The Old Dominion University (ODU) maglev was a failed public transit maglev system for the campus, developed in 2001.[1] It was developed in partnership with the company American Maglev Technology (AMT) from Georgia and with funding coming from Dominion Virginia Power, Lockheed Martin, and the state.[2] The track spanned 1 kilometer (0.6 miles) from Powhatan Avenue to 46th Street in Norfolk, Virginia.[3] ODU claimed it would have been the first of its kind in America.[4] The guideway served as an important landmark for students.[5] The system has been completely torn down, with the only part remaining being a section of the concrete guideway that spans overtop Hampton Boulevard.[6][5]

Old Dominion University Maglev
The maglev at one of the stations
Overview
Other name(s)ODU Maglev
StatusDemolished
OwnerOld Dominion University
LocaleNorfolk, Virginia
Termini
  • Powhatan Avenue Residence Halls
  • Ted Constant Convocation Center Parking Garage
Stations3 (planned)
Service
TypeMaglev
Rolling stock1 custom-built train
History
Commenced2001
Planned openingAround 2002 (not met)
Closed2003
Technical
Line length1 km (0.62 mi)
Number of tracks1
CharacterFully elevated
Operating speed40 mph (64 km/h)

History edit

 
The remaining section of the guideway over Hampton Boulevard.

Plans for the maglev were first announced in 1999, with it slated to begin groundbreaking in the spring of 2001.[4] The maglev was given an initial budget of $14 million. A groundbreaking ceremony was held on August 2001[7] and by 2002, the concrete guideway and steel track had been completed.[8] The train was put on the track the same year. The vehicle was made from a modified railcar from a different system that had been decommissioned in Florida.[9]

Due to multiple technical issues that consumed the budget, the system was not open yet by 2003. AMT was also faced with lawsuits for not paying contractors working on the system, resulting in additional delays.[10] The vehicle failed to reach its proposed speed of 40 miles per hour, instead only roughly moving around 45 feet before coming to a stop[11] and it made bumping and rattling noises, in addition to vibrating.[12] ODU was granted another $2 million loan to continue development by the Federal Railroad Administration in 2003 due to these issues,[11] although they estimated another $5 million would be needed to finish the stations.[2] AMT departed from the contract around the same time.[12] Due to these issues, it would be announced they would focus on researching maglev technology instead of aiming to get the system operational for public transport.[3][13]

In 2006, ODU reported that they had made improvements on the train and had successfully moved it from one end of the campus to another without major issues.[14][15]

 
The ODU maglev sitting at the Powhatan Avenue end, circa 2009

In 2008, ODU announced a partnership with another company, MagneMotion Inc. from Massachusetts, to continue research and development of maglev technology using money from a federal Urban Maglev Program grant. The project would create a new vehicle but reuse the currently existing guideway.[13] A 12 foot long bogie was successfully tested in 2009,[16] which led to plans to continue further development with MagneMotion using a new prototype vehicle built by the company.[17] Later on in 2010, a majority of the existing metal track except for a section near Powhatan Avenue was sold off for scrap money to continue research,[18] along with the demolition of what was built of one of the stations.[17] It is unclear what happened to the original vehicle. A new 80 foot section of track was built on top of the concrete guideway to better interact with the prototype vehicle.[18] A 2013 report on the MagneMotion vehicle published by the Federal Railroad Administration states that the prototype vehicle was successful but additional testing was needed to ensure its reliability for commercial usage.[19] This report also stated that MagneMotion was considering either using the rest of the track at ODU to finish testing or building a test facility in Devens, Massachusetts to complete the design.

After this phase, the guideway sat idle for many years with no further tests being seemingly being conducted. Students at Old Dominion University used it as a rain shelter[8] and as a landmark in the meantime. It was eventually demolished in the summer of 2023, except for one segment that was kept over Hampton Boulevard.[5][6]

Planned infrastructure edit

 
These trees and parking garage mark the location of a former station at ODU's convocation center. The maglev used to be parked here before being moved to Powhatan Avenue.

