fbpx
Wikipedia

Victorian Goldfields Railway

The Victorian Goldfields Railway is a 1,600 mm (5 ft 3 in) broad gauge tourist railway in Victoria, Australia. It operates along a formerly disused branch line between the towns of Maldon and Castlemaine.

Victorian Goldfields Railway
Overview
Termini
Connecting linesDeniliquin line
Former connectionsShelbourne Line, Moolort line
Websitevgr.com.au
Service
TypeTourist Railway
History
Completed1884
Closed1976
Reopened1986
Technical
Line length17 km (10.6 mi)
Number of tracksSingle track
Track gauge1,600 mm (5 ft 3 in)
Old gauge5 ft 3 in (1,600 mm)
Route map

Muckleford
Shelbourne extension (closed 1970, later dismantled)
Maldon
Pollard
Shelbourne

History

The original line was opened on 16 June 1884,[1] opening up rail access from the established station at Castlemaine to the towns of Muckleford and Maldon. The area was prosperous, as Castlemaine and Maldon had both experienced gold rushes in the preceding years, and local residents had been petitioning the government for a railway since 1874. On 2 August 1884, a contract was let for an extension to Laanecoorie, however further construction was suspended after the line reached the small town of Shelbourne in 1891.[2]

The line was served by twice-daily trains for the first forty years of its life, which was increased to four-times-daily trains in 1924.[3] However, these were cut back at the end of the 1920s due to a decrease in the local population, and passenger services were eliminated altogether during World War II.[4] This meant that the line was used by only a weekly goods train which went through to Shelbourne. When bushfire damage caused the closure of the Shelbourne extension in 1970, the remainder of the line was rendered largely useless, and it was officially closed in December 1976.[5]

The response to the closure from the local community was swift, and the Castlemaine and Maldon Railway Preservation Society was founded in the same month, with the intention of reopening the line as a tourist railway. While Maldon station was intact, and was able to be used as a base for their operations, they were faced with numerous problems: a line that needed substantial repairs, a lack of rolling stock, and rebuilding the demolished station at Muckleford.

Reconstruction

 
First train from Maldon approaches Castlemaine station, 19 December 2004

Over the next decade, volunteers obtained and renovated rolling stock and by 1986, trains were able to operate on a one kilometre section of track out of Maldon.[5] By 1996, the line from Muckleford to Maldon had been restored, with the platforms being reinstated and a small replacement building being constructed.[5] Services were able to operate along a regular timetable, and the society set about reopening the Muckleford-Castlemaine section of the line.

The project received the support of the local,[6] state[7] and federal[8] governments. The necessary physical work had largely been completed by 2003, but it took another year to secure the necessary approvals and sign an agreement with freight operator Pacific National over the use of its line into Castlemaine station, which is still in regular passenger use today.[9] The section of line finally opened on 19 December 2004, approximately a year behind schedule.[10] As of April 2006, the Society has shown no plans to restore the dismantled Shelbourne extension in the foreseeable future.

Current operations

The railway now operates two return trips to Castlemaine on Sundays, Wednesdays and public holidays. Steam locomotives operate most services, although the Society also operates diesels during days of total fire ban or when steam is not available. During December, January and February all services are hauled by diesel locomotives.[11]

The Railway also operates a number of special trains such as Ales on Rails and Murder on the Orient Express Trains. Additionally, the railway offers Driver Experiences, where customers can drive a locomotive and Footplate Experiences where you can ride in the cab for either the Maldon to Muckleford or Muckleford to Maldon leg of the trip.

Rolling stock

VGR Locomotives & Railmotors

Number Image Year built Builder Status Notes
T 333 1956 Clyde Engineering, Sydney Currently being re-activated Was on long-term loan to Seymour Railway Heritage Centre, based at their Seymour depot who until 2013, sub-leased it to defunct freight company El Zorro. In March 2019, T333 returned to VGR attached to the transfer of the Royal Train and after a period of storage, it moved under its own power in October 2022 for the first time since 2013.[12]
Y 133   1965 Operational Allocated to the VGR from the Register of Heritage and Tourist Railways. The Y was formerly allocated to Seymour Railway Heritage Centre. In 2016 it was sent to Melbourne for maintenance and returned to the VGR in August 2016. Returned to service in January 2019 after being repainted by the VGR Young Volunteers Group.

