Mount Piper Power Station

Mount Piper Power Station is a coal powered power station with two steam turbines with a combined generating capacity of 1,400 MW of electricity. It is located near Portland, in the Central West of New South Wales, Australia and owned by EnergyAustralia, a subsidiary of CLP Group. On 23 September 2021, it was announced that the closure of the power station is being brought forward from 2042 to 2040 at the latest. The power station employs 250 workers.[1]

Mount Piper Power Station
CountryAustralia
LocationNew South Wales
Coordinates33°21′32″S 150°1′56″E / 33.35889°S 150.03222°E / -33.35889; 150.03222
StatusOperational
Commission date1993
Owner(s)EnergyAustralia
Thermal power station
Primary fuelCoal
Turbine technologySteam turbine
Power generation
Units operational2 × 700 megawatts (940,000 hp)
Make and modelTokyo Shibaura Electric (Japan)
Nameplate capacity1,400 MW
Capacity factor56.60% (average 2017-2021)
Annual net output6,941 GW·h (average 2017-2021)
External links
CommonsRelated media on Commons

Construction edit

The first generator (Unit 2) was completed in 1992, and the second (Unit 1) in 1993. Units 3 and 4, although planned, were not built. It was the last power station built by the Electricity Commission of New South Wales (a body since abolished). Much of the design work done was undertaken in-house by the commission.

In 2009 Delta Electricity (the government owned enterprise that previously owned and managed the power station as a commercial entity) unofficially re-rated the units at Mount Piper from their original 660MW to 700MW.[2]

In 2007 & early 2008 there was public talk of 'completing' the power station by using modern super-critical, dry-cooling tower, coal-fired units of up to 1000MW capacity which uses much less water from surrounding rivers.[3]

On 7 April 2010 the New South Wales Department of Planning announced that approval had been given to Delta Electricity to 'complete' the station by installing 2000MW of new generating capacity.[4]

Technical edit

Mount Piper draws its cooling water from Lyell Dam and Thomsons Creek Dam, both purpose-built for the station. Lyell Dam is located on the Coxs River 20 kilometres (12 mi) away. Large pumps draw water from the dam and transfer it to a pipeline built between Thompsons Creek Dam and Mount Piper. The power station taking what water it needs and the excess flowing into Thompsons Creek Dam. When no pumps are in service the water supply to the power station is gravity fed from Thompsons Creek Dam.

Carbon Monitoring for Action estimates this power station emits 9.08 million tonnes of greenhouse gases each year as a result of burning coal.[5] The National Pollutant Inventory[6] provides details of other pollutant emissions, but, as at 23 November 2008, not CO2.

Operations edit

Yearly generation (MWh) by unit
Year Total MP1 MP2
2011 10,242,151 5,163,830[7] 5,078,321[8]
2012 8,776,593 3,942,534[9] 4,834,059[10]
2013 9,854,146 5,340,532[11] 4,513,614[12]
2014 8,239,950 4,187,273[13] 4,052,677[14]
2015 5,467,455 2,796,720[15] 2,670,735[16]
2016 7,749,257 3,372,276[17] 4,376,981[18]
2017 7,344,075 4,189,078[19] 3,154,997[20]
2018 8,715,653 3,835,639[21] 4,880,014[22]
2019 4,691,506 2,423,968[23] 2,267,538[24]
2020 6,769,304 3,005,181[25] 3,764,123[26]
2021 7,185,315 3,870,977[27] 3,314,338[28]

See also edit

References edit

  1. ^ Toscano, Nick; Foley, Mike (23 September 2021). "EnergyAustralia to close NSW coal power plant early". The Age.
  2. ^ "Mt Piper Power Station Extension Environmental Assessment" (PDF).
  3. ^ "Mt Piper Power Station Extension".
  4. ^ Hall, Louise (7 April 2010). "Approved: power plant with emissions equal to 2.9m cars". The Sydney Morning Herald.
  5. ^ "Carbon Monitoring for Action". Retrieved 23 November 2008.
  6. ^ "National Pollutant Inventory".
  7. ^ Nem Log[permanent dead link]
  8. ^ Nem Log[permanent dead link]
  9. ^ Nem Log[permanent dead link]
  10. ^ Nem Log[permanent dead link]
  11. ^ Nem Log[permanent dead link]
  12. ^ Nem Log[permanent dead link]
  13. ^ Nem Log[permanent dead link]
  14. ^ Nem Log[permanent dead link]
  15. ^ Nem Log[permanent dead link]
  16. ^ Nem Log[permanent dead link]
  17. ^ Nem Log[permanent dead link]
  18. ^ Nem Log[permanent dead link]
  19. ^ Nem Log[permanent dead link]
  20. ^ Nem Log[permanent dead link]
  21. ^ Nem Log[permanent dead link]
  22. ^ Nem Log[permanent dead link]
  23. ^ Nem Log[permanent dead link]
  24. ^ Nem Log[permanent dead link]
  25. ^ Nem Log[permanent dead link]
  26. ^ Nem Log[permanent dead link]
  27. ^ Nem Log[permanent dead link]
  28. ^ Nem Log[permanent dead link]

