fbpx
Wikipedia

Taman Perindustrian Puchong LRT station

3°1′22.3″N 101°36′48.6″E / 3.022861°N 101.613500°E / 3.022861; 101.613500

 SP26  Taman Perindustrian Puchong
| LRT station
General information
LocationDamansara–Puchong Expressway
Taman Perindustrian Puchong
47100 Puchong, Selangor
Malaysia
Owned byPrasarana Malaysia; operated by Rapid Rail.
Line(s)4 Sri Petaling Line
Platforms2 side platforms
Tracks2
Construction
Structure typeElevated
ParkingAvailable with payment. 347 total parking bays.[1]
Bicycle facilitiesAvailable, 20 bicycle racks.[2]
Other information
Station code SP26 
History
Opened31 March 2016
Services
Preceding station Following station
Pusat Bandar Puchong
towards Sentul Timur
Sri Petaling Line Bandar Puteri

Taman Perindustrian Puchong LRT station (abbreviate as TPP LRT Station) is a Light Rapid Transit station at Puchong Industrial Park, in Puchong, Selangor, Malaysia. It is part of the Sri Petaling Line, which is situated between Bandar Puteri station and Pusat Bandar Puchong station.[3] Like most other LRT stations operating in Klang Valley, this station is elevated.

The station is situated beside Rakan Muda Complex, with 1M4U sentral situated in it.[4][5] A pedestrian bridge over Damansara-Puchong Expressway connects the station to the shopping area in Bandar Puteri Puchong.

This station probably holds the distinction for having the longest station name with 25 character among all rapid transit stations in the Kuala Lumpur rapid transit network.

History edit

 
Station platform

The extension of Sri Petaling Line was announced on 29 August 2006 by then Malaysian Deputy Prime Minister Mohd Najib Abdul Razak.[6] Then Prime Minister of Malaysia Tun Abdullah Badawi also confirm that the government was considering and researching the possibilities of the extension in his National Budget speech in 2006.[7] The station was originally planned to be built near the Puchong Fire and Rescue Station on the east side of LDP, however the current side was approved by the municipal in 2009.

The extension project, worth RM955.84 million,[8] was awarded to a joint venture (JV) consortium of George Kent (M) Bhd and its partner Lion Pacific Sdn Bhd.[9] Construction started in 2010.[10] However, construction was halted when SJK (T) Castlefield, a tamil school which is in the way of the project, refused to be reallocate to the proposed site.[11] The proposed site had caused disputes when another school, SJK (C) Kheng Cheng, was also planned to be built on the same site.[12][13] After some negotiation and interference of the local MPs, the school remains at its original site with the elevated railway using just 0.7 acres of school ground.[14]

Fault free test runs of the trains started on 22 January 2016.[15] Although it faced some delays,[16] the station was opened on 31 March 2016, as a part of the second phase of the extension.[17]

Station edit

Station Layout edit

Park-and-ride facilities are provided in the station with 347 parking bays built next to the station.[18] Two convenience store, operated by Mynews.com and 7-Eleven, can be found in the station.[19] Like all LRT station in Klang Valley, the station provides disabled-friendly facilities such as accessibility lifts, accessible toilets, special gate entrance for wheelchair users and tactile paving provided throughout the station. The trains and station platforms are level with one another, with a minimal gap between the two. This allows for easy boarding with a wheelchair.[20]

P Side platform, doors will open on the left  
Platform 1[a] 4 Sri Petaling towards Sentul Timur (Pusat Bandar Puchong)
Platform 2[b] 4 Sri Petaling towards Putra Heights (Bandar Puteri)
Side platform, doors will open on the left  
C Concourse level Ticket vending machine, faregates, convenience store, customer service office, pedestrian bridge  
G Street level Park N' Ride, bus stop, bus information kiosk, convenience store  
  refers to accessibility lift for disabled.