Leased Locomotives

Since October 2011, Steamrail Victoria have leased members of their fleet to the VGR in order to lighten the load on the railway's own limited fleet. This has seen use of K190, K153, D3 639 and Y164 on the Maldon branch.[13]

Number Image Year built Builder Status Notes
D3 639   1903 Newport Workshops Operational Loaned from Steamrail Victoria.
J 515   1954 Vulcan Foundry Overhaul Returned to traffic in mid-April 2012. Loaned from Seymour Railway Heritage Centre. Returned to Seymour 24 January 2015.
J 541   Privately owned by a group including the Yarra Valley Railway and some of its members. Stored at a number of locations (including Healesville) until 2003, when it was moved to the Puffing Billy Railway for restoration. After restoration, it was loaned to the Victorian Goldfields Railway, where it entered traffic on 5 September 2007. Left VGR in late 2011 for Newport Workshops for an overhaul for preparation to return to Healesville.
K 153   1940 Newport Workshops Operational Loaned from Steamrail Victoria. Returned to Newport Workshops on 18 August 2019 after 11 months at the VGR
K 190   1946 Loaned from Steamrail Victoria. Returned to Melbourne on 19 August 2018 after an 11-month stint at the VGR
Y 157 1968 Clyde Engineering, Sydney Privately owned, leased to the VGR.
Y 164 1968 On hire from Steamrail Victoria from February 2016 while Y133 was in Melbourne for repairs. Y164 returned to Steamrail in August 2016.

Carriages

Number Image Year built Status Builder Notes
18 AE 1909 Transferred to Seymour Railway Heritage Centre Victorian Railways
15 BE 1908 Transferred to Seymour Railway Heritage Centre Victorian Railways
20 BE 1909 Transferred to Seymour Railway Heritage Centre Victorian Railways
2 BCE 1909 Transferred to Seymour Railway Heritage Centre Victorian Railways
61 BW   1926 Operational Victorian Railways On loan from Steamrail Victoria
63 BW 1926
80 BW   1926
25 ABU   1914 Stored Victorian Railways Used as volunteer accommodation at Maldon Station.
41 BU   Operational Victorian Railways
42 BU Operational Victorian Railways
23 AW 1914 Operational Victorian Railways
39 AW 1925 Stored Victorian Railways
43 BPL   1921 Operational Victorian Railways Modified to provide disabled access.
29 BCPL 1921 Stored Victorian Railways
30 BCPL   1921 Under Restoration Victorian Railways
40 X 1861 Operational Victorian Railways Used on Colonial Express Trains
309 Y 1886 Operational Victorian Railways Used on Colonial Express Trains.
69 YZ 1886 Operational Victorian Railways Used on Colonial Express Trains.
Tambo   1919 Operational Victorian Railways Owned by Victorian Goldfields Railway. Operational for use on trains as a First Class Carriage.
Acheron 1923 Operational Victorian Railways Restored in 2022 to operate as a First Class Carriage.[14]
Macedon   1928 Operational Pullman Carriage Company Operational for use on trains as a First Class Carriage.
Lowanna[15] 1942 Transferred to 707 Operations South Australian Railways Formerly used as a occasional First Class Carriage. Sold to 707 Operations in 2022 and transferred to Melbourne on 2 April 2022.[16]

[17][18]

Guards Vans

Number Image Year built Status Builder Notes
16 ZLP[19]   1962 Under Restoration Victorian Railways
333 Z[20]   1912 Operational Victorian Railways

Highlights

29 March 1986: First section of railway reopened between Maldon station and the Bendigo Road crossing (approx. 1 km). The reopening train consist being K160-2BCE-42BU-16BCPL.

1987: Diesel locomotives F212 and T333 acquired from VicRail. F212 was transferred from Melbourne to Maldon by road. T333 was railed from Bendigo to Maldon.

31 March 1991: Locomotive J549 makes its first move under steam and returned to service later that year.

9 October 1993: Railmotor 61RM officially handed over to the VGR. It had been held by a group of railmotor drivers at Spencer St prior to being railed to Bendigo and then trucked to Maldon.

25 September 1995: Locomotive D3 646 retrieved from a park outside Maryborough Railway Station.

8 June 1996: Line officially reopened to Muckleford. J549 was used on the official train.

11–12 July 1998: First heritage rail weekend, promoted as "Steamfreight '98". A variety of passenger, goods and mixed trains ran with K160, J549, T333, F212 and 61RM over the 2 days.

July 1999: "Steamfreight '99", the 2nd such event held. A similar program of operations to the previous one. Highlights included K160 being renumbered K157 on the Sunday. A triple headed goods also operated with "K157"-T333-F212.

May 2001: "Steamfreight 2001", the 3rd such event to be held. K160, J549, T333 and 61RM operated. 2 L type sheep wagons were transferred by road from the collection at Castlemaine and restored for this event.

