fbpx
Wikipedia

Shahid Abbaspour Dam

The Shahid Abbaspour Dam (Persian: سد شهید عباسپور), formerly known as Great Reza Shah Kabir Dam (Persian: سد رضاشاه کبیر) before the 1979 Revolution, is a large arch dam providing hydroelectricity from the Karun River; it is located about 50 kilometres (31 mi) northeast of Masjed Soleiman, in the province of Khuzestan, Iran, and originally completed in 1976.[2] The dam was the first of a series of dams planned for development on the Karun River.[3]

Shahid Abbaspour Dam
(Karun-1 Dam)
LocationKhuzestan, Iran
Coordinates32°07′00″N 49°37′00″E / 32.11667°N 49.61667°E / 32.11667; 49.61667
StatusOperational
Opening date1976
Owner(s)Water and Power Organization of Khuzestan
Operator(s)IWPRDC
Dam and spillways
Type of damArch dam
ImpoundsKarun River
Height200 m (660 ft)
Length380 m (1,250 ft)
Reservoir
Total capacity3.139 km3 (2,545,000 acre⋅ft)
Surface area54.8 km2 (21.2 sq mi)
Power Station
Commission date1976 - 2006[1]
Turbines8 × 250 MW (340,000 hp) Francis-type
Installed capacity2,000 MW (2,700,000 hp)
Website
https://kwpa.ir/

The dam is a double-curvature concrete arch dam, 200 metres (660 ft) high from the foundation rock. Its crest width is 6 metres (20 ft).[4] The arch dam design was chosen for the narrow, rocky gorge where it is located. The double-curvature arch design withstands the pressure created by the reservoir with a minimum of concrete, because the shape transmits the force of the reservoir downward and laterally, against the rock foundation; this has the effect of strengthening the dam concrete and its foundation by keeping it in compression.[5]

The dam site houses two power stations, one built in 1976 and another built in 1995. Each contains four water turbines connected to electric generators of 250 megawatts (340,000 hp), for a combined generating capacity of 2,000 megawatts (2,700,000 hp). The dam's electrical output is connected to the national electrical grid, with most generation occurring during periods of peak demand for electricity.

See also edit

References edit

  1. ^ "Hydroelectric Power Plants in Iran". IndustCards. Archived from the original on 8 September 2012. Retrieved 21 February 2013.
  2. ^ Peter Beaumont, Water Resource Development in Iran, in The Geographical Journal, Vol. 140, No. 3 (Oct., 1974), pp. 418-431
  3. ^ P.T. Shourijed, A Soroush, N. Nemati, A.H Izad-doustdar, Karun River hydropower cascade development and its socio- environmental impacts in L. Berga, et al. (eds), Dams and Reservoirs, Societies and Environment in the 21st Century ..., Volume 1, (2006)
  4. ^ Iran Ministry of Energy News 2008-12-26 at the Wayback Machine
  5. ^ "Dam basics". PBS. Retrieved 2008-06-11.

External links edit

shahid, abbaspour, persian, سد, شهید, عباسپور, formerly, known, great, reza, shah, kabir, persian, سد, رضاشاه, کبیر, before, 1979, revolution, large, arch, providing, hydroelectricity, from, karun, river, located, about, kilometres, northeast, masjed, soleiman. The Shahid Abbaspour Dam Persian سد شهید عباسپور formerly known as Great Reza Shah Kabir Dam Persian سد رضاشاه کبیر before the 1979 Revolution is a large arch dam providing hydroelectricity from the Karun River it is located about 50 kilometres 31 mi northeast of Masjed Soleiman in the province of Khuzestan Iran and originally completed in 1976 2 The dam was the first of a series of dams planned for development on the Karun River 3 Shahid Abbaspour Dam Karun 1 Dam LocationKhuzestan IranCoordinates32 07 00 N 49 37 00 E 32 11667 N 49 61667 E 32 11667 49 61667StatusOperationalOpening date1976Owner s Water and Power Organization of KhuzestanOperator s IWPRDCDam and spillwaysType of damArch damImpoundsKarun RiverHeight200 m 660 ft Length380 m 1 250 ft ReservoirTotal capacity3 139 km3 2 545 000 acre ft Surface area54 8 km2 21 2 sq mi Power StationCommission date1976 2006 1 Turbines8 250 MW 340 000 hp Francis typeInstalled capacity2 000 MW 2 700 000 hp Websitehttps kwpa ir The dam is a double curvature concrete arch dam 200 metres 660 ft high from the foundation rock Its crest width is 6 metres 20 ft 4 The arch dam design was chosen for the narrow rocky gorge where it is located The double curvature arch design withstands the pressure created by the reservoir with a minimum of concrete because the shape transmits the force of the reservoir downward and laterally against the rock foundation this has the effect of strengthening the dam concrete and its foundation by keeping it in compression 5 The dam site houses two power stations one built in 1976 and another built in 1995 Each contains four water turbines connected to electric generators of 250 megawatts 340 000 hp for a combined generating capacity of 2 000 megawatts 2 700 000 hp The dam s electrical output is connected to the national electrical grid with most generation occurring during periods of peak demand for electricity See also editDams in IranReferences edit Hydroelectric Power Plants in Iran IndustCards Archived from the original on 8 September 2012 Retrieved 21 February 2013 Peter Beaumont Water Resource Development in Iran in The Geographical Journal Vol 140 No 3 Oct 1974 pp 418 431 P T Shourijed A Soroush N Nemati A H Izad doustdar Karun River hydropower cascade development and its socio environmental impacts in L Berga et al eds Dams and Reservoirs Societies and Environment in the 21st Century Volume 1 2006 Iran Ministry of Energy News Archived 2008 12 26 at the Wayback Machine Dam basics PBS Retrieved 2008 06 11 External links edit nbsp Iran portal nbsp Water portal nbsp Renewable energy portal Retrieved from https en wikipedia org w index php title Shahid Abbaspour Dam amp oldid 1191040686, wikipedia, wiki, book, books, library,

article