fbpx
Wikipedia

Mercury-Redstone Launch Vehicle

The Mercury-Redstone Launch Vehicle, designed for NASA's Project Mercury, was the first American crewed space booster. It was used for six sub-orbital Mercury flights from 1960–1961; culminating with the launch of the first, and 11 weeks later, the second American (and the second and third humans) in space. The four subsequent Mercury human spaceflights used the more powerful Atlas booster to enter low Earth orbit.

Mercury-Redstone Launch Vehicle
Mercury-Redstone 2 launch carrying Ham, a chimpanzee, on 31 January 1961.
FunctionHuman-rated sub-orbital launch vehicle
ManufacturerChrysler Corporation
Country of originUnited States
Size
Height25.41 m (83.38 ft)
Diameter1.78 m (5.83 ft)
Mass30,000 kg (66,000 lb)
Stages1
Capacity
Payload to sub-orbital trajectory
Mass1,800 kg (4,000 lb)
Launch history
StatusRetired
Launch sitesLaunch Complex 5, Cape Canaveral, Florida
Total launches6
Success(es)5
Failure(s)1
First flight21 November 1960
Last flight21 July 1961
Type of passengers/cargoMercury spacecraft
Single stage
Powered by1 Rocketdyne A-7
Maximum thrust350 kN (78,000 lbf)
Specific impulse215 s (2.11 km/s)
Burn time143.5 s
PropellantLOX/ethyl alcohol

A member of the Redstone rocket family, it was derived from the U.S. Army's Redstone ballistic missile and the first stage of the related Jupiter-C launch vehicle; but to human-rate it, the structure and systems were modified to improve safety and reliability.

Modifications from the Redstone missile edit

 
Comparison of Mercury-Redstone (right) with Redstone missile and Jupiter-C

NASA chose the U.S. Army's Redstone liquid-fueled ballistic missile for its sub-orbital flights as it was the oldest one in the US fleet, having been active since 1953 and had[1] many successful test flights.[2]

The standard military Redstone lacked sufficient thrust to lift a Mercury capsule into the ballistic suborbital trajectory needed for the project;[2] however, the first stage of the Jupiter-C, which was a modified Redstone with lengthened tanks, could carry enough propellant to reach the desired trajectory. Therefore, this Jupiter-C first stage was used as the starting point for the Mercury-Redstone design.[3] The Jupiter-C's engine, however, was being phased out by the Army, so to avoid potential complications such as parts shortages or design revisions, the Mercury-Redstone designers chose the Rocketdyne A-7 engine used on the latest military Redstone.[4] Hans Paul and William Davidson, propulsion engineers at the Army Ballistic Missile Agency (ABMA), were assigned the task of modifying the A-7 to be safe and reliable for crewed flights.

During 1959, most of ABMA were preoccupied with the Saturn project, but those engineers who could find enough free time in their schedule were invited to work on man-rating the Jupiter-C. As a starting point, the most obvious step was getting rid of its staging capability as the Mercury-Redstone would not utilize upper stages. Many of the more advanced Jupiter-C components were also removed for reliability reasons or because they were not necessary for Project Mercury.

The standard Redstone was fueled with 25 percent water–75 percent ethyl alcohol with liquid oxygen (LOX) used as the oxidizer,[5] essentially the same propellants as the V-2, but the Jupiter-C first stage had used hydyne fuel, a blend of 60 % unsymmetrical dimethylhydrazine (UDMH) and 40 % diethylenetriamine (DETA).[6] This was a more powerful fuel than ethyl alcohol, but it was also more toxic,[7] which could be hazardous for an astronaut in a launch pad emergency.[8] Furthermore, hydyne had never been used with the new A-7 engine.[9] The Mercury-Redstone designers rejected hydyne and returned to the standard ethyl alcohol fuel. The lengthened propellant tanks were thus also necessary in lieu of using more powerful fuel.[10]

Use of alcohol created a problem with the Mercury-Redstone in that the graphite thrust vector vanes could be eroded due to the significantly longer burn time, hence NASA put out a requirement that the launch vehicles needed high-quality vanes.