19–20 June 2007: The VGR held a Steam on Show Event using J515, K160 & diesel Y133. A variety of passenger, goods and mixed trains operated from Maldon to Castlemaine on the 19th, while regular services ran as mixed trains headed by K160 and J515 on the 20th.

26 July 2008: The VGR ran the first double-headed J Class working in thirty years, using J515 and J541.

6 September 2008: The VGR held the first "Picnic at Muckleford" event, combined with Steam on Show. The major highlight of this event was the first triple headed steam on the VGR (and the Castlemaine-Maldon branchline) with K160-J515-J541. A variety of passenger and mixed trains ran throughout the day.

14 June 2009: The VGR celebrated the 125th anniversary of the Castlemaine-Maldon line with a special train from Castlemaine hauled by doubled headed J class. Steamrail Victoria operated double headed R class from Melbourne as part of the festivities.

19 December 2010: E cars 2BCE, 20BE, 15BE & 18AE, were sold to the SRHC & transferred from Maldon to Seymour for restoration.[21]

29 October 2011: Steamrail Victoria locomotive K190 transferred by rail from Melbourne to Maldon to provide back-up motive power. It left the railway on 9 March 2012. It returned for a second period of hire on 23 October 2012 and left on 23 June 2013.

26 November 2011: Another "Steam on Show" event was held. K190-K160 ran a special mixed train from Maldon to Muckleford with K190 leading tender-first and K160 trailing funnel-first. At Muckleford K160 ran around the train to form a tender-to-tender formation for the run to Castlemaine. The return from Castlemaine was run as a double-header with K190 leading K160.

12 May 2013: Diesel Electric Rail Motor Preservation Association Victoria ran a special from Melbourne to Maldon and return with 58RM. It was the first time a passenger train has operated such a trip since the last VR train on the Maldon line in November 1976. The railmotor crossed J515 operating the regular VGR service in both directions.

23 June 2013: D3 639 arrived at Maldon by rail from Melbourne on loan from Steamrail Victoria, making it the first time a D3 has traveled on the branch in forty years.[13]

20 October 2013: J549 undertakes its first test runs after completion of a 9-year overhaul. During the overhaul the loco received new tyres on the pony truck and coupled wheels, a new smokebox barrel, cylinders re-bored, motion gear re-metaled and the tender bogie wheels re-profiled. The test run included a light engine trial around Maldon yard, followed by a line test to Muckleford and return with Y133. The following week it undertook load tests to Muckleford and Castlemaine.

26 October 2013: Steamrail Victoria and the VGR operate a special tour from Melbourne to Maldon and return, dubbed the "Maldon Steam Spectacular". R761-K190 hauled the train from Melbourne to Castlemaine where it transferred to the VGR yards. R761 was removed from the train and locomotive J515 and carriage 42BU were added. K190-J515 then ran from Castlemaine to Muckleford with photostops en route. At Muckleford J515 was swapped with J549 which had operated a Wedding Charter from Maldon. K190-J549 then continued to Maldon where K190 was left for another hire stint on the railway. D3 639 was attached and the train returned to Castlemaine. Upon its return to Castlemaine J549 and 42BU were shunted off and the D3 turned. R761-D3 639 returned the train from Castlemaine to Melbourne later that evening.

20 January 2014: K160 transferred by road from Maldon to Newport Workshops. It was moved to Newport to conduct a major overhaul. A finish date for this overhaul is unknown at this stage.

15–17 August 2014: Steamrail Victoria operate a special weekend tour from Melbourne to Castlemaine with K153 and T356 on 15 August. K153 then joined K190 which was already at the VGR to operate the special to Maldon early on the morning of 16 August. A series of workings using both K-class locos operated in either double-headed, tender-to-tender and tender-first combinations on passenger or mixed trains for the remainder of the day. Both K153-K190 returned to Melbourne with the mainline train and T356 on 17 August.

19 October 2014: To commemorate the Centenary of the commencement of the First World War, a special re-enactment of the troop trains that conveyed Australian soldiers to Ports for transport to the Warfronts was operated on 19 October 2014 under the banner "Answering the Call". The train was hauled by D3 639 from Steamrail and J515 from the SRHC. The D3 was decked out with flags and a special headboard while the train itself featured replica banners that appeared on the original troop specials.

13 December 2014: Centenary of the first DD-class locomotive constructed at Thompson's Foundry Castlemaine. Locomotive DD 893 rolled out of the foundry on 12 December 1914. To commemorate the Centenary Steamrail locomotive D3 639 was used to re-enact the locomotive steaming from the foundry (instead using the new VGR carriage shed to represent the foundry shed). The D3 also bore replica DD 893 plates as well as replica Thompson's Foundry plates.

