fbpx
Wikipedia

North Triangle Common Station

The North Triangle Common Station[3][4] (official temporary designation: Unified Grand Central Station,[5] also called Grand Central Station), popularly known as the Common Station, is an under-construction[6] rapid transit terminal and transport hub that will connect LRT Line 1, MRT Line 3, and MRT Line 7,[7] and the nearby Metro Manila Subway.[8][9] It is located in Bagong Pag-asa, Quezon City, Philippines, and is named after its location, which is at the corner of EDSA and North Avenue.[10]

North Triangle Common Station
The construction progress of Area A in October 2023
General information
Other namesNorth Avenue Common Station
Unified Grand Central Common Station
Location Quezon City, Metro Manila
Philippines
Owned by
Operated by
Line(s)
PlatformsSide and island platforms
Tracks7
ConnectionsFuture:  MMS  North Avenue
Construction
Structure typeElevated
ParkingYes (TriNoma, SM City North EDSA)
Other information
StatusUnder construction
History
Opening2024 (partial)[1]
2025 (full)[1]
Previous namesMetro Manila Integrated Rail Terminal
Passengers
478,000 (projected)[2]
Services
Preceding station
Manila LRT
Following station
Terminus Line 1 Fernando Poe Jr.
towards Baclaran
Preceding station Manila MRT Following station
Terminus Line 3 Quezon Avenue
towards Taft Avenue
Line 7 Quezon Memorial Circle

The common alignment had been in limbo for years since the Department of Transportation and Communications (DOTC), now Department of Transportation (DOTr), reviewed the project's technical and financial components.[11] It was in January 2017 that an agreement was reached to build the station. The groundbreaking of the station was held at the North Triangle Transport Terminal in September 2017. The station was expected to fully open in January 2021 but has now been targeted to 2025, with partial operations for MRT-3 and LRT-1 slated for the end of 2023.[12]

History edit

Negotiations edit

On June 2, 2011, the Department of Transportation and Communications (DOTC) called for bidders for the contract to build the station, which was estimated to cost 1.5 billion.[7] But on July 13 of that year, then-Secretary of Transportation and Communications Mar Roxas announced a review of the project and considering adding store space for lease. The government, by that time, had allotted ₱2 billion for its construction.[10]

On July 22, 2012, the government shelved the project indefinitely due to the Philippine financial crisis in favor of demolition of the tracks and pillars.[13] Secretary Roxas said that the station was being studied by engineers because the MRT-3's original plans did not include the station, and that problems with the line's timing system may arise. He included that in the event that the station does not go through, the ₱200 million paid by SM Prime Holdings, Inc., the operator of SM City North EDSA and other SM Malls, to the Light Rail Transit Authority for naming rights may have to be returned.

However, at the start of 2013, Roxas' successor, Joseph Emilio Abaya announced that the government has cancelled and abandoned the project indefinitely because the construction of the common station was supposed to be completed back in May 2010 during the presidency of Gloria Macapagal Arroyo but disputes over cost, engineering issues and naming rights caused due to the halting of the project by Arroyo's successor President Benigno Aquino III on January 2, 2013.

On January 9, 2013, Abaya announced that the government has filed for the candidacies for three sites of the common station linking three rapid transit systems for Metro Manila, DOTC is not keen on build the common station in front of the Annex Building of the SM City North EDSA shopping mall, adding that other potential locations are the TriNoma mall and the Malvar LRT station in Caloocan. Abaya said the agency is awaiting the results of a study that would determine the final location of the common station. He had said the original design near SM City North EDSA Annex was "ineffective and costly" because the rails of Line 3 would have to be extended and trains would have to be added.[14]

On November 21, 2013, the NEDA board, chaired by President Benigno Aquino III, approved the construction of a common station within North Avenue between SM City North EDSA and TriNoma, estimated to cost ₱1.4 billion. The station was set to feature head-to-head platforms for LRT 1 and MRT 3 trains with a 147.4 m (483 ft 7 in) elevated walkalator to MRT 7,[15] inconsistent with the original plan of having seamless connectivity to Monumento and is also an unusual arrangement of having two train stations beside each other.[16] Secretary Abaya said that SM would be able to keep the naming rights for the station, even if it is transferred near rival Ayala's TriNoma mall.[17] This led to the change of the station's location, which was initially set to be near SM City North EDSA, earning the ire of the group of the country's largest mall operator SM Prime Holdings Inc., which paid an initial ₱200 million for the naming rights of the station.

