fbpx
Wikipedia

USS United States (CVA-58)

USS United States (CVA-58) was to be the lead ship of a new design of aircraft carrier. On 29 July 1948, President Harry Truman approved construction of five "supercarriers", for which funds had been provided in the Naval Appropriations Act of 1949. The keel of the first of the five planned postwar carriers was laid down on 18 April 1949 at Newport News Drydock and Shipbuilding.[2] The program was canceled in 1949, United States was not completed, and the other four planned carriers were never built.

Artist's rendering of the proposed USS United States handling McDonnell FH-1 Phantom fighters and Lockheed P2V-3C Neptune twin-engine bombers
Class overview
NameUnited States class
BuildersNewport News Shipbuilding
Preceded byMidway class
Succeeded byForrestal class
Planned5
Completed0
History
United States
NameUnited States
NamesakeUnited States
Ordered29 July 1948[1]
BuilderNewport News Drydock and Shipbuilding[2]
Laid down18 April 1949[2]
FateCancelled 23 April 1949[2]
General characteristics
TypeAircraft carrier
Displacement
Length1,090 ft (330 m) overall,[4] 1,030 ft (310 m) waterline,[5] 1,088 feet (332 m) flight deck[1]
Beam125 ft (38 m) waterline (molded), 190 ft (58 m) flight deck[4]
Draft37 ft (11 m)
Propulsion
  • Eight 1,200 psi (8.3 MPa) Foster Wheeler boilers,
  • four Westinghouse steam turbines totaling 280,000 hp (209 MW)
  • driving four 20.5 ft (6.2 m) diameter screws[1]
Speed33 knots (61 km/h; 38 mph)
Complement
  • 3,019 officers and crew;[4]
  • 2,480 air wing officers and crew[4]
Armament8 × 5 in (127 mm) / 54 caliber guns in single mounts, 16 × 76 mm / 70 caliber guns in eight twin mounts, 20 × Oerlikon 20 mm cannons[1]
Aircraft carried12 to 18 heavy bombers[1] and 54 jet engined fighter aircraft[1]

Design edit

The chief proponent for the new large carrier was Admiral Marc Mitscher.[6] He wanted a carrier that would be able to handle the most effective weapons of the day. Early design discussions centered around developing a carrier that would be able to support combat missions using the new jet aircraft. These were faster, larger and significantly heavier than the aircraft the Essex- and Midway-class carriers were handling at the end of the Second World War. It was thought that the aircraft carried would have to have longer range to allow the carrier to operate farther away from the target. The deck would have to be able to handle the weight of the heavy jet aircraft landing on the deck. The implication was that the ship's strength deck would have to be the flight deck rather than the hangar deck, as had been the case for earlier U.S. carriers.[7] Armoring the flight deck would mean the ship would have a greater tendency to roll in rough seas, as a greater part of the ship's weight would be high above the waterline.

 
A preliminary design model undergoing seakeeping tests in a water tank

Based on the size of the aircraft that the new ship was to carry, the design of the carrier was to be flush decked, meaning that the ship would have no island control structure. This would be done to create more space for large winged aircraft.[8] The flush-deck design carried with it two major concerns. The first concern was over how smoke from the power plants would be diverted from the flight deck.[9] This had been a major issue with the US Navy's first aircraft carrier, USS Langley, in the 1920s when carrier development was first underway. The second concern was the placement of early warning radar equipment to allow the ship to detect incoming attacks. One solution was for a command ship to be close by which would carry the commander of the task force and the early detection radar. The command ship would radio electronic information and orders from its command center over to the carrier. This command ship role was termed a 'pilotfish' and the USS Northampton (CLC-1) would be built in part to fulfill this role.[10] A second solution was for the ship to carry aircraft that could fly the early warning radar. These would fly overhead and detect approaching aircraft.[8] In truth, the ship as designed would not be able to safely operate by itself, but would need to operate in conjunction with traditional fleet carriers as a complementary bomber-carrier. In fact, the ship was being designed on the basis of the aircraft that it was thought it would carry, and these were based on projections of what aircraft would be in existence in the period 1952 to 1960.[8]