13 February 2016: Steamrail Victoria transferred 31CE behind Y164 and T356 to Castlemaine for restoration at the VGR for future use on the railway.[22] On the same day, Y133 was transferred to Melbourne for repairs.

18 August 2018: In conjunction with Steamrail's Maldon weekender. K153, J549 and K190 hauled one of the largest and heaviest trains to run on the VGR. With 6 sleeping carriages, a power van, water gin, Lowanna, the VGR 4 wheel goods set and Y133 hauled dead. This was the first triple header on the VGR in over 10 years.

Maldon Station fire

During the late hours of 20 October 2009, a fire ripped through Maldon station building causing major damage and loss of equipment. Not to be brought down by the situation, the VGR ran regular services as usual on the 21st hauled by K160. The major brickwork structure of the station was deemed safe to rebuild on. Contract work to completely rebuild the roof through VicTrack commenced on 4 February 2011.

On Thursday 30 June 2011, the VGR was handed the keys to the completed Maldon Station Rebuild Project.

 
J 515 heading for Maldon station, as seen from the fireman's side window of the cab

References

  1. ^ "VR History". victorianrailways.net. 2 February 2007. from the original on 30 May 2008. Retrieved 20 January 2007.
  2. ^ "VGR Timechart 1881-1890". vgr.com.au. 27 February 2005. from the original on 22 August 2006. Retrieved 17 January 2007.
  3. ^ "VGR Timechart 1921-1940". vgr.com.au. 27 February 2005. from the original on 22 August 2006. Retrieved 17 January 2007.
  4. ^ "VGR Timechart 1941-1960". vgr.com.au. 27 February 2005. from the original on 12 March 2007. Retrieved 17 January 2007.
  5. ^ a b c "History & Preservation". vgr.com.au. 16 September 2006. from the original on 12 March 2007. Retrieved 17 January 2007.
  6. ^ (PDF). p. 34. Archived from the original (PDF) on 3 November 2005. Retrieved 30 April 2007.
  7. ^ "PREMIER AND SCHOOL STUDENTS SEE THE SIGHTS OF MT ALEXANDER SHIRE VIA STEAM TRAIN" (Press release). Victorian Government. 7 March 2005. from the original on 15 September 2007. Retrieved 30 April 2007.
  8. ^ "$20 Million For 13,000 New Work for the Dole Places". Commonwealth of Australia; Department of Employment and Workplace Relations. 18 December 1998. from the original on 1 September 2007. Retrieved 30 April 2007.
  9. ^ Catharine Munro (20 December 2004). "Goldfields railway trundles into history". The Age. from the original on 29 September 2007. Retrieved 17 January 2007.
  10. ^ "MUCKLEFORD - CASTLEMAINE RESTORATION". vgr.com.au. 20 October 2004. from the original on 11 December 2004. Retrieved 20 January 2007.
  11. ^ "Victorian Goldfields Railway". Victorian Goldfields Railway. 1 December 2016. from the original on 1 September 2017. Retrieved 1 September 2017.
  12. ^ "T333 rides the rails again!". Facebook. Retrieved 6 October 2022.
  13. ^ a b "VGR". from the original on 24 September 2015. Retrieved 28 June 2013.
  14. ^ "Victorian Goldfields Railway". Facebook. Retrieved 4 April 2022.
  15. ^ "S.A.R. 780 Class Steel Cars". from the original on 6 December 2018. Retrieved 5 December 2018.
  16. ^ "707 Operations". Facebook. Retrieved 4 April 2022.
  17. ^ "Victorian Goldfields Railway". from the original on 6 December 2018. Retrieved 5 December 2018.
  18. ^ "Victorian Railways - Loco hauled Passenger Carriages". pjv101.net. from the original on 11 December 2018. Retrieved 7 December 2018.
  19. ^ "ZLP guards vans". victorianrailways.net. from the original on 6 December 2018. Retrieved 6 December 2018.
  20. ^ "ZL guards vans". victorianrailways.net. from the original on 6 December 2018. Retrieved 6 December 2018.
  21. ^ "VGR". from the original on 10 October 2012. Retrieved 21 December 2010.
  22. ^ "Steamrail Victoria on Facebook". Facebook. Archived from the original on 30 April 2022.[user-generated source]

External links

 
Maldon railway station
  • Victorian Goldfields Railway Official VGR website
  • Various photographs of the Muckleford to Castlemaine restoration, 2002–2004
  • Photographs of VGR operations from 1998