External links edit

mount, piper, power, station, coal, powered, power, station, with, steam, turbines, with, combined, generating, capacity, electricity, located, near, portland, central, west, south, wales, australia, owned, energyaustralia, subsidiary, group, september, 2021, . Mount Piper Power Station is a coal powered power station with two steam turbines with a combined generating capacity of 1 400 MW of electricity It is located near Portland in the Central West of New South Wales Australia and owned by EnergyAustralia a subsidiary of CLP Group On 23 September 2021 it was announced that the closure of the power station is being brought forward from 2042 to 2040 at the latest The power station employs 250 workers 1 Mount Piper Power StationCountryAustraliaLocationNew South WalesCoordinates33 21 32 S 150 1 56 E 33 35889 S 150 03222 E 33 35889 150 03222StatusOperationalCommission date1993Owner s EnergyAustraliaThermal power stationPrimary fuelCoalTurbine technologySteam turbinePower generationUnits operational2 700 megawatts 940 000 hp Make and modelTokyo Shibaura Electric Japan Nameplate capacity1 400 MWCapacity factor56 60 average 2017 2021 Annual net output6 941 GW h average 2017 2021 External linksCommonsRelated media on Commons edit on Wikidata Contents 1 Construction 2 Technical 3 Operations 4 See also 5 References 6 External linksConstruction editThe first generator Unit 2 was completed in 1992 and the second Unit 1 in 1993 Units 3 and 4 although planned were not built It was the last power station built by the Electricity Commission of New South Wales a body since abolished Much of the design work done was undertaken in house by the commission In 2009 Delta Electricity the government owned enterprise that previously owned and managed the power station as a commercial entity unofficially re rated the units at Mount Piper from their original 660MW to 700MW 2 In 2007 amp early 2008 there was public talk of completing the power station by using modern super critical dry cooling tower coal fired units of up to 1000MW capacity which uses much less water from surrounding rivers 3 On 7 April 2010 the New South Wales Department of Planning announced that approval had been given to Delta Electricity to complete the station by installing 2000MW of new generating capacity 4 Technical editMount Piper draws its cooling water from Lyell Dam and Thomsons Creek Dam both purpose built for the station Lyell Dam is located on the Coxs River 20 kilometres 12 mi away Large pumps draw water from the dam and transfer it to a pipeline built between Thompsons Creek Dam and Mount Piper The power station taking what water it needs and the excess flowing into Thompsons Creek Dam When no pumps are in service the water supply to the power station is gravity fed from Thompsons Creek Dam Carbon Monitoring for Action estimates this power station emits 9 08 million tonnes of greenhouse gases each year as a result of burning coal 5 The National Pollutant Inventory 6 provides details of other pollutant emissions but as at 23 November 2008 not CO2 Operations editYearly generation MWh by unit Year Total MP1 MP22011 10 242 151 5 163 830 7 5 078 321 8 2012 8 776 593 3 942 534 9 4 834 059 10 2013 9 854 146 5 340 532 11 4 513 614 12 2014 8 239 950 4 187 273 13 4 052 677 14 2015 5 467 455 2 796 720 15 2 670 735 16 2016 7 749 257 3 372 276 17 4 376 981 18 2017 7 344 075 4 189 078 19 3 154 997 20 2018 8 715 653 3 835 639 21 4 880 014 22 2019 4 691 506 2 423 968 23 2 267 538 24 2020 6 769 304 3 005 181 25 3 764 123 26 2021 7 185 315 3 870 977 27 3 314 338 28 See also edit nbsp Energy portal nbsp Australia portalWallerawang Power StationReferences edit Toscano Nick Foley Mike 23 September 2021 EnergyAustralia to close NSW coal power plant early The Age Mt Piper Power Station Extension Environmental Assessment PDF Mt Piper Power Station Extension Hall Louise 7 April 2010 Approved power plant with emissions equal to 2 9m cars The Sydney Morning Herald Carbon Monitoring for Action Retrieved 23 November 2008 National Pollutant Inventory Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link Nem Log permanent dead link External links editDelta Electricity page on Mount Piper Retrieved from https en wikipedia org w index php title Mount Piper Power Station amp oldid 1158941997, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.