fbpx
Wikipedia

Main Suburban railway line

The Main Suburban railway line is the technical name for the trunk railway line between Redfern railway station and Parramatta railway station in Sydney, Australia, but now generally refers to the section between Redfern and where the Old Main South Line branches off at Granville Junction.[4] The railway line then continues on as the Main Western line towards the Blue Mountains. This term distinguished this trunk line from the Illawarra Line which branched south from the Illawarra Junction to Wollongong, and later the North Shore tracks which carried trains north over the Harbour Bridge.

Main Suburban railway
Sydney Metropolitan Rail Area with Main Suburban railway highlighted in black
Overview
OwnerTransport Asset Holding Entity
Termini
Stations17
Service
Services
Operator(s)Sydney Trains
History
Opened1855; 168 years ago (1855)
Technical
Track length10 km (6.2 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationOverhead 1500 V DC[1]
Operating speed
  • Track speed varies between 50 km/h (on local) and 100 km/h (on main)[2]
  • 43.3 km/h (network average)[3]
Route map

Main Suburban line through Croydon
Note: most crossovers not shown

History Edit

 
Former Petersham railway station on the Up Main. Replaced by a station on the local tracks.

The Main Suburban line between Redfern and Granville was the first railway line to be constructed in New South Wales. The first company to start rail transport in New South Wales was the Sydney Railway Company[5] which was incorporated on 10 October 1849 with the aim of building a railway from Sydney to Parramatta. Capital was raised, shares were sold, and a route was surveyed. The first sod was turned by Mrs Keith Stewart (daughter of the Governor) at Cleveland Paddocks (an area between the southern end of the current Central station and Cleveland Street) on 20 May 1850.

The original engineer appointed was Francis Webb Sheilds, an Irishman. He persuaded the New South Wales legislature to pass an Act on 27 July 1852 requiring all railways in the colony to be of 5 ft 3 in (1,600 mm) gauge. This was the gauge in use in Ireland and is now referred to as 1,600 mm gauge. After Sheilds resigned due to difficulties, a Scot named James Wallace was appointed. Wallace persuaded the legislature to repeal the previous act and replace it, on 4 August 1853, with one requiring a gauge of 4 ft 8+12 in (1,435 mm) – the current standard gauge. (Unfortunately for Australia, the legislation requiring the broad gauge had been noted in the colonies of Victoria and South Australia and some rolling stock ordered.)

The Sydney Railway Company encountered many troubles: engineers came and went; real estate required became expensive and difficult to acquire; money, supplies and manpower ran short, partly because of a gold rush. Eventually the property of the Sydney Railway Company was transferred to the government of New South Wales on 3 September 1855.

The line opened on 26 September 1855, from Sydney to Parramatta Junction (near Granville Station), with stations at Newtown, Ashfield, Burwood and Homebush.[6][7] The Sydney terminal station was on the south side of Devonshire Street, just south of the current Central Station. Although the vicinity was sometimes referred to as Redfern, it was not near the current Redfern station.

 
Sextuplication works at Newtown station in 1927

The line was quadrupled to Flemington in 1892.[8] The line saw its most dramatic change in the period 1926–1927, when the section from Redfern to Homebush was expanded from 4 to 6 tracks by the addition of 2 tracks initially intended for non-electric express trains. Prior to 1926, all stations on the line had platform faces to all four tracks, and the tracks were labelled as 'fast' and 'slow'. After the completion of works in 1927, only Redfern and Strathfield had platform faces on all six tracks.[9] The four tracks now known as the 'Up and Down Local lines' and the 'Up and Down Suburban Lines' were electrified in 1928. It was not until 1955 that the 'Up and Down Main Lines' were also electrified to coincide with the opening of the Blue Mountains electrification programme.

Double-deck trailer cars were introduced between 1964 and 1967 replacing old wooden trailer cars in the Iine's electric multiple unit passenger trains.[10]

Description of route Edit

The line commences at the Illawarra Junction south of Redfern station, the junction point of the Illawarra railway line. The line consists of three pairs of electrified tracks, six in total, which head west through the Inner Western suburbs of Sydney to Strathfield. The tracks are named 'Up' and 'Down' Main', 'Up' and 'Down' Suburban, and 'Up' and 'Down' Local. The 'Main' lines are express lines which have no intermediate platforms between Redfern and Burwood, and usually carry Intercity, Interstate, Heritage, or express suburban trains. The inner 'Suburban' pair of tracks have some intermediate platforms and generally carry express or limited stops suburban train services (usually North Shore & Western Line suburban services). The southernmost 'Local' pair of tracks have platforms at all intermediate stations and carry all-stations and some limited stops services (usually Inner West & Leppington Line suburban services).