37°1′8.29″S 144°8′44.34″E / 37.0189694°S 144.1456500°E / -37.0189694; 144.1456500

victorian, goldfields, railway, broad, gauge, tourist, railway, victoria, australia, operates, along, formerly, disused, branch, line, between, towns, maldon, castlemaine, overviewterminimaldoncastlemaineconnecting, linesdeniliquin, lineformer, connectionsshel. The Victorian Goldfields Railway is a 1 600 mm 5 ft 3 in broad gauge tourist railway in Victoria Australia It operates along a formerly disused branch line between the towns of Maldon and Castlemaine Victorian Goldfields RailwayOverviewTerminiMaldonCastlemaineConnecting linesDeniliquin lineFormer connectionsShelbourne Line Moolort lineWebsitevgr com auServiceTypeTourist RailwayHistoryCompleted1884Closed1976Reopened1986TechnicalLine length17 km 10 6 mi Number of tracksSingle trackTrack gauge1 600 mm 5 ft 3 in Old gauge5 ft 3 in 1 600 mm Route mapLegendDeniliquin lineCastlemaineDeniliquin lineMoolort lineMucklefordShelbourne extension closed 1970 later dismantled MaldonPollardShelbourne Contents 1 History 2 Reconstruction 3 Current operations 4 Rolling stock 4 1 VGR Locomotives amp Railmotors 4 2 Leased Locomotives 4 3 Carriages 4 4 Guards Vans 5 Highlights 6 Maldon Station fire 7 References 8 External linksHistory EditThe original line was opened on 16 June 1884 1 opening up rail access from the established station at Castlemaine to the towns of Muckleford and Maldon The area was prosperous as Castlemaine and Maldon had both experienced gold rushes in the preceding years and local residents had been petitioning the government for a railway since 1874 On 2 August 1884 a contract was let for an extension to Laanecoorie however further construction was suspended after the line reached the small town of Shelbourne in 1891 2 The line was served by twice daily trains for the first forty years of its life which was increased to four times daily trains in 1924 3 However these were cut back at the end of the 1920s due to a decrease in the local population and passenger services were eliminated altogether during World War II 4 This meant that the line was used by only a weekly goods train which went through to Shelbourne When bushfire damage caused the closure of the Shelbourne extension in 1970 the remainder of the line was rendered largely useless and it was officially closed in December 1976 5 The response to the closure from the local community was swift and the Castlemaine and Maldon Railway Preservation Society was founded in the same month with the intention of reopening the line as a tourist railway While Maldon station was intact and was able to be used as a base for their operations they were faced with numerous problems a line that needed substantial repairs a lack of rolling stock and rebuilding the demolished station at Muckleford Reconstruction Edit First train from Maldon approaches Castlemaine station 19 December 2004Over the next decade volunteers obtained and renovated rolling stock and by 1986 trains were able to operate on a one kilometre section of track out of Maldon 5 By 1996 the line from Muckleford to Maldon had been restored with the platforms being reinstated and a small replacement building being constructed 5 Services were able to operate along a regular timetable and the society set about reopening the Muckleford Castlemaine section of the line The project received the support of the local 6 state 7 and federal 8 governments The necessary physical work had largely been completed by 2003 but it took another year to secure the necessary approvals and sign an agreement with freight operator Pacific National over the use of its line into Castlemaine station which is still in regular passenger use today 9 The section of line finally opened on 19 December 2004 approximately a year behind schedule 10 As of April 2006 update the Society has shown no plans to restore the dismantled Shelbourne extension in the foreseeable future Current operations EditThe railway now operates two return trips to Castlemaine on Sundays Wednesdays and public holidays Steam locomotives operate most services although the Society also operates diesels during days of total fire ban or when steam is not available During December January and February all services are hauled by diesel locomotives 11 The Railway also operates a number of special trains such as Ales on Rails and Murder on the Orient Express Trains Additionally the railway offers Driver Experiences where customers can drive a locomotive and Footplate Experiences where you can ride in the cab for either the Maldon to Muckleford or Muckleford to Maldon leg of the trip Rolling stock EditVGR Locomotives amp Railmotors Edit Number Image Year built Builder Status NotesT 333 1956 Clyde Engineering Sydney Currently being re activated Was on long term loan to Seymour Railway Heritage