The Munich–Treuchtlingen railway, also known as the Altmühlbahn (Altmühl Railway), is a railway line in the German state of Bavaria. As part of the new and upgraded Nuremberg–Ingolstadt–Munich line project, the Munich-Ingolstadt section is gradually being upgraded for a line speed of up to 200 km/h (120 mph).

Munich–Treuchtlingen railway
Overview
StatusOperational
OwnerDeutsche Bahn
Line number5501
LocaleBavaria, Germany
Termini
Service
TypeHeavy rail, Passenger/freight rail
Regional rail, Intercity rail
Route number900 (Munich–Ingolstadt)
990 (Ingolstadt–Treuchtlingen)
Operator(s)DB Bahn
History
Opened14 November 1867
Technical
Line length136.747 km (84.971 mi)
Number of tracksDouble track
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification15 kV/16.7 Hz AC overhead catenary
Operating speed200 km/h (120 mph)
Route map

km
0.018
Munich
523 m
5.441
München Kanal
(junction)
to München-Pasing freight yard
to München-Laim marshalling yard
6.671
München-Obermenzing junction
7.610
München-Obermenzing
(until 2005)
9.0
München-Untermenzing
10.425
München-Allach
508 m
to Munich North marshalling yard
13.752
from Munich North marshalling yard
14.200
München-Karlsfeld
17.800
Dachau Bahnhof
18.519
Amper (53 m)
21.960
Walpertshofen
(until 2003)
22.2
Hebertshausen
(2003 deviation)
23.718
Sietenbach (141 m)
24.119
viaduct near Reipertshofen (141 m)
25.000
27.2
Röhrmoos Hp
27.217
Röhrmoos
493 m
30.3
Vierkirchen-Esterhofen
30.300
Esterhofen
(until 2003)
34.845
Glonn (51 m)
36.438
Petershausen
469 m
end of S-Bahn tracks
40.182
Paindorf
43.847
Reichertshausen (Ilm)
454 m
49.662
Pfaffenhofen (Ilm)
435 m
54.550
Uttenhofen
55.420
Walkersbach
60.169
Rohrbach (Ilm)
(Wolnzach until 2000)
420 m
to Mainburg
to Geisenfeld (until 1988)
60.822
Ilm (25 m)
66.210
Hög
70.977
Paar (69 m)
72.370
Reichertshofen (Oberbay)
(until 2011)
373 m
72.913
Baar-Ebenhausen
(since 2011)
373 m
Ebenhausen factory siding
77.080
Oberstimm
81.0
Ingolstadt
368 m
to Neuoffingen, until 1994)
B 13
83.2
Danube (Ingolstadt rail bridge, 184 m)
B 13
84.3
Ingolstadt Nord
to Riedenburg
84.3
87.9
Ingolstadt north yard
90.0
Gaimersheim
387 m
B 13 bridge
94.2
Eitensheim
97.5
Tauberfeld
421 m
102.9
Adelschlag
107.3
Gravel works siding
107.7
Eichstätt Bahnhof (station)
425 m
to Eichstätt town
111.1
Obereichstätt
118.0
Dollnstein
401 m
to Rennertshofen
Esslingerberg crossover
(switchable)
121.3
Esslingerberg Tunnel (633 m)
Altmühl
125.1
Solnhofen
408 m
Altmühl
Altmühl
128.9
Kirchberg Tunnel (108 m)
129.4
Plastal siding
130.3
Pappenheim
Altmühl
Altmühl
136.8
Treuchtlingen
420 m
km
Source: German railway atlas[1]

History edit

The history of the Altmühl Railway starts in 1833, when the former politician and economist Friedrich List unveiled his plans for a Germany-wide railway network. Even then he envisaged a direct connection from Munich via Ingolstadt to Nuremberg.

During the next 25 years, these plans were considered by the council of the town of Eichstätt, in particular by Mayor Fehlner. They promised economic recovery mainly due to increased freight traffic, in particular from the quarries at Solnhofen and Eichstätt and the local steelworks. Therefore, Eichstätt, along with the other communities and businesses along the proposed route, established a committee to build the Altmühl railway, which made representations on several occasions to King Ludwig I.

Only when the town of Ansbach financed a railway from Ansbach to Gunzenhausen, where it connected to the Ludwig South-North Railway (German: Ludwig-Süd-Nord-Bahn) between Lindau and Nuremberg, did the committee succeed. The issue at this time was how to connect the line to Eichstätt—which was eventually linked by a branch line—and how to connect the line to Pleinfeld and Gunzenhausen. The Royal Chief Engineer (königlich functionierende Oberingenieur) Balbier examined several different lines, and finally decided to follow largely the valley of the Altmühl with separate routes from Treuchtlingen to Gunzenhausen and Pleinfeld. On 24 September 1863, the Bavarian parliament approved this plan and on 5 October 1863 King Maximilian II finally signed a law to build the line from Ingolstadt to Gunzenhausen and Pleinfeld.[2]

Construction and commissioning edit

Construction began officially on 11 November 1867 and it was officially opened on 12 April 1870 by the Royal Bavarian State Railways (Königliche Bayerische Staats-Eisenbahnen).[3] The line was initially built as a single track, with the formation built for double-track.[4]

Duplication and electrification edit

With increasing traffic and as a result of the Röhrmoos railway accident on 6 July 1889,[5] duplication of the line was carried out from 1889 to 1892.[4] An act of 8 December 1889 granted the necessary funds for this.[6] The second track was put into operation in sections on 3 August from Allach to Dachau, on 17 August to Röhrmoos, on 3 September to Petershausen, on 4 September to Pfaffenhofen, on 7 April 1892 to Wolnzach, on 23 June to Reichertshofen, on 18 July to Ingolstadt, on 9 July between Munich and Allach[7] and the remaining section between Ingolstadt and Treuchtlingen on 4 August 1892.[8]