According to an ODU press report, the maglev system would have featured a singular train that ran in intervals of four minutes, with a planned top speed of 40 miles per hour and a capacity of 140. It would have been free of cost to ride and would have featured 3 stations - one at the residence halls, one at the 43rd street garage, and one at the convocation center parking garage.[4] The train levitated around half an inch off of the track.[14] The length of the track was 1 kilometer, or around 3,200 feet.[15]

Criticism edit

The maglev system was criticized for remaining unfinished and for going through a high budget, with a couple sources calling it a $16 million flop[8][5] and one calling it infamous.[6] Old Dominion University students reportedly called it the "mag left" after it was reported the project would be left unfinished.[20] Students were also critical of it being demolished, wondering why they would build it if it was never used and sad that an ODU landmark was being taken down.[5]

See also edit

References edit

  1. ^ Bookman, Steve; Ritchie, Jessica (2017). Old Dominion University. Charleston, South Carolina: Arcadia Publishing. ISBN 9781467127004.
  2. ^ a b "ODU's $2 million to fix maglev". The Washington Times. 2003-09-07. from the original on 2024-01-13. Retrieved 2024-01-13.
  3. ^ a b Bookman, Steve (2017-10-26). "MAGLEV". Old Dominion University History Wiki. from the original on 2024-01-13. Retrieved 2024-01-12.
  4. ^ a b c "INNOVATIVE MAGLEV TRANSPORTATION SYSTEM -- FIRST OF ITS KIND IN THE COUNTRY -- TO BE BUILT ON OLD DOMINION CAMPUS". Old Dominion University. December 1999. from the original on 2022-10-10. Retrieved 2024-01-12.
  5. ^ a b c d e Head, Leondra (2023-06-06). "'It's heartbreaking:' Demolition of failed maglev underway at ODU". News 3 WTKR Norfolk. from the original on 2024-01-13. Retrieved 2024-01-13.
  6. ^ a b c Reese, Brian (2023-05-10). "ODU's 'Maglev' in process of being removed". WAVY.com. from the original on 2024-01-19. Retrieved 2024-01-13.
  7. ^ "GROUNDBREAKING FOR MAGLEV TRANSPORTATION SYSTEM TODAY". Old Dominion University. August 2001. from the original on 2022-10-10. Retrieved 2024-01-13.
  8. ^ a b c Patton, Zach (2018-12-21). "Behind the Lens: A $16 Million Flop". Governing. from the original on 2024-01-13. Retrieved 2024-01-13.
  9. ^ Giusti, Michael (2002-06-12). . The Daytona Beach News-Journal. Archived from the original on 2011-06-08. Retrieved 2024-01-13.
  10. ^ "ODU's stop-and-start maglev project back on track 2024-01-14 at the Wayback Machine". Suffolk News-Herald. Vol. 75, no. 94. 2004-04-18. p. 13. Retrieved 2024-01-14.
  11. ^ a b Witt, Will (2022-11-15). "Twenty One Years Later, the Ghost of ODU's Monorail Remains". Mace & Crown. from the original on 2024-01-13. Retrieved 2024-01-13.
  12. ^ a b Messina, Debbie (2007-04-11). "Doesn't run in Fla. Stalled at ODU. Now maglev maven is in Georgia". The Virginian-Pilot. from the original on 2024-01-13. Retrieved 2024-01-13.
  13. ^ a b Messina, Debbie (2008-01-15). "ODU partners with Massachusetts company to test another maglev train". The Virginian-Pilot. from the original on 2024-01-13. Retrieved 2024-01-13.
  14. ^ a b "MAGLEV PASSES NEW MILESTONE". Old Dominion University. November 2006. from the original on 2022-10-11. Retrieved 2024-01-13.
  15. ^ a b Debbie, Messina (2006-08-14). "Trial run of ODU maglev gets it off the ground". The Virginian-Pilot. from the original on 2024-01-13. Retrieved 2024-01-13.
  16. ^ "MAGLEV Passes Milestone TEST". Old Dominion University. December 2009. from the original on 2022-10-12. Retrieved 2024-01-13.
  17. ^ a b Messina, Debbie (2010-01-10). "ODU's stalled maglev gears up for next phase". The Virginian-Pilot. from the original on 2024-01-13. Retrieved 2024-01-13.
  18. ^ a b Messina, Debbie (2010-06-20). "ODU to sell unused material to keep maglev research on track". The Virginian-Pilot. from the original on 2024-01-13. Retrieved 2024-01-13.
  19. ^ Lanzilotti, Lisa; Alberts, Thomas (2013). "MagneMotion Maglev Demonstration on ODU Guideway" (PDF). University of Washington. Federal Railroad Administration. (PDF) from the original on 2024-01-13. Retrieved 2024-01-13.
  20. ^ Vogel, Mike (2015-05-27). "Still hovering: Tony Morris pushes 'maglev' trains". Florida Trend. from the original on 2024-01-14. Retrieved 2024-01-15.