Centre based at their Seymour depot who until 2013 sub leased it to defunct freight company El Zorro In March 2019 T333 returned to VGR attached to the transfer of the Royal Train and after a period of storage it moved under its own power in October 2022 for the first time since 2013 12 Y 133 1965 Operational Allocated to the VGR from the Register of Heritage and Tourist Railways The Y was formerly allocated to Seymour Railway Heritage Centre In 2016 it was sent to Melbourne for maintenance and returned to the VGR in August 2016 Returned to service in January 2019 after being repainted by the VGR Young Volunteers Group Leased Locomotives Edit Since October 2011 Steamrail Victoria have leased members of their fleet to the VGR in order to lighten the load on the railway s own limited fleet This has seen use of K190 K153 D3 639 and Y164 on the Maldon branch 13 Number Image Year built Builder Status NotesD3 639 1903 Newport Workshops Operational Loaned from Steamrail Victoria J 515 1954 Vulcan Foundry Overhaul Returned to traffic in mid April 2012 Loaned from Seymour Railway Heritage Centre Returned to Seymour 24 January 2015 J 541 Privately owned by a group including the Yarra Valley Railway and some of its members Stored at a number of locations including Healesville until 2003 when it was moved to the Puffing Billy Railway for restoration After restoration it was loaned to the Victorian Goldfields Railway where it entered traffic on 5 September 2007 Left VGR in late 2011 for Newport Workshops for an overhaul for preparation to return to Healesville K 153 1940 Newport Workshops Operational Loaned from Steamrail Victoria Returned to Newport Workshops on 18 August 2019 after 11 months at the VGRK 190 1946 Loaned from Steamrail Victoria Returned to Melbourne on 19 August 2018 after an 11 month stint at the VGRY 157 1968 Clyde Engineering Sydney Privately owned leased to the VGR Y 164 1968 On hire from Steamrail Victoria from February 2016 while Y133 was in Melbourne for repairs Y164 returned to Steamrail in August 2016 Carriages Edit Number Image Year built Status Builder Notes18 AE 1909 Transferred to Seymour Railway Heritage Centre Victorian Railways15 BE 1908 Transferred to Seymour Railway Heritage Centre Victorian Railways20 BE 1909 Transferred to Seymour Railway Heritage Centre Victorian Railways2 BCE 1909 Transferred to Seymour Railway Heritage Centre Victorian Railways61 BW 1926 Operational Victorian Railways On loan from Steamrail Victoria63 BW 192680 BW 192625 ABU 1914 Stored Victorian Railways Used as volunteer accommodation at Maldon Station 41 BU Operational Victorian Railways42 BU Operational Victorian Railways23 AW 1914 Operational Victorian Railways39 AW 1925 Stored Victorian Railways43 BPL 1921 Operational Victorian Railways Modified to provide disabled access 29 BCPL 1921 Stored Victorian Railways30 BCPL 1921 Under Restoration Victorian Railways40 X 1861 Operational Victorian Railways Used on Colonial Express Trains309 Y 1886 Operational Victorian Railways Used on Colonial Express Trains 69 YZ 1886 Operational Victorian Railways Used on Colonial Express Trains Tambo 1919 Operational Victorian Railways Owned by Victorian Goldfields Railway Operational for use on trains as a First Class Carriage Acheron 1923 Operational Victorian Railways Restored in 2022 to operate as a First Class Carriage 14 Macedon 1928 Operational Pullman Carriage Company Operational for use on trains as a First Class Carriage Lowanna 15 1942 Transferred to 707 Operations South Australian Railways Formerly used as a occasional First Class Carriage Sold to 707 Operations in 2022 and transferred to Melbourne on 2 April 2022 16 17 18 Guards Vans Edit Number Image Year built Status Builder Notes16 ZLP 19 1962 Under Restoration Victorian Railways333 Z 20 1912 Operational Victorian RailwaysHighlights Edit29 March 1986 First section of railway reopened between Maldon station and the Bendigo Road crossing approx 1 km The reopening train consist being K160 2BCE 42BU 16BCPL 1987 Diesel locomotives F212 and T333 acquired from VicRail F212 was transferred from Melbourne to Maldon by road T333 was railed from Bendigo to Maldon 31 March 1991 Locomotive J549 makes its first move under steam and returned to service later that year 9 October 1993 Railmotor 61RM officially handed over to the VGR It had been held by a group of railmotor drivers at Spencer St prior to being railed to Bendigo and then trucked to Maldon 25 September 1995 Locomotive D3 646 retrieved from a park outside Maryborough Railway Station 8 June 1996 Line officially reopened to Muckleford J549 was used on the official train 11 12 July 1998 First heritage rail weekend promoted as Steamfreight 98 A variety of passenger goods and mixed trains ran with K160 J549 T333 F212 and 61RM over the 2 days July 1999 Steamfreight 99 the 2nd