After completion of electrification on the Nuremberg–Augsburg line in 1935, it was decided to also electrify the Altmühl Railway to Munich. Because of the Second World War, the only part completed was the Munich–Dachau section. However, due to the Second World War, Deutsche Reichsbahn only operated the Munich–Dachau section until 1 June 1944.[7] After the war, Deutsche Bundesbahn considered that electrification of the Passau–Nuremberg–Frankfurt had higher priority, which meant that electrification of the Altmühl line was not completed until the early 1960s.[8] Electrical services commenced with the start of the summer timetable on 27 May 1962.[7]

New and upgraded Nuremberg–Ingolstadt–Munich line edit

In the 1990s, the line had two tracks throughout (three tracks from Munich to Munich-Allach) and was operable at speeds of up to 160 km/h. The 19th century route required speed restrictions of up to 110 km/h at numerous points with a minimum curve radius of 3000 Bavarian feet (876 metres, although the curve at Reichertshofen had a radius of 814 metres).[9] In addition to long-distance passenger, regional and freight traffic, the Munich S-Bahn also used the Petershausen–Munich section of the line.

The southern Munich-Ingolstadt section of the line is being rebuilt as part of the Nuremberg-Ingolstadt-Munich new and upgraded line project (Neu- und Ausbaustrecke Nürnberg–Ingolstadt–München) and upgraded for higher speeds.

 
Upgraded line near Hebertshausen with ICE S on measurement run (September 2006)

According to the planning status report of 1994, line improvements with a total length of 37 kilometres were planned, mostly with reductions of length of well under 50 metres.[10]

The route was divided into three sections.

Southern section (Munich–Petershausen) edit

Since 10 December 2006, trains have been able to operate at up to 200 km/h on the 29-kilometre section between Obermenzing and Petershausen. The rest of the route is mainly operated at 160 km/h, with the maximum speed reduced only between Munich Hauptbahnhof and Obermenzing (up to 120 km/h) and in Pfaffenhofen (150 km/h). This enables a travel time of 35 minutes between Munich and Ingolstadt.

Between Munich-Obermenzing and Dachau, the line could be upgraded for 200 km/h without line improvements.[11] In the high-speed section, the curve radii were widened to at least 1,548 metres with a maximum cant of 160 millimetres and a cant deficiency of up to 150 millimetres.[12] In many places, shifting the tracks by a few metres was sufficient. A new route was only necessary north of Hebertshausen. The route was shifted around 800 metres to the east over a length of around 4.5 kilometres. Since April 2003, the town of Unterweilbach has no longer been passed to the west, but to the east. In the high-speed section, more than 50 crossing structures were rebuilt or newly built. Extensive changes were also required at the stations along the route; among other things, 275 metre-long platforms were built.[12] The upgrade was largely carried out during ongoing operations. A total of 14 level crossings were removed.[13]

As part of the work, a separate parallel route was built for Munich S-Bahn traffic between Munich and Petershausen. The section between Dachau Nord and Petershausen was put into operation on 21 April 2003, and the entire route on 11 December 2005. Since the S-Bahn and long-distance trains have been separated, a 10-minute cycle can be run to Dachau during peak hour. The stations were also modernised, in particular made barrier-free, and the park-and-ride facilities were enlarged.

The bidding consortium around GP Günter Papenburg, the company which carried out the construction, was suspected of having undercut a competing company by using inside information about its offer. The contract to upgrade the line between Munich and the district of Dachau was awarded for €260 million in 2002. The Munich public prosecutor investigated the issue in 2002.[14][15]

Middle section (Petershausen–Rohrbach) edit

The central section (Petershausen–Rohrbach, km 38.2 to 61.1) was to be upgraded for 190 km/h. This also applied to the area around the Reichertshofen curve, which, with a top speed of 120 km/h, was the slowest section of the route. The upgrade between Petershausen and Pfaffenhofen was completed in mid-July 2014.

Long-distance travel times were to be reduced by three minutes.[16] Construction work began in mid-June 2011.[17] Due to a lack of planning resources for the new ETCS train control system, the final upgrade was delayed indefinitely.[18] Among other things, Pfaffenhofen station was renovated in 2020 and 2021.[19][20] Residual work was expected to be completed in the second quarter of 2022.[21] The planning and construction costs for the final upgrade was estimated to be €234 million at the beginning of 2018. The implementation of ETCS, which is necessary to realise the higher speeds, is to be completed by 2023.[22][23]

 
ICE 1 on the undeveloped section of the Munich–Ingolstadt route near Fahlenbach (2007)

The design speed of 190 km/h, which has been planned since at least 1999,[11] results from economic considerations. An originally planned option for a complete upgrade to allow operations at 200 km/h[13] no longer exists.

The central section was upgraded in individual sections while rail operations continued:

  • Reichertshausen–Pfaffenhofen in 2012
  • Pfaffenhofen–Uttenhofen in 2013
  • Uttenhofen–Rohrbach in 2014

Section North (Rohrbach–Ingolstadt) edit

As part of the upgrade, the section from Rohrbach to Ingolstadt was upgraded for 160 km/h from spring 2000 to December 2006.[24] From 1999 to 2001, another bridge was built over the Danube for the construction of a third track between Ingolstadt Hauptbahnhof and Ingolstadt Nord station. The symbolic start of construction for the expansion of the Ingolstadt–Petershausen section was celebrated on 18 June 2010.[16] Line improvements of 7.95 kilometres were planned, along with 5.15 kilometres of new earthworks and the required widening of cross-sections. Completion of the overall project, which included 20 construction phases, was planned for 2014.[25] A total of around €200 million of Deutsche Bahn's own funds[16] would be invested in both sections. Without the upgrade, Deutsche Bahn would have to pay back EU funds for the entire project.[26] In the course of this work, Reichertshofen station was rebuilt about 500 m north of the previous location as Baar-Ebenhausen station.[27] The new station went into operation in July 2011 along with a new section of line.[28] In contrast to the old Reichertshofen station, all the main tracks in the new station are continuous.[29] The number of sidings at the existing station is to remain unchanged.[30]

The northern section was upgraded in separate sections while trains operated:

  • construction of the new Baar-Ebenhausen station in 2010–2011
  • line improvement in Reichertshofen in 2011–2014
  • Petershausen–Reichertshofen in 2013

German clock-face timetable edit

In the third expert draft of the proposed German-wide clock face timetable (Deutschlandtakt), a four-track upgrade between Ingolstadt and Petershausen is assumed. Work costing an estimated €973 million at 2015 prices were planned for this. A third track between Munich Hauptbahnhof and Dachau is to be built for €454 million, and two overtaking tracks for freight traffic in Petershausen for a further €42 million.[31][32]

In July 2022, Deutsche Bahn suggestions of a new high-speed line between Munich and Ingolstadt with a journey time of 25 minutes and a branch from this to a new station at Munich Airport became known. The costs for this project were estimated at around €5 billion and the economic benefit at €7.1 billion.[33]

Route edit

 
Esslingerberg Tunnel with slab track

The line leaves Munich Hauptbahnhof in a westerly direction and then swings to the north. Connecting curves connect the Munich North marshalling yard to the line near Allach. In the following high-speed section, the line runs in wide curves from the entry into the Danube-Isar hill country near Dachau, running due north. After Petershausen, the line swings into the Ilm valley and follows it with some sharper bends to Rohrbach. The line cuts through the ridge between Rohrbach and Reichertshofen to the Paar valley and the line then continues to the north-west to Ingolstadt in the Danube lowlands.

From Ingolstadt the line runs mostly north-westerly towards Eichstätt Bahnhof, which is located on the edge of the Eichstätt district of Wasserzell. A 5.1 km long remnant of the non-electrified Eichstätt–Beilngries line connects as a branch line from Eichstätt Stadt (town) station to the main line. From Eichstätt Bahnhof the line runs largely in the narrow Altmühl valley and as a result it is very curvy. Between Eichstätt Bahnhof and Dollnstein there are two bends that make almost 180° turns. In order to avoid unnecessary bridges over the Altmühl the river was diverted or cuttings were blown through the rocks. Two tunnels, Kirchberg tunnel near Zimmern and Esslingerberg tunnel near Esslingen, and a cutting through a spur of the Perlachberge range near Treuchtlingen cut through loops of the Altmühl. Just before Treuchtlingen station the line also crosses a plate girder bridge over the Möhrenbach, which is similar in design and size to the many bridges over the Altmühl.

Stations edit

Treuchtlingen station is at the junction of the Treuchtlingen–Würzburg, the Treuchtlingen–Ingolstadt–Munich and the Nuremberg–Augsburg lines. It was established in 1869 in its current form. In addition, it formerly had a depot with 20 tracks, which are now partly dismantled.

Pappenheim station has existed since the opening of the line in 1870.

Solnhofen station was established with the opening of the line in 1870. It has two main platform tracks and through track for non-stopping traffic.

Infrastructure edit

The course is designed to permit speeds of 110–200 km/h. The superstructure is built with a conventional ballasted track with both wooden and concrete sleepers. An exception is in the Esslingerberg tunnel, which was completely refurbished up until early 2006 for €19 million including the installation of slab track.

Rail services edit

 
EuroNight 483 Copenhagen–Munich crossing the Altmühl near Dollnstein

The line has an hourly Regionalbahn service on the Munich–Ingolstadt–Treuchtlingen route, which is extended to Nuremberg at two-hourly intervals. Until 2013, the trains continuing to Nuremberg operated as Regional-Expresses. The München-Nürnberg-Express and long-distance trains also operate on the Munich-Ingolstadt section, not stopping between Munich and Ingolstadt and some services not stopping at Ingolstadt. Extra Regionalbahn services of the Bayerische Regiobahn (BRB) operate during peak hours between Ingolstadt and Eichstätt. The northern section of the line was formerly of great importance for long-distance traffic, but since 27 May 2006 all long distance services have run on the Nuremberg–Ingolstadt high-speed railway. Prior to its discontinuance in December 2010, the line was served by a pair of Eurocity services (EN 482/483) on the Munich–Copenhagen route via Ingolstadt and Treuchtlingen, because the trains did not have the required approvals to operate over the high-speed line. Currently the only long-distance services running over the northern section are motorail trains and seasonal services.

The line is of great importance for freight transport. It is an important link for north-south traffic for trains running from and to Ingolstadt and for traffic coming from Würzburg or Nuremberg and continuing to Munich.