At Strathfield, there is a grade separated junction with the Main North Line. Northern line trains on the suburban tracks switch onto the Main North, along with Central Coast & Newcastle Line trains on the main tracks. There is also a single track link that takes freight trains from the Main North west, joining onto a goods line that runs parallel to the Main Suburban. At the next station, Homebush, the local tracks end. Generally, trains on the suburban track merge onto the main, while trains on the local either terminate or merge on the suburban track. The line then continues to Flemington, where there is a complex double triangle junction around Flemington Maintenance Depot, which provides access from the main tracks to the Olympic Park line and the Sydney Freight Network. The goods line turns into the Sydney Freight Network (also known as the Metropolitan Goods Line) here.

A bit further down is Lidcombe, where there is another triangle junction, connecting the suburban tracks to the Main Southern railway line. Continuing down the line, there are further junctions with various yards and workshops at Auburn, including Auburn Maintenance Centre and Maintrain, and the now closed Carlingford railway line at Clyde. At Granville, the line ends with a triangle junction, continuing onto either the Main Western Line or the Old Main South line.

Speed limits on the route vary between locations and tracks (main, suburban or local). The main generally has the highest speed limits, around 80 km/h (50 mph), with some 90 or 100 km/h (56 or 62 mph) sections. The suburban and local tracks vary between 50 and 80 km/h (31 and 50 mph) limits. The limits on the suburban and local reduce to 50 km/h (31 mph) around bridges on curves at Newtown and Ashfield, as the bridges have their supports between the running lines, with a risk of bridge collapse if a train were to derail at high speed, similar to the Granville rail disaster.[11]

Stations Edit

 
Sydney Trains Tangara at Newtown
Station Platforms Served by
Macdonaldtown 2
Newtown 2
Stanmore 3
Petersham 2
Lewisham 2
Summer Hill 3
Ashfield 5 (inc 1 turnback)
Croydon 5
Burwood 6
Strathfield 8
Homebush 6 (inc 1 turnback)
Flemington 4
Lidcombe 4 (plus 1 turnback for Olympic Park line & 1 for Bankstown line)
Auburn 4
Clyde 4 (plus 1 fenced off, 1 formerly for Carlingford line)
Granville 4

See also Edit

References Edit

Citations Edit

  1. ^ Asset Standards Authority (19 March 2014). (PDF). Archived from the original (PDF) on 23 June 2015. Retrieved 23 August 2015.
  2. ^ Sydney Trains, Drivers Route Knowledge Diagrams (Main South Line) (PDF)
  3. ^ Saulwick, Jacob (24 July 2013). "Smallest stations are biggest losers in new rail timetable". The Sydney Morning Herald.
  4. ^ Sydney Electric Trains from 1926-1960, Australian Railway Historical Society Bulletin, April 2001.
  5. ^ "Sydney Railway Company". State Records.
  6. ^ . www.warrenfahey.com. The Iron Road. Archived from the original on 10 March 2014. Retrieved 26 April 2006.
  7. ^ "FIRST RAILWAY FIREMAN". The Evening News. No. 11, 948. New South Wales, Australia. 25 September 1905. p. 5. Retrieved 9 October 2016 – via National Library of Australia.
  8. ^ Australian Railway History, Vol 56, No. 810, April 2005
  9. ^ Sydney Electric Trains from 1926-1960, Australian Railway Historical Society Bulletin, April 2001.
  10. ^ Cooke, B.W.C., ed. (May 1964). "Double-Deckers in Sydney". Railway Magazine. Vol. 110, no. 757. pp. 418–419.
  11. ^ Sydney Trains (October 2019). "Drivers Route Knowledge Diagrams (Main South Line)" (PDF). Railsafe. Retrieved 26 October 2019.