Because Mercury-Redstone had larger propellant tanks than the Redstone missile, an additional nitrogen bottle was added for tank pressurization, and an extra hydrogen peroxide tank for powering the turbopump due to the longer burn time.

The most important change in making the Mercury-Redstone a suitable vehicle for an astronaut was the addition of an automatic in-flight abort sensing system.[11] In an emergency where the rocket was about to suffer a catastrophic failure, an abort would activate the launch escape system attached to the Mercury capsule, which would rapidly eject it from the booster. Either the astronaut or the ground controllers could initiate an abort manually,[12] but some potential failures during flight might lead to disaster before an abort could be manually triggered.[13]

 
Exploded view

The Mercury-Redstone's automatic in-flight abort sensing system solved this problem by monitoring the rocket's performance during flight. If it detected an anomaly which might threaten the astronaut, such as loss of flight control, engine thrust, or electrical power, it would automatically abort, shutting down the engine and activating the capsule's escape system.[14] The abort system could not shut off the engine until at least 30 seconds after liftoff in order to prevent a malfunctioning launch vehicle from coming down on or near the pad; during the initial 30 seconds, only the Range Safety Officer could terminate the flight.[15] Review of flight data from the more than 60 Redstone and Jupiter C launches since 1953 was used to analyze the most likely failure modes of this launch vehicle family. In the interest of simplicity, the abort sensing system had to be kept as simple as possible and only monitor parameters that were vital to booster operation. An automatic abort could be triggered by any of the following conditions, all of which could be indicative of a catastrophic launch vehicle malfunction:

  • Pitch, yaw, or roll angle deviating too far from the programmed flight profile,[16]
  • Pitch or yaw angle changing too rapidly,[17]
  • Pressure in the engine's combustion chamber falling below a critical level,[18]
  • Loss of electrical power for the flight control system,[19] or
  • Loss of general electrical power (including power for the abort sensing system itself), which could indicate a catastrophic failure.[20]

Instant abort capability was important because certain failure modes such as loss of thrust upon liftoff (for example the third Redstone test flight in May 1954) could result in an immediate catastrophic situation. Other failure modes such as deviation from the proper flight path or a drop in engine chamber pressure during ascent did not necessarily present an immediate risk to the astronaut's safety and he could either initiate a manual abort by pulling a lever in the capsule to activate the Launch Escape System or ground control could send a command to activate it.

The range safety system was modified slightly in that a three-second delay would take place between engine cutoff and missile destruct so as to give the escape tower enough time to pull the capsule away.[21]

 
Schematic view

The most visible difference between the Jupiter-C first stage and the Mercury-Redstone was in the section just below the Mercury capsule and above the propellant tanks. This section was known as the aft section, a term which was inherited from the military Redstone. (The actual rear end of the rocket was called the tail section.) The aft section held most of the Mercury-Redstone's electronics and instrumentation, including the guidance system, as well as the adapter for the Mercury capsule.[22] In the military Redstone and the Jupiter-C first stage, when the rocket had burned out, its lower portion, containing the rocket engine and propellant tanks, would separate from the aft section and be discarded, and the aft section, with its guidance system, would direct the top half of the rocket during its unpowered ballistic flight. However, in the Mercury-Redstone, the aft section was permanently attached to the lower portion of the rocket.[23] When the rocket had shut down, the Mercury capsule would separate from the aft section and would rely on its own guidance.

