Sriram Sagar Project

The Sriram Sagar Project is also known as the Pochampadu Project is an Indian flood-flow project on the Godavari. The Project is located in Nizamabad district, 3 km away from National Highway 44. It has been described by The Hindu as a "lifeline for a large part of Telangana".[2]

Sriram Sagar Project
Sriram Sagar Dam (Pochampadu Dam)
Location of Sriram Sagar Project in Telangana
Sriram Sagar Project (India)
LocationNizamabad, Telangana, India
Coordinates18°58′03″N 78°20′35″E / 18.96750°N 78.34306°E / 18.96750; 78.34306
Construction began1963
Opening date1977; 46 years ago (1977)
Dam and spillways
ImpoundsGodavari River
Height43 metres (141 ft) from river level
Length15,600 metres (51,181 ft)
Reservoir
Total capacity3,172,000,000 m3 (2,571,582 acre⋅ft) (112.02 tmcft)
Active capacity2,322,000,000 m3 (1,882,476 acre⋅ft) (81.95 tmcft)[1]
Surface area451 km2 (174 sq mi)

Sriramsagar is an irrigation project across river Godavari in Telangana to serve irrigational needs in Karimnagar, Warangal, Adilabad, Nizamabad, and Khammam districts. It also provides drinking water to Warangal city. There is a hydroelectric plant working at the dam site, with 4 turbines each with 9 MW capacity generating 36 MW.

History Edit

Irrigation in drought prone Telangana State has existed for a few hundred years in small areas served by locally constructed village tanks. from 1942 to 1951, the erst while Government of Hyderabad submitted a scheme to Government of India, Planning Commission with a dam Proposal at Pochampadu village on river Godavari and Dams on its tributaries namely the Kaddam and Manair Rivers. The Pochampadu site was located 54.50 km below the entry point of Godavari River into AP Territory ( now Telangana). The Project was further revised in the year 1958. The foundation was laid on 26 July 1963 by the late Jawaharlal Nehru, first Prime Minister of India. The Pochampadu Project was cleared by the planning commission and Central Water Commission, vide Lr. No. NPII-2(13)/1964, I&P Dt: 07.08.1964 for the construction of reservoir across Godavari River, Pochampadu Village Adilabad. which is about 5 km upstream of Soan Bridge on Hyderabad- Nagpur National highway No 7 to irrigate 5.7 Lakh Acres up to Manair valley under right bank canal named as Kakatiya Canal. The Administrative sanction for the Pochamopadu was accorded by the Government of Andhra Pradesh vide G.O. Ms. No 361 ( PWD Irrigation Project wing) Dt 27.11.1964 for Rs, 40.10 Crores with SSR 1963–64. Water was first impounded & released in July 1970 & in July 1973 into Kakatiya Main Canal up to 36 km & 68 km creating an Irrigation potential of 25000 acres and 58000 acres respectively. The Pochampadu project was renamed as Sriramasagar Project, vide G.O.Ms. No. 355 Irrigation & Power ( Projects wing) Dept., Dt 20.11.1978. The Reservoir was first filled to its fillcapacity i.e. (+)1091 ft in the year 1983.The engineers responsible for the construction were wide, among them was Mohammed Moin Ahmed (R&b) Nizamabad later in the 1980s.

The project Edit

Sriram Sagar Reservoir's capacity is 90 tmcft and it has 42 floodgates.[3] It also includes Kakatiya Canal covering 346 km, Laxmi Canal, Sarswati Canal, and Flood flow canal. Construction of this dam was started in 1957. Most of the catchment area upstream of this dam is located in Maharashtra.

This project is also locally known as Khustapuram dam. The Khustapuram project proposal was first mooted/investigated by erstwhile Hyderabad state under Nizam rule to utilize 227 tmcft of upper Godavari river water. This dam site is located in the Nizamabad district of Telangana State after the confluence of Manjira river with Godavari. Under stage I of this project nearly 1 million acres (400,000 ha) irrigation facility is created to utilize 140 tmc water. Stage II of this project is under advanced stage of construction to irrigate 440,000 acres (180,000 ha) using 25 tmc water. The flood flow canal project is also under implementation to irrigate 200,000 acres (81,000 ha) using 20 tmcft water available at Pochampadu dam site. The live storage capacity of SS dam is limited to 90 tmcft to reduce submergence area in Maharashtra up to FRL level 1,091 feet (333 m) above mean sea level as per the agreement between Maharashtra & Telangana.

Interstate dispute Edit

In the catchment area[4] of this dam, Maharashtra has constructed many medium and minor irrigation projects[5][6] in excess of its water use entitlements under Godavari Water Disputes Tribunal ( GWDT ).[7] In last nine years, the dependable water availability has reduced to 33% (i.e. adequate water is available once in three years) against the designed dependability of 75% under GWDT. This major irrigation project[8] has become many years unproductive / idle in the last decade. Due to complete utilization of river water in the upstream river basin area, the water quality in the reservoir has high alkalinity and salinity which is unsafe for human and cattle consumption. Also the ground water in the lower reaches of Pochampadu dam catchment area would gradually turn unsuitable for irrigation and human consumption.

