Sarawak Corridor of Renewable Energy

The Sarawak Corridor of Renewable Energy ("SCORE") is an economic region and development corridor covering central Sarawak, a Malaysian State on the island of Borneo. SCORE was launched in 2008. It is one of the five regional development corridors launched throughout Malaysia during the Abdullah Badawi administration.[1] SCORE is managed by the Regional Corridors Development Authority ("RECODA"), a state government agency created through an Ordinance of the State Legislative Assembly.[2][3]

The logo of SCORE

History

SCORE was launched on 11 February 2008 by the 5th Malaysian Prime Minister, Datuk Seri Abdullah Ahmad Badawi.[4] SCORE was immediately placed under the jurisdiction of Regional Corridors Development Authority (RECODA) where the latter was created under an ordinance passed in the state assembly back in 2006. RECODA must consist of a chairman, two deputy chairmen, and between five and ten other board members. This agency promotes, manages, and oversees the implementation of development projects inside the corridor.[3] SCORE covered an area of 70,000 km2 at the central region of Sarawak, with a coast line of 320 km long; encompassing urban centres such as Sibu, Bintulu, Mukah, Sarikei, Bintulu, Miri, Lawas, Limbang, and Kapit.[2]

Initial plan for SCORE was to construct 12 hydroelectric dams with 7,800 MW of installed capacity, connected to industrial facilities located at the coast of Sarawak, targeting 50 dams with eventual installation capacity of 20,000 MW.[5] Batang Ai Dam was commissioned on 21 August 1985, followed by Bakun Dam in 2014,[6] and Murum Dam in 2015.[7] In November 2015, chief minister Adenan Satem halted the Baram Dam project indefinitely due to persistent protests from the local communities.[8] In 2017, Sarawak acquired Bakun Dam from the Malaysian federal government at a cost of RM 2.5 billion.[9] Baleh Dam started construction in 2020 after completion of river diversions works.[10] The dam is expected to commission in 2026.[11]

Companies given the pioneer status, involving in high tech industries, heavy capital investments, or high research and development activities will enjoy 100% exemption on its statutory income for 5 years.[12]

Targets

The initial aim of setting up SCORE was to develop central region of Sarawak, improving the state's economic growth, thus achieving the national objective of Vision 2020 for becoming a developed state.[2] The development corridor also targets 1.5 million jobs creation by the year 2030.[13] By 2013, the state government has identified SCORE as one of the means to achieve high income and advanced economy by 2030.[14][15] The economic corridor also planned to achieve RM 334 billion (US$110 billion) in total investments, where RM 67 billion (20%) are funded by the government[15] (a mix of investments from government-linked companies, state, and federal funds)[5] and the remaining RM 267 billion (80%) are funded by private sector.[15] Other targets include: increase the size of the economy by a factor of five, increase the number of jobs by a factor of 2.5, and doubling the population to 4.6 million.[5]

It focus on ten priority industries in agriculture, mining, and manufacturing sectors such as aquaculture, livestock rearing, timber, palm oil, petroleum, aluminum, and steel and glass industries.[2] Total investments into these industries are projected to reach RM 200 billion where oil-based industries amount to RM 60 billion, aluminium industry accounted for RM 23 billion, palm oil industry at RM 17 billion, and timber-based industry RM 11 billion.[5] Malaysia failed to achieve developed nation status in the year 2020.[16]

Agencies Under RECODA

 
Source: RECODA

In order to expand the SCORE initiative into rural Sarawak, three agencies under RECODA were established. This initiative expanded the SCORE development area from initial 70,000 km2 to 100,000 km2, which is about two-thirds of Sarawak area.[17]

Upper Rajang Development Agency (URDA)

URDA was established on July 12, 2017.[17] Its inaugural chairman was deputy chief minister James Jemut Masing.[18] This agency covers areas involving Kapit, Kanowit, Song, Belaga, and Bukit Mabong, totalling 41,186 km2 in area.[19] Major development projects for URDA are the construction and management of Bakun Dam, Murum Dam, and Baleh Dam and building access roads to the dams and between settlement areas.[20]

As of December 2020, there were four projects under planning and 28 projects under implementation. One of such projects is the construction of 73 km road network from Kapit to Baleh Dam. This enables remote villages from around Baleh area road access to Kapit town.[21]

Highland Development Agency (HDA)

HDA was established on July 12, 2017.[17] This agency covers an area of 18,462 km2 involving 75,000 people across 244 villages and longhouses in Bario, Mulu, and Long Lama.[19][22] Deputy chief minister Douglas Uggah Embas served as the inaugural chairman of the HDA.[17][18][23] As of December 2020, 10 projects were under planning and 19 projects were under implementation under HDA.[21] Among the projects implemented were Long Lama Rural Growth Centre and Integrated Highland Agriculture Station (IHAS).[24] IHAS aims to become an agricultural products collection, chilling, and packaging facility for the Baram region.[21] IHAS covers an area of 634 hectares including Long Beruang, Long Banga, and Long Peluan areas. Facilities included in IHAS are offices, an internet centre, a multipurpose hall, a production centre, schools, hostels, a training centre, and road networks connecting to surrounding farmlands.[20]

Northern Region Development Agency (NRDA)