Other changes were made to improve the Mercury-Redstone's reliability. The standard Redstone's ST-80 inertial guidance system was replaced in the Mercury-Redstone with the simpler LEV-3 autopilot. The LEV-3, whose design dated back to the German V-2 missile, was not as sophisticated or as precise as the ST-80, but it was accurate enough for the Mercury mission and its simplicity made it more reliable.[24] A special instrument compartment was built in the "aft section" to hold the most important instrumentation and electronics, including the guidance system, the abort and destruct systems, the telemetry instrumentation, and the electrical power supplies. To reduce the chance of failure in this equipment, this compartment was cooled before launch and kept pressurized during flight.[25]

The fuel prevalves were deleted from the Mercury-Redstone in the interest of improved reliability, since if they closed during a launch, an abort condition could be triggered. On the three uncrewed flights, it was discovered that the Mercury-Redstone exhibited a roll transient of 8° per second versus 4° for the Redstone missile. Although this was below the 12° per second roll transient required to trigger an abort, the roll rate sensor was removed from the two crewed flights to reduce the chances of an accidental abort (the booster still retained the roll attitude angle sensor which would be triggered at 10°).

Mercury-Redstone 1A and Mercury-Redstone 2 both experienced overacceleration in flight, the former due to a problem with an accelerometer, the latter due to a problem with the LOX regulator which oversupplied the engine with oxidizer and caused thrust termination to occur 1.2 seconds early. The ASIS system activated and the escape tower yanked the capsule away, subjecting Ham, its chimpanzee passenger to high G loads. The third flight, Mercury-Redstone BD, was designed as an engineering test to correct these problems before the booster could be considered man-rated.

The space between the pressurized instrument compartment and the capsule was originally intended to hold a parachute recovery system for the rocket, but it had been left empty after this system was abandoned. The three uncrewed Mercury-Redstone flights exhibited high vibration levels and structural bending in the adapter area, so Alan Shepard's flight included 340 pounds of lead-infused plastic in the adapter section along with additional bracing and stiffeners. After Shepard still reported noticeable vibration during launch, Gus Grissom's booster included even more ballast. The Atlas booster used for orbital Mercury flights had also experienced this issue, but with more catastrophic results as Mercury-Atlas 1 was destroyed in-flight due to structural failure caused by excessive flexing at the point where the booster mated with the capsule adapter.[26]

In total, some 800 modifications were made to the Redstone design in the process of adapting it for the Mercury program. The process of man-rating Redstone was so extensive that NASA quickly found themselves not using an off-the-shelf rocket, but what was in effect a completely new one and thus negating all of the hardware and flight test data from previous Redstone and Jupiter-C launches. This created a series of disputes between Von Braun's team at ABMA and NASA, as the former preferred simply making the abort system as foolproof as possible so as to guarantee that the astronaut would be bailed out of a malfunctioning launch vehicle, while the latter favored maximum booster reliability to minimize the chance of aborts happening at all.

Proposed parachute recovery system edit

The Mercury-Redstone designers originally planned for the rocket to be recovered by parachute after its separation from the Mercury capsule. This was the first significant effort to develop a recoverable launch vehicle and the first to reach the testing phase.[27]

The recovery system, at the top of the rocket, would have used two stages of parachutes. In the first stage, a single parachute, 17 feet (5.2 m) in diameter, would stabilize the rocket's fall and slow its descent. This parachute would then draw out a set of three main parachutes, each 67 feet (20 m) across. The rocket would come down in the Atlantic Ocean, to be recovered by ship.[28]

To determine the feasibility of this system, several tests were performed on full-sized Redstone, including water impact and flotation tests, and an exercise at sea in which a floating Redstone was picked up by a Navy recovery ship. All these tests showed recovery of the rocket to be workable.[29] Further development was halted, however, due to lack of funding, so the parachute system was not tested.[30]

Flights edit

Mercury-Redstone flights were designated with the prefix "MR-". Confusingly, the Mercury-Redstone boosters used for these flights were designated in the same way, usually with different numbers. This designation can be seen on the rocket's tail end (usually visible in full resolution images, check the table below).