Supreme court verdict (section 83 ii b) on Babli Project dispute stipulated that the gates of Babhali barrage remain lifted during the monsoon season, i.e., 1 July to 28 October and there is no obstruction to the natural flow of Godavari river during monsoon season below the three dams (Paithan, Siddheshwar & Nizamsagar dams) mentioned in Clause II (i) of the GWDT agreement dated 06.10.1975 towards Pochampad dam.[9] Thus Pochampadu reservoir is accorded first priority over any other reservoir (major, medium, minor, barrage, etc.) to receive the water generated from the Godavari basin area located below these three dams. As stipulated by Supreme court, central government has set up monitoring committee to implement / supervise the water sharing as per agreement dated 06.10.1975 and supreme court verdict.[10]

 
Panoramic View

See also Edit

References Edit

  1. ^ (PDF). Central Water Commission. Archived from the original (PDF) on 20 August 2014. Retrieved 26 August 2014.
  2. ^ . The Hindu, 16 May 2005
  3. ^ "Sriram Sagar(Srsp)/ Pochampad Dam D00921". Retrieved 26 August 2015.
  4. ^ (PDF). Archived from the original (PDF) on 12 October 2013. Retrieved 22 September 2012.
  5. ^ "Barrages built on Marathwada rivers hold 11.3 TMC water". The Times of India. 8 December 2019. Retrieved 10 December 2019.
  6. ^ "Dams & barrages location map in India". Retrieved 14 December 2012.
  7. ^ "Highest no. of small & medium projects, but lowest water stock in Marathwada region". The Times of India. 18 June 2015. Retrieved 20 June 2015.
  8. ^ "Godavari river water sharing accord". Scribd.com. 6 October 1975. Retrieved 22 September 2012.
  9. ^ "Supreme Court verdict on Babhali project dispute". February 2013. Retrieved 21 March 2013.
  10. ^ Kumar, U Anand (18 October 2013). "Centre sets up panel on Babli". The New Indian Express. Retrieved 22 July 2018.