External links edit

  • Pictures of the ODU maglev system in 2015
  • Two pictures of the maglev from 2005
  • MAGLEV on the ODU Wiki

dominion, university, maglev, dominion, university, maglev, failed, public, transit, maglev, system, campus, developed, 2001, developed, partnership, with, company, american, maglev, technology, from, georgia, with, funding, coming, from, dominion, virginia, p. The Old Dominion University ODU maglev was a failed public transit maglev system for the campus developed in 2001 1 It was developed in partnership with the company American Maglev Technology AMT from Georgia and with funding coming from Dominion Virginia Power Lockheed Martin and the state 2 The track spanned 1 kilometer 0 6 miles from Powhatan Avenue to 46th Street in Norfolk Virginia 3 ODU claimed it would have been the first of its kind in America 4 The guideway served as an important landmark for students 5 The system has been completely torn down with the only part remaining being a section of the concrete guideway that spans overtop Hampton Boulevard 6 5 Old Dominion University MaglevThe maglev at one of the stationsOverviewOther name s ODU MaglevStatusDemolishedOwnerOld Dominion UniversityLocaleNorfolk VirginiaTerminiPowhatan Avenue Residence HallsTed Constant Convocation Center Parking GarageStations3 planned ServiceTypeMaglevRolling stock1 custom built trainHistoryCommenced2001Planned openingAround 2002 not met Closed2003TechnicalLine length1 km 0 62 mi Number of tracks1CharacterFully elevatedOperating speed40 mph 64 km h Contents 1 History 2 Planned infrastructure 3 Criticism 4 See also 5 References 6 External linksHistory edit nbsp The remaining section of the guideway over Hampton Boulevard Plans for the maglev were first announced in 1999 with it slated to begin groundbreaking in the spring of 2001 4 The maglev was given an initial budget of 14 million A groundbreaking ceremony was held on August 2001 7 and by 2002 the concrete guideway and steel track had been completed 8 The train was put on the track the same year The vehicle was made from a modified railcar from a different system that had been decommissioned in Florida 9 Due to multiple technical issues that consumed the budget the system was not open yet by 2003 AMT was also faced with lawsuits for not paying contractors working on the system resulting in additional delays 10 The vehicle failed to reach its proposed speed of 40 miles per hour instead only roughly moving around 45 feet before coming to a stop 11 and it made bumping and rattling noises in addition to vibrating 12 ODU was granted another 2 million loan to continue development by the Federal Railroad Administration in 2003 due to these issues 11 although they estimated another 5 million would be needed to finish the stations 2 AMT departed from the contract around the same time 12 Due to these issues it would be announced they would focus on researching maglev technology instead of aiming to get the system operational for public transport 3 13 In 2006 ODU reported that they had made improvements on the train and had successfully moved it from one end of the campus to another without major issues 14 15 nbsp The ODU maglev sitting at the Powhatan Avenue end circa 2009In 2008 ODU announced a partnership with another company MagneMotion Inc from Massachusetts to continue research and development of maglev technology using money from a federal Urban Maglev Program grant The project would create a new vehicle but reuse the currently existing guideway 13 A 12 foot long bogie was successfully tested in 2009 16 which led to plans to continue further development with MagneMotion using a new prototype vehicle built by the company 17 Later on in 2010 a majority of the existing metal track except for a section near Powhatan Avenue was sold off for scrap money to continue research 18 along with the demolition of what was built of one of the stations 17 It is unclear what happened to the original vehicle A new 80 foot section of track was built on top of the concrete guideway to better interact with the prototype vehicle 18 A 2013 report on the MagneMotion vehicle published by the Federal Railroad Administration states that the prototype vehicle was successful but additional testing was needed to ensure its reliability for commercial usage 19 This report also stated that MagneMotion was considering either using the rest of the track at ODU to finish testing or building a test facility in Devens Massachusetts to complete the design After this phase the guideway sat idle for many years with no further tests being seemingly being conducted Students at Old Dominion University used it as a rain shelter 8 and as a landmark in the meantime It was eventually demolished in the summer of 2023 except for one segment that was kept over Hampton Boulevard 5 6 Planned infrastructure edit nbsp These trees