Two rockets, MR-4 and MR-6, were never flown. Although there had been rumors that NASA in the very beginning of Project Mercury had intended to launch each astronaut on a suborbital mission before beginning orbital Atlas flights, they only purchased eight Mercury-Redstone boosters, one of which was damaged in the unsuccessful MR-1 launch and not reused, and another used for the MR-BD flight (the original schedule was for one uncrewed Mercury-Redstone flight, one chimpanzee flight, and six crewed flights). Since Alan Shepard and Gus Grissom's flights were successful and since the Soviet Union had flown two orbital crewed space flights by the late summer of 1961, there was no need to continue with Redstone missions.[31]

Mercury-Redstone booster and flight designations
Flight designation Rocket designation Launch date Comments
MR-1 MR-1 21 November 1960  
Empty capsule; launch abort; rocket shut down at liftoff due to electrical fault
MR-1A MR-3 19 December 1960  
Empty capsule
MR-2 MR-2 31 January 1961  
Carried Ham, a chimpanzee
MR-BD MR-5 24 March 1961  
Empty nonfunctional boilerplate capsule
MR-3 MR-7 5 May 1961  
Carried astronaut Alan Shepard
MR-4 MR-8 21 July 1961  
Carried astronaut Gus Grissom
(unflown) MR-4
(unflown) MR-6


Gallery edit

Notes edit

  1. ^ This New Ocean, p. 122.
  2. ^ a b The Mercury-Redstone Project, p. 2-2, 3-1.
  3. ^ The Mercury-Redstone Project, p. 2-2, 3-1, 4-39 to 4-41.
  4. ^ The Mercury-Redstone Project, p. 4-41, 9-5.
  5. ^ "V-2".
  6. ^ The Mercury-Redstone Project, p. 2-2.
  7. ^ The Mercury-Redstone Project, p. 3-2, 4-42.
  8. ^ The Mercury-Redstone Project, p. 9-6.
  9. ^ The Mercury-Redstone Project, p. 4-42.
  10. ^ The Mercury-Redstone Project, p. 2-2, 3-2, 4-42.
  11. ^ The Mercury-Redstone Project, p. 3-2, 9-3.
  12. ^ The Mercury-Redstone Project, p. 5-10, 5-11, 9-4.
  13. ^ The Mercury-Redstone Project, p. 5-2, 9-4.
  14. ^ The Mercury-Redstone Project, p. 5-1, 5-2, 9-4.
  15. ^ The Mercury-Redstone Project, p. 3-5, 5-10.
  16. ^ The Mercury-Redstone Project, p. 5-3, 5-6, 5-17, 5-19.
  17. ^ The Mercury-Redstone Project, p. 5-3, 5-6, 5-17, 5-23.
  18. ^ The Mercury-Redstone Project, p. 5-3, 5-6.
  19. ^ The Mercury-Redstone Project, p. 5-3, 5-6, 5-17.
  20. ^ The Mercury-Redstone Project, p. 5-3, 5-6, 5-10.
  21. ^ The Mercury-Redstone Project, p. 4-39, 4-43, 9-7.
  22. ^ The Mercury-Redstone Project, p. 4-5, 4-6, 9-6.
  23. ^ The Mercury-Redstone Project, p. 3-2, 4-40.
  24. ^ The Mercury-Redstone Project, p. 3-2, 9-7.
  25. ^ The Mercury-Redstone Project, p. 4-5, 4-41.
  26. ^ The Mercury-Redstone Project, p. 3-2, 4-5, 4-21, 4-41.
  27. ^ The Mercury-Redstone Project, p. 6-22, 6-23.
  28. ^ The Mercury-Redstone Project, p. 6-29, 6-30.
  29. ^ The Mercury-Redstone Project, p. 6-33 to 6-39.
  30. ^ The Mercury-Redstone Project, p. 6-23.
  31. ^ The Mercury-Redstone Project, p. 6-3, 8-1.