External links Edit

  • Supreme Court verdict on Babhali project dispute

sriram, sagar, project, also, known, pochampadu, project, indian, flood, flow, project, godavari, project, located, nizamabad, district, away, from, national, highway, been, described, hindu, lifeline, large, part, telangana, sriram, sagar, pochampadu, locatio. The Sriram Sagar Project is also known as the Pochampadu Project is an Indian flood flow project on the Godavari The Project is located in Nizamabad district 3 km away from National Highway 44 It has been described by The Hindu as a lifeline for a large part of Telangana 2 Sriram Sagar ProjectSriram Sagar Dam Pochampadu Dam Location of Sriram Sagar Project in TelanganaShow map of TelanganaSriram Sagar Project India Show map of IndiaLocationNizamabad Telangana IndiaCoordinates18 58 03 N 78 20 35 E 18 96750 N 78 34306 E 18 96750 78 34306Construction began1963Opening date1977 46 years ago 1977 Dam and spillwaysImpoundsGodavari RiverHeight43 metres 141 ft from river levelLength15 600 metres 51 181 ft ReservoirTotal capacity3 172 000 000 m3 2 571 582 acre ft 112 02 tmcft Active capacity2 322 000 000 m3 1 882 476 acre ft 81 95 tmcft 1 Surface area451 km2 174 sq mi Sriramsagar is an irrigation project across river Godavari in Telangana to serve irrigational needs in Karimnagar Warangal Adilabad Nizamabad and Khammam districts It also provides drinking water to Warangal city There is a hydroelectric plant working at the dam site with 4 turbines each with 9 MW capacity generating 36 MW Contents 1 History 2 The project 3 Interstate dispute 4 See also 5 References 6 External linksHistory EditIrrigation in drought prone Telangana State has existed for a few hundred years in small areas served by locally constructed village tanks from 1942 to 1951 the erst while Government of Hyderabad submitted a scheme to Government of India Planning Commission with a dam Proposal at Pochampadu village on river Godavari and Dams on its tributaries namely the Kaddam and Manair Rivers The Pochampadu site was located 54 50 km below the entry point of Godavari River into AP Territory now Telangana The Project was further revised in the year 1958 The foundation was laid on 26 July 1963 by the late Jawaharlal Nehru first Prime Minister of India The Pochampadu Project was cleared by the planning commission and Central Water Commission vide Lr No NPII 2 13 1964 I amp P Dt 07 08 1964 for the construction of reservoir across Godavari River Pochampadu Village Adilabad which is about 5 km upstream of Soan Bridge on Hyderabad Nagpur National highway No 7 to irrigate 5 7 Lakh Acres up to Manair valley under right bank canal named as Kakatiya Canal The Administrative sanction for the Pochamopadu was accorded by the Government of Andhra Pradesh vide G O Ms No 361 PWD Irrigation Project wing Dt 27 11 1964 for Rs 40 10 Crores with SSR 1963 64 Water was first impounded amp released in July 1970 amp in July 1973 into Kakatiya Main Canal up to 36 km amp 68 km creating an Irrigation potential of 25000 acres and 58000 acres respectively The Pochampadu project was renamed as Sriramasagar Project vide G O Ms No 355 Irrigation amp Power Projects wing Dept Dt 20 11 1978 The Reservoir was first filled to its fillcapacity i e 1091 ft in the year 1983 The engineers responsible for the construction were wide among them was Mohammed Moin Ahmed R amp b Nizamabad later in the 1980s The project EditSriram Sagar Reservoir s capacity is 90 tmcft and it has 42 floodgates 3 It also includes Kakatiya Canal covering 346 km Laxmi Canal Sarswati Canal and Flood flow canal Construction of this dam was started in 1957 Most of the catchment area upstream of this dam is located in Maharashtra This project is also locally known as Khustapuram dam The Khustapuram project proposal was first mooted investigated by erstwhile Hyderabad state under Nizam rule to utilize 227 tmcft of upper Godavari river water This dam site is located in the Nizamabad district of Telangana State after the confluence of Manjira river with Godavari Under stage I of this project nearly 1 million acres 400 000 ha irrigation facility is created to utilize 140 tmc water Stage II of this project is under advanced stage of construction to irrigate 440 000 acres 180 000 ha using 25 tmc water The flood flow canal project is also under implementation to irrigate 200 000 acres 81 000 ha using 20 tmcft water available at Pochampadu dam site The live storage capacity of SS dam is limited to 90 tmcft to reduce submergence area in Maharashtra up to FRL level 1 091 feet 333 m above mean sea level as per the agreement between Maharashtra amp Telangana Interstate dispute EditIn the catchment area 4 of this dam Maharashtra has constructed many medium and minor irrigation projects 5 6 in excess of its water use entitlements under Godavari Water Disputes Tribunal GWDT 7 In last nine years the dependable water availability has reduced to 33 i e adequate water is available once in three years against the designed dependability of 75 under GWDT This major irrigation project 8 has become many years unproductive idle in the last decade Due to complete utilization of river water in the upstream river basin area the water quality in the reservoir has high alkalinity and salinity which is unsafe for human and cattle consumption Also the ground water in the lower reaches of Pochampadu dam catchment area would gradually turn unsuitable for irrigation and human consumption Supreme court verdict section 83 ii b on Babli Project dispute stipulated that the gates of Babhali barrage remain lifted during the monsoon season i e 1 July to 28 October and there is no obstruction to the natural flow of Godavari river during monsoon season below the three dams Paithan Siddheshwar amp Nizamsagar dams mentioned in Clause II i of the GWDT agreement dated 06 10 1975 towards Pochampad dam 9 Thus Pochampadu reservoir is accorded first priority over any other reservoir major medium minor barrage etc to receive the water generated from the Godavari basin area located below these three dams As stipulated by Supreme court central government has set up monitoring committee to implement supervise the water sharing as per agreement dated 06 10 1975 and supreme court verdict 10 nbsp Panoramic ViewSee also EditGodavari River Basin Irrigation Projects Pranahita Chevella lift irrigation scheme Interstate River Water Disputes Act Babli Project Alisagar lift irrigation scheme Krishna Water Disputes Tribunal Nizamsagar Icchampally ProjectReferences Edit India National Register of Large Dams 2012 PDF Central Water Commission Archived from the original PDF on 20 August 2014 Retrieved 26 August 2014 Maharashtra projects hit Sriram Sagar project inflows BJP The Hindu 16 May 2005 Sriram Sagar Srsp Pochampad Dam D00921 Retrieved 26 August 2015 Godavari river basin map PDF Archived from the original PDF on 12 October 2013 Retrieved 22 September 2012 Barrages built on Marathwada rivers hold 11 3 TMC water The Times of India 8 December 2019 Retrieved 10 December 2019 Dams amp barrages location map in India Retrieved 14 December 2012 Highest no of small amp medium projects but lowest water stock in Marathwada region The Times of India 18 June 2015 Retrieved 20 June 2015 Godavari river water sharing accord Scribd com 6 October 1975 Retrieved 22 September 2012 Supreme Court verdict on Babhali project dispute February 2013 Retrieved 21 March 2013 Kumar U Anand 18 October 2013 Centre sets up panel on Babli The New Indian Express Retrieved 22 July 2018 External links EditSupreme Court verdict on Babhali project dispute Retrieved from https en wikipedia org w index php title Sriram Sagar Project amp oldid 1177724846, wikipedia, wiki, book, books, library,