NRDA was established on March 15, 2018.[17] Deputy chief minister Awang Tengah Ali Hassan was the inaugural NRDA Chairman.[18] It encompasses Limbang and Lawas, covering an area of 7,790 km2.[19] NRDA is involved in roads constructions, building water supply, and a new airport in Lawas.[25] As of December 2020, 12 projects were under planning and 64 projects were under implementation. One of such projects is Northern Coastal Highway that aims to connect Miri, Limbang, and Lawas to neighbouring state of Sabah through various custom checkpoints in Brunei, Limbang, and Lawas; by constructing a dual carriageway.[21]

Growth nodes

Samalaju

Samalaju Industrial Park began construction in 2009.[26][27] In January 2011, Tokuyama's polycrystalline silicon factory was opened in the industrial park.[26] As of 2014, 15 out of 19 projects in SCORE are located in Samalaju, with total cumulative foreign direct investment (FDI) of MYR 27 billion.[28] Companies such as Press Metal Bhd, OM Materials (Sarawak), Pertama Ferroalloys, Sakura Ferroalloys, OCI Malaysia (previously Tokuyama Malaysia), and Iwatani-SIG Industrial Gases Sdn Bhd, and Elkem Carbon Malaysia are operational in Samalaju since 2014.[28][29] Other development projects near the industrial park are Samalaju Eco Park Township and Samalaju port. Residential properties, shoplots, transportation hub, and light industrial facilities are located inside the Eco Park Township. Samalaju port handled 4 million tonnes of cargo annually in 2015.[30]

As of 2018, there was no data of socioeconomic impact on the local community, such as employment and wages, and involvement of local companies in the industrial park.[31]

Mukah

Mukah aims to become a smart city focusing in education and information technology.[32] Amongst projects that were planned in 2013 were: new Mukah Airport, Universiti Teknologi MARA (UiTM) campus, and Mukah Science Park. Mukah Coal Fired power plant started operation in April 2009. This was followed by Press Metal Sarawak opening its first aluminium smelting plant in August 2009.[26] In April 2011, Mukah new administrative centre was built that houses the head office of RECODA[26] and Dalat & Mukah District Council.[33] Since 2014, Matadeng Industrial park, located at 30 km from the Mukah town, was planned.[34][35] New Mukah Airport started construction in 2017 and commenced operation in June 2021.[36] Construction of new UiTM Mukah Campus started in 2012 and completed in 2015, capable of housing 2,000 students.[37] Three faculties are based in this new campus, namely: faculty of business management, faculty of plantation and agrotechnology, and faculty of Applied Science.[38] Mukah Rinwood 10 MW biomass power plant also started construction in 2015. It uses oil palm waste such as empty fruit branch, palm kernel shell, and mesocarp fibre to generate electricity.[30]

Balingian coal fired power plant began construction in 2015.[30] The power plant started operating in May 2019.[39][40]

Tanjung Manis

Tanjung Manis aims to become a palm oil integrated centre and halal food hub.[32] Tanjung Manis Halal Hub was launched in February 2009.[26] Other projects planned includes building an integrated port and deep sea fishing port. In 2013, Sea Party International Co Ltd from Taiwan invested in this area, involving in tilapia, marine fish, and shrimp farming projects.[26]

Baram

The Baram region encompasses Miri, Marudi, Telang Usan, and Beluru. It aims develop highland agriculture, livestock rearing, and ecotourism.[41] Construction of IHAS started in 2015.[42] Access roads to Baram Dam and Murum Dam were also planned.[26]

Tunoh

Similar to Baram, Tunoh also aims to become an agriculture and eco-tourism centre. Access road to Baleh Dam was planned in 2013.[26] Access road to Tunoh and a new township at Bukit Mabong was planned in 2016.[43]

Results

As of 2014, 19 projects with more than RM 32 billion in FDI has been approved cumulatively. Of these projects, 15 of them were located in Samalaju, and the remaining four were located in Tanjung Manis, Mukah and Kidurong.[28] In the year 2014 alone, SCORE accounted for 90% of Sarawak's total foreign direct investment (FDI), amounting RM 9.6 billion, where 87.2% the investments were foreign.[44] As of 2016, 16 projects in basic metal products industry, two projects in chemical industry, two projects under food manufacturing, and one project under petrochemical industry was approved.[15] As of 2018, a total of nine projects were operational in the economic corridor, where seven of them were located in Samalaju, one each at Mukah and Tanjung Manis. SCORE recorded RM 79.97 billion in total investments, where RM 33.64 billion (42%) came from private investments.[45] As of 2020, SCORE created 6,654[46] to 18,000 job opportunities.[47] A total of 68% of the jobs were filled by locals.[46] Export values worth RM 9.4 billion were generated in the same year.[46] As of October 2021, cumulative private and public investments in SCORE stood at RM 71.1 billion, where public sector contributes 58.2% and foreign investments stood at 36.7%.[48]

