Remington Centre (Chinese: 滙通廣場) is an upcoming 800,000-square-foot (74,000 m2) Chinese-themed mall to be built at the corner of Kennedy Road and Steeles Avenue in Markham, Ontario, Canada, on the site of the former Market Village mall which closed on March 1, 2018.[1] It will be connected to Pacific Mall by an indoor walkway. Market Village was scheduled for demolition and construction of the new mall which should have begun in the third quarter of 2013,[2] but demolition began in October 2018.

Remington Centre Mall
LocationMarkham, Ontario, Canada
Coordinates43°49′31.8″N 79°18′12.6″W / 43.825500°N 79.303500°W / 43.825500; -79.303500Coordinates: 43°49′31.8″N 79°18′12.6″W / 43.825500°N 79.303500°W / 43.825500; -79.303500
DeveloperRemington Group
ManagementRemington Group
OwnerRemington Group
ArchitectKohn Partnership Architects Inc. and Markham's Green Development
No. of stores and services700
No. of floors3
Websiteremingtoncentre.ca
Remington Centre
Traditional Chinese滙通廣場
Simplified Chinese汇通广场
Transcriptions
Standard Mandarin
Hanyu PinyinHuì Tōng Guǎngchǎng

The new mall will have a contemporary design and unique features, including light-filled hallways, indoor and outdoor public spaces and signature night market.[3]

In 2009, plans were developed to demolish Market Village and replace it with a larger and modern complex called the Remington Centre. It will feature a two level structure with over 800,000 square feet (74,000 m2) of retail and commercial space and two condo towers (billed at The Grand Residences at Remington Centre) located on the southeast end. The Remington Centre will aim for LEED status along with the installation of 1100 tonnes of geothermal capacity.[4] It is unknown when the mall will be constructed and completed due to several delays.

Transportation access

The new mall along with Pacific Mall are located at the major intersection of Steeles Avenue and Kennedy Road. They are served by both the TTC (43 Kennedy and 53 Steeles East) and York Region Transit (8 Kennedy) buses, and located within walking distance from Milliken GO Station. The two entrance roads of the malls are Redlea Avenue and Clayton Drive. The railway crossing is being upgraded as an underpass which will eliminate traffic tieups along Steeles.

References

  1. ^ "Market Village closes its doors". blogTO. Retrieved 2018-04-02.
  2. ^ "The Remington Centre will not be a strip club".
  3. ^ http://www.remingtoncentre.ca/pdf/newsletter_201211_en.pdf[bare URL PDF]
  4. ^ "In the Loop, July 2011" (PDF). Remington Group. Retrieved 29 January 2012.

External links

  • Official website

remington, centre, chinese, 滙通廣場, upcoming, square, foot, chinese, themed, mall, built, corner, kennedy, road, steeles, avenue, markham, ontario, canada, site, former, market, village, mall, which, closed, march, 2018, will, connected, pacific, mall, indoor, w. Remington Centre Chinese 滙通廣場 is an upcoming 800 000 square foot 74 000 m2 Chinese themed mall to be built at the corner of Kennedy Road and Steeles Avenue in Markham Ontario Canada on the site of the former Market Village mall which closed on March 1 2018 1 It will be connected to Pacific Mall by an indoor walkway Market Village was scheduled for demolition and construction of the new mall which should have begun in the third quarter of 2013 2 but demolition began in October 2018 Remington Centre MallLocationMarkham Ontario CanadaCoordinates43 49 31 8 N 79 18 12 6 W 43 825500 N 79 303500 W 43 825500 79 303500 Coordinates 43 49 31 8 N 79 18 12 6 W 43 825500 N 79 303500 W 43 825500 79 303500DeveloperRemington GroupManagementRemington GroupOwnerRemington GroupArchitectKohn Partnership Architects Inc and Markham s Green DevelopmentNo of stores and services700No of floors3Websiteremingtoncentre wbr caRemington CentreTraditional Chinese滙通廣場Simplified Chinese汇通广场TranscriptionsStandard MandarinHanyu PinyinHui Tōng GuǎngchǎngThe new mall will have a contemporary design and unique features including light filled hallways indoor and outdoor public spaces and signature night market 3 In 2009 plans were developed to demolish Market Village and replace it with a larger and modern complex called the Remington Centre It will feature a two level structure with over 800 000 square feet 74 000 m2 of retail and commercial space and two condo towers billed at The Grand Residences at Remington Centre located on the southeast end The Remington Centre will aim for LEED status along with the installation of 1100 tonnes of geothermal capacity 4 It is unknown when the mall will be constructed and completed due to several delays Transportation access EditThe new mall along with Pacific Mall are located at the major intersection of Steeles Avenue and Kennedy Road They are served by both the TTC 43 Kennedy and 53 Steeles East and York Region Transit 8 Kennedy buses and located within walking distance from Milliken GO Station The two entrance roads of the malls are Redlea Avenue and Clayton Drive The railway crossing is being upgraded as an underpass which will eliminate traffic tieups along Steeles References Edit Market Village closes its doors blogTO Retrieved 2018 04 02 The Remington Centre will not be a strip club http www remingtoncentre ca pdf newsletter 201211 en pdf bare URL PDF In the Loop July 2011 PDF Remington Group Retrieved 29 January 2012 External links Edit Wikimedia Commons has media related to Remington Centre Official website Retrieved from https en wikipedia org w index php title Remington Centre amp oldid 1107959840, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.