References edit

  1. ^ Eisenbahnatlas Deutschland (German railway atlas). Schweers + Wall. 2009. p. 97. ISBN 978-3-89494-139-0.
  2. ^ "Dritter Abschnitt. Der Eisenbahnbau". Die Kgl. Bayerischen Staatseisenbahnen in geschichtlicher und statistischer Beziehung: Gedenkschrift zum fünfzigsten Jahrestage der Inbetriebsetzung der ersten Staatsbahnstrecke Nürnberg - Bamberg am 1. Oktober 1844 (in German). Berlin/Boston: Oldenbourg Wissenschaftsverlag. 1894. pp. 31–83. doi:10.1515/9783486727197-006.
  3. ^ Sauer, Andreas (2017). "Eine möglichst schnelle Verbindung unserer Landeshauptstadt mit der Festungsstadt Ingolstadt – Vorgeschichte und Bau der Eisenbahnverbindung München-Ingolstadt" (PDF). Eine möglichst schnelle Verbindung – 150-jähriges Bahnjubiläum München–Ingolstadt (in German). Landkreis Dachau. pp. 12–13. Retrieved 7 July 2023.
  4. ^ a b Fitger, Heinrich (2017). "35 Pferde, 266 Ochsen, 143 Schafe und 17.110 Personen – Daten und Fakten rund um den Bahnbau 1867" (PDF). Eine möglichst schnelle Verbindung – 150-jähriges Bahnjubiläum München–Ingolstadt (in German). Landkreis Dachau. p. 15. Retrieved 7 July 2023.
  5. ^ Sauer, Andreas (2017). "Eine möglichst schnelle Verbindung unserer Landeshauptstadt mit der Festungsstadt Ingolstadt – Vorgeschichte und Bau der Eisenbahnverbindung München-Ingolstadt" (PDF). Eine möglichst schnelle Verbindung – 150-jähriges Bahnjubiläum München–Ingolstadt (in German). Landkreis Dachau. p. 13. Retrieved 7 July 2023.
  6. ^ "Dritter Abschnitt. Der Eisenbahnbau". Die Kgl. Bayerischen Staatseisenbahnen in geschichtlicher und statistischer Beziehung: Gedenkschrift zum fünfzigsten Jahrestage der Inbetriebsetzung der ersten Staatsbahnstrecke Nürnberg - Bamberg am 1. Oktober 1844 (in German). Berlin/Boston: Oldenbourg Wissenschaftsverlag. 1894. p. 42. doi:10.1515/9783486727197-006.
  7. ^ a b c Korhammer, Klaus-Dieter; Franzke, Armin; Rudolph, Ernst (1991). Lisson, Peter (ed.). "Drehscheibe des Südens – Eisenbahnknoten München" (PDF) (in German). Darmstadt: Hestra-Verlag. p. 151. ISBN 978-3-7771-0236-8. Retrieved 7 July 2023.
  8. ^ a b Ettle, Josef (3 May 2020). "Als die "Dampfrösser" kamen". Donaukurier (in German). Retrieved 7 July 2023.
  9. ^ Weigelt 2006, p. 42.
  10. ^ Weigelt, Horst; Nußberge, Peter (July–August 2002). "Neubaustrecke Nürnberg–Ingolstadt vom Konzept zum Spatenstich". Eisenbahntechnische Rundschau (in German). 43.
  11. ^ a b Nürnberg–München in einer Stunde (in German). Nürnberg: Planungsgesellschaft Bahnbau Deutsche Einheit. 30 November 1999. pp. 3–5, 7, 8, 11. (similar version from January 1999)
  12. ^ a b Weigelt 2006, pp. 160–173.
  13. ^ a b Könnigs, Heinz-Dietrich (1999). "Ab 2003: In einer Stunde von Nürnberg nach München". Eisenbahntechnische Rundschau (in German). 48 (4): 216.
  14. ^ Ott, Klaus (23 March 2010). "Aus der Bahn geraten". Süddeutsche Zeitung (in German). No. 68. p. 19.
  15. ^ Fröhlingsdorf, Michael (30 June 2002). "Tanz auf dem Müllberg". Spiegel Online (in German). Retrieved 8 July 2023.
  16. ^ a b c "Deutsche Bahn: 200 Millionen für drei Minuten". Tz.de (in German). 18 June 2010. Retrieved 8 July 2023.
  17. ^ Die Bauarbeiten zwischen Ingolstadt und München ziehen sich noch bis 2014 (in German). Deutsche Bahn. March 2012. pp. 2, 3. (6-page document)
  18. ^ Kraus, Michael (14 March 2017). . Donau Kurier (in German). Archived from the original on 25 November 2018.
  19. ^ . bauprojekte.deutschebahn.com (in German). Deutsche Bahn. 2020. Archived from the original on 22 March 2020. Retrieved 9 July 2023.
  20. ^ . deutschebahn.com (Press release) (in German). Deutsche Bahn. 19 July 2021. Archived from the original on 20 October 2021. Retrieved 9 July 2023.
  21. ^ Kraus, Michael (22 November 2022). "Umgebauten Bahnhof Pfaffenhofen planmäßig in Betrieb genommen". Donau Kurier (in German). Retrieved 9 July 2023.
  22. ^ (in German). DB Netz. January 2018. Archived from the original on 27 January 2018. Retrieved 9 July 2023.
  23. ^ "ERTMS: Korridor A kommt vor dem Starterpaket". Der Eisenbahningenieur (in German). 70 (11): 60. November 2019. ISSN 0013-2810.
  24. ^ (PDF) (in German). DB Netze. Archived from the original (PDF) on 7 September 2014. Retrieved 10 July 2023.
  25. ^ Nied, Joachim; Löns, Wolfgang; Ritzert, Jörg (2009). "Ausbau der Strecke Ingolstadt–Petershausen – Projektziele und aktueller Sachstand". Eisenbahntechnische Rundschau (in German). 11: 556–560.
  26. ^ "Bahn holt aus zum großen Wurf". Donaukurier (in German). 19 March 2010.
  27. ^ "Aus für Bahnhof Reichertshofen". Donaukurier (in German). 21 March 2008. Retrieved 10 July 2023.
  28. ^ . Donaukurier (in German). 25 July 2011. Archived from the original on 6 October 2014. Retrieved 10 July 2023.
  29. ^ "Erster Spatenstich mit der Baggerschaufel". Donaukurier (in German). 18 June 2010. Retrieved 10 July 2023.
  30. ^ "Auf alten Rangiergleisen tut sich wieder was". Donaukurier (in German). 11 May 2010. Retrieved 10 July 2023.
  31. ^ Maier, Marten (17 August 2021). "Infrastrukturliste Bewertung: Maßnahmen des Planfalls "Deutschlandtakt", laufende Nummer 44 des Unterabschnitts 2, Vorhaben des Potentiellen Bedarfs des Bedarfsplans der Bundesschienenwege" (PDF). bmvi.de (in German). SMA und Partner. p. 18. Retrieved 9 July 2023.
  32. ^ "Deutschlandtakt: Bewertung Infrastrukturmaßnahmen für den 3. Gutachterentwurf" (PDF). downloads.ctfassets.net (in German). Intraplan Consult, TTS TRIMODE Transport Solutions. 17 August 2021. p. 2. Retrieved 9 July 2023.
  33. ^ Traufetter, Gerald (22 July 2022). "Münchner Flughafen soll ICE-Anschluss bekommen". Spiegel Online (in German). Retrieved 9 July 2023.