Analysis

According to a report published in 2011, although SCORE helps to diversify Sarawak energy sources away from fossil fuels, it met several technical challenges such as a lack of proper highways to carry raw materials into rural areas, lack of proper electricity networks to carry power to consumers, difficulties in river diversion, tunneling, channeling, transportation of machines and turbines to the dam construction sites, and lack of highly trained engineers and construction workers to build the spillways, powerhouses, transformers, turbines, and dam face. The turbid river waters are filled with silt, sediments, logs, and rocks due to logging, erosions, and unsustainable agricultural practices. Such low quality river waters can make dam projects more complicated and shorten the lifetime of the dam usage to 30 to 40 years. These problems could make the electricity generated from SCORE unaffordable because of cost overruns and delays in financing the projects. An example is the cost overruns of Bakun Dam six times higher than the original price of RM 2.5 billion due to delays, rising interest rates, strikes and problems with excavations. Initially, construction companies have to underestimate their risks in order to have an edge in the tender bidding process. When problems emerged during constructions, additional payment have to be made in order to keep the project afloat, thus making the electricity generated by dams in Sarawak to be two to three times higher than expected.[5] Building dams in the middle of the forests can be construed as high risk project as it deals with many problems such as logistical issues, indigenous communities and their lands, contractors and corruptions. The caused the investors to be risk averse, thus leading to delay in financing. The electrical energy generated from the dams are mainly for industry players, instead for local population. One respondent from the interview predicted that "the amount of jobs created for the local population is practically zero". Besides, the policy of SCORE to attract "energy inefficient" metal smelters is a waste of electricity. The construction of dams also causes environmental damage due to logging, changes in water biochemical profile, emission of methane gas from rotten vegetation, and submersion of tropical rainforests.[5]

A study done in March 2015 at University of California showed that distributed energy plants such as solar and biomass can meet the future energy demand of the state when compared to dam construction.[49] A study conducted by Universiti Malaysia Sabah concluded that there is a potential for agricultural development in SCORE because of the Sarawak government and Development Bank of Sarawak (DBOS) commitments to developing this industry. However, encouraging youths to participate in this industry would be a major challenge.[50]