such event held A similar program of operations to the previous one Highlights included K160 being renumbered K157 on the Sunday A triple headed goods also operated with K157 T333 F212 May 2001 Steamfreight 2001 the 3rd such event to be held K160 J549 T333 and 61RM operated 2 L type sheep wagons were transferred by road from the collection at Castlemaine and restored for this event 19 20 June 2007 The VGR held a Steam on Show Event using J515 K160 amp diesel Y133 A variety of passenger goods and mixed trains operated from Maldon to Castlemaine on the 19th while regular services ran as mixed trains headed by K160 and J515 on the 20th 26 July 2008 The VGR ran the first double headed J Class working in thirty years using J515 and J541 6 September 2008 The VGR held the first Picnic at Muckleford event combined with Steam on Show The major highlight of this event was the first triple headed steam on the VGR and the Castlemaine Maldon branchline with K160 J515 J541 A variety of passenger and mixed trains ran throughout the day 14 June 2009 The VGR celebrated the 125th anniversary of the Castlemaine Maldon line with a special train from Castlemaine hauled by doubled headed J class Steamrail Victoria operated double headed R class from Melbourne as part of the festivities 19 December 2010 E cars 2BCE 20BE 15BE amp 18AE were sold to the SRHC amp transferred from Maldon to Seymour for restoration 21 29 October 2011 Steamrail Victoria locomotive K190 transferred by rail from Melbourne to Maldon to provide back up motive power It left the railway on 9 March 2012 It returned for a second period of hire on 23 October 2012 and left on 23 June 2013 26 November 2011 Another Steam on Show event was held K190 K160 ran a special mixed train from Maldon to Muckleford with K190 leading tender first and K160 trailing funnel first At Muckleford K160 ran around the train to form a tender to tender formation for the run to Castlemaine The return from Castlemaine was run as a double header with K190 leading K160 12 May 2013 Diesel Electric Rail Motor Preservation Association Victoria ran a special from Melbourne to Maldon and return with 58RM It was the first time a passenger train has operated such a trip since the last VR train on the Maldon line in November 1976 The railmotor crossed J515 operating the regular VGR service in both directions 23 June 2013 D3 639 arrived at Maldon by rail from Melbourne on loan from Steamrail Victoria making it the first time a D3 has traveled on the branch in forty years 13 20 October 2013 J549 undertakes its first test runs after completion of a 9 year overhaul During the overhaul the loco received new tyres on the pony truck and coupled wheels a new smokebox barrel cylinders re bored motion gear re metaled and the tender bogie wheels re profiled The test run included a light engine trial around Maldon yard followed by a line test to Muckleford and return with Y133 The following week it undertook load tests to Muckleford and Castlemaine 26 October 2013 Steamrail Victoria and the VGR operate a special tour from Melbourne to Maldon and return dubbed the Maldon Steam Spectacular R761 K190 hauled the train from Melbourne to Castlemaine where it transferred to the VGR yards R761 was removed from the train and locomotive J515 and carriage 42BU were added K190 J515 then ran from Castlemaine to Muckleford with photostops en route At Muckleford J515 was swapped with J549 which had operated a Wedding Charter from Maldon K190 J549 then continued to Maldon where K190 was left for another hire stint on the railway D3 639 was attached and the train returned to Castlemaine Upon its return to Castlemaine J549 and 42BU were shunted off and the D3 turned R761 D3 639 returned the train from Castlemaine to Melbourne later that evening 20 January 2014 K160 transferred by road from Maldon to Newport Workshops It was moved to Newport to conduct a major overhaul A finish date for this overhaul is unknown at this stage 15 17 August 2014 Steamrail Victoria operate a special weekend tour from Melbourne to Castlemaine with K153 and T356 on 15 August K153 then joined K190 which was already at the VGR to operate the special to Maldon early on the morning of 16 August A series of workings using both K class locos operated in either double headed tender to tender and tender first combinations on passenger or mixed trains for the remainder of the day Both K153 K190 returned to Melbourne with the mainline train and T356 on 17 August 19 October 2014 To commemorate the Centenary of the commencement of the First World War a special re enactment of the troop trains that conveyed Australian soldiers to Ports for transport to the Warfronts was operated on 19 October 2014 under the banner Answering the Call The train was hauled by D3 639 from Steamrail and J515 from the SRHC The D3 was