Transportation officials have repeatedly said building the station near TriNoma is both economically and environmentally viable, as this would result in a lower cost and less urban blight.

SM Prime then brought its battle to the Supreme Court, which issued a stay order against the DOTC and the Light Rail Transit Authority (LRTA) in June 2014, enjoining them to stop the transfer of the common alignment's location.[11][18][19]

Agreement edit

At a business forum held on August 12, 2016, Department of Transportation (now abbreviated as DOTr) Secretary Arthur Tugade said that all stakeholders namely Metro Pacific Corporation, SMC-Mass Rail Transit 7 Inc. of San Miguel Corporation, SM Prime Holdings, and Ayala Corporation had agreed in principle that the common station will be built in North Avenue between the Southeast end of SM North EDSA and North side of the TriNoma Mall.[20] Negotiations took about 8 years for the station to be built near SM North EDSA and TriNoma.[21]

A memorandum of agreement was signed by the station's stakeholders on January 18, 2017.[5]

Construction edit

 
Area B construction progress in January 2020
 
Area C construction progress in August 2022

The groundbreaking ceremony of the station was held on September 29, 2017, marking the start of construction.[19] It is planned to be completed in 2023. Three areas were designated for the project with each area with its own developers. Area A which will host a platform and concourse for Lines 1 and 3 will be developed by the Department of Transportation. Area B, which covers two concourses that will connect Areas A and C will be developed by North Triangle Depot Commercial Corporation, an affiliate of Ayala Land. San Miguel Corporation will develop and finance Area C which will host the Line 7 platform. By January 2017, the projected cost for the station is ₱2.8 billion.[21][22]

The construction of Area A is carried out by BF Corporation and Foresight Development and Surveying Company. The contract for the construction of Area A was signed on February 13, 2019.[23] The Area A involves a spur line branching from Line 1's portion, reusing the previously dug foundations originally intended for the station in front of SM North EDSA for its pier beams. All-steel girders will be used.

As of January 31, 2023, the station is 79.72% complete.[24] The station was originally supposed to open in January 2021,[1] but mainly due to the COVID-19 pandemic, which affected manpower as well as construction logistics delays, the station opening was postponed to June 2023,[1] with full operations expected to begin by 2025.[1] Issues such as utilities relocation, the aforementioned pandemic-related issues, and systems upgrades (such as signalling & automated fare collection)[1] contributed to repeated completion delays. In April, additional delays have pushed back the opening of the common station to the end of 2023.[12]

Naming edit

In 2009, SM Prime Holdings which owns SM North EDSA secured naming rights for the station by paying ₱200 million while Ayala which owns TriNoma contributed ₱150 million which also made it eligible for naming rights.[5] In January 2017, it was agreed that naming rights of both SM Prime Holdings and Ayala will be honored and until the two companies agreed upon a name, the station shall be temporarily called as the Unified Grand Central Station.[5]

Station layout edit

The station is divided into three primary areas: A, B, and C. Area A hosts a platform and concourse for Lines 1 and 3. Area B will connect Areas A and C. Area C hosts a platform and concourse for Line 7.[21]