Sources edit

  • Weigelt, Horst (2006). Honerkamp, Bernd (ed.). Schnellbahnachse Nürnberg–Ingolstadt–München – Neue Infrastruktur mit Spitzentechnologie (in German). Hamburg: Eurailpress. ISBN 3-7771-0350-0.

External links edit

  • "Photographs of tunnel portals" (in German). Tunnelportale. Retrieved 10 February 2012.

munich, treuchtlingen, railway, also, known, altmühlbahn, altmühl, railway, railway, line, german, state, bavaria, part, upgraded, nuremberg, ingolstadt, munich, line, project, munich, ingolstadt, section, gradually, being, upgraded, line, speed, overviewstatu. The Munich Treuchtlingen railway also known as the Altmuhlbahn Altmuhl Railway is a railway line in the German state of Bavaria As part of the new and upgraded Nuremberg Ingolstadt Munich line project the Munich Ingolstadt section is gradually being upgraded for a line speed of up to 200 km h 120 mph Munich Treuchtlingen railwayOverviewStatusOperationalOwnerDeutsche BahnLine number5501LocaleBavaria GermanyTerminiMunichTreuchtlingenServiceTypeHeavy rail Passenger freight railRegional rail Intercity railRoute number900 Munich Ingolstadt 990 Ingolstadt Treuchtlingen Operator s DB BahnHistoryOpened14 November 1867TechnicalLine length136 747 km 84 971 mi Number of tracksDouble trackTrack gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification15 kV 16 7 Hz AC overhead catenaryOperating speed200 km h 120 mph Route mapLegendkm elevTunnel of the S Bahn trunk line0 018 Munich 523 m see Munich Augsburg railway 5 441 Munchen Kanal junction to Munchen Pasing freight yard flying junction to Regensburgto Munchen Laim marshalling yard6 671 Munchen Obermenzing junction7 610 Munchen Obermenzing until 2005 9 0 Munchen Untermenzing10 425 Munchen Allach 508 mto Munich North marshalling yardMunchen Trudering Steinwerk North ring 13 752 from Munich North marshalling yard14 200 Munchen Karlsfeld17 800 Dachau Bahnhofto Altomunster18 519 Amper 53 m 21 960 Walpertshofen until 2003 22 2 Hebertshausen 2003 deviation 23 718 Sietenbach 141 m 24 119 viaduct near Reipertshofen 141 m 25 00027 2 Rohrmoos Hp27 217 Rohrmoos 493 m30 3 Vierkirchen Esterhofen30 300 Esterhofen until 2003 34 845 Glonn 51 m 36 438 Petershausen 469 mend of S Bahn tracks40 182 Paindorf43 847 Reichertshausen Ilm 454 m49 662 Pfaffenhofen Ilm 435 m54 550 Uttenhofen55 420 Walkersbach60 169 Rohrbach Ilm Wolnzach until 2000 420 mto Mainburgto Geisenfeld until 1988 60 822 Ilm 25 m 66 210 Hog70 977 Paar 69 m 72 370 Reichertshofen Oberbay until 2011 373 m72 913 Baar Ebenhausen since 2011 373 mEbenhausen factory siding77 080 Oberstimmfrom Augsburg Hbffrom Regensburg Hbf81 0 Ingolstadt 368 mto Neuoffingen until 1994 B 1383 2 Danube Ingolstadt rail bridge 184 m B 1384 3 Ingolstadt Nordto Riedenburg84 3 HSR to Nuremberg87 9 Ingolstadt north yard90 0 Gaimersheim 387 mB 13 bridge94 2 Eitensheim97 5 Tauberfeld 421 m102 9 Adelschlag107 3 Gravel works siding107 7 Eichstatt Bahnhof station 425 mto Eichstatt town111 1 Obereichstatt118 0 Dollnstein 401 mto RennertshofenAltmuhlEsslingerberg crossover switchable 121 3 Esslingerberg Tunnel 633 m Altmuhl125 1 Solnhofen 408 mAltmuhlAltmuhl128 9 Kirchberg Tunnel 108 m 129 4 Plastal siding130 3 PappenheimAltmuhlAltmuhlB 2from Augsburg 136 8 Treuchtlingen 420 mto Wurzburg Hbfto Nurembergkm elevSource German railway atlas 1 Contents 1 History 1 1 Construction and commissioning 1 2 Duplication and electrification 1 3 New and upgraded Nuremberg Ingolstadt Munich line 1 3 1 Southern section Munich Petershausen 1 3 2 Middle section Petershausen Rohrbach 1 3 3 Section North Rohrbach Ingolstadt 1 3 4 German clock face timetable 2 Route 2 1 Stations 2 2 Infrastructure 3 Rail services 4 References 4 1 Sources 5 External linksHistory editThe history of the Altmuhl Railway starts in 1833 when the former politician and economist Friedrich List unveiled his plans for a Germany wide railway network Even then he envisaged a direct connection from Munich via Ingolstadt to Nuremberg During the next 25 years these plans were considered by the council of the town of Eichstatt in particular by Mayor Fehlner They promised economic recovery mainly due to increased freight traffic in particular from the quarries at Solnhofen and Eichstatt and the local steelworks Therefore Eichstatt along with the other communities and businesses along the proposed route established a committee to build the Altmuhl railway which made representations on several occasions to King Ludwig I Only when the town of Ansbach financed a railway from Ansbach to Gunzenhausen where it connected to the Ludwig South North Railway German Ludwig Sud Nord Bahn between Lindau and Nuremberg did the committee succeed The issue at this time was how to connect the line to Eichstatt which was eventually linked by a branch line and how to connect the line to Pleinfeld and Gunzenhausen The Royal Chief Engineer koniglich functionierende Oberingenieur Balbier examined several different lines and finally decided to follow largely the valley of the Altmuhl with separate routes from Treuchtlingen to Gunzenhausen and Pleinfeld On 24 September 1863 the Bavarian parliament approved this plan and on 5 October 1863 King Maximilian II finally signed a law to build the line from Ingolstadt to Gunzenhausen and Pleinfeld 2 Construction and commissioning edit Construction began officially on 11 November 1867 and it was officially opened on 12 April 1870 by the Royal Bavarian State Railways Konigliche Bayerische Staats Eisenbahnen 3 The line was initially built as a single track with the formation built for double track 4 Duplication and electrification edit With increasing traffic and as a result of the Rohrmoos railway accident on 6 July 1889 5 duplication of the line was carried out from 1889 to 1892 4 An act of 8 December 1889 granted the necessary funds