See also

References

  1. ^ . New Straits Times. 22 April 2018. Archived from the original on 22 April 2018. Retrieved 4 December 2021.
  2. ^ a b c d . Sarawak Manufacturers Association. Archived from the original on 25 November 2021. Retrieved 4 December 2021.
  3. ^ a b (PDF). Sarawak state government. Archived from the original (PDF) on 1 August 2019. Retrieved 5 December 2021.
  4. ^ "Majlis Pelancaran Koridor Sarawak - Sarawak Corridor of Renewable Energy (SCORE)". Koleksi Arkib Ucapan Ketua Eksekutif. 11 February 2008. Retrieved 31 July 2019.
  5. ^ a b c d e f K. Sovacool, Benjamin; Bulan, L.C. (2011). "Meeting Targets' Missing People: The Energy Security Implications of the Sarawak Corridor of Renewable Energy (SCORE)". Contemporary Southeast Asia. 33 (1): 56. doi:10.1355/cs33-1c. ISSN 0129-797X.
  6. ^ Jack, Wong (22 July 2014). "Bakun at 50% capacity producing 900MW". The Star (Malaysia). Retrieved 23 November 2015.
  7. ^ Christopher, Lindom (11 July 2015). . New Sarawak Tribune. Archived from the original on 23 November 2015. Retrieved 23 November 2015. ... Murum HEP had officially started commercial operation on 8 June 2015,"...
  8. ^ Ogilvy Ruekeith, Geryl (19 November 2015). . The Borneo Post. Archived from the original on 12 June 2021. Retrieved 7 May 2022.
  9. ^ Povera, Adib (16 August 2017). . New Straits Times. Archived from the original on 31 August 2020. Retrieved 7 May 2022.
  10. ^ Wong, Jack (30 November 2020). . The Star (Malaysia). Archived from the original on 18 April 2021. Retrieved 7 May 2022.
  11. ^ Siew Yean, Tham. . ISEAS Yusof Ishak Institute, Singapore. Archived from the original on 29 April 2022. Retrieved 7 May 2022.
  12. ^ . Federation of Malaysian Manufacturers. Archived from the original on 4 March 2021. Retrieved 13 January 2022.
  13. ^ . The Star (Malaysia). 7 August 2008. Archived from the original on 6 January 2022. Retrieved 6 January 2022.
  14. ^ . Astro Awani. 16 September 2013. Archived from the original on 6 January 2022. Retrieved 6 January 2022.
  15. ^ a b c d (PDF). State Planning Unit - Chief Minister Department. Archived from the original (PDF) on 18 July 2017. Retrieved 6 January 2022.
  16. ^ Jianing, Xu (2020). Ahn, Y.; Wu, F. (eds.). "The Economic Impact of Malaysia's Institution on the Failure of the Wawasan 2020". E3S Web of Conferences. 214: 02005. doi:10.1051/e3sconf/202021402005. ISSN 2267-1242.
  17. ^ a b c d e Veno, Jeremy. . The Borneo Post. Archived from the original on 2 June 2021. Retrieved 12 December 2021.
  18. ^ a b c . The Borneo Post. 29 July 2018. Archived from the original on 6 June 2021. Retrieved 12 December 2021.
  19. ^ a b c "Regional Development Agencies". RECODA. Archived from the original on 12 December 2021. Retrieved 12 December 2021.
  20. ^ a b (PDF). RECODA. Archived from the original (PDF) on 12 February 2022. Retrieved 12 February 2022.
  21. ^ a b c d (PDF). RECODA. Archived from the original (PDF) on 23 December 2021. Retrieved 23 December 2021.
  22. ^ Johari, Zaheera (2 November 2018). . The Borneo Post. Archived from the original on 2 June 2021. Retrieved 17 December 2021.
  23. ^ . New Sarawak Tribune. 20 July 2017. Archived from the original on 31 July 2019. Retrieved 19 December 2021.
  24. ^ . The Borneo Post. 19 July 2017. Archived from the original on 10 June 2021. Retrieved 23 December 2021.
  25. ^ (PDF). RECODA. Archived from the original (PDF) on 19 February 2022. Retrieved 18 February 2022.
  26. ^ a b c d e f g h (PDF). RECODA. 2013. p. 50. Archived from the original (PDF) on 10 May 2021.
  27. ^ . RECODA. Archived from the original on 30 May 2017. Retrieved 30 November 2021.
  28. ^ a b c . The Borneo Post. Archived from the original on 12 June 2021. Retrieved 12 November 2015.
  29. ^ Wong, Jack (13 August 2018). . The Star (Malaysia). Archived from the original on 29 September 2020.
  30. ^ a b c (PDF). RECODA. Archived from the original (PDF) on 10 February 2022. Retrieved 10 February 2022.
  31. ^ . The Borneo Post. Archived from the original on 4 December 2021. Retrieved 4 December 2021.
  32. ^ a b Sibon, Peter (9 July 2014). . The Borneo Post. Archived from the original on 31 May 2021. Retrieved 31 December 2021.
  33. ^ . Service Sarawak. Archived from the original on 27 January 2022. Retrieved 27 January 2022.
  34. ^ Sibon, Peter (25 March 2014). . The Borneo Post. Archived from the original on 5 June 2021. Retrieved 14 January 2022.
  35. ^ (PDF). RECODA. Archived from the original (PDF) on 14 January 2022. Retrieved 14 January 2022.
  36. ^ . The Star (Malaysia). Archived from the original on 27 June 2021. Retrieved 14 January 2022.
  37. ^ . Hock Seng Lee Construction. Archived from the original on 14 May 2021. Retrieved 14 January 2022.
  38. ^ . UiTM Sarawak. Archived from the original on 17 April 2021. Retrieved 14 January 2022.
  39. ^ 王, 桀 (14 May 2019). . 北极星电力网 (Bei Ji Xin Energy Grid). Archived from the original on 1 September 2019. Retrieved 24 January 2020.
  40. ^ 蒋, 武林 (5 July 2019). . 北极星电力网 (Bei Ji Xin Energy Grid). Archived from the original on 1 September 2019. Retrieved 24 January 2020.
  41. ^ . RECODA. Archived from the original on 2 January 2021. Retrieved 2 January 2022.
  42. ^ . Malaysiakini. 14 May 2015. Archived from the original on 9 June 2021. Retrieved 2 January 2022.
  43. ^ (PDF). Sarawak: RECODA. 2016. pp. 1–104. Archived from the original (PDF) on 27 May 2019. Retrieved 4 January 2022.
  44. ^ Alias, Nor Zahidi. . Malaysian Rating Corporation Berhad. Archived from the original on 20 October 2021. Retrieved 5 December 2021.
  45. ^ Teo, Ronnie (13 January 2019). . The Borneo Post. Archived from the original on 14 June 2021. Retrieved 4 December 2021.
  46. ^ a b c . The Borneo Post. Archived from the original on 7 November 2021. Retrieved 13 January 2022.
  47. ^ "SCORE has Generated Investments of RM39.94 billion and Created 18,000 Job Opportunities". RECODA. Archived from the original on 7 January 2022. Retrieved 7 January 2022.
  48. ^ Tuah, Yvonne (15 January 2022). . The Borneo Post. Archived from the original on 23 April 2022. Retrieved 20 May 2022.
  49. ^ Shirley, Rebekah; Kammen, Daniel (July 2015). "Energy planning and development in Malaysian Borneo: Assessing the benefits of distributed technologies versus large scale energy mega-projects". Energy Strategy Reviews. 8: 15–29. doi:10.1016/j.esr.2015.07.001.
  50. ^ Salleh, Norhuda; Mansur, Kasim (25 May 2020). Pembangunan Sumber di Luar Bandar (Resource development in rural areas). Universiti Malaysia Sabah. pp. 34–35. ISBN 9789672962199. Retrieved 2 April 2023.