See also edit

External links edit

  • North Avenue Common station construction

References edit

  1. ^ a b c d e f Chavez, Cesar (February 20, 2023). "Common Station na magdurugtong sa MRT-3 at LRT-1, planong buksan sa Hunyo – DOTr" [Common Station that will connect MRT Line 3 and LRT Line 1, planned to open in June – DOTr]. Ito Ang Balita (Interview) (in Filipino). Interviewed by JP Nuñez. Philippines: UNTV News and Rescue. Retrieved February 21, 2023.[unreliable source?]
  2. ^ Rosales, Clara (June 9, 2022). "LOOK: The Common Station Connecting Metro Trains is Almost Complete". reportr.world. Retrieved June 9, 2022.
  3. ^ "Take a look at the North Avenue Common Station project". philkotse.com. Retrieved April 26, 2021.
  4. ^ "North Triangle Common Station". Visionarch. Retrieved April 26, 2021.
  5. ^ a b c d Gonzales, Yuji Vincent (January 19, 2017). "What will the MRT-LRT common station be called?". Inquirer.net. Retrieved January 19, 2017.
  6. ^ Jiao, Claire (September 29, 2017). . CNN Philippines. Archived from the original on April 11, 2018. Retrieved April 10, 2018.
  7. ^ a b Montecillo, Paolo G. (June 5, 2011). "Bidders for LRT-MRT central station sought". Inquirer.net. Retrieved October 23, 2012.
  8. ^ Pateña, Aerol John (February 13, 2019). "DOTr inks deal on common station construction". Philippine News Agency. Retrieved February 22, 2022.
  9. ^ Department of Transportation (March 7, 2022). . dotr.gov.ph. Archived from the original on March 8, 2022. Retrieved March 31, 2022.
  10. ^ a b Montecillo, Paolo G. (July 13, 2011). "DOTC reviews MRT-LRT central station project". Inquirer.net. Retrieved October 24, 2012.
  11. ^ a b Marasigan, Lorenz S. (February 25, 2015). "SM ready to end feud with Ayala". BusinessMirror.
  12. ^ a b Manabat, Jacque (April 12, 2023). "Opening of common station for train lines postponed anew". ABS-CBN News.
  13. ^ Venzon, Cliff Harvey (July 23, 2012). . BusinessWorld. Archived from the original on April 26, 2021. Retrieved April 26, 2021.
  14. ^ Amojelar, Darwin G. (January 9, 2013). . Archived from the original on February 2, 2017.
  15. ^ Tan, Kimberly Jane (November 21, 2013). "NEDA approves MRT 7, LRT-1 extension projects". GMA News and Public Affairs. Retrieved January 1, 2014.
  16. ^ Marasigan, Gelo; Remitio, Rex (September 28, 2016). . CNN Philippines. Archived from the original on April 10, 2018. Retrieved April 10, 2018.
  17. ^ "MRT-LRT common station to be located at Trinoma". ABS-CBN News. April 22, 2014.
  18. ^ Flores, Mikhail Franz; dela Paz, Chrisee Jalyssa (August 2, 2014). . BW. Archived from the original on June 16, 2018. Retrieved August 2, 2014.
  19. ^ a b Fe, Kaye (September 29, 2017). "Construction of P2.8-B Grand Unified Central Station to begin after almost a decade of delay". Eagle News. Eagle Broadcasting Corporation. Retrieved September 29, 2017.
  20. ^ Camus, Miguel R. (August 13, 2016). "Common railway station row resolved". Inquirer.net.
  21. ^ a b c Ong, Jennifer (January 19, 2017). . International Business Times. IBT Media Inc. Archived from the original on January 31, 2017. Retrieved January 19, 2017.
  22. ^ GMA News (January 18, 2017). Common station na magkokonekta sa LRT1, MRT3 at MRT7, sisimulan sa Disyembre. YouTube. Archived from the original on December 15, 2021. Retrieved May 19, 2021.
  23. ^ Valdez, Denise A. (February 13, 2019). "Contracting arrangements finalized for common station". BusinessWorld. Retrieved August 15, 2021.
  24. ^ "HOUSE TACKLES DOTR'S RAILWAY PROJECTS STATUS, URGES AGENCY TO FIX PROJECT DELAYS". House of Representatives of the Philippines. Press and Public Affairs Bureau. February 16, 2023. Retrieved February 21, 2023.

