fbpx
Wikipedia

Yanqing railway station

Yanqing railway station (simplified Chinese: 延庆站; traditional Chinese: 延慶站; pinyin: Yánqìng zhàn) is the terminus of the Yanqing branch of the Line S2 of the Beijing Suburban Railway. Yanqing railway station was used as a freight station since 1983, and in 2003 it closed due to the fall of shipments. In 2008, the station finished its first renovation and resumed passenger services. From 2019, a new station hall began construction for the coming Winter Olympics. Since 1 December 2020, The new station hall as well as Yanqing branch of Beijing–Zhangjiakou intercity railway begin serve the station.[1]

Yanqing

延庆

General information
LocationYanqing District, Beijing
China
Line(s)
Platforms3 (1 island platform, 2 side platforms)
Other information
Station code
  • TMIS code: 12224
  • Telegraph code: YNP
  • Pinyin code: YQI
History
Opened29 November 1983 (old station hall)
1 December 2020[1] (new station hall)
Services
Preceding station Beijing Suburban Railway Following station
Badaling
towards Huangtudian
Line S2 Terminus

Design

Yanqing railway station has been expanded for several major events hosted by Yanqing District. An upgrade of the bus transportation hub has been conducted for the Expo 2019 Horticultural Exhibition and the 2022 Winter Olympic Games, whose alpine events will be hosted in Yanqing District.[2][3] The whole construction site covers an area of 65,818 m2 (708,460 sq ft), and its gross construction area is 14,951.14 m2 (160,932.7 sq ft). The design of the facade image is inspired by both the local landscape, and Alpine skiing represented in the use of metal roof. The overall design scheme is defined as lofty mountains and flowing water, metaphos to the Yanqing welcomes the guests from all over the world. In the decoration design, the main elements are the Winter Olympics, the Great Wall and Yanqing local culture. The highly representative cultural symbols in Yanqing such as Mountain Haituo, Badaling and Xiadu Bridge have been applied to the relievo in the exit hall and waiting hall.[4]

Services and Structure

The station contains a concourse, an integrated service center, ticket vending machines, a convenience store and two check-in gates. Outside the new station hall is Yanqing integrated transportation hub include a visitors service center, a bus terminus, charging stations, and parking lots for vehicles and sharing bicycles. In December 2020, 5 pairs of high-speed trains and 3 pairs of      Line S2 trains serve here.[5]

Mezzanine Business floor (not yet open)
1F side platform, open left doors
Platform 4 Yanqing railway to Beijing urban area Badaling/Badaling Great Wall 
Plarform 3 Yanqing railway to Beijing urban area Badaling/Badaling Great Wall 
island platform
Platform 2 Yanqing railway to Beijing urban area Badaling/Badaling Great Wall 
Platform 1 Yanqing railway to Beijing urban area Badaling/Badaling Great Wall 
side platform,open right doors
Integrated service center, security check, washrooms, waiting hall,
Check-in Gate 1 (for intercity trian), Check-in Gate 2 (for   S2),
north square (Yanqing public transportation hub), south square
GF underpass, exit, visitors service center, bus terminus, taxi stands

References

  1. ^ a b "京张高铁延庆支线今晨通车 清河到延庆只用26分钟". 2020-12-01.
  2. ^ . Archived from the original on 2015-09-25. Retrieved 2015-10-13.
  3. ^ "京张高铁今年全线开工 计划在2019年完工_新闻_腾讯网".
  4. ^ Yanqing transportation bureau. "Introduction to the Yanqing integrated transportation hub (Interchange center)".
  5. ^ "【S2线延庆站12月1日恢复运营】你怀念的,总会重逢". 2020-11-30.

Coordinates: 40°26′05″N 115°58′41″E / 40.4347°N 115.9780°E / 40.4347; 115.9780

yanqing, railway, station, simplified, chinese, 延庆站, traditional, chinese, 延慶站, pinyin, yánqìng, zhàn, terminus, yanqing, branch, line, beijing, suburban, railway, used, freight, station, since, 1983, 2003, closed, fall, shipments, 2008, station, finished, fir. Yanqing railway station simplified Chinese 延庆站 traditional Chinese 延慶站 pinyin Yanqing zhan is the terminus of the Yanqing branch of the Line S2 of the Beijing Suburban Railway Yanqing railway station was used as a freight station since 1983 and in 2003 it closed due to the fall of shipments In 2008 the station finished its first renovation and resumed passenger services From 2019 a new station hall began construction for the coming Winter Olympics Since 1 December 2020 The new station hall as well as Yanqing branch of Beijing Zhangjiakou intercity railway begin serve the station 1 Yanqing延庆General informationLocationYanqing District BeijingChinaLine s Line S2 Beijing Zhangjiakou intercity railway Yanqing branch Platforms3 1 island platform 2 side platforms Other informationStation codeTMIS code 12224 Telegraph code YNP Pinyin code YQIHistoryOpened29 November 1983 old station hall 1 December 2020 1 new station hall ServicesPreceding station Beijing Suburban Railway Following stationBadalingtowards Huangtudian Line S2 TerminusDesign EditYanqing railway station has been expanded for several major events hosted by Yanqing District An upgrade of the bus transportation hub has been conducted for the Expo 2019 Horticultural Exhibition and the 2022 Winter Olympic Games whose alpine events will be hosted in Yanqing District 2 3 The whole construction site covers an area of 65 818 m2 708 460 sq ft and its gross construction area is 14 951 14 m2 160 932 7 sq ft The design of the facade image is inspired by both the local landscape and Alpine skiing represented in the use of metal roof The overall design scheme is defined as lofty mountains and flowing water metaphos to the Yanqing welcomes the guests from all over the world In the decoration design the main elements are the Winter Olympics the Great Wall and Yanqing local culture The highly representative cultural symbols in Yanqing such as Mountain Haituo Badaling and Xiadu Bridge have been applied to the relievo in the exit hall and waiting hall 4 Services and Structure EditThe station contains a concourse an integrated service center ticket vending machines a convenience store and two check in gates Outside the new station hall is Yanqing integrated transportation hub include a visitors service center a bus terminus charging stations and parking lots for vehicles and sharing bicycles In December 2020 5 pairs of high speed trains and 3 pairs of Line S2 trains serve here 5 Mezzanine Business floor not yet open 1F side platform open left doorsPlatform 4 Yanqing railway to Beijing urban area Badaling Badaling Great Wall Plarform 3 Yanqing railway to Beijing urban area Badaling Badaling Great Wall island platformPlatform 2 Yanqing railway to Beijing urban area Badaling Badaling Great Wall Platform 1 Yanqing railway to Beijing urban area Badaling Badaling Great Wall side platform open right doorsIntegrated service center security check washrooms waiting hall Check in Gate 1 for intercity trian Check in Gate 2 for S2 north square Yanqing public transportation hub south squareGF underpass exit visitors service center bus terminus taxi standsReferences Edit a b 京张高铁延庆支线今晨通车 清河到延庆只用26分钟 2020 12 01 千龙网 千龙原创 新活法 精彩故事 延庆8000农民变身园林工 Archived from the original on 2015 09 25 Retrieved 2015 10 13 京张高铁今年全线开工 计划在2019年完工 新闻 腾讯网 Yanqing transportation bureau Introduction to the Yanqing integrated transportation hub Interchange center S2线延庆站12月1日恢复运营 你怀念的 总会重逢 2020 11 30 Coordinates 40 26 05 N 115 58 41 E 40 4347 N 115 9780 E 40 4347 115 9780 Retrieved from https en wikipedia org w index php title Yanqing railway station amp oldid 1105517179, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.