decked out with flags and a special headboard while the train itself featured replica banners that appeared on the original troop specials 13 December 2014 Centenary of the first DD class locomotive constructed at Thompson s Foundry Castlemaine Locomotive DD 893 rolled out of the foundry on 12 December 1914 To commemorate the Centenary Steamrail locomotive D3 639 was used to re enact the locomotive steaming from the foundry instead using the new VGR carriage shed to represent the foundry shed The D3 also bore replica DD 893 plates as well as replica Thompson s Foundry plates 13 February 2016 Steamrail Victoria transferred 31CE behind Y164 and T356 to Castlemaine for restoration at the VGR for future use on the railway 22 On the same day Y133 was transferred to Melbourne for repairs 18 August 2018 In conjunction with Steamrail s Maldon weekender K153 J549 and K190 hauled one of the largest and heaviest trains to run on the VGR With 6 sleeping carriages a power van water gin Lowanna the VGR 4 wheel goods set and Y133 hauled dead This was the first triple header on the VGR in over 10 years Maldon Station fire EditDuring the late hours of 20 October 2009 a fire ripped through Maldon station building causing major damage and loss of equipment Not to be brought down by the situation the VGR ran regular services as usual on the 21st hauled by K160 The major brickwork structure of the station was deemed safe to rebuild on Contract work to completely rebuild the roof through VicTrack commenced on 4 February 2011 On Thursday 30 June 2011 the VGR was handed the keys to the completed Maldon Station Rebuild Project J 515 heading for Maldon station as seen from the fireman s side window of the cabReferences Edit VR History victorianrailways net 2 February 2007 Archived from the original on 30 May 2008 Retrieved 20 January 2007 VGR Timechart 1881 1890 vgr com au 27 February 2005 Archived from the original on 22 August 2006 Retrieved 17 January 2007 VGR Timechart 1921 1940 vgr com au 27 February 2005 Archived from the original on 22 August 2006 Retrieved 17 January 2007 VGR Timechart 1941 1960 vgr com au 27 February 2005 Archived from the original on 12 March 2007 Retrieved 17 January 2007 a b c History amp Preservation vgr com au 16 September 2006 Archived from the original on 12 March 2007 Retrieved 17 January 2007 Mount Alexander Shire Annual Report 2004 Part 1 PDF p 34 Archived from the original PDF on 3 November 2005 Retrieved 30 April 2007 PREMIER AND SCHOOL STUDENTS SEE THE SIGHTS OF MT ALEXANDER SHIRE VIA STEAM TRAIN Press release Victorian Government 7 March 2005 Archived from the original on 15 September 2007 Retrieved 30 April 2007 20 Million For 13 000 New Work for the Dole Places Commonwealth of Australia Department of Employment and Workplace Relations 18 December 1998 Archived from the original on 1 September 2007 Retrieved 30 April 2007 Catharine Munro 20 December 2004 Goldfields railway trundles into history The Age Archived from the original on 29 September 2007 Retrieved 17 January 2007 MUCKLEFORD CASTLEMAINE RESTORATION vgr com au 20 October 2004 Archived from the original on 11 December 2004 Retrieved 20 January 2007 Victorian Goldfields Railway Victorian Goldfields Railway 1 December 2016 Archived from the original on 1 September 2017 Retrieved 1 September 2017 T333 rides the rails again Facebook Retrieved 6 October 2022 a b VGR Archived from the original on 24 September 2015 Retrieved 28 June 2013 Victorian Goldfields Railway Facebook Retrieved 4 April 2022 S A R 780 Class Steel Cars Archived from the original on 6 December 2018 Retrieved 5 December 2018 707 Operations Facebook Retrieved 4 April 2022 Victorian Goldfields Railway Archived from the original on 6 December 2018 Retrieved 5 December 2018 Victorian Railways Loco hauled Passenger Carriages pjv101 net Archived from the original on 11 December 2018 Retrieved 7 December 2018 ZLP guards vans victorianrailways net Archived from the original on 6 December 2018 Retrieved 6 December 2018 ZL guards vans victorianrailways net Archived from the original on 6 December 2018 Retrieved 6 December 2018 VGR Archived from the original on 10 October 2012 Retrieved 21 December 2010 Steamrail Victoria on Facebook Facebook Archived from the original on 30 April 2022 user generated source External links Edit Maldon railway stationVictorian Goldfields Railway Official VGR website Mark Parker s Victorian Goldfields Railway Photos Various photographs of the Muckleford to Castlemaine restoration 2002 2004 Railpix Australia VIC Victorian Goldfields Rwy Photographs of VGR operations from 1998 37 1 8 29 S 144 8 44 34 E 37 0189694 S 144 1456500 E 37 0189694 144 1456500 Retrieved from https en wikipedia org w index php title Victorian Goldfields Railway amp oldid 1170269568, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.