14°39′21″N 121°1′41″E / 14.65583°N 121.02806°E / 14.65583; 121.02806

north, triangle, common, station, nearby, line, station, intends, replace, north, avenue, station, official, temporary, designation, unified, grand, central, station, also, called, grand, central, station, popularly, known, common, station, under, construction. For the nearby MRT Line 3 station it intends to replace see North Avenue station MRT The North Triangle Common Station 3 4 official temporary designation Unified Grand Central Station 5 also called Grand Central Station popularly known as the Common Station is an under construction 6 rapid transit terminal and transport hub that will connect LRT Line 1 MRT Line 3 and MRT Line 7 7 and the nearby Metro Manila Subway 8 9 It is located in Bagong Pag asa Quezon City Philippines and is named after its location which is at the corner of EDSA and North Avenue 10 North Triangle Common StationThe construction progress of Area A in October 2023General informationOther namesNorth Avenue Common StationUnified Grand Central Common StationLocationEDSA Bagong Pag asa LRT 1 and MRT 3 North Avenue Bagong Pag asa MRT 7 Quezon City Metro ManilaPhilippinesOwned byDepartment of Transportation Metro Rail Transit CorporationOperated byDepartment of Transportation Light Rail Manila Corporation Metro Rail Transit Corporation SMC Mass Rail Transit 7 IncorporatedLine s Line 1 Line 3 Line 7PlatformsSide and island platformsTracks7 2 for Line 12 for Line 33 for Line 7ConnectionsFuture MMS North AvenueConstructionStructure typeElevatedParkingYes TriNoma SM City North EDSA Other informationStatusUnder constructionHistoryOpening2024 partial 1 2025 full 1 Previous namesMetro Manila Integrated Rail TerminalPassengers478 000 projected 2 ServicesPreceding station Manila LRT Following station Terminus Line 1 Fernando Poe Jr towards Baclaran Preceding station Manila MRT Following station Terminus Line 3 Quezon Avenuetowards Taft Avenue Line 7 Quezon Memorial Circletowards San Jose Del Monte The common alignment had been in limbo for years since the Department of Transportation and Communications DOTC now Department of Transportation DOTr reviewed the project s technical and financial components 11 It was in January 2017 that an agreement was reached to build the station The groundbreaking of the station was held at the North Triangle Transport Terminal in September 2017 The station was expected to fully open in January 2021 but has now been targeted to 2025 with partial operations for MRT 3 and LRT 1 slated for the end of 2023 12 Contents 1 History 1 1 Negotiations 1 2 Agreement 1 3 Construction 2 Naming 3 Station layout 4 See also 5 External links 6 ReferencesHistory editNegotiations edit On June 2 2011 the Department of Transportation and Communications DOTC called for bidders for the contract to build the station which was estimated to cost 1 5 billion 7 But on July 13 of that year then Secretary of Transportation and Communications Mar Roxas announced a review of the project and considering adding store space for lease The government by that time had allotted 2 billion for its construction 10 On July 22 2012 the government shelved the project indefinitely due to the Philippine financial crisis in favor of demolition of the tracks and pillars 13 Secretary Roxas said that the station was being studied by engineers because the MRT 3 s original plans did not include the station and that problems with the line s timing system may arise He included that in the event that the station does not go through the 200 million paid by SM Prime Holdings Inc the operator of SM City North EDSA and other SM Malls to the Light Rail Transit Authority for naming rights may have to be returned However at the start of 2013 Roxas successor Joseph Emilio Abaya announced that the government has cancelled and abandoned the project indefinitely because the construction of the common station was supposed to be completed back in May 2010 during the presidency of Gloria Macapagal Arroyo but disputes over cost engineering issues and naming rights caused due to the halting of the project by Arroyo s successor President Benigno Aquino III on January 2 2013 On January 9 2013 Abaya announced that the government has filed for the candidacies for three sites of the common station linking three rapid transit systems for Metro Manila DOTC is not keen on build the common station in