Sources Edit

  • Hagarty, Don; Australian Railway Historical Society. New South Wales Division (2005), Sydney Railway 1848-1857, The building of the first railway from Sydney to Parramatta, Australian Railway Historical Society, New South Wales Division, ISBN 0-9757870-1-2

main, suburban, railway, line, technical, name, trunk, railway, line, between, redfern, railway, station, parramatta, railway, station, sydney, australia, generally, refers, section, between, redfern, where, main, south, line, branches, granville, junction, ra. The Main Suburban railway line is the technical name for the trunk railway line between Redfern railway station and Parramatta railway station in Sydney Australia but now generally refers to the section between Redfern and where the Old Main South Line branches off at Granville Junction 4 The railway line then continues on as the Main Western line towards the Blue Mountains This term distinguished this trunk line from the Illawarra Line which branched south from the Illawarra Junction to Wollongong and later the North Shore tracks which carried trains north over the Harbour Bridge Main Suburban railwaySydney Metropolitan Rail Area with Main Suburban railway highlighted in blackOverviewOwnerTransport Asset Holding EntityTerminiRedfernGranvilleStations17ServiceServicesNorth Shore amp Western Line Northern Inner West amp Leppington LineOperator s Sydney TrainsHistoryOpened1855 168 years ago 1855 TechnicalTrack length10 km 6 2 mi Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrificationOverhead 1500 V DC 1 Operating speedTrack speed varies between 50 km h on local and 100 km h on main 2 43 3 km h network average 3 Route mapMain Suburban line through CroydonLegendkmTo Sydney Harbour Bridge or City Circle0 00 Central1 30 RedfernIllawarra line2 48 Macdonaldtown3 10 Newtown4 67 Stanmore5 50 Petersham6 25 LewishamInner West Light Rail7 03 Summer Hill8 38 Ashfield9 42 Croydon10 62 Burwood11 81 StrathfieldMain North lineMain North line12 74 Homebush14 32 FlemingtonOlympic Park line16 61 LidcombeMain South line18 63 Auburn20 66 ClydeCarlingford line21 22 GranvilleOld Main South lineMain Western lineNote most crossovers not shownThis diagram viewtalkedit Contents 1 History 2 Description of route 3 Stations 4 See also 5 References 5 1 Citations 5 2 SourcesHistory Edit nbsp Former Petersham railway station on the Up Main Replaced by a station on the local tracks The Main Suburban line between Redfern and Granville was the first railway line to be constructed in New South Wales The first company to start rail transport in New South Wales was the Sydney Railway Company 5 which was incorporated on 10 October 1849 with the aim of building a railway from Sydney to Parramatta Capital was raised shares were sold and a route was surveyed The first sod was turned by Mrs Keith Stewart daughter of the Governor at Cleveland Paddocks an area between the southern end of the current Central station and Cleveland Street on 20 May 1850 The original engineer appointed was Francis Webb Sheilds an Irishman He persuaded the New South Wales legislature to pass an Act on 27 July 1852 requiring all railways in the colony to be of 5 ft 3 in 1 600 mm gauge This was the gauge in use in Ireland and is now referred to as 1 600 mm gauge After Sheilds resigned due to difficulties a Scot named James Wallace was appointed Wallace persuaded the legislature to repeal the previous act and replace it on 4 August 1853 with one requiring a gauge of 4 ft 8 1 2 in 1 435 mm the current standard gauge Unfortunately for Australia the legislation requiring the broad gauge had been noted in the colonies of Victoria and South Australia and some rolling stock ordered The Sydney Railway Company encountered many troubles engineers came and went real estate required became expensive and difficult to acquire money supplies and manpower ran short partly because of a gold rush Eventually the property of the Sydney Railway Company was transferred to the government of New South Wales on 3 September 1855 The line opened on 26 September 1855 from Sydney to Parramatta Junction near Granville Station with stations at Newtown Ashfield Burwood and Homebush 6 7 The Sydney terminal station was on the south side of Devonshire Street just south of the current Central Station Although the vicinity was sometimes referred to as Redfern it was not near the current Redfern station nbsp Sextuplication works at Newtown station in 1927The line was quadrupled to Flemington in 1892 8 The line saw its most dramatic change in the period 1926 1927 when the section from Redfern to Homebush was expanded from 4 to 6 tracks by the addition of 2 tracks initially intended for non electric express trains Prior to 1926 all stations on the line had platform faces to all four tracks and the tracks were labelled as fast and slow After the completion of works in 1927 only Redfern and Strathfield had platform faces on all six tracks 9 The four tracks now known as the Up and Down Local lines and the Up and Down Suburban Lines were electrified in 1928 It was not until 1955 that the Up and Down Main Lines were also electrified to coincide with the opening of the Blue Mountains electrification programme Double deck