Discussions included debate on the aircraft carrier's mission. One view was that it would carry a group of large bombers that would be secured to the flight deck, with no hangar for these aircraft, as they would be too large to move up and down in an elevator.[11] Though they would be built to carry large nuclear weapons, the total amount of space used for munition storage would be reduced as multiple strikes would not be likely. A small hangar deck would be available for a limited fighter escort and a small magazine for a small number of heavy nuclear weapons. Another plan was that it could be built with conventional attack capability with a large hangar deck for a large air wing and a large magazine.[12] The nuclear attack supporters won in the initial design stage, but the design was modified to carry more fighters. The flush-deck United States was designed to launch and recover the 100,000 pound (45 t) aircraft required to carry early-model nuclear weapons, which weighed as much as five tons.[4] The ship would have no permanently raised island or command tower structure.[8] It would be equipped with four aircraft elevators located at the deck edges to avoid decreasing the structural strength of the flight deck. Four catapults would be used to launch aircraft, with two at the bow and two others on the outer edge of the deck staggered back. The carrier was designed so that it could land aircraft at the rear while at the same time launching aircraft from the catapults at the bow and forward area simultaneously.[13] The construction cost of the new ship was estimated at US$189 million[1] (equivalent to US$1.73 billion in 2021).[14]

Proposed operations edit

USS United States was designed with the primary mission of carrying long-range bomber aircraft that could carry a heavy enough load to undertake nuclear bombardment missions. It would also carry long range escort fighters that would fly along and protect its bombers. The ship could also take on other roles, such as providing air support for amphibious forces and to conduct sea control operations, but it was primarily to be a "bomber carrier".[15] It was thought it would operate in a task force coupled with traditional attack carriers, which would provide the air cover for the task force. That mission was virtually certain to make the ship a target of inter-service rivalries over missions and funding. The United States Air Force viewed United States as a challenge to their monopoly on strategic nuclear weapons delivery.[1]

Keel laying; cancellation edit

 
Keelplate laid

Looking to cut the military budget and accepting without question the Air Force argument on nuclear deterrence by means of large, long-range bombers, Secretary of Defense Louis A. Johnson announced the cancellation of United States on 23 April 1949, five days after the ship's keel was laid.[3] Secretary of the Navy John Sullivan immediately resigned, and Congress held an inquiry into the manner and wisdom of Johnson's decision. In the subsequent "Revolt of the Admirals", the Navy was unable to advance its case that large carriers would be essential to national defense.[16]

 
Commencement of construction

Soon afterward, Johnson and Francis P. Matthews, the man he advanced to be the new Secretary of the Navy, set about punishing those officers that let their opposition be known.[17] Navy Admiral Louis Denfeld was forced to resign as Chief of Naval Operations, and a number of other admirals and lesser ranks were punished. The invasion of South Korea six months later resulted in an immediate need for a strong naval presence, and Matthews' position as Secretary of the Navy and Johnson's position as Secretary of Defense crumbled, both ultimately resigning.

The Navy soon found a means to carry nuclear weapons at sea, placed aboard the aircraft carrier USS Franklin D. Roosevelt in 1950.[4] Thus the question of which service would have primary responsibility for strategic nuclear strikes was not answered with Johnson's cancellation of USS United States.

See also edit

Citations edit

  1. ^ a b c d e f g h Elward 2011, pp. 6–8
  2. ^ a b c d DANFS United States 2016
  3. ^ a b Naval Historical Center 2001
  4. ^ a b c d e f g Pike 2000
  5. ^ a b Polmar 2008, pp. 47, 474
  6. ^ Friedman 1983, p. 230.
  7. ^ Cracknell 1972, p. 56: "The main armor carried on Enterprise is the heavy armored flight deck. This was to prove a significant factor in the catastrophic fire and explosions that occurred on Enterprise's flight deck in 1969. The US Navy learned its lesson the hard way during World War II when all its carriers had only armored hangar decks. All attack carriers built since the Midway class have had armored flight decks."
  8. ^ a b c d Friedman 1983, p. 244.
  9. ^ Friedman 1983, pp. 241–243.
  10. ^ Friedman 1984, p. 340.
  11. ^ Friedman 1983, p. 241.
  12. ^ Gustafson 1949, p. 115.
  13. ^ Friedman 1983, p. 188.
  14. ^ Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved 1 January 2023. United States Gross Domestic Product deflator figures follow the Measuring Worth series.
  15. ^ Friedman 1983, p. 242.
  16. ^ Lewis 1998, pp. 32–35.
  17. ^ McFarland 1980, p. 61.