front of the Annex Building of the SM City North EDSA shopping mall adding that other potential locations are the TriNoma mall and the Malvar LRT station in Caloocan Abaya said the agency is awaiting the results of a study that would determine the final location of the common station He had said the original design near SM City North EDSA Annex was ineffective and costly because the rails of Line 3 would have to be extended and trains would have to be added 14 On November 21 2013 the NEDA board chaired by President Benigno Aquino III approved the construction of a common station within North Avenue between SM City North EDSA and TriNoma estimated to cost 1 4 billion The station was set to feature head to head platforms for LRT 1 and MRT 3 trains with a 147 4 m 483 ft 7 in elevated walkalator to MRT 7 15 inconsistent with the original plan of having seamless connectivity to Monumento and is also an unusual arrangement of having two train stations beside each other 16 Secretary Abaya said that SM would be able to keep the naming rights for the station even if it is transferred near rival Ayala s TriNoma mall 17 This led to the change of the station s location which was initially set to be near SM City North EDSA earning the ire of the group of the country s largest mall operator SM Prime Holdings Inc which paid an initial 200 million for the naming rights of the station Transportation officials have repeatedly said building the station near TriNoma is both economically and environmentally viable as this would result in a lower cost and less urban blight SM Prime then brought its battle to the Supreme Court which issued a stay order against the DOTC and the Light Rail Transit Authority LRTA in June 2014 enjoining them to stop the transfer of the common alignment s location 11 18 19 Agreement edit At a business forum held on August 12 2016 Department of Transportation now abbreviated as DOTr Secretary Arthur Tugade said that all stakeholders namely Metro Pacific Corporation SMC Mass Rail Transit 7 Inc of San Miguel Corporation SM Prime Holdings and Ayala Corporation had agreed in principle that the common station will be built in North Avenue between the Southeast end of SM North EDSA and North side of the TriNoma Mall 20 Negotiations took about 8 years for the station to be built near SM North EDSA and TriNoma 21 A memorandum of agreement was signed by the station s stakeholders on January 18 2017 5 Construction edit nbsp Area B construction progress in January 2020 nbsp Area C construction progress in August 2022 The groundbreaking ceremony of the station was held on September 29 2017 marking the start of construction 19 It is planned to be completed in 2023 Three areas were designated for the project with each area with its own developers Area A which will host a platform and concourse for Lines 1 and 3 will be developed by the Department of Transportation Area B which covers two concourses that will connect Areas A and C will be developed by North Triangle Depot Commercial Corporation an affiliate of Ayala Land San Miguel Corporation will develop and finance Area C which will host the Line 7 platform By January 2017 the projected cost for the station is 2 8 billion 21 22 The construction of Area A is carried out by BF Corporation and Foresight Development and Surveying Company The contract for the construction of Area A was signed on February 13 2019 23 The Area A involves a spur line branching from Line 1 s portion reusing the previously dug foundations originally intended for the station in front of SM North EDSA for its pier beams All steel girders will be used As of January 31 2023 update the station is 79 72 complete 24 The station was originally supposed to open in January 2021 1 but mainly due to the COVID 19 pandemic which affected manpower as well as construction logistics delays the station opening was postponed to June 2023 1 with full operations expected to begin by 2025 1 Issues such as utilities relocation the aforementioned pandemic related issues and systems upgrades such as signalling amp automated fare collection 1 contributed to repeated completion delays In April additional delays have pushed back the opening of the common station to the end of 2023 12 Naming editIn 2009 SM Prime Holdings which owns SM North EDSA secured naming rights for the station by paying 200 million while Ayala which owns TriNoma contributed 150 