trailer cars were introduced between 1964 and 1967 replacing old wooden trailer cars in the Iine s electric multiple unit passenger trains 10 Description of route EditThe line commences at the Illawarra Junction south of Redfern station the junction point of the Illawarra railway line The line consists of three pairs of electrified tracks six in total which head west through the Inner Western suburbs of Sydney to Strathfield The tracks are named Up and Down Main Up and Down Suburban and Up and Down Local The Main lines are express lines which have no intermediate platforms between Redfern and Burwood and usually carry Intercity Interstate Heritage or express suburban trains The inner Suburban pair of tracks have some intermediate platforms and generally carry express or limited stops suburban train services usually North Shore amp Western Line suburban services The southernmost Local pair of tracks have platforms at all intermediate stations and carry all stations and some limited stops services usually Inner West amp Leppington Line suburban services At Strathfield there is a grade separated junction with the Main North Line Northern line trains on the suburban tracks switch onto the Main North along with Central Coast amp Newcastle Line trains on the main tracks There is also a single track link that takes freight trains from the Main North west joining onto a goods line that runs parallel to the Main Suburban At the next station Homebush the local tracks end Generally trains on the suburban track merge onto the main while trains on the local either terminate or merge on the suburban track The line then continues to Flemington where there is a complex double triangle junction around Flemington Maintenance Depot which provides access from the main tracks to the Olympic Park line and the Sydney Freight Network The goods line turns into the Sydney Freight Network also known as the Metropolitan Goods Line here A bit further down is Lidcombe where there is another triangle junction connecting the suburban tracks to the Main Southern railway line Continuing down the line there are further junctions with various yards and workshops at Auburn including Auburn Maintenance Centre and Maintrain and the now closed Carlingford railway line at Clyde At Granville the line ends with a triangle junction continuing onto either the Main Western Line or the Old Main South line Speed limits on the route vary between locations and tracks main suburban or local The main generally has the highest speed limits around 80 km h 50 mph with some 90 or 100 km h 56 or 62 mph sections The suburban and local tracks vary between 50 and 80 km h 31 and 50 mph limits The limits on the suburban and local reduce to 50 km h 31 mph around bridges on curves at Newtown and Ashfield as the bridges have their supports between the running lines with a risk of bridge collapse if a train were to derail at high speed similar to the Granville rail disaster 11 Stations Edit nbsp Sydney Trains Tangara at NewtownStation Platforms Served byMacdonaldtown 2 T2Newtown 2 T2Stanmore 3 T2Petersham 2 T2Lewisham 2 T2Summer Hill 3 T2Ashfield 5 inc 1 turnback T2Croydon 5 T2Burwood 6 T2T9Strathfield 8 T1T2T9BMTCCNHomebush 6 inc 1 turnback T2Flemington 4 T2Lidcombe 4 plus 1 turnback for Olympic Park line amp 1 for Bankstown line T1T2T3T7Auburn 4 T1T2Clyde 4 plus 1 fenced off 1 formerly for Carlingford line T1T2Granville 4 T1T2See also EditThe CBD Relief Line was proposed to connect to the Main lines Railways in Sydney for an overview of railways in Sydney Sydney Trains for the organisation responsible for running electric passenger trains in Sydney References EditCitations Edit Asset Standards Authority 19 March 2014 RailCorp electrical system general description version 1 0 PDF Archived from the original PDF on 23 June 2015 Retrieved 23 August 2015 Sydney Trains Drivers Route Knowledge Diagrams Main South Line PDF Saulwick Jacob 24 July 2013 Smallest stations are biggest losers in new rail timetable The Sydney Morning Herald Sydney Electric Trains from 1926 1960 Australian Railway Historical Society Bulletin April 2001 Sydney Railway Company State Records William Webster the first railway engineer www warrenfahey com The Iron Road Archived from the original on 10 March 2014 Retrieved 26 April 2006 FIRST RAILWAY FIREMAN The Evening News No 11 948 New South Wales Australia 25 September 1905 p 5 Retrieved 9 October 2016 via National Library of Australia Australian Railway History Vol 56 No 810 April 2005 Sydney Electric Trains from 1926 1960 Australian Railway Historical Society Bulletin April 2001 Cooke B W C ed May 1964 Double Deckers in Sydney Railway Magazine Vol 110 no 757 pp 418 419 Sydney Trains October 2019 Drivers Route Knowledge Diagrams Main South Line PDF Railsafe Retrieved 26 October 2019 Sources Edit Hagarty Don Australian Railway Historical Society New South Wales Division 2005 Sydney Railway 1848 1857 The building of the first railway from Sydney to Parramatta Australian Railway Historical Society New South Wales Division ISBN 0 9757870 1 2 Retrieved from https en wikipedia org w index php title Main Suburban railway line amp oldid 1167881727, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.