External links

  • Sarawak Corridor of Renewable Energy
  • Regional Corridor Development Authority (RECODA)


sarawak, corridor, renewable, energy, score, economic, region, development, corridor, covering, central, sarawak, malaysian, state, island, borneo, score, launched, 2008, five, regional, development, corridors, launched, throughout, malaysia, during, abdullah,. The Sarawak Corridor of Renewable Energy SCORE is an economic region and development corridor covering central Sarawak a Malaysian State on the island of Borneo SCORE was launched in 2008 It is one of the five regional development corridors launched throughout Malaysia during the Abdullah Badawi administration 1 SCORE is managed by the Regional Corridors Development Authority RECODA a state government agency created through an Ordinance of the State Legislative Assembly 2 3 The logo of SCORE Contents 1 History 2 Targets 3 Agencies Under RECODA 3 1 Upper Rajang Development Agency URDA 3 2 Highland Development Agency HDA 3 3 Northern Region Development Agency NRDA 4 Growth nodes 4 1 Samalaju 4 2 Mukah 4 3 Tanjung Manis 4 4 Baram 4 5 Tunoh 5 Results 6 Analysis 7 See also 8 References 9 External linksHistory EditSCORE was launched on 11 February 2008 by the 5th Malaysian Prime Minister Datuk Seri Abdullah Ahmad Badawi 4 SCORE was immediately placed under the jurisdiction of Regional Corridors Development Authority RECODA where the latter was created under an ordinance passed in the state assembly back in 2006 RECODA must consist of a chairman two deputy chairmen and between five and ten other board members This agency promotes manages and oversees the implementation of development projects inside the corridor 3 SCORE covered an area of 70 000 km2 at the central region of Sarawak with a coast line of 320 km long encompassing urban centres such as Sibu Bintulu Mukah Sarikei Bintulu Miri Lawas Limbang and Kapit 2 Initial plan for SCORE was to construct 12 hydroelectric dams with 7 800 MW of installed capacity connected to industrial facilities located at the coast of Sarawak targeting 50 dams with eventual installation capacity of 20 000 MW 5 Batang Ai Dam was commissioned on 21 August 1985 followed by Bakun Dam in 2014 6 and Murum Dam in 2015 7 In November 2015 chief minister Adenan Satem halted the Baram Dam project indefinitely due to persistent protests from the local communities 8 In 2017 Sarawak acquired Bakun Dam from the Malaysian federal government at a cost of RM 2 5 billion 9 Baleh Dam started construction in 2020 after completion of river diversions works 10 The dam is expected to commission in 2026 11 Companies given the pioneer status involving in high tech industries heavy capital investments or high research and development activities will enjoy 100 exemption on its statutory income for 5 years 12 Targets EditThe initial aim of setting up SCORE was to develop central region of Sarawak improving the state s economic growth thus achieving the national objective of Vision 2020 for becoming a developed state 2 The development corridor also targets 1 5 million jobs creation by the year 2030 13 By 2013 the state government has identified SCORE as one of the means to achieve high income and advanced economy by 2030 14 15 The economic corridor also planned to achieve RM 334 billion US 110 billion in total investments where RM 67 billion 20 are funded by the government 15 a mix of investments from government linked companies state and federal funds 5 and the remaining RM 267 billion 80 are funded by private sector 15 Other targets include increase the size of the economy by a factor of five increase the number of jobs by a factor of 2 5 and doubling the population to 4 6 million 5 It focus on ten priority industries in agriculture mining and manufacturing sectors such as aquaculture livestock rearing timber palm oil petroleum aluminum and steel and glass industries 2 Total investments into these industries are projected to reach RM 200 billion where oil based industries amount to RM 60 billion aluminium industry accounted for RM 23 billion palm oil industry at RM 17 billion and timber based industry RM 11 billion 5 Malaysia failed to achieve developed nation status in the year 2020 16 Agencies Under RECODA Edit Source RECODA In order to expand the SCORE initiative into rural Sarawak three agencies under RECODA were established This initiative expanded the SCORE development area from initial 70 000 km2 to 100 000 km2 which is about two thirds of Sarawak area 17 Upper Rajang Development Agency URDA Edit URDA was established on July 12 2017 17 Its inaugural chairman was deputy chief minister James Jemut Masing 18 This agency covers areas involving Kapit Kanowit Song Belaga and Bukit Mabong totalling 41 186 km2 in area 19 Major development projects for URDA are the construction and management of Bakun Dam Murum Dam and Baleh Dam and building access roads to the dams and between settlement areas 20 As of December 2020 there were four projects under planning and 28 projects under implementation One of such projects is the construction of 73 km road network from Kapit to Baleh Dam This enables remote villages from around Baleh area road access to Kapit town 21 Highland Development Agency HDA Edit HDA was established on July 12 2017 17 This agency covers an area of 18 462 km2 involving 75 000 people across 244 villages and longhouses in Bario Mulu and Long Lama 19 22 Deputy chief minister Douglas Uggah Embas served as the inaugural chairman of the HDA 17 18 23 As of December 2020 10 projects were under planning and 19 projects