fbpx
Wikipedia

Rosenheim–Kufstein railway

The Rosenheim–Kufstein railway (German: Bahnstrecke Rosenheim–Kufstein) is a 32 kilometre-long double-track main line of the German railways. It connects the Munich–Rosenheim and the Rosenheim–Salzburg lines at Rosenheim with the line to Innsbruck, thus connecting Germany, Salzburg and eastern Austria with Innsbruck and the Brenner line to Italy and the Arlberg line to far western Austria. The line is part of the Line 1 of Trans-European Transport Networks (TEN-T). It is electrified at 15 kV, 16.7 Hz.

Rosenheim–Kufstein railway
Overview
Native nameBahnstrecke Rosenheim–
Staatsgrenze bei Kufstein
StatusOperational
OwnerDeutsche Bahn
Line number5702
LocaleBavaria, Germany and Austria
Termini
Stations9
Service
TypeHeavy rail, Passenger/Freight rail
Intercity rail, Regional rail
Route number950
Operator(s)DB Bahn, Bayerische Regiobahn
History
Opened5 August 1858
Technical
Line length31.9 km (19.8 mi)
Number of tracksDouble track
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification15 kV/16.7 Hz AC Overhead line
Operating speed140 km/h (87 mph)
Route map

Line from Mühldorf am Inn
0.0
Rosenheim
Rosenheim curve from Salzburg
2.0
Rosenheim south
6.1
Pfraundorf (Inn)
7.9
Raubling
To Nicklheim
13.4
15.8
Flintsbach
17.6
Fischbach (Inn)
24.7
Oberaudorf crossover
25.0
Oberaudorf
30.5
Kiefersfelden
Wachtl Railway (narrow gauge)
31.9
GermanyAustria border
Kufstein
Source: German railway atlas[1]

History edit

A treaty between Austria and Bavaria, signed on 21 June 1851, regulated the access of each state to the other in relation to the building of railways. As there was no direct rail link between Vienna and the Tyrol at that time, Bavaria agreed in Article 1 that it would build railways from Munich to the border at Salzburg and from Rosenheim to the border at Kufstein. Austria committed itself under Article 2 to build a railway from Salzburg to Bruck an der Mur and from Kufstein to Innsbruck.[2] The line was opened on 5 August 1858 as part of the Bavarian Maximilian’s Railway.[3]

Route edit

The line runs from Rosenheim in a southerly direction. After leaving Rosenheim station, it joins the southern end of the Rosenheim loop (or Rosenheim curve). The curve was opened on the 8 February 1982 and connects the line with the line from Salzburg, bypassing the station. The line also connects in Rosenheim station with the line from Mühldorf and the Mangfall Valley line from Holzkirchen.[3]

To the south, the line passes through the Inn valley. A standard gauge line once ran from Raubling station to a peat works at Nicklheim. The narrow gauge Wendelstein Railway ran from Brannenburg station until 1961 when it was cut back to Waching in order to avoid several level crossings. Another narrow gauge line, the Wachtl Railway, still connects the cement plant near Kiefersfelden station with limestone quarries at Wachtl, just inside Austria in the municipality of Thiersee. Since 1991 a tourist service, called the Wachtl Express, has operated on the line from time to time. Between Kiefersfelden and Kufstein, the line crosses the border into Austria; the border station serves Kufstein. After Kufstein, the line becomes the Lower Inn Valley railway and leads on to Innsbruck.[3]

Operations edit

 
Signpost at the Austrian border

The route is part of the northern access to the Brenner railway to Italy and is thus part of the Berlin–Palermo railway axis. Non-stop travel time between Rosenheim and the border at Kufstein is 15 minutes, but due to temporary speed restrictions in most cases trains take longer. There is an hourly regional train service to Innsbruck, which requires a change in Kufstein. Every two hours, a EuroCity (EC) train operates on the route through Innsbruck and the Brenner Pass to Italy. Every two hours, Austrian Federal Railways runs Vienna–Salzburg–Innsbruck–Vorarlberg express trains over the line from South Rosenheim to Kufstein, but they do not stop. Although there are additional passenger services, there is still no regular-interval hourly service between Salzburg and Innsbruck. As of 2009, there were 32 scheduled services passenger services and approximately 20 freight trains each day on the line.[3]

Development edit

The construction of additional tracks to create a four-track line on the Rosenheim–Kufstein section is considered from time to time to cope with the expected increase in traffic after the opening of the Brenner Base Tunnel. Further expansion plans would provide a bypass of Rosenheim, with a branch off the line from Munich at Großkarolinenfeld and connecting with the Rosenheim–Kufstein line at Brannenburg.

Currently, only small projects are underway. These include the elimination of level crossings (most recently at Flintsbach and Brannenburg) and the installation of noise barriers, particularly in towns in the Inn Valley.