Infrastructure edit

As part of a green initiative launched by Prasarana, the station includes green practices. Energy-efficient lights and rainwater harvesting systems were installed in every station. Windows were designed to allow sunlight into the stations. Construction utilized sustainable materials and recycling practices.[21]

Entrances and Exits edit

Taman Perindustrian Puchong LRT station has a total of two entrances/exits, one heading towards the industrial area and the Park N' Ride facilities, while another leads to the shopping district of Bandar Puteri.

 SP26  Taman Perindustrian Puchong LRT station
Entrance Location Destination Picture
A Jalan TPP 1/7 Taman Perindustrian Puchong  
B Jalan Puteri 4/2 Jalan Puteri shop lots  

Bus services edit

Feeder bus edit

Route No. Origin Destination Via
T604[22]  SP26  Taman Perindustrian Puchong LRT station  SP25  Pusat Bandar Puchong LRT station Jalan Sri Puchong 1,

Jalan Bandar 7,

Damansara-Puchong Expressway,

Jalan Bandar Puchong Jaya,

Jalan Puchong

Other buses edit

Route No. Origin Destination Via
506[23] Putrajaya Sentral Bandar Utama Central Park Avenue,

Jalan Burhanuddin al-Helmi,

Damansara-Puchong Expressway,

Persiaran Bandar Utama,

Dataran Bandar Utama

600[24] Puchong Utama Pasar Seni Jalan Tun Sambanthan,

Jalan Klang Lama,

Jalan Puchong,

Damansara-Puchong Expressway

601[25] Pasar Seni Putra Perdana Jalan Tun Sambanthan,

Jalan Klang Lama,

Lebuh Puteri,

Jalan Puchong,

Damansara-Puchong Expressway,

Bulatan Putra Perdana

604[26] Pasar Seni Saujana Puchong Jalan Tun Sambanthan,

Jalan Klang Lama,

Lebuh Puteri,

Jalan Puchong,

Damansara-Puchong Expressway,

Persiaran Saujana Puchong,

Jalan Bukit Puchong

Gallery edit

Notes edit

  1. ^ Northbound Sri Petaling LRT Line
  2. ^ Northbound Sri Petaling LRT Line

References edit

  1. ^ "Park N' Ride - Travelling with Us". myrapid.com.my. MyRapid. Retrieved 2 July 2020.
  2. ^ "Bike N' Ride - Travelling with Us". myrapid.com.my. MyRapid. Retrieved 2 July 2020.
  3. ^ "Monorail and LRTs - Rapid KL | MyRapid Your Public Transport Portal". www.myrapid.com.my. Retrieved 2020-07-02.
  4. ^ "iM4U Sentral to be youth development hub". www.thesundaily.my. Retrieved 2020-07-02.
  5. ^ Idris, Oleh Rohaniza (2016-04-09). "PM lancar iM4U Sentral". BH Online (in Malay). Retrieved 2020-07-02.
