Mohmand Dam (previously known as Munda Dam[1]) is an under construction multi-purpose concrete-faced rock-filled dam located on the Swat River approximately 37 km north of Peshawar and 5 km upstream of Munda Headworks in Mohmand District, Khyber Pakhtunkhwa, Pakistan.[2][3]

Mohmand Dam
Location of Mohmand Dam in Pakistan
Official nameMohmand Dam
LocationMohmand District, Khyber Pakhtunkhwa, Pakistan
Coordinates34°21′11.49″N 071°31′58.72″E / 34.3531917°N 71.5329778°E / 34.3531917; 71.5329778
StatusUnder Construction
Construction began02 May 2019
Opening dateNov 2024
Construction costRs. 340 billion (US$1.2 billion)
Owner(s)Government of Pakistan
Operator(s)Water and Power Development Authority (WAPDA)
Dam and spillways
Type of damConcrete-faced rock-filled
ImpoundsSwat River
Height698.82 ft (213.00 m)
Length2,500 ft (760 m)
Reservoir
CreatesMohmand Reservoir
Power Station
Installed capacity800 MW
Annual generation2407 GWh

Once completed, the dam will generate 740 MW of hydroelectricity, would irrigate 15,100 acres of land and control floods downstream.[1] It is expected to provide numerous estimated annual benefits including Rs. 4.98 billion in annual water storage benefits, Rs. 19.6 billion in power generation benefits by generating 2.4 billion units of electricity annually and Rs. 79 million in annual flood mitigation benefits.[4][3]

Mohmand Dam is also expected to protect Nowshera and Charsadda districts from seasonal floods by storing peak flood water in its reservoir and releasing it in dry seasons.[3] In December 2010, in the aftermath of the July 2010 floods in Pakistan, the Pakistan Supreme Court had constituted a flood inquiry commission to investigate the damage caused by the July floods that engulfed the country and caused unprecedented damage to life and property. In its report, the commission noted that if the Mohmand Dam had been constructed, there would have been minimal damage downstream in Charsadda, Peshawar and Nowshera districts and Munda Headworks.[5][6]

The reservoir that will be created behind the dam would also provide recreational facilities and promote fisheries.[7]

Planning and Financing Edit

The initial feasibility study of the Mohmand Dam Project was completed in March 2000. Subsequently, Pakistan's Ministry of Water & Power awarded a review of the initial feasibility study to an American firm, AMZO LLC, which submitted a revised feasibility study to the Private Power Infrastructure Board (PPIB). The Ministry of Water & Power reassigned the project to Pakistan's Water and Power Development Authority (WAPDA) for carrying out detailed engineering design and construction of the project. Revised Project Cost (PC-II) amounting estimate to Rs. 648.324 million was approved by CDWP subject to availability of foreign funding.

Expression of Interest (EOI) for shortlisting of consultants for detailed engineering design and preparation of tender documents were received on 23 November 2010. Nine firms/joint ventures (JVs) submitted EOI documents out of which five firms/JVs were shortlisted and RFP issued to shortlisted firms. Technical and financial proposals from shortlisted firms for detailed engineering design and preparation of tender documents were invited on 6 July 2011.[1] A consortium of consulting firms comprising include (i) SMEC(Australia), (ii) NK (Japan) and (iii) NESPAK-ACE-BAK (Pakistan) were finalized as the detailed engineering design consultants for the project in August 2011.[4] Currently, the dam is in final detailed design.

France has granted Euro 61 million (Rs. 8.5 Billion) funding for two hydropower projects in Pakistan. The two projects were :Munda hydropower project (800 MW) located in Mohmand Agency, KPK and Harpo hydropower project (35 MW) in the Gilgit-Baltistan, Skardu region.[8]

Mohmand Dam detailed engineering design was completed in April, 2017. - Its PC-1 approved by CDWP on 19-3-2018 - Its PC-I approved by ECNEC on 26-4-2018 - Rs 2 billion allocated in PSDP 2018–19 to start the project in 2019 after completion of procedures. On 6 July 2018 chief justice of Pakistan donated 1 million Pakistani rupees for the construction of Diamer-Bhasha and Mohmand Dams project.

After completion of initial planning, study, financing, consultation and cooking up by previous governments finally, Prime Minister Imran Khan inaugurated construction of Mohmand Dam on May 2, 2019. Its expected completion year is 2024.