for this 6 The second track was put into operation in sections on 3 August from Allach to Dachau on 17 August to Rohrmoos on 3 September to Petershausen on 4 September to Pfaffenhofen on 7 April 1892 to Wolnzach on 23 June to Reichertshofen on 18 July to Ingolstadt on 9 July between Munich and Allach 7 and the remaining section between Ingolstadt and Treuchtlingen on 4 August 1892 8 After completion of electrification on the Nuremberg Augsburg line in 1935 it was decided to also electrify the Altmuhl Railway to Munich Because of the Second World War the only part completed was the Munich Dachau section However due to the Second World War Deutsche Reichsbahn only operated the Munich Dachau section until 1 June 1944 7 After the war Deutsche Bundesbahn considered that electrification of the Passau Nuremberg Frankfurt had higher priority which meant that electrification of the Altmuhl line was not completed until the early 1960s 8 Electrical services commenced with the start of the summer timetable on 27 May 1962 7 New and upgraded Nuremberg Ingolstadt Munich line edit In the 1990s the line had two tracks throughout three tracks from Munich to Munich Allach and was operable at speeds of up to 160 km h The 19th century route required speed restrictions of up to 110 km h at numerous points with a minimum curve radius of 3000 Bavarian feet 876 metres although the curve at Reichertshofen had a radius of 814 metres 9 In addition to long distance passenger regional and freight traffic the Munich S Bahn also used the Petershausen Munich section of the line The southern Munich Ingolstadt section of the line is being rebuilt as part of the Nuremberg Ingolstadt Munich new and upgraded line project Neu und Ausbaustrecke Nurnberg Ingolstadt Munchen and upgraded for higher speeds nbsp Upgraded line near Hebertshausen with ICE S on measurement run September 2006 According to the planning status report of 1994 line improvements with a total length of 37 kilometres were planned mostly with reductions of length of well under 50 metres 10 The route was divided into three sections Southern section Munich Petershausen edit Since 10 December 2006 trains have been able to operate at up to 200 km h on the 29 kilometre section between Obermenzing and Petershausen The rest of the route is mainly operated at 160 km h with the maximum speed reduced only between Munich Hauptbahnhof and Obermenzing up to 120 km h and in Pfaffenhofen 150 km h This enables a travel time of 35 minutes between Munich and Ingolstadt Between Munich Obermenzing and Dachau the line could be upgraded for 200 km h without line improvements 11 In the high speed section the curve radii were widened to at least 1 548 metres with a maximum cant of 160 millimetres and a cant deficiency of up to 150 millimetres 12 In many places shifting the tracks by a few metres was sufficient A new route was only necessary north of Hebertshausen The route was shifted around 800 metres to the east over a length of around 4 5 kilometres Since April 2003 the town of Unterweilbach has no longer been passed to the west but to the east In the high speed section more than 50 crossing structures were rebuilt or newly built Extensive changes were also required at the stations along the route among other things 275 metre long platforms were built 12 The upgrade was largely carried out during ongoing operations A total of 14 level crossings were removed 13 As part of the work a separate parallel route was built for Munich S Bahn traffic between Munich and Petershausen The section between Dachau Nord and Petershausen was put into operation on 21 April 2003 and the entire route on 11 December 2005 Since the S Bahn and long distance trains have been separated a 10 minute cycle can be run to Dachau during peak hour The stations were also modernised in particular made barrier free and the park and ride facilities were enlarged The bidding consortium around GP Gunter Papenburg the company which carried out the construction was suspected of having undercut a competing company by using inside information about its offer The contract to upgrade the line between Munich and the district of Dachau was awarded for 260 million in 2002 The Munich public prosecutor investigated the issue in 2002 14 15 Middle section Petershausen Rohrbach edit The central section Petershausen Rohrbach km 38 2 to 61 1 was to be upgraded for 190 km h This also applied to the area around the Reichertshofen curve which with a top speed of 120 km h was the slowest section of the route The upgrade between Petershausen and Pfaffenhofen was completed in mid July 2014 Long distance travel times were to be reduced by three minutes 16 Construction work began in mid June 2011 17 Due to a lack of planning resources for the new ETCS train control system the final upgrade was delayed indefinitely 18 Among other things Pfaffenhofen station was renovated in 2020 and 2021 19 20 Residual work was expected to be completed in the second quarter of 2022 21 The planning and construction costs for the final upgrade was estimated to be 234 million at the beginning of 2018 The implementation of ETCS which is necessary to realise the higher speeds is to be completed by 2023 22 23 nbsp ICE 1 on the undeveloped section of the Munich Ingolstadt route near Fahlenbach 2007 The design speed of 190 km h which has been planned since at least 1999 11 results from economic considerations An originally planned option for a complete upgrade to allow operations at 200 km h 13 no longer exists The central section was upgraded in individual sections while rail operations continued Reichertshausen Pfaffenhofen in 2012 Pfaffenhofen Uttenhofen in 2013 Uttenhofen Rohrbach in 2014Section North Rohrbach Ingolstadt edit As part of the upgrade the section from Rohrbach to Ingolstadt was