were under implementation under HDA 21 Among the projects implemented were Long Lama Rural Growth Centre and Integrated Highland Agriculture Station IHAS 24 IHAS aims to become an agricultural products collection chilling and packaging facility for the Baram region 21 IHAS covers an area of 634 hectares including Long Beruang Long Banga and Long Peluan areas Facilities included in IHAS are offices an internet centre a multipurpose hall a production centre schools hostels a training centre and road networks connecting to surrounding farmlands 20 Northern Region Development Agency NRDA Edit NRDA was established on March 15 2018 17 Deputy chief minister Awang Tengah Ali Hassan was the inaugural NRDA Chairman 18 It encompasses Limbang and Lawas covering an area of 7 790 km2 19 NRDA is involved in roads constructions building water supply and a new airport in Lawas 25 As of December 2020 12 projects were under planning and 64 projects were under implementation One of such projects is Northern Coastal Highway that aims to connect Miri Limbang and Lawas to neighbouring state of Sabah through various custom checkpoints in Brunei Limbang and Lawas by constructing a dual carriageway 21 Growth nodes EditSamalaju Edit Samalaju Industrial Park began construction in 2009 26 27 In January 2011 Tokuyama s polycrystalline silicon factory was opened in the industrial park 26 As of 2014 15 out of 19 projects in SCORE are located in Samalaju with total cumulative foreign direct investment FDI of MYR 27 billion 28 Companies such as Press Metal Bhd OM Materials Sarawak Pertama Ferroalloys Sakura Ferroalloys OCI Malaysia previously Tokuyama Malaysia and Iwatani SIG Industrial Gases Sdn Bhd and Elkem Carbon Malaysia are operational in Samalaju since 2014 28 29 Other development projects near the industrial park are Samalaju Eco Park Township and Samalaju port Residential properties shoplots transportation hub and light industrial facilities are located inside the Eco Park Township Samalaju port handled 4 million tonnes of cargo annually in 2015 30 As of 2018 there was no data of socioeconomic impact on the local community such as employment and wages and involvement of local companies in the industrial park 31 Mukah Edit Mukah aims to become a smart city focusing in education and information technology 32 Amongst projects that were planned in 2013 were new Mukah Airport Universiti Teknologi MARA UiTM campus and Mukah Science Park Mukah Coal Fired power plant started operation in April 2009 This was followed by Press Metal Sarawak opening its first aluminium smelting plant in August 2009 26 In April 2011 Mukah new administrative centre was built that houses the head office of RECODA 26 and Dalat amp Mukah District Council 33 Since 2014 Matadeng Industrial park located at 30 km from the Mukah town was planned 34 35 New Mukah Airport started construction in 2017 and commenced operation in June 2021 36 Construction of new UiTM Mukah Campus started in 2012 and completed in 2015 capable of housing 2 000 students 37 Three faculties are based in this new campus namely faculty of business management faculty of plantation and agrotechnology and faculty of Applied Science 38 Mukah Rinwood 10 MW biomass power plant also started construction in 2015 It uses oil palm waste such as empty fruit branch palm kernel shell and mesocarp fibre to generate electricity 30 Balingian coal fired power plant began construction in 2015 30 The power plant started operating in May 2019 39 40 Tanjung Manis Edit Tanjung Manis aims to become a palm oil integrated centre and halal food hub 32 Tanjung Manis Halal Hub was launched in February 2009 26 Other projects planned includes building an integrated port and deep sea fishing port In 2013 Sea Party International Co Ltd from Taiwan invested in this area involving in tilapia marine fish and shrimp farming projects 26 Baram Edit The Baram region encompasses Miri Marudi Telang Usan and Beluru It aims develop highland agriculture livestock rearing and ecotourism 41 Construction of IHAS started in 2015 42 Access roads to Baram Dam and Murum Dam were also planned 26 Tunoh Edit Similar to Baram Tunoh also aims to become an agriculture and eco tourism centre Access road to Baleh Dam was planned in 2013 26 Access road to Tunoh and a new township at Bukit Mabong was planned in 2016 43 Results EditAs of 2014 19 projects with more than RM 32 billion in FDI has been approved cumulatively Of these projects 15 of them were located in Samalaju and the remaining four were located in Tanjung Manis Mukah and Kidurong 28 In the year 2014 alone SCORE accounted for 90 of Sarawak s total foreign direct investment FDI amounting RM 9 6 billion where 87 2 the investments were foreign 44 As of 2016 16 projects in basic metal products industry two projects in chemical industry two projects under food manufacturing and one project under petrochemical industry was approved 15 As of 2018 a total of nine projects were operational in the economic corridor where seven of them were located in Samalaju one each at Mukah and Tanjung Manis SCORE recorded RM 79 97 billion in total investments where RM 33 64 billion 42 came from private investments 45 As of 2020 SCORE created 6 654 46 to 18 000 job opportunities 47 A total of 68 of the jobs were filled by locals 46 Export values worth RM 9 4 billion were generated in the same year 46 As of October 2021 cumulative private and public investments in SCORE stood at RM 71 1 billion where public sector contributes 58 2 and foreign investments stood at 36 7 48 Analysis EditAccording to a