  6. ^ Muhammad Farhan bin Mohd Arif (July 2017). A STUDY ON RIDERSHIP CAPACITY ANALYSIS AT RAPID KELANA JAYA LINE STATION (PDF) (Report). Faculty of Engineering Technology, Universiti Tun Hussein Onn Malaysia. p. 23,24. Retrieved 26 June 2020.
  7. ^ Haji Ahmad Badawi, Abdullah. UCAPAN BAJET TAHUN 2006 (PDF) (Speech) (in Malay). Retrieved 26 June 2020.
  8. ^ "George Kent's LRT line extension project worth RM955.84m". The Edge Markets. 2012-08-01. Retrieved 2020-06-25.
  9. ^ . 2017-09-12. Archived from the original on 2017-09-12. Retrieved 2020-06-25.
  10. ^ "LRT Line Extension Project". Railway Technology. Retrieved 2020-06-26.
  11. ^ "Sekolah Tamil penyebab LRT Puchong tertangguh". Malaysiakini (in Malay). 2013-12-03. Retrieved 2020-07-02.
  12. ^ "一块校地2校争.郭素沁:淡小先申请.竞智应让步". www.sinchew.com.my (in Chinese). Retrieved 2020-07-02.
  13. ^ "淡小董事:华裔人口集中.建议竞智申请第4区校地". www.sinchew.com.my (in Chinese). Retrieved 2020-07-02.
  14. ^ "国家基建澄清Castlefield横幅."轻快铁可与淡小'共存'"". www.sinchew.com.my (in Chinese). Retrieved 2020-07-02.
  15. ^ "Tests on LRV fault free runs in Kinrara start today | The Star". www.thestar.com.my. Retrieved 2020-06-28.
  16. ^ "Delay in Kelana Jaya-Ampang LRT line extension". The Edge Markets. 2013-09-30. Retrieved 2020-06-25.
  17. ^ "Another four LRT stations in Puchong to open next week | The Star". www.thestar.com.my. Retrieved 2020-06-28.
  18. ^ myMetro (2016-03-29). "4 stesen LRT baru tarik ramai penumpang". HM Online (in Malay). Retrieved 2020-06-28.
  19. ^ "myNEWS.com". www.facebook.com. Retrieved 2020-07-02.
  20. ^ "Kuala Lumpur Public Transportation". Wheelchair Travel. Retrieved 2020-06-28.
  21. ^ "Extension of Ampang and Kelana Jaya lines proceeding smoothly | The Star". www.thestar.com.my. Retrieved 2020-06-27.
  22. ^ "Number - Bus | MyRapid Your Public Transport Portal". www.myrapid.com.my. Retrieved 2020-07-06.
  23. ^ "Number - Bus | MyRapid Your Public Transport Portal". www.myrapid.com.my. Retrieved 2020-07-06.
  24. ^ "Number - Bus | MyRapid Your Public Transport Portal". www.myrapid.com.my. Retrieved 2020-07-06.
  25. ^ "Malaysia online express bus ticketing in Johor Bahru and Singapore|causewaylink express". www.causewaylink.com.my. Retrieved 2020-07-06.
  26. ^ "Malaysia online express bus ticketing in Johor Bahru and Singapore|causewaylink express". www.causewaylink.com.my. Retrieved 2020-07-06.

