expressway is completed, besides this 41 km of peripheral road and 8.5 km of link road is also constructed.[5]

Gallery edit

See also edit

References edit

  1. ^ "119 km Bengaluru – Mysuru Expressway project on NH-275 is an under construction 6-10 lane access-controlled highway with a route alignment in Karnataka.This mix of brownfield-upgrade (60%) and greenfield (40%) project was envisioned as an alternate to the now-scrapped Nandi Infrastructure Corridor Enterprises (NICE) Road". themetrorailguy. Bangalore. 25 October 2012. Retrieved 13 March 2012.
  2. ^ Yadav, Umesh. "Now, BMRCL chalks out a 'NICE' plan for Namma Metro - The Economic Times". The Economic Times. Retrieved 8 May 2017.
  3. ^ "NICE project: HDK to approach PM Modi with documents".
  4. ^ Chaturvedi, Amit (25 October 2012). "Mysore infrastructure corridor project: Probe ordered against former Karnataka chief ministers". Bangalore. NDTV. Retrieved 25 October 2012.
  5. ^ "Kumaraswamy mum on NICE project he once opposed". 16 November 2018.

External links edit

    bangalore, mysore, infrastructure, corridor, this, article, needs, additional, citations, verification, please, help, improve, this, article, adding, citations, reliable, sources, unsourced, material, challenged, removed, find, sources, news, newspapers, books. This article needs additional citations for verification Please help improve this article by adding citations to reliable sources Unsourced material may be challenged and removed Find sources Bangalore Mysore Infrastructure Corridor news newspapers books scholar JSTOR July 2011 Learn how and when to remove this template message The Nandi Infrastructure Corridor Enterprises Road commonly known as NICE Road is a partially implemented and largely scrapped 4 to 6 lane private tolled expressway in Karnataka 1 that was intended to connect the two important cities Bengaluru and Mysuru in the Indian state of Karnataka It will not be implemented as Bengaluru Mysuru access controlled Highway part of NH 275 is going to replace it as a section of the new Bengaluru Mangaluru Industrial Corridor EC 34 Bengaluru Mysuru Infrastructure CorridorNandi Infrastructure Corridor Enterprises RoadNICE Peripheral Ring RoadNICE road at MallasandraRoute informationMaintained by Nandi Infrastructure Corridor Enterprises RoadLength40 km 25 mi Existed1996 presentMajor junctionsNorth endBengaluruMajor intersectionsHosur Road junction at Electronic CityBannerghatta Road junction at GottigereKanakapura Road junction at TalaghattapuraClover Leaf IntersectionHosakerehalli junction near NayandahalliMysore Road junction at KengeriMagadi Road junction at GollarahattiTumkur Road junction near BIECSouth endMysuruLocationCountryIndiaStatesKarnatakaHighway systemRoads in IndiaExpressways National State AsianAs of May 2017 around 800 000 vehicles use the road daily on its presently operational section from Electronic City on Hosur Road to Tumakuru Road 2 There has been accusation of irregularities in the execution of the Bengaluru Mysore Infrastructure Corridor BMIC by the Nandi Infrastructure Corridor Enterprise NICE 3 Contents 1 History 2 Status updates 3 Gallery 4 See also 5 References 6 External linksHistory edit nbsp NICE Road toll plazaIn conjunction with a 1995 Trade Mission to India sponsored by the then Governor of Massachusetts William Weld a memorandum of understanding was signed by Consortium members Indian officials including then Karnataka Chief Minister H D Deve Gowda and U S officials which set the stage for launching the Bangalore Mysore Infrastructure Corridor project The Consortium Nandi Infrastructure Corridor Enterprises NICE comprises the Kalyani Group of Companies VHB International LTD and SAB International LTD to develop the Bangalore Mysore Infrastructure Corridor The project has been in controversy since the day of planning In October 2012 the Karnataka Lokayukta ordered a probe into several former chief ministers in matters relating to irregularities in land acquisition for the project 4 Status updates editMar 2019 4 km of expressway is completed besides this 41 km of peripheral road and 8 5 km of link road is also constructed 5 Gallery edit nbsp Sunrise at NICE roadSee also editBengaluru Mysuru Expressway Expressways of India Infrastructure in Bangalore Bangalore Elevated Tollway Inner Ring Road Bangalore Outer Ring Road Bangalore Peripheral Ring Road Satellite Town Ring RoadReferences edit 119 km Bengaluru Mysuru Expressway project on NH 275 is an under construction 6 10 lane access controlled highway with a route alignment in Karnataka This mix of brownfield upgrade 60 and greenfield 40 project was envisioned as an alternate to the now scrapped Nandi Infrastructure Corridor Enterprises NICE Road themetrorailguy Bangalore 25 October 2012 Retrieved 13 March 2012 Yadav Umesh Now BMRCL chalks out a NICE plan for Namma Metro The Economic Times The Economic Times Retrieved 8 May 2017 NICE project HDK to approach PM Modi with documents Chaturvedi Amit 25 October 2012 Mysore infrastructure corridor project Probe ordered against former Karnataka chief ministers Bangalore NDTV Retrieved 25 October 2012 Kumaraswamy mum on NICE project he once opposed 16 November 2018 External links editBangalore Mysore Infrastructure Corridor Area Planning Authority nbsp Wikimedia Commons has media related to Bangalore Mysore Infrastructure Corridor Retrieved from https en wikipedia org w index php title Bangalore Mysore Infrastructure Corridor amp oldid 1209273879, wikipedia, wiki, book, books, library,

    article

    , read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.