References edit

  • Cassidy, J. L.; Johnson, R. I.; Leveye, J. C.; Miller, F. E. (December 1964). The Mercury-Redstone Project (PDF). NASA.
  • Swenson Jr., Loyd S.; Grimwood, James M.; Alexander, Charles C. (1966). . NASA. Archived from the original on June 17, 2010. Retrieved April 18, 2009.

mercury, redstone, launch, vehicle, designed, nasa, project, mercury, first, american, crewed, space, booster, used, orbital, mercury, flights, from, 1960, 1961, culminating, with, launch, first, weeks, later, second, american, second, third, humans, space, fo. The Mercury Redstone Launch Vehicle designed for NASA s Project Mercury was the first American crewed space booster It was used for six sub orbital Mercury flights from 1960 1961 culminating with the launch of the first and 11 weeks later the second American and the second and third humans in space The four subsequent Mercury human spaceflights used the more powerful Atlas booster to enter low Earth orbit Mercury Redstone Launch VehicleMercury Redstone 2 launch carrying Ham a chimpanzee on 31 January 1961 FunctionHuman rated sub orbital launch vehicleManufacturerChrysler CorporationCountry of originUnited StatesSizeHeight25 41 m 83 38 ft Diameter1 78 m 5 83 ft Mass30 000 kg 66 000 lb Stages1CapacityPayload to sub orbital trajectoryMass1 800 kg 4 000 lb Launch historyStatusRetiredLaunch sitesLaunch Complex 5 Cape Canaveral FloridaTotal launches6Success es 5Failure s 1First flight21 November 1960Last flight21 July 1961Type of passengers cargoMercury spacecraftSingle stagePowered by1 Rocketdyne A 7Maximum thrust350 kN 78 000 lbf Specific impulse215 s 2 11 km s Burn time143 5 sPropellantLOX ethyl alcohol edit on Wikidata A member of the Redstone rocket family it was derived from the U S Army s Redstone ballistic missile and the first stage of the related Jupiter C launch vehicle but to human rate it the structure and systems were modified to improve safety and reliability Contents 1 Modifications from the Redstone missile 2 Proposed parachute recovery system 3 Flights 4 Gallery 5 Notes 6 ReferencesModifications from the Redstone missile edit nbsp Comparison of Mercury Redstone right with Redstone missile and Jupiter CNASA chose the U S Army s Redstone liquid fueled ballistic missile for its sub orbital flights as it was the oldest one in the US fleet having been active since 1953 and had 1 many successful test flights 2 The standard military Redstone lacked sufficient thrust to lift a Mercury capsule into the ballistic suborbital trajectory needed for the project 2 however the first stage of the Jupiter C which was a modified Redstone with lengthened tanks could carry enough propellant to reach the desired trajectory Therefore this Jupiter C first stage was used as the starting point for the Mercury Redstone design 3 The Jupiter C s engine however was being phased out by the Army so to avoid potential complications such as parts shortages or design revisions the Mercury Redstone designers chose the Rocketdyne A 7 engine used on the latest military Redstone 4 Hans Paul and William Davidson propulsion engineers at the Army Ballistic Missile Agency ABMA were assigned the task of modifying the A 7 to be safe and reliable for crewed flights During 1959 most of ABMA were preoccupied with the Saturn project but those engineers who could find enough free time in their schedule were invited to work on man rating the Jupiter C As a starting point the most obvious step was getting rid of its staging capability as the Mercury Redstone would not utilize upper stages Many of the more advanced Jupiter C components were also removed for reliability reasons or because they were not necessary for Project Mercury The standard Redstone was fueled with 25 percent water 75 percent ethyl alcohol with liquid oxygen LOX used as the oxidizer 5 essentially the same propellants as the V 2 but the Jupiter C first stage had used hydyne fuel a blend of 60 unsymmetrical dimethylhydrazine UDMH and 40 diethylenetriamine DETA 6 This was a more powerful fuel than ethyl alcohol but it was also more toxic 7 which could be hazardous for an astronaut in a launch pad emergency 8 Furthermore hydyne had never been used with the new A 7 engine 9 The Mercury Redstone designers rejected hydyne and returned to the standard ethyl alcohol fuel The lengthened propellant tanks were thus also necessary in lieu of