On May 21, 2019, WAPDA signed the contract agreement worth Rs9.98 billion with a joint venture namely Mohmand Dam Consultants Group (MDCG) for consultancy services, construction design, construction supervision and contract management of Mohmand Dam Hydropower Project. The JV, led by NESPAK, comprised six partners and seven sub-consultants (four foreign and nine local firms). It is pertinent to mention that a Pakistani engineering firm had been assigned the lead role in the contract for consultancy services in such a mega water sector project for the first time in the history of Pakistan for capacity building of the local engineering firms and making them at par with the known international consultants.[9]

Salient features Edit

Dam:
Type: Concrete-Faced Rock-Filled
Length: 2,500 ft (760 m)[7]
Height: 698.82 ft (213.00 m)
Width: N/A

Reservoir Capacity:
Gross: 1.293 million acre-feet (1.595 km3)
Live: 0.676 MAF
Dead: 0.617 MAF
Flood: 0.081 MAF

Power Generation estimate:
Maximum Capacity: 800 MW

Command Area:
Total: 17,000 Acres

Construction:
Construction Period estimated: 5 years + 8 months

See also Edit

References Edit

  1. ^ a b c . Archived from the original on 2011-10-04. Retrieved 2011-08-20.
  2. ^ "Mohmand Dam Project". wapda.gov.pk. Retrieved 2019-06-12.
  3. ^ a b c "Munda Dam to be constructed on priority basis - The Express Tribune". tribune.com.pk. 4 September 2010. Retrieved 16 September 2018.
  4. ^ a b WAPDA advertisement appearing in The Nation, 20 August 2011
  5. ^ Newspaper, the (16 June 2011). "Munda dam should be a priority". dawn.com. Retrieved 16 September 2018.
  6. ^ . www.allvoices.com. Archived from the original on 2012-10-13.
  7. ^ a b . Archived from the original on 2010-10-19. Retrieved 2011-08-20.{{cite web}}: CS1 maint: archived copy as title (link)
  8. ^ "France provides 61mn euros to Pakistan for two hydropower projects". 2 April 2014.
  9. ^ "WAPDA Signs Consultancy Agreement For Mohmand Dam - UrduPoint".

External links Edit

  • The Impact of Mohmand Dam on the Farm Sector in the Dam Command Area (NWFP-Pakistan)
  • Hydro Potential in Pakistan (WAPDA Report)