report published in 2011 although SCORE helps to diversify Sarawak energy sources away from fossil fuels it met several technical challenges such as a lack of proper highways to carry raw materials into rural areas lack of proper electricity networks to carry power to consumers difficulties in river diversion tunneling channeling transportation of machines and turbines to the dam construction sites and lack of highly trained engineers and construction workers to build the spillways powerhouses transformers turbines and dam face The turbid river waters are filled with silt sediments logs and rocks due to logging erosions and unsustainable agricultural practices Such low quality river waters can make dam projects more complicated and shorten the lifetime of the dam usage to 30 to 40 years These problems could make the electricity generated from SCORE unaffordable because of cost overruns and delays in financing the projects An example is the cost overruns of Bakun Dam six times higher than the original price of RM 2 5 billion due to delays rising interest rates strikes and problems with excavations Initially construction companies have to underestimate their risks in order to have an edge in the tender bidding process When problems emerged during constructions additional payment have to be made in order to keep the project afloat thus making the electricity generated by dams in Sarawak to be two to three times higher than expected 5 Building dams in the middle of the forests can be construed as high risk project as it deals with many problems such as logistical issues indigenous communities and their lands contractors and corruptions The caused the investors to be risk averse thus leading to delay in financing The electrical energy generated from the dams are mainly for industry players instead for local population One respondent from the interview predicted that the amount of jobs created for the local population is practically zero Besides the policy of SCORE to attract energy inefficient metal smelters is a waste of electricity The construction of dams also causes environmental damage due to logging changes in water biochemical profile emission of methane gas from rotten vegetation and submersion of tropical rainforests 5 A study done in March 2015 at University of California showed that distributed energy plants such as solar and biomass can meet the future energy demand of the state when compared to dam construction 49 A study conducted by Universiti Malaysia Sabah concluded that there is a potential for agricultural development in SCORE because of the Sarawak government and Development Bank of Sarawak DBOS commitments to developing this industry However encouraging youths to participate in this industry would be a major challenge 50 See also EditMalaysian National Projects Ninth Malaysia Plan Sabah Development Corridor Iskandar Malaysia Northern Corridor Economic Region East Coast Economic RegionReferences Edit 5 major national corridors to translate county s development agenda Zahid NSTTV New Straits Times 22 April 2018 Archived from the original on 22 April 2018 Retrieved 4 December 2021 a b c d Sarawak Corridor of Renewable Energy SCORE Sarawak Manufacturers Association Archived from the original on 25 November 2021 Retrieved 4 December 2021 a b Laws of Sarawak Chapter 64 Regional Corridors Development Authority Ordinance 2006 PDF Sarawak state government Archived from the original PDF on 1 August 2019 Retrieved 5 December 2021 Majlis Pelancaran Koridor Sarawak Sarawak Corridor of Renewable Energy SCORE Koleksi Arkib Ucapan Ketua Eksekutif 11 February 2008 Retrieved 31 July 2019 a b c d e f K Sovacool Benjamin Bulan L C 2011 Meeting Targets Missing People The Energy Security Implications of the Sarawak Corridor of Renewable Energy SCORE Contemporary Southeast Asia 33 1 56 doi 10 1355 cs33 1c ISSN 0129 797X Jack Wong 22 July 2014 Bakun at 50 capacity producing 900MW The Star Malaysia Retrieved 23 November 2015 Christopher Lindom 11 July 2015 Making HEPs in Sarawak safe New Sarawak Tribune Archived from the original on 23 November 2015 Retrieved 23 November 2015 Murum HEP had officially started commercial operation on 8 June 2015 Ogilvy Ruekeith Geryl 19 November 2015 Baram dam project halted indefinitely The Borneo Post Archived from the original on 12 June 2021 Retrieved 7 May 2022 Povera Adib 16 August 2017 Sarawak Energy completes acquisition of Bakun Dam New Straits Times Archived from the original on 31 August 2020 Retrieved 7 May 2022 Wong Jack 30 November 2020 Baleh main dam to be built soon The Star Malaysia Archived from the original on 18 April 2021 Retrieved 7 May 2022 Siew Yean Tham 2022 45 Hydropower Development in Sarawak Sensitivities over Sustainability and China s Involvement ISEAS Yusof Ishak Institute Singapore Archived from the original on 29 April 2022 Retrieved 7 May 2022 FMM Sarawak State News Federation of Malaysian Manufacturers Archived from the original on 4 March 2021 Retrieved 13 January 2022 1 5 million jobs by 2030 The Star Malaysia 7 August 2008 Archived from the original on 6 January 2022 Retrieved 6 January 2022 Sarawak sets Sarawak Gemilang 2030 vision Astro Awani 16 September 2013 Archived from the original on 6 January 2022 Retrieved 6 January 2022 a b c d Sarawak Corridor of Renewable Energy Powering the Future PDF State Planning Unit Chief Minister Department Archived from the original PDF on 18 July 2017 Retrieved 6 January 2022 Jianing Xu 2020 Ahn Y Wu F eds The Economic Impact of Malaysia s Institution on the Failure of the Wawasan 2020 E3S