Bibliography edit

  • Cracknell, W. H. (1972). USS Enterprise (CVAN 65) Nuclear Attack Carrier. Warship Profile. Vol. 15. Profile Publications.
  • Elward, Brad (2011). Nimitz-Class Aircraft Carriers. Osprey Publishing. pp. 6–8. ISBN 978-1-84908-971-5.
  • Friedman, Norman (1983). U.S. Aircraft Carriers: An Illustrated Design History. Annapolis, Maryland: Naval Institute Press. ISBN 978-0-87021-739-5.
  • Friedman, Norman (1984), U.S. Cruisers: an illustrated design history, Annapolis, MD: Naval Institute Press, ISBN 0-87021-718-6, OCLC 10949320
  • Gustafson, Phil (January 1949). "Why the Navy Wants Supercarriers". Popular Science. pp. 114–120.
  • Lewis, Andrew L. (April 1998). The Revolt of the Admirals (Thesis). Air Command and Staff College, Maxwell Air Force Base – via Federation of American Scientists.
  • McFarland, Keith (1980). "The 1949 Revolt of the Admirals" (PDF). Parameters: Journal of the U.S. Army War College Quarterly. U.S. Army War College. XI (2): 53–63. Retrieved 28 April 2014.
  • Naval Historical Center (8 September 2001). "USS United States (CVA-58)". Online Library of Selected Images: U.S. Navy Ships. U.S. Navy, Naval Historical Command. from the original on 7 August 2021. Retrieved 16 August 2021 – via HyperWar Foundation.
  • Pike, John (3 January 2000). "CVA 58 United States". FAS Military Analysis Network. Federation of American Scientists. Retrieved 16 August 2021.
  • Polmar, Norman (2008). Aircraft Carriers: A History of Carrier Aviation and Its Influence on World Events: Vol. II, 1946-2006. Dulles, Virginia: Potomac Books. ISBN 978-157488-665-8.
  • "United States (frigate), 1797–1865". Dictionary of American Naval Fighting Ships. Navy Department, Naval History and Heritage Command. 22 February 2016. Retrieved 16 August 2021.

Further reading edit

  • Zichek, Jared A. (2009). The Incredible Attack Aircraft of the USS United States, 1948–1949. Atglen, Pennsylvania: Schiffer Publishing. ISBN 978-0-7643-3229-6.