External links edit

  • Taman Perindustrian Puchong LRT Station - KL MRT Line Integrations

taman, perindustrian, puchong, station, 022861, 613500, 022861, 613500, sp26, taman, perindustrian, puchong, stationgeneral, informationlocationdamansara, puchong, expressway, taman, perindustrian, puchong, 47100, puchong, selangormalaysiaowned, byprasarana, m. 3 1 22 3 N 101 36 48 6 E 3 022861 N 101 613500 E 3 022861 101 613500 SP26 Taman Perindustrian Puchong LRT stationGeneral informationLocationDamansara Puchong Expressway Taman Perindustrian Puchong 47100 Puchong SelangorMalaysiaOwned byPrasarana Malaysia operated by Rapid Rail Line s 4 Sri Petaling LinePlatforms2 side platformsTracks2ConstructionStructure typeElevatedParkingAvailable with payment 347 total parking bays 1 Bicycle facilitiesAvailable 20 bicycle racks 2 Other informationStation code SP26 HistoryOpened31 March 2016ServicesPreceding station Following station Pusat Bandar Puchongtowards Sentul Timur Sri Petaling Line Bandar Puteritowards Putra Heights Taman Perindustrian Puchong LRT station abbreviate as TPP LRT Station is a Light Rapid Transit station at Puchong Industrial Park in Puchong Selangor Malaysia It is part of the Sri Petaling Line which is situated between Bandar Puteri station and Pusat Bandar Puchong station 3 Like most other LRT stations operating in Klang Valley this station is elevated The station is situated beside Rakan Muda Complex with 1M4U sentral situated in it 4 5 A pedestrian bridge over Damansara Puchong Expressway connects the station to the shopping area in Bandar Puteri Puchong This station probably holds the distinction for having the longest station name with 25 character among all rapid transit stations in the Kuala Lumpur rapid transit network Contents 1 History 2 Station 2 1 Station Layout 2 2 Infrastructure 2 3 Entrances and Exits 3 Bus services 3 1 Feeder bus 3 2 Other buses 4 Gallery 5 Notes 6 References 7 External linksHistory edit nbsp Station platform The extension of Sri Petaling Line was announced on 29 August 2006 by then Malaysian Deputy Prime Minister Mohd Najib Abdul Razak 6 Then Prime Minister of Malaysia Tun Abdullah Badawi also confirm that the government was considering and researching the possibilities of the extension in his National Budget speech in 2006 7 The station was originally planned to be built near the Puchong Fire and Rescue Station on the east side of LDP however the current side was approved by the municipal in 2009 The extension project worth RM955 84 million 8 was awarded to a joint venture JV consortium of George Kent M Bhd and its partner Lion Pacific Sdn Bhd 9 Construction started in 2010 10 However construction was halted when SJK T Castlefield a tamil school which is in the way of the project refused to be reallocate to the proposed site 11 The proposed site had caused disputes when another school SJK C Kheng Cheng was also planned to be built on the same site 12 13 After some negotiation and interference of the local MPs the school remains at its original site with the elevated railway using just 0 7 acres of school ground 14 Fault free test runs of the trains started on 22 January 2016 15 Although it faced some delays 16 the station was opened on 31 March 2016 as a part of the second phase of the extension 17 Station editStation Layout edit Park and ride facilities are provided in the station with 347 parking bays built next to the station 18 Two convenience store operated by Mynews com and 7 Eleven can be found in the station 19 Like all LRT station in Klang Valley the station provides disabled friendly facilities such as accessibility lifts accessible toilets special gate entrance for wheelchair users and tactile paving provided throughout the station The trains and station platforms are level with one another with a minimal gap between the two This allows for easy boarding with a wheelchair 20 P Side platform doors will open on the left nbsp Platform 1 a 4 Sri Petaling towards Sentul Timur Pusat Bandar Puchong Platform 2 b 4 Sri Petaling towards Putra Heights Bandar Puteri Side platform doors will open on the left nbsp C Concourse level Ticket vending machine faregates convenience store customer service office pedestrian bridge nbsp G Street level Park N Ride bus stop bus information kiosk convenience store nbsp nbsp refers to accessibility lift for disabled Infrastructure edit As part of a green initiative launched by Prasarana the station includes green practices Energy efficient lights and rainwater harvesting systems