using more powerful fuel 10 Use of alcohol created a problem with the Mercury Redstone in that the graphite thrust vector vanes could be eroded due to the significantly longer burn time hence NASA put out a requirement that the launch vehicles needed high quality vanes Because Mercury Redstone had larger propellant tanks than the Redstone missile an additional nitrogen bottle was added for tank pressurization and an extra hydrogen peroxide tank for powering the turbopump due to the longer burn time The most important change in making the Mercury Redstone a suitable vehicle for an astronaut was the addition of an automatic in flight abort sensing system 11 In an emergency where the rocket was about to suffer a catastrophic failure an abort would activate the launch escape system attached to the Mercury capsule which would rapidly eject it from the booster Either the astronaut or the ground controllers could initiate an abort manually 12 but some potential failures during flight might lead to disaster before an abort could be manually triggered 13 nbsp Exploded viewThe Mercury Redstone s automatic in flight abort sensing system solved this problem by monitoring the rocket s performance during flight If it detected an anomaly which might threaten the astronaut such as loss of flight control engine thrust or electrical power it would automatically abort shutting down the engine and activating the capsule s escape system 14 The abort system could not shut off the engine until at least 30 seconds after liftoff in order to prevent a malfunctioning launch vehicle from coming down on or near the pad during the initial 30 seconds only the Range Safety Officer could terminate the flight 15 Review of flight data from the more than 60 Redstone and Jupiter C launches since 1953 was used to analyze the most likely failure modes of this launch vehicle family In the interest of simplicity the abort sensing system had to be kept as simple as possible and only monitor parameters that were vital to booster operation An automatic abort could be triggered by any of the following conditions all of which could be indicative of a catastrophic launch vehicle malfunction Pitch yaw or roll angle deviating too far from the programmed flight profile 16 Pitch or yaw angle changing too rapidly 17 Pressure in the engine s combustion chamber falling below a critical level 18 Loss of electrical power for the flight control system 19 or Loss of general electrical power including power for the abort sensing system itself which could indicate a catastrophic failure 20 Instant abort capability was important because certain failure modes such as loss of thrust upon liftoff for example the third Redstone test flight in May 1954 could result in an immediate catastrophic situation Other failure modes such as deviation from the proper flight path or a drop in engine chamber pressure during ascent did not necessarily present an immediate risk to the astronaut s safety and he could either initiate a manual abort by pulling a lever in the capsule to activate the Launch Escape System or ground control could send a command to activate it The range safety system was modified slightly in that a three second delay would take place between engine cutoff and missile destruct so as to give the escape tower enough time to pull the capsule away 21 nbsp Schematic viewThe most visible difference between the Jupiter C first stage and the Mercury Redstone was in the section just below the Mercury capsule and above the propellant tanks This section was known as the aft section a term which was inherited from the military Redstone The actual rear end of the rocket was called the tail section The aft section held most of the Mercury Redstone s electronics and instrumentation including the guidance system as well as the adapter for the Mercury capsule 22 In the military Redstone and the Jupiter C first stage when the rocket had burned out its lower portion containing the rocket engine and propellant tanks would separate from the aft section and be discarded and the aft section with its guidance system would direct the top half of the rocket during its unpowered ballistic flight However in the Mercury Redstone the aft section was permanently attached to the lower portion of the rocket 23 When the rocket had shut down the Mercury capsule would separate from the aft section and