Web of Conferences 214 02005 doi 10 1051 e3sconf 202021402005 ISSN 2267 1242 a b c d e Veno Jeremy Three agencies under Recoda established Score expected to generate RM334 bln The Borneo Post Archived from the original on 2 June 2021 Retrieved 12 December 2021 a b c Five sub committees to prepare list of NRDA projects The Borneo Post 29 July 2018 Archived from the original on 6 June 2021 Retrieved 12 December 2021 a b c Regional Development Agencies RECODA Archived from the original on 12 December 2021 Retrieved 12 December 2021 a b RECODA annual report 2017 PDF RECODA Archived from the original PDF on 12 February 2022 Retrieved 12 February 2022 a b c d ReadCoda Newsletter 2020 PDF RECODA Archived from the original PDF on 23 December 2021 Retrieved 23 December 2021 Johari Zaheera 2 November 2018 Development in HDA areas to benefit about 75 000 inhabitants The Borneo Post Archived from the original on 2 June 2021 Retrieved 17 December 2021 SCORE s new agency HDA starts on a ahigh note New Sarawak Tribune 20 July 2017 Archived from the original on 31 July 2019 Retrieved 19 December 2021 New SCORE agency to accelerate development in highland areas The Borneo Post 19 July 2017 Archived from the original on 10 June 2021 Retrieved 23 December 2021 RECODA 10th anniversary 2018 annual report PDF RECODA Archived from the original PDF on 19 February 2022 Retrieved 18 February 2022 a b c d e f g h Regional Corridor Development Authority Annual Report 2013 PDF RECODA 2013 p 50 Archived from the original PDF on 10 May 2021 Samalaju Industrial Park SIP The engine room of SCORE RECODA Archived from the original on 30 May 2017 Retrieved 30 November 2021 a b c Sarawak scores high on foreign investments The Borneo Post Archived from the original on 12 June 2021 Retrieved 12 November 2015 Wong Jack 13 August 2018 Sarawak corridor attracts RM79 3bil in investments The Star Malaysia Archived from the original on 29 September 2020 a b c 2015 Annual Report Regional Corridor Development Authority PDF RECODA Archived from the original PDF on 10 February 2022 Retrieved 10 February 2022 DCM Statistics needed to review investment impact on Samalaju Industrial Park The Borneo Post Archived from the original on 4 December 2021 Retrieved 4 December 2021 a b Sibon Peter 9 July 2014 Baram Tunoh Baleh identified as two growth nodes within SCORE under 11MP The Borneo Post Archived from the original on 31 May 2021 Retrieved 31 December 2021 Service Provider Profiles Service Sarawak Archived from the original on 27 January 2022 Retrieved 27 January 2022 Sibon Peter 25 March 2014 Drawing up plan for integrated industrial area at Matadeng The Borneo Post Archived from the original on 5 June 2021 Retrieved 14 January 2022 Investment Booklet PDF RECODA Archived from the original PDF on 14 January 2022 Retrieved 14 January 2022 New Mukah Airport to start operating on Thursday June 17 says Dr Wee The Star Malaysia Archived from the original on 27 June 2021 Retrieved 14 January 2022 UiTM Mukah Hock Seng Lee Construction Archived from the original on 14 May 2021 Retrieved 14 January 2022 UiTM Cawangan Sarawak Mukah Campus UiTM Sarawak Archived from the original on 17 April 2021 Retrieved 14 January 2022 王 桀 14 May 2019 马来西亚巴林基安循环流化床燃煤机组项目1号机组投运 Malaysian Balingian circulating fluidisized bed coal powered generator unit 1 commenced operation 北极星电力网 Bei Ji Xin Energy Grid Archived from the original on 1 September 2019 Retrieved 24 January 2020 蒋 武林 5 July 2019 中国能建湖南火电承建马来西亚巴林基安项目2号机组商运 China Energy Engineering Group Hunan Power Conctruction Co Ltd undertakes Malaysian Balingian generator unit 2 for commercial operation 北极星电力网 Bei Ji Xin Energy Grid Archived from the original on 1 September 2019 Retrieved 24 January 2020 Baram Growth Area RECODA Archived from the original on 2 January 2021 Retrieved 2 January 2022 Muhyiddin to adopt two villages in Baram Malaysiakini 14 May 2015 Archived from the original on 9 June 2021 Retrieved 2 January 2022 Regional Corridor Development Authority 2016 Annual Report PDF Sarawak RECODA 2016 pp 1 104 Archived from the original PDF on 27 May 2019 Retrieved 4 January 2022 Alias Nor Zahidi Economic Research State of Sarawak Malaysian Rating Corporation Berhad Archived from the original on 20 October 2021 Retrieved 5 December 2021 Teo Ronnie 13 January 2019 SCORE ing greater success The Borneo Post Archived from the original on 14 June 2021 Retrieved 4 December 2021 a b c Sarawak secures RM15 7 bln in investments amid pandemic The Borneo Post Archived from the original on 7 November 2021 Retrieved 13 January 2022 SCORE has Generated Investments of RM39 94 billion and Created 18 000 Job Opportunities RECODA Archived from the original on 7 January 2022 Retrieved 7 January 2022 Tuah Yvonne 15 January 2022 A look at Sarawak s SCORE card The Borneo Post Archived from the original on 23 April 2022 Retrieved 20 May 2022 Shirley Rebekah Kammen Daniel July 2015 Energy planning and development in Malaysian Borneo Assessing the benefits of distributed technologies versus large scale energy mega projects Energy Strategy Reviews 8 15 29 doi 10 1016 j esr 2015 07 001 Salleh Norhuda Mansur Kasim 25 May 2020 Pembangunan Sumber di Luar Bandar Resource development in rural areas Universiti Malaysia Sabah pp 34 35 ISBN 9789672962199 Retrieved 2 April 2023 External links EditSarawak Corridor of Renewable Energy Regional Corridor Development Authority RECODA Retrieved from https en wikipedia org w index php title Sarawak Corridor of Renewable Energy amp oldid 1148331934, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.