fbpx
Wikipedia

Prajapati Nagar metro station

Prajapati Nagar is the elevated eastern terminal metro station on the East-West Corridor of the Aqua Line of Nagpur Metro in Nagpur, India.[1] This metro station was inaugurated on 11 December 2022 by Prime Minister Narendra Modi and was opened to the public on 12 December 2022. [2][3]

Prajapati Nagar
Nagpur Metro station
General information
LocationOld Pardi Naka, Surya Nagar, Nagpur, Maharashtra 440035
Coordinates21°09′00″N 79°08′55″E / 21.14996°N 79.14870°E / 21.14996; 79.14870
Owned byMaharashtra Metro Rail Corporation Limited (MAHA-METRO)
Operated byNagpur Metro
Line(s)Aqua Line
PlatformsSide platform
Platform-1 → Train Terminates Here
Platform-2 → Lokmanya Nagar
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes
Other information
StatusOperational
History
Opening12 December 2022; 16 months ago (12 December 2022)
Electrified750 V DC third rail
Services
Preceding station Nagpur Metro Following station
Terminus Aqua Line Vaishnodevi Square
Route map
Location

Station layout edit

Prajapati Nagar track layout
 
 
 
 
P2
 
 
 
P1
 
 
 
to Train Terminates Here
 
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left  
Platform 1
Eastbound
Towards → Train Terminates Here
Platform 2
Westbound
Towards ← Lokmanya Nagar next station is Vaishno Devi Square
Side platform | Doors will open on the left  
L2

Entry/Exit edit

See also edit

References edit

  1. ^ "PM Modi Inaugurates Nagpur Metro, Flags Off 6th Vande Bharat Train". NDTV.com. Retrieved 12 August 2023.
  2. ^ "PM Modi to launch remaining routes in Nagpur Metro phase-I on December 11". The Indian Express. 5 December 2022. Retrieved 12 August 2023.
  3. ^ "PM Modi inaugurates Phase-I of Nagpur Metro, takes a ride". Business Today. 11 December 2022. Retrieved 12 August 2023.

External links edit

  • Nagpur Metro Official Website

prajapati, nagar, metro, station, prajapati, nagar, elevated, eastern, terminal, metro, station, east, west, corridor, aqua, line, nagpur, metro, nagpur, india, this, metro, station, inaugurated, december, 2022, prime, minister, narendra, modi, opened, public,. Prajapati Nagar is the elevated eastern terminal metro station on the East West Corridor of the Aqua Line of Nagpur Metro in Nagpur India 1 This metro station was inaugurated on 11 December 2022 by Prime Minister Narendra Modi and was opened to the public on 12 December 2022 2 3 Prajapati NagarNagpur Metro stationGeneral informationLocationOld Pardi Naka Surya Nagar Nagpur Maharashtra 440035Coordinates21 09 00 N 79 08 55 E 21 14996 N 79 14870 E 21 14996 79 14870Owned byMaharashtra Metro Rail Corporation Limited MAHA METRO Operated byNagpur MetroLine s Aqua LinePlatformsSide platformPlatform 1 Train Terminates HerePlatform 2 Lokmanya NagarTracks2ConstructionStructure typeElevated Double trackPlatform levels2AccessibleYesOther informationStatusOperationalHistoryOpening12 December 2022 16 months ago 12 December 2022 Electrified750 V DC third railServicesPreceding station Nagpur Metro Following station Terminus Aqua Line Vaishnodevi Squaretowards Lokmanya NagarRoute mapLegend Prajapati Nagar Vaishnodevi Square Ambedkar Square Telephone Exchange Chitar Oli Square Agrasen Square Dosar Vaishya Square Nagpur Railway Station Cotton Market Sitabuldi Orange Line Jhansi Rani Square Institute of Engineers Shankar Nagar Square LAD Square Dharampeth College Subhash Nagar Rachana Ring Road Junction Vasudev Nagar Bansi Nagar Hingna Mount View Depot Lokmanya NagarLocation Contents 1 Station layout 2 Entry Exit 3 See also 4 References 5 External linksStation layout editPrajapati Nagar track layout Legend nbsp nbsp nbsp nbsp to Vaishnodevi Square P2 nbsp nbsp nbsp P1 nbsp nbsp nbsp to Train Terminates Here nbsp Station with two tracks and two side platforms G Street level Exit Entrance L1 Mezzanine Fare control station agent Metro Card vending machines crossover L2 Side platform Doors will open on the left nbsp Platform 1Eastbound Towards Train Terminates Here Platform 2Westbound Towards Lokmanya Nagar next station is Vaishno Devi Square Side platform Doors will open on the left nbsp L2Entry Exit editThis section is empty You can help by adding to it August 2023 See also editNagpur Maharashtra List of Nagpur Metro stations Rapid transit in IndiaReferences edit PM Modi Inaugurates Nagpur Metro Flags Off 6th Vande Bharat Train NDTV com Retrieved 12 August 2023 PM Modi to launch remaining routes in Nagpur Metro phase I on December 11 The Indian Express 5 December 2022 Retrieved 12 August 2023 PM Modi inaugurates Phase I of Nagpur Metro takes a ride Business Today 11 December 2022 Retrieved 12 August 2023 External links editNagpur Metro Official Website Retrieved from https en wikipedia org w index php title Prajapati Nagar metro station amp oldid 1216942088, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.