united, states, other, ships, with, same, name, united, states, lead, ship, design, aircraft, carrier, july, 1948, president, harry, truman, approved, construction, five, supercarriers, which, funds, been, provided, naval, appropriations, 1949, keel, first, fi. For other ships with the same name see USS United States USS United States CVA 58 was to be the lead ship of a new design of aircraft carrier On 29 July 1948 President Harry Truman approved construction of five supercarriers for which funds had been provided in the Naval Appropriations Act of 1949 The keel of the first of the five planned postwar carriers was laid down on 18 April 1949 at Newport News Drydock and Shipbuilding 2 The program was canceled in 1949 United States was not completed and the other four planned carriers were never built Artist s rendering of the proposed USS United States handling McDonnell FH 1 Phantom fighters and Lockheed P2V 3C Neptune twin engine bombersClass overviewNameUnited States classBuildersNewport News ShipbuildingPreceded byMidway classSucceeded byForrestal classPlanned5Completed0HistoryUnited StatesNameUnited StatesNamesakeUnited StatesOrdered29 July 1948 1 BuilderNewport News Drydock and Shipbuilding 2 Laid down18 April 1949 2 FateCancelled 23 April 1949 2 General characteristicsTypeAircraft carrierDisplacement68 250 ton class 3 4 83 200 tons full 5 Length1 090 ft 330 m overall 4 1 030 ft 310 m waterline 5 1 088 feet 332 m flight deck 1 Beam125 ft 38 m waterline molded 190 ft 58 m flight deck 4 Draft37 ft 11 m PropulsionEight 1 200 psi 8 3 MPa Foster Wheeler boilers four Westinghouse steam turbines totaling 280 000 hp 209 MW driving four 20 5 ft 6 2 m diameter screws 1 Speed33 knots 61 km h 38 mph Complement3 019 officers and crew 4 2 480 air wing officers and crew 4 Armament8 5 in 127 mm 54 caliber guns in single mounts 16 76 mm 70 caliber guns in eight twin mounts 20 Oerlikon 20 mm cannons 1 Aircraft carried12 to 18 heavy bombers 1 and 54 jet engined fighter aircraft 1 Contents 1 Design 2 Proposed operations 3 Keel laying cancellation 4 See also 5 Citations 6 Bibliography 7 Further readingDesign editThe chief proponent for the new large carrier was Admiral Marc Mitscher 6 He wanted a carrier that would be able to handle the most effective weapons of the day Early design discussions centered around developing a carrier that would be able to support combat missions using the new jet aircraft These were faster larger and significantly heavier than the aircraft the Essex and Midway class carriers were handling at the end of the Second World War It was thought that the aircraft carried would have to have longer range to allow the carrier to operate farther away from the target The deck would have to be able to handle the weight of the heavy jet aircraft landing on the deck The implication was that the ship s strength deck would have to be the flight deck rather than the hangar deck as had been the case for earlier U S carriers 7 Armoring the flight deck would mean the ship would have a greater tendency to roll in rough seas as a greater part of the ship s weight would be high above the waterline nbsp A preliminary design model undergoing seakeeping tests in a water tankBased on the size of the aircraft that the new ship was to carry the design of the carrier was to be flush decked meaning that the ship would have no island control structure This would be done to create more space for large winged aircraft 8 The flush deck design carried with it two major concerns The first concern was over how smoke from the power plants would be diverted from the flight deck 9 This had been a major issue with the US Navy s first aircraft carrier USS Langley in the 1920s when carrier development was first underway The second concern was the placement of early warning radar equipment to allow the ship to detect incoming attacks One solution was for a command ship to be close by which would carry the commander of the task force and the early detection radar The command ship would radio electronic information and orders from its command center over to the carrier This command ship role was termed a pilotfish and the USS Northampton CLC 1 would be built in part to fulfill this role 10 A second solution was for the ship to carry aircraft that could fly the early warning radar These would fly overhead and detect approaching aircraft 8 In truth the ship as designed would not be able to safely operate by itself but would need to operate in conjunction with traditional fleet carriers as a complementary bomber carrier In fact the ship was being designed on the basis of the aircraft that it was thought it would carry and these were based on projections of what aircraft would be in existence in the period 1952 to 1960 8 Discussions included debate on the aircraft carrier s mission One view was that it would carry a group of large bombers that would be secured to the flight deck with no hangar for these aircraft as they would be too large to move up and down in an elevator 11 Though they would be built to carry large nuclear weapons the total amount of space used for munition storage would be reduced as multiple strikes would not be likely A small hangar deck would be available for a limited fighter escort and a small magazine for a small number of heavy nuclear weapons Another plan was that it could be built with conventional attack capability with a large hangar deck for a large air wing and a large magazine 12 The nuclear attack supporters won in the initial design stage but the design was modified to carry more fighters The flush deck United States was designed to launch and recover the 100 000 pound 45 t aircraft required to carry early model nuclear weapons which weighed as much as five tons 4 The ship would have no permanently raised island or command tower structure 8 It would be equipped with four aircraft elevators located at the deck