and parking garage mark the location of a former station at ODU s convocation center The maglev used to be parked here before being moved to Powhatan Avenue According to an ODU press report the maglev system would have featured a singular train that ran in intervals of four minutes with a planned top speed of 40 miles per hour and a capacity of 140 It would have been free of cost to ride and would have featured 3 stations one at the residence halls one at the 43rd street garage and one at the convocation center parking garage 4 The train levitated around half an inch off of the track 14 The length of the track was 1 kilometer or around 3 200 feet 15 Criticism editThe maglev system was criticized for remaining unfinished and for going through a high budget with a couple sources calling it a 16 million flop 8 5 and one calling it infamous 6 Old Dominion University students reportedly called it the mag left after it was reported the project would be left unfinished 20 Students were also critical of it being demolished wondering why they would build it if it was never used and sad that an ODU landmark was being taken down 5 See also editTongji University a college in China with a working maglev test track Morgantown Personal Rapid Transit West Virginia University s on campus public transit system Shanghai maglev a maglev built around the same time that was often compared to the ODU maglevReferences edit Bookman Steve Ritchie Jessica 2017 Old Dominion University Charleston South Carolina Arcadia Publishing ISBN 9781467127004 a b ODU s 2 million to fix maglev The Washington Times 2003 09 07 Archived from the original on 2024 01 13 Retrieved 2024 01 13 a b Bookman Steve 2017 10 26 MAGLEV Old Dominion University History Wiki Archived from the original on 2024 01 13 Retrieved 2024 01 12 a b c INNOVATIVE MAGLEV TRANSPORTATION SYSTEM FIRST OF ITS KIND IN THE COUNTRY TO BE BUILT ON OLD DOMINION CAMPUS Old Dominion University December 1999 Archived from the original on 2022 10 10 Retrieved 2024 01 12 a b c d e Head Leondra 2023 06 06 It s heartbreaking Demolition of failed maglev underway at ODU News 3 WTKR Norfolk Archived from the original on 2024 01 13 Retrieved 2024 01 13 a b c Reese Brian 2023 05 10 ODU s Maglev in process of being removed WAVY com Archived from the original on 2024 01 19 Retrieved 2024 01 13 GROUNDBREAKING FOR MAGLEV TRANSPORTATION SYSTEM TODAY Old Dominion University August 2001 Archived from the original on 2022 10 10 Retrieved 2024 01 13 a b c Patton Zach 2018 12 21 Behind the Lens A 16 Million Flop Governing Archived from the original on 2024 01 13 Retrieved 2024 01 13 Giusti Michael 2002 06 12 Maglev train makes tracks to Va The Daytona Beach News Journal Archived from the original on 2011 06 08 Retrieved 2024 01 13 ODU s stop and start maglev project back on track Archived 2024 01 14 at the Wayback Machine Suffolk News Herald Vol 75 no 94 2004 04 18 p 13 Retrieved 2024 01 14 a b Witt Will 2022 11 15 Twenty One Years Later the Ghost of ODU s Monorail Remains Mace amp Crown Archived from the original on 2024 01 13 Retrieved 2024 01 13 a b Messina Debbie 2007 04 11 Doesn t run in Fla Stalled at ODU Now maglev maven is in Georgia The Virginian Pilot Archived from the original on 2024 01 13 Retrieved 2024 01 13 a b Messina Debbie 2008 01 15 ODU partners with Massachusetts company to test another maglev train The Virginian Pilot Archived from the original on 2024 01 13 Retrieved 2024 01 13 a b MAGLEV PASSES NEW MILESTONE Old Dominion University November 2006 Archived from the original on 2022 10 11 Retrieved 2024 01 13 a b Debbie Messina 2006 08 14 Trial run of ODU maglev gets it off the ground The Virginian Pilot Archived from the original on 2024 01 13 Retrieved 2024 01 13 MAGLEV Passes Milestone TEST Old Dominion University December 2009 Archived from the original on 2022 10 12 Retrieved 2024 01 13 a b Messina Debbie 2010 01 10 ODU s stalled maglev gears up for next phase The Virginian Pilot Archived from the original on 2024 01 13 Retrieved 2024 01 13 a b Messina Debbie 2010 06 20 ODU to sell unused material to keep maglev research on track The Virginian Pilot Archived from the original on 2024 01 13 Retrieved 2024 01 13 Lanzilotti Lisa Alberts Thomas 2013 MagneMotion Maglev Demonstration on ODU Guideway PDF University of Washington Federal Railroad Administration Archived PDF from the original on 2024 01 13 Retrieved 2024 01 13 Vogel Mike 2015 05 27 Still hovering Tony Morris pushes maglev trains Florida Trend Archived from the original on 2024 01 14 Retrieved 2024 01 15 External links editPictures of the ODU maglev system in 2015 Two pictures of the maglev from 2005 MAGLEV on the ODU Wiki Archived copy of ODU s maglev website Retrieved from https en wikipedia org w index php title Old Dominion University maglev amp oldid 1215274657, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.