were installed in every station Windows were designed to allow sunlight into the stations Construction utilized sustainable materials and recycling practices 21 Entrances and Exits edit Taman Perindustrian Puchong LRT station has a total of two entrances exits one heading towards the industrial area and the Park N Ride facilities while another leads to the shopping district of Bandar Puteri SP26 Taman Perindustrian Puchong LRT station Entrance Location Destination Picture A Jalan TPP 1 7 Taman Perindustrian Puchong nbsp B Jalan Puteri 4 2 Jalan Puteri shop lots nbsp Bus services editFeeder bus edit Route No Origin Destination Via T604 22 SP26 Taman Perindustrian Puchong LRT station SP25 Pusat Bandar Puchong LRT station Jalan Sri Puchong 1 Jalan Bandar 7 Damansara Puchong Expressway Jalan Bandar Puchong Jaya Jalan Puchong Other buses edit Route No Origin Destination Via 506 23 Putrajaya Sentral Bandar Utama Central Park Avenue Jalan Burhanuddin al Helmi Damansara Puchong Expressway Persiaran Bandar Utama Dataran Bandar Utama 600 24 Puchong Utama Pasar Seni Jalan Tun Sambanthan Jalan Klang Lama Jalan Puchong Damansara Puchong Expressway 601 25 Pasar Seni Putra Perdana Jalan Tun Sambanthan Jalan Klang Lama Lebuh Puteri Jalan Puchong Damansara Puchong Expressway Bulatan Putra Perdana 604 26 Pasar Seni Saujana Puchong Jalan Tun Sambanthan Jalan Klang Lama Lebuh Puteri Jalan Puchong Damansara Puchong Expressway Persiaran Saujana Puchong Jalan Bukit PuchongGallery edit nbsp Station sign entrance from Damansara Puchong Expressway LDP nbsp Station outview from LDP Northbound nbsp Station outview from LDP Southbound Notes edit Northbound Sri Petaling LRT Line Northbound Sri Petaling LRT LineReferences edit Park N Ride Travelling with Us myrapid com my MyRapid Retrieved 2 July 2020 Bike N Ride Travelling with Us myrapid com my MyRapid Retrieved 2 July 2020 Monorail and LRTs Rapid KL MyRapid Your Public Transport Portal www myrapid com my Retrieved 2020 07 02 iM4U Sentral to be youth development hub www thesundaily my Retrieved 2020 07 02 Idris Oleh Rohaniza 2016 04 09 PM lancar iM4U Sentral BH Online in Malay Retrieved 2020 07 02 Muhammad Farhan bin Mohd Arif July 2017 A STUDY ON RIDERSHIP CAPACITY ANALYSIS AT RAPID KELANA JAYA LINE STATION PDF Report Faculty of Engineering Technology Universiti Tun Hussein Onn Malaysia p 23 24 Retrieved 26 June 2020 Haji Ahmad Badawi Abdullah UCAPAN BAJET TAHUN 2006 PDF Speech in Malay Retrieved 26 June 2020 George Kent s LRT line extension project worth RM955 84m The Edge Markets 2012 08 01 Retrieved 2020 06 25 George Kent Lion Pacific JV gets Ampang Line extension job 2017 09 12 Archived from the original on 2017 09 12 Retrieved 2020 06 25 LRT Line Extension Project Railway Technology Retrieved 2020 06 26 Sekolah Tamil penyebab LRT Puchong tertangguh Malaysiakini in Malay 2013 12 03 Retrieved 2020 07 02 一块校地2校争 郭素沁 淡小先申请 竞智应让步 www sinchew com my in Chinese Retrieved 2020 07 02 淡小董事 华裔人口集中 建议竞智申请第4区校地 www sinchew com my in Chinese Retrieved 2020 07 02 国家基建澄清Castlefield横幅 轻快铁可与淡小 共存 www sinchew com my in Chinese Retrieved 2020 07 02 Tests on LRV fault free runs in Kinrara start today The Star www thestar com my Retrieved 2020 06 28 Delay in Kelana Jaya Ampang LRT line extension The Edge Markets 2013 09 30 Retrieved 2020 06 25 Another four LRT stations in Puchong to open next week The Star www thestar com my Retrieved 2020 06 28 myMetro 2016 03 29 4 stesen LRT baru tarik ramai penumpang HM Online in Malay Retrieved 2020 06 28 myNEWS com www facebook com Retrieved 2020 07 02 Kuala Lumpur Public Transportation Wheelchair Travel Retrieved 2020 06 28 Extension of Ampang and Kelana Jaya lines proceeding smoothly The Star www thestar com my Retrieved 2020 06 27 Number Bus MyRapid Your Public Transport Portal www myrapid com my Retrieved 2020 07 06 Number Bus MyRapid Your Public Transport Portal www myrapid com my Retrieved 2020 07 06 Number Bus MyRapid Your Public Transport Portal www myrapid com my Retrieved 2020 07 06 Malaysia online express bus ticketing in Johor Bahru and Singapore causewaylink express www causewaylink com my Retrieved 2020 07 06 Malaysia online express bus ticketing in Johor Bahru and Singapore causewaylink express www causewaylink com my Retrieved 2020 07 06 External links editTaman Perindustrian Puchong LRT Station KL MRT Line Integrations Retrieved from https en wikipedia org w index php title Taman Perindustrian Puchong LRT station amp oldid 1191229459, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.