would rely on its own guidance Other changes were made to improve the Mercury Redstone s reliability The standard Redstone s ST 80 inertial guidance system was replaced in the Mercury Redstone with the simpler LEV 3 autopilot The LEV 3 whose design dated back to the German V 2 missile was not as sophisticated or as precise as the ST 80 but it was accurate enough for the Mercury mission and its simplicity made it more reliable 24 A special instrument compartment was built in the aft section to hold the most important instrumentation and electronics including the guidance system the abort and destruct systems the telemetry instrumentation and the electrical power supplies To reduce the chance of failure in this equipment this compartment was cooled before launch and kept pressurized during flight 25 The fuel prevalves were deleted from the Mercury Redstone in the interest of improved reliability since if they closed during a launch an abort condition could be triggered On the three uncrewed flights it was discovered that the Mercury Redstone exhibited a roll transient of 8 per second versus 4 for the Redstone missile Although this was below the 12 per second roll transient required to trigger an abort the roll rate sensor was removed from the two crewed flights to reduce the chances of an accidental abort the booster still retained the roll attitude angle sensor which would be triggered at 10 Mercury Redstone 1A and Mercury Redstone 2 both experienced overacceleration in flight the former due to a problem with an accelerometer the latter due to a problem with the LOX regulator which oversupplied the engine with oxidizer and caused thrust termination to occur 1 2 seconds early The ASIS system activated and the escape tower yanked the capsule away subjecting Ham its chimpanzee passenger to high G loads The third flight Mercury Redstone BD was designed as an engineering test to correct these problems before the booster could be considered man rated The space between the pressurized instrument compartment and the capsule was originally intended to hold a parachute recovery system for the rocket but it had been left empty after this system was abandoned The three uncrewed Mercury Redstone flights exhibited high vibration levels and structural bending in the adapter area so Alan Shepard s flight included 340 pounds of lead infused plastic in the adapter section along with additional bracing and stiffeners After Shepard still reported noticeable vibration during launch Gus Grissom s booster included even more ballast The Atlas booster used for orbital Mercury flights had also experienced this issue but with more catastrophic results as Mercury Atlas 1 was destroyed in flight due to structural failure caused by excessive flexing at the point where the booster mated with the capsule adapter 26 In total some 800 modifications were made to the Redstone design in the process of adapting it for the Mercury program The process of man rating Redstone was so extensive that NASA quickly found themselves not using an off the shelf rocket but what was in effect a completely new one and thus negating all of the hardware and flight test data from previous Redstone and Jupiter C launches This created a series of disputes between Von Braun s team at ABMA and NASA as the former preferred simply making the abort system as foolproof as possible so as to guarantee that the astronaut would be bailed out of a malfunctioning launch vehicle while the latter favored maximum booster reliability to minimize the chance of aborts happening at all Proposed parachute recovery system editThe Mercury Redstone designers originally planned for the rocket to be recovered by parachute after its separation from the Mercury capsule This was the first significant effort to develop a recoverable launch vehicle and the first to reach the testing phase 27 The recovery system at the top of the rocket would have used two stages of parachutes In the first stage a single parachute 17 feet 5 2 m in diameter would stabilize the rocket s fall and slow its descent This parachute would then draw out a set of three main parachutes each 67 feet 20 m across The rocket would come down in the Atlantic Ocean to be recovered by ship 28 To determine the feasibility of this system several tests were performed on full sized Redstone including water impact and flotation tests and