upgraded for 160 km h from spring 2000 to December 2006 24 From 1999 to 2001 another bridge was built over the Danube for the construction of a third track between Ingolstadt Hauptbahnhof and Ingolstadt Nord station The symbolic start of construction for the expansion of the Ingolstadt Petershausen section was celebrated on 18 June 2010 16 Line improvements of 7 95 kilometres were planned along with 5 15 kilometres of new earthworks and the required widening of cross sections Completion of the overall project which included 20 construction phases was planned for 2014 25 A total of around 200 million of Deutsche Bahn s own funds 16 would be invested in both sections Without the upgrade Deutsche Bahn would have to pay back EU funds for the entire project 26 In the course of this work Reichertshofen station was rebuilt about 500 m north of the previous location as Baar Ebenhausen station 27 The new station went into operation in July 2011 along with a new section of line 28 In contrast to the old Reichertshofen station all the main tracks in the new station are continuous 29 The number of sidings at the existing station is to remain unchanged 30 The northern section was upgraded in separate sections while trains operated construction of the new Baar Ebenhausen station in 2010 2011 line improvement in Reichertshofen in 2011 2014 Petershausen Reichertshofen in 2013German clock face timetable edit In the third expert draft of the proposed German wide clock face timetable Deutschlandtakt a four track upgrade between Ingolstadt and Petershausen is assumed Work costing an estimated 973 million at 2015 prices were planned for this A third track between Munich Hauptbahnhof and Dachau is to be built for 454 million and two overtaking tracks for freight traffic in Petershausen for a further 42 million 31 32 In July 2022 Deutsche Bahn suggestions of a new high speed line between Munich and Ingolstadt with a journey time of 25 minutes and a branch from this to a new station at Munich Airport became known The costs for this project were estimated at around 5 billion and the economic benefit at 7 1 billion 33 Route edit nbsp Esslingerberg Tunnel with slab trackThe line leaves Munich Hauptbahnhof in a westerly direction and then swings to the north Connecting curves connect the Munich North marshalling yard to the line near Allach In the following high speed section the line runs in wide curves from the entry into the Danube Isar hill country near Dachau running due north After Petershausen the line swings into the Ilm valley and follows it with some sharper bends to Rohrbach The line cuts through the ridge between Rohrbach and Reichertshofen to the Paar valley and the line then continues to the north west to Ingolstadt in the Danube lowlands From Ingolstadt the line runs mostly north westerly towards Eichstatt Bahnhof which is located on the edge of the Eichstatt district of Wasserzell A 5 1 km long remnant of the non electrified Eichstatt Beilngries line connects as a branch line from Eichstatt Stadt town station to the main line From Eichstatt Bahnhof the line runs largely in the narrow Altmuhl valley and as a result it is very curvy Between Eichstatt Bahnhof and Dollnstein there are two bends that make almost 180 turns In order to avoid unnecessary bridges over the Altmuhl the river was diverted or cuttings were blown through the rocks Two tunnels Kirchberg tunnel near Zimmern and Esslingerberg tunnel near Esslingen and a cutting through a spur of the Perlachberge range near Treuchtlingen cut through loops of the Altmuhl Just before Treuchtlingen station the line also crosses a plate girder bridge over the Mohrenbach which is similar in design and size to the many bridges over the Altmuhl Stations edit Treuchtlingen station is at the junction of the Treuchtlingen Wurzburg the Treuchtlingen Ingolstadt Munich and the Nuremberg Augsburg lines It was established in 1869 in its current form In addition it formerly had a depot with 20 tracks which are now partly dismantled Pappenheim station has existed since the opening of the line in 1870 Solnhofen station was established with the opening of the line in 1870 It has two main platform tracks and through track for non stopping traffic Infrastructure edit The course is designed to permit speeds of 110 200 km h The superstructure is built with a conventional ballasted track with both wooden and concrete sleepers An exception is in the Esslingerberg tunnel which was completely refurbished up until early 2006 for 19 million including the installation of slab track Rail services edit nbsp EuroNight 483 Copenhagen Munich crossing the Altmuhl near DollnsteinThe line has an hourly Regionalbahn service on the Munich Ingolstadt Treuchtlingen route which is extended to Nuremberg at two hourly intervals Until 2013 the trains continuing to Nuremberg operated as Regional Expresses The Munchen Nurnberg Express and long distance trains also operate on the Munich Ingolstadt section not stopping between Munich and Ingolstadt and some services not stopping at Ingolstadt Extra Regionalbahn services of the Bayerische Regiobahn BRB operate during peak hours between Ingolstadt and Eichstatt The northern section of the line was formerly of great importance for long distance traffic but since 27 May 2006 all long distance services have run on the Nuremberg Ingolstadt high speed railway Prior to its discontinuance in December 2010 the line was served by a pair of Eurocity services EN 482 483 on the Munich Copenhagen route via Ingolstadt and Treuchtlingen because the trains did not have the required approvals to operate over the high speed line Currently the only long distance services running over the northern section are motorail trains and seasonal services The line is of great importance for freight transport It is