Miombo Hewani Wind Power Station

Miombo Hewani Wind Power Station, also Miombo Hewani Wind Farm (meaning "rocks in the air" in Swahili), is a planned 300 megawatts (400,000 hp) wind-powered power station in the Njombe Region of Tanzania.[1]

Miombo Hewani Wind Power Station
CountryTanzania
LocationMakambako, Njombe Region
Coordinates08°37′51″S 34°48′39″E / 8.63083°S 34.81083°E / -8.63083; 34.81083
StatusProposed
Construction began2018 Expected
Commission date2024 Expected
Owner(s)Windlab Developments Tanzania Limited
Power generation
Nameplate capacity300 megawatts (400,000 hp)

Location edit

The power station would be located in the villages of Isimike, Igomba and Itengelo, in Sasa Ward, in Wanging'ombe District, Njombe Region, approximately 10 kilometres (6 mi), north of the town of Makambako,[2] close to the tri-point area, where Njombe Region, Iringa Region and Mbeya Region meet.[1]

Overview edit

To help diversify Tanzania's electricity sources, Windlab Developments Tanzania Limited (WDTL), have proposed to establish Miombo Hewani Wind Farm, a 300 megawatt project, to be developed in phases. The development company, WDTL, is a subsidiary of Australia’s Windlab Limited of Australia, with developments in Australia, the United States and South Africa.[1]

In May 2018, the developers of this wind farm were granted an electricity generation license for a power plant of up to 300 megawatts. The license is the first-ever for a grid-ready wind farm in the history of Tanzania.[1] The wind farm has a planned lifespan of 25 years from completion.[3]

Development edit

It is expected that the first phase, consisting 34 turbines, will generate 100 megawatts (130,000 hp) and cost US$300 million. A new transmission line will transmit the power to a substation in Makambako, where the energy will be integrated into the national electric grid.[1] The power station is expected to power one million average-sized Tanzanian homes.[4]

Funding edit

This development has received partial funding from the Ministry for Foreign Affairs of Finland.[1]

See also edit

References edit

  1. ^ a b c d e f Senelwa, Kennedy (18 June 2018). "Tanzania signs deal to build first-ever wind farm". The EastAfrican. Nairobi. Retrieved 18 June 2018.
  2. ^ Windlab (12 June 2018). "Tanzania approves its first Wind Farm Project". Canberra City, Australia: Windlab Limited. Retrieved 18 June 2018.
  3. ^ Richard, Craig (12 June 2018). "Tanzanian project gets environmental approval". Windpowermonthly.com. Retrieved 18 June 2018.
  4. ^ The Citizen Reporter (13 June 2018). "Australian firm gets nod for 300MW wind farm". The Citizen Tanzania Online. Dar es Salaam. Retrieved 18 June 2018.

External links edit

  • Website of Windlab Limited

miombo, hewani, wind, power, station, also, miombo, hewani, wind, farm, meaning, rocks, swahili, planned, megawatts, wind, powered, power, station, njombe, region, tanzania, countrytanzanialocationmakambako, njombe, regioncoordinates08, 63083, 81083, 63083, 81. Miombo Hewani Wind Power Station also Miombo Hewani Wind Farm meaning rocks in the air in Swahili is a planned 300 megawatts 400 000 hp wind powered power station in the Njombe Region of Tanzania 1 Miombo Hewani Wind Power StationCountryTanzaniaLocationMakambako Njombe RegionCoordinates08 37 51 S 34 48 39 E 8 63083 S 34 81083 E 8 63083 34 81083StatusProposedConstruction began2018 ExpectedCommission date2024 ExpectedOwner s Windlab Developments Tanzania LimitedPower generationNameplate capacity300 megawatts 400 000 hp edit on Wikidata Contents 1 Location 2 Overview 3 Development 4 Funding 5 See also 6 References 7 External linksLocation editThe power station would be located in the villages of Isimike Igomba and Itengelo in Sasa Ward in Wanging ombe District Njombe Region approximately 10 kilometres 6 mi north of the town of Makambako 2 close to the tri point area where Njombe Region Iringa Region and Mbeya Region meet 1 Overview editTo help diversify Tanzania s electricity sources Windlab Developments Tanzania Limited WDTL have proposed to establish Miombo Hewani Wind Farm a 300 megawatt project to be developed in phases The development company WDTL is a subsidiary of Australia s Windlab Limited of Australia with developments in Australia the United States and South Africa 1 In May 2018 the developers of this wind farm were granted an electricity generation license for a power plant of up to 300 megawatts The license is the first ever for a grid ready wind farm in the history of Tanzania 1 The wind farm has a planned lifespan of 25 years from completion 3 Development editIt is expected that the first phase consisting 34 turbines will generate 100 megawatts 130 000 hp and cost US 300 million A new transmission line will transmit the power to a substation in Makambako where the energy will be integrated into the national electric grid 1 The power station is expected to power one million average sized Tanzanian homes 4 Funding editThis development has received partial funding from the Ministry for Foreign Affairs of Finland 1 See also edit nbsp Tanzania portal nbsp Weather portal nbsp Renewable energy portal List of power stations in TanzaniaReferences edit a b c d e f Senelwa Kennedy 18 June 2018 Tanzania signs deal to build first ever wind farm The EastAfrican Nairobi Retrieved 18 June 2018 Windlab 12 June 2018 Tanzania approves its first Wind Farm Project Canberra City Australia Windlab Limited Retrieved 18 June 2018 Richard Craig 12 June 2018 Tanzanian project gets environmental approval Windpowermonthly com Retrieved 18 June 2018 The Citizen Reporter 13 June 2018 Australian firm gets nod for 300MW wind farm The Citizen Tanzania Online Dar es Salaam Retrieved 18 June 2018 External links editWebsite of Windlab Limited Retrieved from https en wikipedia org w index php title Miombo Hewani Wind Power Station amp oldid 1166857663, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.