edges to avoid decreasing the structural strength of the flight deck Four catapults would be used to launch aircraft with two at the bow and two others on the outer edge of the deck staggered back The carrier was designed so that it could land aircraft at the rear while at the same time launching aircraft from the catapults at the bow and forward area simultaneously 13 The construction cost of the new ship was estimated at US 189 million 1 equivalent to US 1 73 billion in 2021 14 Proposed operations editUSS United States was designed with the primary mission of carrying long range bomber aircraft that could carry a heavy enough load to undertake nuclear bombardment missions It would also carry long range escort fighters that would fly along and protect its bombers The ship could also take on other roles such as providing air support for amphibious forces and to conduct sea control operations but it was primarily to be a bomber carrier 15 It was thought it would operate in a task force coupled with traditional attack carriers which would provide the air cover for the task force That mission was virtually certain to make the ship a target of inter service rivalries over missions and funding The United States Air Force viewed United States as a challenge to their monopoly on strategic nuclear weapons delivery 1 Keel laying cancellation edit nbsp Keelplate laidLooking to cut the military budget and accepting without question the Air Force argument on nuclear deterrence by means of large long range bombers Secretary of Defense Louis A Johnson announced the cancellation of United States on 23 April 1949 five days after the ship s keel was laid 3 Secretary of the Navy John Sullivan immediately resigned and Congress held an inquiry into the manner and wisdom of Johnson s decision In the subsequent Revolt of the Admirals the Navy was unable to advance its case that large carriers would be essential to national defense 16 nbsp Commencement of constructionSoon afterward Johnson and Francis P Matthews the man he advanced to be the new Secretary of the Navy set about punishing those officers that let their opposition be known 17 Navy Admiral Louis Denfeld was forced to resign as Chief of Naval Operations and a number of other admirals and lesser ranks were punished The invasion of South Korea six months later resulted in an immediate need for a strong naval presence and Matthews position as Secretary of the Navy and Johnson s position as Secretary of Defense crumbled both ultimately resigning The Navy soon found a means to carry nuclear weapons at sea placed aboard the aircraft carrier USS Franklin D Roosevelt in 1950 4 Thus the question of which service would have primary responsibility for strategic nuclear strikes was not answered with Johnson s cancellation of USS United States See also editList of aircraft carriers List of aircraft carriers of the United States Navy Naval aviationCitations edit a b c d e f g h Elward 2011 pp 6 8 a b c d DANFS United States 2016 a b Naval Historical Center 2001 a b c d e f g Pike 2000 a b Polmar 2008 pp 47 474 Friedman 1983 p 230 Cracknell 1972 p 56 The main armor carried on Enterprise is the heavy armored flight deck This was to prove a significant factor in the catastrophic fire and explosions that occurred on Enterprise s flight deck in 1969 The US Navy learned its lesson the hard way during World War II when all its carriers had only armored hangar decks All attack carriers built since the Midway class have had armored flight decks a b c d Friedman 1983 p 244 Friedman 1983 pp 241 243 Friedman 1984 p 340 Friedman 1983 p 241 Gustafson 1949 p 115 Friedman 1983 p 188 Johnston Louis Williamson Samuel H 2023 What Was the U S GDP Then MeasuringWorth Retrieved 1 January 2023 United States Gross Domestic Product deflator figures follow the Measuring Worth series Friedman 1983 p 242 Lewis 1998 pp 32 35 McFarland 1980 p 61 Bibliography editCracknell W H 1972 USSEnterprise CVAN 65 Nuclear Attack Carrier Warship Profile Vol 15 Profile Publications Elward Brad 2011 Nimitz Class Aircraft Carriers Osprey Publishing pp 6 8 ISBN 978 1 84908 971 5 Friedman Norman 1983 U S Aircraft Carriers An Illustrated Design History Annapolis Maryland Naval Institute Press ISBN 978 0 87021 739 5 Friedman Norman 1984 U S Cruisers an illustrated design history Annapolis MD Naval Institute Press ISBN 0 87021 718 6 OCLC 10949320 Gustafson Phil January 1949 Why the Navy Wants Supercarriers Popular Science pp 114 120 Lewis Andrew L April 1998 The Revolt of the Admirals Thesis Air Command and Staff College Maxwell Air Force Base via Federation of American Scientists McFarland Keith 1980 The 1949 Revolt of the Admirals PDF Parameters Journal of the U S Army War College Quarterly U S Army War College XI 2 53 63 Retrieved 28 April 2014 Naval Historical Center 8 September 2001 USS United States CVA 58 Online Library of Selected Images U S Navy Ships U S Navy Naval Historical Command Archived from the original on 7 August 2021 Retrieved 16 August 2021 via HyperWar Foundation Pike John 3 January 2000 CVA 58 United States FAS Military Analysis Network Federation of American Scientists Retrieved 16 August 2021 Polmar Norman 2008 Aircraft Carriers A History of Carrier Aviation and Its Influence on World Events Vol II 1946 2006 Dulles Virginia Potomac Books ISBN 978 157488 665 8 United States frigate 1797 1865 Dictionary of American Naval Fighting Ships Navy Department Naval History and Heritage Command 22 February 2016 Retrieved 16 August 2021 Further reading edit nbsp Wikimedia Commons has media related to USS United States CVA 58 Zichek Jared A 2009 The Incredible Attack Aircraft of the USSUnited States 1948 1949 Atglen Pennsylvania Schiffer Publishing ISBN 978 0 7643 3229 6 Retrieved from https en wikipedia org w index php title USS United States CVA 58 amp oldid 1171115411, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.