an important link for north south traffic for trains running from and to Ingolstadt and for traffic coming from Wurzburg or Nuremberg and continuing to Munich References edit Eisenbahnatlas Deutschland German railway atlas Schweers Wall 2009 p 97 ISBN 978 3 89494 139 0 Dritter Abschnitt Der Eisenbahnbau Die Kgl Bayerischen Staatseisenbahnen in geschichtlicher und statistischer Beziehung Gedenkschrift zum funfzigsten Jahrestage der Inbetriebsetzung der ersten Staatsbahnstrecke Nurnberg Bamberg am 1 Oktober 1844 in German Berlin Boston Oldenbourg Wissenschaftsverlag 1894 pp 31 83 doi 10 1515 9783486727197 006 Sauer Andreas 2017 Eine moglichst schnelle Verbindung unserer Landeshauptstadt mit der Festungsstadt Ingolstadt Vorgeschichte und Bau der Eisenbahnverbindung Munchen Ingolstadt PDF Eine moglichst schnelle Verbindung 150 jahriges Bahnjubilaum Munchen Ingolstadt in German Landkreis Dachau pp 12 13 Retrieved 7 July 2023 a b Fitger Heinrich 2017 35 Pferde 266 Ochsen 143 Schafe und 17 110 Personen Daten und Fakten rund um den Bahnbau 1867 PDF Eine moglichst schnelle Verbindung 150 jahriges Bahnjubilaum Munchen Ingolstadt in German Landkreis Dachau p 15 Retrieved 7 July 2023 Sauer Andreas 2017 Eine moglichst schnelle Verbindung unserer Landeshauptstadt mit der Festungsstadt Ingolstadt Vorgeschichte und Bau der Eisenbahnverbindung Munchen Ingolstadt PDF Eine moglichst schnelle Verbindung 150 jahriges Bahnjubilaum Munchen Ingolstadt in German Landkreis Dachau p 13 Retrieved 7 July 2023 Dritter Abschnitt Der Eisenbahnbau Die Kgl Bayerischen Staatseisenbahnen in geschichtlicher und statistischer Beziehung Gedenkschrift zum funfzigsten Jahrestage der Inbetriebsetzung der ersten Staatsbahnstrecke Nurnberg Bamberg am 1 Oktober 1844 in German Berlin Boston Oldenbourg Wissenschaftsverlag 1894 p 42 doi 10 1515 9783486727197 006 a b c Korhammer Klaus Dieter Franzke Armin Rudolph Ernst 1991 Lisson Peter ed Drehscheibe des Sudens Eisenbahnknoten Munchen PDF in German Darmstadt Hestra Verlag p 151 ISBN 978 3 7771 0236 8 Retrieved 7 July 2023 a b Ettle Josef 3 May 2020 Als die Dampfrosser kamen Donaukurier in German Retrieved 7 July 2023 Weigelt 2006 p 42 Weigelt Horst Nussberge Peter July August 2002 Neubaustrecke Nurnberg Ingolstadt vom Konzept zum Spatenstich Eisenbahntechnische Rundschau in German 43 a b Nurnberg Munchen in einer Stunde in German Nurnberg Planungsgesellschaft Bahnbau Deutsche Einheit 30 November 1999 pp 3 5 7 8 11 similar version from January 1999 a b Weigelt 2006 pp 160 173 a b Konnigs Heinz Dietrich 1999 Ab 2003 In einer Stunde von Nurnberg nach Munchen Eisenbahntechnische Rundschau in German 48 4 216 Ott Klaus 23 March 2010 Aus der Bahn geraten Suddeutsche Zeitung in German No 68 p 19 Frohlingsdorf Michael 30 June 2002 Tanz auf dem Mullberg Spiegel Online in German Retrieved 8 July 2023 a b c Deutsche Bahn 200 Millionen fur drei Minuten Tz de in German 18 June 2010 Retrieved 8 July 2023 Die Bauarbeiten zwischen Ingolstadt und Munchen ziehen sich noch bis 2014 in German Deutsche Bahn March 2012 pp 2 3 6 page document Kraus Michael 14 March 2017 Viertes Gleis kommt nicht vor 2020 Donau Kurier in German Archived from the original on 25 November 2018 Pfaffenhofen Bahnhof bauprojekte deutschebahn com in German Deutsche Bahn 2020 Archived from the original on 22 March 2020 Retrieved 9 July 2023 Bahnprojekt Pfaffenhofen Umbauarbeiten gehen voran deutschebahn com Press release in German Deutsche Bahn 19 July 2021 Archived from the original on 20 October 2021 Retrieved 9 July 2023 Kraus Michael 22 November 2022 Umgebauten Bahnhof Pfaffenhofen planmassig in Betrieb genommen Donau Kurier in German Retrieved 9 July 2023 NIM ABS Nord Endausbau Petershausen Ingolstadt in German DB Netz January 2018 Archived from the original on 27 January 2018 Retrieved 9 July 2023 ERTMS Korridor A kommt vor dem Starterpaket Der Eisenbahningenieur in German 70 11 60 November 2019 ISSN 0013 2810 Inbetriebnahmen zum bzw im Netzfahrplan 2016 PDF in German DB Netze Archived from the original PDF on 7 September 2014 Retrieved 10 July 2023 Nied Joachim Lons Wolfgang Ritzert Jorg 2009 Ausbau der Strecke Ingolstadt Petershausen Projektziele und aktueller Sachstand Eisenbahntechnische Rundschau in German 11 556 560 Bahn holt aus zum grossen Wurf Donaukurier in German 19 March 2010 Aus fur Bahnhof Reichertshofen Donaukurier in German 21 March 2008 Retrieved 10 July 2023 Baar Ebenhausen Neuer Bahnhof in Betrieb genommen Donaukurier in German 25 July 2011 Archived from the original on 6 October 2014 Retrieved 10 July 2023 Erster Spatenstich mit der Baggerschaufel Donaukurier in German 18 June 2010 Retrieved 10 July 2023 Auf alten Rangiergleisen tut sich wieder was Donaukurier in German 11 May 2010 Retrieved 10 July 2023 Maier Marten 17 August 2021 Infrastrukturliste Bewertung Massnahmen des Planfalls Deutschlandtakt laufende Nummer 44 des Unterabschnitts 2 Vorhaben des Potentiellen Bedarfs des Bedarfsplans der Bundesschienenwege PDF bmvi de in German SMA und Partner p 18 Retrieved 9 July 2023 Deutschlandtakt Bewertung Infrastrukturmassnahmen fur den 3 Gutachterentwurf PDF downloads ctfassets net in German Intraplan Consult TTS TRIMODE Transport Solutions 17 August 2021 p 2 Retrieved 9 July 2023 Traufetter Gerald 22 July 2022 Munchner Flughafen soll ICE Anschluss bekommen Spiegel Online in German Retrieved 9 July 2023 Sources edit Weigelt Horst 2006 Honerkamp Bernd ed Schnellbahnachse Nurnberg Ingolstadt Munchen Neue Infrastruktur mit Spitzentechnologie in German Hamburg Eurailpress ISBN 3 7771 0350 0 External links edit Photographs of tunnel portals in German Tunnelportale Retrieved 10 February 2012 Retrieved from https en wikipedia org w index php title Munich Treuchtlingen railway amp oldid 1173672629, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.