References edit

  1. ^ Eisenbahnatlas Deutschland (German railway atlas). Schweers + Wall. 2017. p. 116. ISBN 978-3-89494-146-8.
  2. ^ "ALEX – Historische Rechts- und Gesetzestexte Online; Allgemeines Reichs-Gesetz- und Regierungsblatt für das Kaiserthum Österreich, Jahrgang 1852 (Austrian government gazette 1852)" (in German). Austrian National Library. Retrieved 14 February 2010.
  3. ^ a b c d Bufe, Siegfried (2009). "Bayerns Tor zum Süden (Bavaria's gateway to the south)". Eisenbahn Geschichte (Railway History) (in German) (36): 36–47.

rosenheim, kufstein, railway, german, bahnstrecke, rosenheim, kufstein, kilometre, long, double, track, main, line, german, railways, connects, munich, rosenheim, rosenheim, salzburg, lines, rosenheim, with, line, innsbruck, thus, connecting, germany, salzburg. The Rosenheim Kufstein railway German Bahnstrecke Rosenheim Kufstein is a 32 kilometre long double track main line of the German railways It connects the Munich Rosenheim and the Rosenheim Salzburg lines at Rosenheim with the line to Innsbruck thus connecting Germany Salzburg and eastern Austria with Innsbruck and the Brenner line to Italy and the Arlberg line to far western Austria The line is part of the Line 1 of Trans European Transport Networks TEN T It is electrified at 15 kV 16 7 Hz Rosenheim Kufstein railwayOverviewNative nameBahnstrecke Rosenheim Staatsgrenze bei KufsteinStatusOperationalOwnerDeutsche BahnLine number5702LocaleBavaria Germany and AustriaTerminiRosenheimBorder of Germany AustriaStations9ServiceTypeHeavy rail Passenger Freight railIntercity rail Regional railRoute number950Operator s DB Bahn Bayerische RegiobahnHistoryOpened5 August 1858TechnicalLine length31 9 km 19 8 mi Number of tracksDouble trackTrack gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification15 kV 16 7 Hz AC Overhead lineOperating speed140 km h 87 mph Route mapLegendLine from MunichLine from Muhldorf am InnMangfall Valley line from Holzkirchen0 0 RosenheimLine to SalzburgRosenheim curve from Salzburg2 0 Rosenheim south6 1 Pfraundorf Inn 7 9 RaublingTo Nicklheim13 4 Brannenburg Wendelstein Railway closed 1961 narrow gauge 15 8 Flintsbach17 6 Fischbach Inn 24 7 Oberaudorf crossover25 0 Oberaudorf30 5 KiefersfeldenWachtl Railway narrow gauge 31 9 Germany Austria borderKufsteinLower Inn Valley railway to InnsbruckSource German railway atlas 1 Contents 1 History 2 Route 3 Operations 4 Development 5 ReferencesHistory editA treaty between Austria and Bavaria signed on 21 June 1851 regulated the access of each state to the other in relation to the building of railways As there was no direct rail link between Vienna and the Tyrol at that time Bavaria agreed in Article 1 that it would build railways from Munich to the border at Salzburg and from Rosenheim to the border at Kufstein Austria committed itself under Article 2 to build a railway from Salzburg to Bruck an der Mur and from Kufstein to Innsbruck 2 The line was opened on 5 August 1858 as part of the Bavarian Maximilian s Railway 3 Route editThe line runs from Rosenheim in a southerly direction After leaving Rosenheim station it joins the southern end of the Rosenheim loop or Rosenheim curve The curve was opened on the 8 February 1982 and connects the line with the line from Salzburg bypassing the station The line also connects in Rosenheim station with the line from Muhldorf and the Mangfall Valley line from Holzkirchen 3 To the south the line passes through the Inn valley A standard gauge line once ran from Raubling station to a peat works at Nicklheim The narrow gauge Wendelstein Railway ran from Brannenburg station until 1961 when it was cut back to Waching in order to avoid several level crossings Another narrow gauge line the Wachtl Railway still connects the cement plant near Kiefersfelden station with limestone quarries at Wachtl just inside Austria in the municipality of Thiersee Since 1991 a tourist service called the Wachtl Express has operated on the line from time to time Between Kiefersfelden and Kufstein the line crosses the border into Austria the border station serves Kufstein After Kufstein the line becomes the Lower Inn Valley railway and leads on to Innsbruck 3 Operations edit nbsp Signpost at the Austrian borderThe route is part of the northern access to the Brenner railway to Italy and is thus part of the Berlin Palermo railway axis Non stop travel time between Rosenheim and the border at Kufstein is 15 minutes but due to temporary speed restrictions in most cases trains take longer There is an hourly regional train service to Innsbruck which requires a change in Kufstein Every two hours a EuroCity EC train operates on the route through Innsbruck and the Brenner Pass to Italy Every two hours Austrian Federal Railways runs Vienna Salzburg Innsbruck Vorarlberg express trains over the line from South Rosenheim to Kufstein but they do not stop Although there are additional passenger services there is still no regular interval hourly service between Salzburg and Innsbruck As of 2009 there were 32 scheduled services passenger services and approximately 20 freight trains each day on the line 3 Development editThe construction of additional tracks to create a four track line on the Rosenheim Kufstein section is considered from time to time to cope with the expected increase in traffic after the opening of the Brenner Base Tunnel Further expansion plans would provide a bypass of Rosenheim with a branch off the line from Munich at Grosskarolinenfeld and connecting with the Rosenheim Kufstein line at Brannenburg Currently only small projects are underway These include the elimination of level crossings most recently at Flintsbach and Brannenburg and the installation of noise barriers particularly in towns in the Inn Valley References edit Eisenbahnatlas Deutschland German railway atlas Schweers Wall 2017 p 116 ISBN 978 3 89494 146 8 ALEX Historische Rechts und Gesetzestexte Online Allgemeines Reichs Gesetz und Regierungsblatt fur das Kaiserthum Osterreich Jahrgang 1852 Austrian government gazette 1852 in German Austrian National Library Retrieved 14 February 2010 a b c d Bufe Siegfried 2009 Bayerns Tor zum Suden Bavaria s gateway to the south Eisenbahn Geschichte Railway History in German 36 36 47 Retrieved from https en wikipedia org w index php title Rosenheim Kufstein railway amp oldid 1161343279, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.