an exercise at sea in which a floating Redstone was picked up by a Navy recovery ship All these tests showed recovery of the rocket to be workable 29 Further development was halted however due to lack of funding so the parachute system was not tested 30 Flights editMercury Redstone flights were designated with the prefix MR Confusingly the Mercury Redstone boosters used for these flights were designated in the same way usually with different numbers This designation can be seen on the rocket s tail end usually visible in full resolution images check the table below Two rockets MR 4 and MR 6 were never flown Although there had been rumors that NASA in the very beginning of Project Mercury had intended to launch each astronaut on a suborbital mission before beginning orbital Atlas flights they only purchased eight Mercury Redstone boosters one of which was damaged in the unsuccessful MR 1 launch and not reused and another used for the MR BD flight the original schedule was for one uncrewed Mercury Redstone flight one chimpanzee flight and six crewed flights Since Alan Shepard and Gus Grissom s flights were successful and since the Soviet Union had flown two orbital crewed space flights by the late summer of 1961 there was no need to continue with Redstone missions 31 Mercury Redstone booster and flight designations Flight designation Rocket designation Launch date CommentsMR 1 MR 1 21 November 1960 nbsp Empty capsule launch abort rocket shut down at liftoff due to electrical faultMR 1A MR 3 19 December 1960 nbsp Empty capsuleMR 2 MR 2 31 January 1961 nbsp Carried Ham a chimpanzeeMR BD MR 5 24 March 1961 nbsp Empty nonfunctional boilerplate capsuleMR 3 MR 7 5 May 1961 nbsp Carried astronaut Alan ShepardMR 4 MR 8 21 July 1961 nbsp Carried astronaut Gus Grissom unflown MR 4 unflown MR 6Gallery edit nbsp Mercury Redstone prior to test firing in the Redstone Test Stand at Marshall Space Flight Center Alabama nbsp MSFC Mercury Redstone Project Manager Joachim Kuettner l and center officials host MR 4 astronaut Gus Grissom 6th from l nbsp MR 3 prelaunch activities April 21 1961 at LC 5 Cape Canaveral Florida nbsp MR 3 launch May 5 1961 Shepard nbsp MR 4 booster erection at LC 5 nbsp MR 4 launch July 21 1961 Grissom nbsp At Merritt Island Florida the Kennedy Space Center Visitor Complex has a Mercury Redstone rocket on display nbsp Mercury Redstone at Cape Canaveral Air Force Station Launch Complex 5 pad nbsp Mercury Redstone rocket on display at Johnson Space Center Houston TX nbsp Mercury Redstone at Cosmo Isle Hakui nbsp Mercury Redstone at OTC Satellite Earth Station CarnarvonNotes edit This New Ocean p 122 a b The Mercury Redstone Project p 2 2 3 1 The Mercury Redstone Project p 2 2 3 1 4 39 to 4 41 The Mercury Redstone Project p 4 41 9 5 V 2 The Mercury Redstone Project p 2 2 The Mercury Redstone Project p 3 2 4 42 The Mercury Redstone Project p 9 6 The Mercury Redstone Project p 4 42 The Mercury Redstone Project p 2 2 3 2 4 42 The Mercury Redstone Project p 3 2 9 3 The Mercury Redstone Project p 5 10 5 11 9 4 The Mercury Redstone Project p 5 2 9 4 The Mercury Redstone Project p 5 1 5 2 9 4 The Mercury Redstone Project p 3 5 5 10 The Mercury Redstone Project p 5 3 5 6 5 17 5 19 The Mercury Redstone Project p 5 3 5 6 5 17 5 23 The Mercury Redstone Project p 5 3 5 6 The Mercury Redstone Project p 5 3 5 6 5 17 The Mercury Redstone Project p 5 3 5 6 5 10 The Mercury Redstone Project p 4 39 4 43 9 7 The Mercury Redstone Project p 4 5 4 6 9 6 The Mercury Redstone Project p 3 2 4 40 The Mercury Redstone Project p 3 2 9 7 The Mercury Redstone Project p 4 5 4 41 The Mercury Redstone Project p 3 2 4 5 4 21 4 41 The Mercury Redstone Project p 6 22 6 23 The Mercury Redstone Project p 6 29 6 30 The Mercury Redstone Project p 6 33 to 6 39 The Mercury Redstone Project p 6 23 The Mercury Redstone Project p 6 3 8 1 References edit nbsp Wikimedia Commons has media related to Mercury Redstone boosters Cassidy J L Johnson R I Leveye J C Miller F E December 1964 The Mercury Redstone Project PDF NASA Swenson Jr Loyd S Grimwood James M Alexander Charles C 1966 This New Ocean A History of Project Mercury NASA Archived from the original on June 17 2010 Retrieved April 18 2009 Retrieved from https en wikipedia org w index php title Mercury Redstone Launch Vehicle amp oldid 1208715148, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.