million which also made it eligible for naming rights 5 In January 2017 it was agreed that naming rights of both SM Prime Holdings and Ayala will be honored and until the two companies agreed upon a name the station shall be temporarily called as the Unified Grand Central Station 5 Station layout editThe station is divided into three primary areas A B and C Area A hosts a platform and concourse for Lines 1 and 3 Area B will connect Areas A and C Area C hosts a platform and concourse for Line 7 21 See also editList of rail transit stations in Metro Manila Manila Light Rail Transit SystemExternal links editNorth Avenue Common station constructionReferences edit a b c d e f Chavez Cesar February 20 2023 Common Station na magdurugtong sa MRT 3 at LRT 1 planong buksan sa Hunyo DOTr Common Station that will connect MRT Line 3 and LRT Line 1 planned to open in June DOTr Ito Ang Balita Interview in Filipino Interviewed by JP Nunez Philippines UNTV News and Rescue Retrieved February 21 2023 unreliable source Rosales Clara June 9 2022 LOOK The Common Station Connecting Metro Trains is Almost Complete reportr world Retrieved June 9 2022 Take a look at the North Avenue Common Station project philkotse com Retrieved April 26 2021 North Triangle Common Station Visionarch Retrieved April 26 2021 a b c d Gonzales Yuji Vincent January 19 2017 What will the MRT LRT common station be called Inquirer net Retrieved January 19 2017 Jiao Claire September 29 2017 LRT MRT common station breaks ground CNN Philippines Archived from the original on April 11 2018 Retrieved April 10 2018 a b Montecillo Paolo G June 5 2011 Bidders for LRT MRT central station sought Inquirer net Retrieved October 23 2012 Patena Aerol John February 13 2019 DOTr inks deal on common station construction Philippine News Agency Retrieved February 22 2022 Department of Transportation March 7 2022 DOTr CONSTRUCTION OF COMMON STATION STRUCTURE TO BE COMPLETED BY END OF MARCH 2022 TUGADE dotr gov ph Archived from the original on March 8 2022 Retrieved March 31 2022 a b Montecillo Paolo G July 13 2011 DOTC reviews MRT LRT central station project Inquirer net Retrieved October 24 2012 a b Marasigan Lorenz S February 25 2015 SM ready to end feud with Ayala BusinessMirror a b Manabat Jacque April 12 2023 Opening of common station for train lines postponed anew ABS CBN News Venzon Cliff Harvey July 23 2012 Central station near SM North shelved BusinessWorld Archived from the original on April 26 2021 Retrieved April 26 2021 Amojelar Darwin G January 9 2013 DOTC to choose among 3 possible sites for common train station Archived from the original on February 2 2017 Tan Kimberly Jane November 21 2013 NEDA approves MRT 7 LRT 1 extension projects GMA News and Public Affairs Retrieved January 1 2014 Marasigan Gelo Remitio Rex September 28 2016 Finally A common station for LRT MRT lines CNN Philippines Archived from the original on April 10 2018 Retrieved April 10 2018 MRT LRT common station to be located at Trinoma ABS CBN News April 22 2014 Flores Mikhail Franz dela Paz Chrisee Jalyssa August 2 2014 High court stops transfer of common train station site BW Archived from the original on June 16 2018 Retrieved August 2 2014 a b Fe Kaye September 29 2017 Construction of P2 8 B Grand Unified Central Station to begin after almost a decade of delay Eagle News Eagle Broadcasting Corporation Retrieved September 29 2017 Camus Miguel R August 13 2016 Common railway station row resolved Inquirer net a b c Ong Jennifer January 19 2017 MRT LRT Common Station Construction To Start In 2017 International Business Times IBT Media Inc Archived from the original on January 31 2017 Retrieved January 19 2017 GMA News January 18 2017 Common station na magkokonekta sa LRT1 MRT3 at MRT7 sisimulan sa Disyembre YouTube Archived from the original on December 15 2021 Retrieved May 19 2021 Valdez Denise A February 13 2019 Contracting arrangements finalized for common station BusinessWorld Retrieved August 15 2021 HOUSE TACKLES DOTR S RAILWAY PROJECTS STATUS URGES AGENCY TO FIX PROJECT DELAYS House of Representatives of the Philippines Press and Public Affairs Bureau February 16 2023 Retrieved February 21 2023 14 39 21 N 121 1 41 E 14 65583 N 121 02806 E 14 65583 121 02806 Retrieved from https en wikipedia org w index php title North Triangle Common Station amp oldid 1224387673, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.