mohmand, previously, known, munda, under, construction, multi, purpose, concrete, faced, rock, filled, located, swat, river, approximately, north, peshawar, upstream, munda, headworks, mohmand, district, khyber, pakhtunkhwa, pakistan, location, pakistanofficia. Mohmand Dam previously known as Munda Dam 1 is an under construction multi purpose concrete faced rock filled dam located on the Swat River approximately 37 km north of Peshawar and 5 km upstream of Munda Headworks in Mohmand District Khyber Pakhtunkhwa Pakistan 2 3 Mohmand DamLocation of Mohmand Dam in PakistanOfficial nameMohmand DamLocationMohmand District Khyber Pakhtunkhwa PakistanCoordinates34 21 11 49 N 071 31 58 72 E 34 3531917 N 71 5329778 E 34 3531917 71 5329778StatusUnder ConstructionConstruction began02 May 2019Opening dateNov 2024Construction costRs 340 billion US 1 2 billion Owner s Government of PakistanOperator s Water and Power Development Authority WAPDA Dam and spillwaysType of damConcrete faced rock filledImpoundsSwat RiverHeight698 82 ft 213 00 m Length2 500 ft 760 m ReservoirCreatesMohmand ReservoirPower StationInstalled capacity800 MWAnnual generation2407 GWhOnce completed the dam will generate 740 MW of hydroelectricity would irrigate 15 100 acres of land and control floods downstream 1 It is expected to provide numerous estimated annual benefits including Rs 4 98 billion in annual water storage benefits Rs 19 6 billion in power generation benefits by generating 2 4 billion units of electricity annually and Rs 79 million in annual flood mitigation benefits 4 3 Mohmand Dam is also expected to protect Nowshera and Charsadda districts from seasonal floods by storing peak flood water in its reservoir and releasing it in dry seasons 3 In December 2010 in the aftermath of the July 2010 floods in Pakistan the Pakistan Supreme Court had constituted a flood inquiry commission to investigate the damage caused by the July floods that engulfed the country and caused unprecedented damage to life and property In its report the commission noted that if the Mohmand Dam had been constructed there would have been minimal damage downstream in Charsadda Peshawar and Nowshera districts and Munda Headworks 5 6 The reservoir that will be created behind the dam would also provide recreational facilities and promote fisheries 7 Contents 1 Planning and Financing 2 Salient features 3 See also 4 References 5 External linksPlanning and Financing EditThe initial feasibility study of the Mohmand Dam Project was completed in March 2000 Subsequently Pakistan s Ministry of Water amp Power awarded a review of the initial feasibility study to an American firm AMZO LLC which submitted a revised feasibility study to the Private Power Infrastructure Board PPIB The Ministry of Water amp Power reassigned the project to Pakistan s Water and Power Development Authority WAPDA for carrying out detailed engineering design and construction of the project Revised Project Cost PC II amounting estimate to Rs 648 324 million was approved by CDWP subject to availability of foreign funding Expression of Interest EOI for shortlisting of consultants for detailed engineering design and preparation of tender documents were received on 23 November 2010 Nine firms joint ventures JVs submitted EOI documents out of which five firms JVs were shortlisted and RFP issued to shortlisted firms Technical and financial proposals from shortlisted firms for detailed engineering design and preparation of tender documents were invited on 6 July 2011 1 A consortium of consulting firms comprising include i SMEC Australia ii NK Japan and iii NESPAK ACE BAK Pakistan were finalized as the detailed engineering design consultants for the project in August 2011 4 Currently the dam is in final detailed design France has granted Euro 61 million Rs 8 5 Billion funding for two hydropower projects in Pakistan The two projects were Munda hydropower project 800 MW located in Mohmand Agency KPK and Harpo hydropower project 35 MW in the Gilgit Baltistan Skardu region 8 Mohmand Dam detailed engineering design was completed in April 2017 Its PC 1 approved by CDWP on 19 3 2018 Its PC I approved by ECNEC on 26 4 2018 Rs 2 billion allocated in PSDP 2018 19 to start the project in 2019 after completion of procedures On 6 July 2018 chief justice of Pakistan donated 1 million Pakistani rupees for the construction of Diamer Bhasha and Mohmand Dams project After completion of initial planning study financing consultation and cooking up by previous governments finally Prime Minister Imran Khan inaugurated construction of Mohmand Dam on May 2 2019 Its expected completion year is 2024 On May 21 2019 WAPDA signed the contract agreement worth Rs9 98 billion with a joint venture namely Mohmand Dam Consultants Group MDCG for consultancy services construction design construction supervision and contract management of Mohmand Dam Hydropower Project The JV led by NESPAK comprised six partners and seven sub consultants four foreign and nine local firms It is pertinent to mention that a Pakistani engineering firm had been assigned the lead role in the contract for consultancy services in such a mega water sector project for the first time in the history of Pakistan for capacity building of the local engineering firms and making them at par with the known international consultants 9 Salient features EditDam Type Concrete Faced Rock Filled Length 2 500 ft 760 m 7 Height 698 82 ft 213 00 m Width N AReservoir Capacity Gross 1 293 million acre feet 1 595 km3 Live 0 676 MAF Dead 0 617 MAF Flood 0 081 MAFPower Generation estimate Maximum Capacity 800 MWCommand Area Total 17 000 AcresConstruction Construction Period estimated 5 years 8 monthsSee also Edit nbsp Pakistan portal nbsp Water portal nbsp Renewable energy portal List of dams and reservoirs in PakistanReferences Edit a b c Munda Dam Archived from the original on 2011 10 04 Retrieved 2011 08 20 Mohmand Dam Project wapda gov pk Retrieved 2019 06 12 a b c Munda Dam to be constructed on priority basis The Express Tribune tribune com pk 4 September 2010 Retrieved 16 September 2018 a b WAPDA advertisement appearing in The Nation 20 August 2011 Newspaper the 16 June 2011 Munda dam should be a priority dawn com Retrieved 16 September 2018 Munda Dam could have avoided flood devastation report www allvoices com Archived from the original on 2012 10 13 a b Archived copy Archived from the original on 2010 10 19 Retrieved 2011 08 20 a href Template Cite web html title Template Cite web cite web a CS1 maint archived copy as title link France provides 61mn euros to Pakistan for two hydropower projects 2 April 2014 WAPDA Signs Consultancy Agreement For Mohmand Dam UrduPoint External links EditWAPDA Project Details The Impact of Mohmand Dam on the Farm Sector in the Dam Command Area NWFP Pakistan Hydro Potential in Pakistan WAPDA Report Retrieved from https en wikipedia org w index php title Mohmand Dam amp oldid 1170813114, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.