fbpx
Wikipedia

Arizona State Route 303

Arizona State Route 303 (SR 303) or Loop 303, also known as the Bob Stump Memorial Parkway (formerly the Estrella Freeway), is a freeway that serves the west part of the Phoenix metropolitan area. The freeway, originally a two-lane rural highway, was maintained by Maricopa County until 2004 when the Arizona Department of Transportation again took control of upgrading the interim road to a freeway.[2]

State Route 303

Bob Stump Memorial Parkway
Loop 303 highlighted in red
Route information
Maintained by ADOT
Length35.25 mi[1] (56.73 km)
Existed1991–present
Major junctions
From MC 85 in Goodyear (Planned)
Major intersections
To I-17 in Phoenix
Location
CountryUnited States
StateArizona
Highway system
  • Arizona State Highway System
Loop 303/I-10 interchange

Route description edit

Loop 303 currently begins at Van Buren Street, one mile south of I-10 in Goodyear. It becomes a six-lane freeway with a stack interchange at I-10.[3] South of Van Buren Street it continues as Cotton Lane but without a route number. The freeway heads north under McDowell and Thomas Roads, then over an interchange with Indian School Road. It then proceeds through a farmland terrain and passes by the Wildlife World Zoo near the Northern Parkway trumpet interchange.[4] After passing Northern Parkway, the freeway continues for a few miles before entering a residential community at Greenway Road and turning northeast. It passes above Grand Avenue (US 60) and a BNSF railroad line at a parclo interchange.[5] The freeway turns eastward north of Sun City West before turning north again at the Happy Valley Parkway interchange. It turns east again south of Lake Pleasant at the Agua Fria River. Following the Lake Pleasant Parkway interchange, the freeway condenses down to four lanes and passes through planned arterial interchanges.[6] The freeway comes to an end at a temporary at-grade interchange (eventually to be a freeway-to-freeway interchange) with I-17 near Skunk Creek. East of this interchange, Loop 303 becomes Sonoran Desert Drive. The southern portion between US 60 to I-10 is used to bypass Grand Avenue, and the whole route is used to bypass the Phoenix Metropolitan Area.

History edit

1985–1995 edit

 
Old colored Arizona Loop 303 shield that has been phased out.

Loop 303 was originally a part of the 1985 Maricopa County Regional Transportation Plan that was funded by a sales tax approved by Maricopa County voters.[7] The freeway, designed to serve the Northwest Valley, was originally designated SR 517 in 1985; the Loop 303 designation was first assigned on December 18, 1987.[8] The interim two-lane highway was completed between US 60 and I-10 in 1991, marking the first road along the Loop 303 corridor. The freeway was scheduled to be completed sometime by 2005. However, funding shortfalls and increasing construction costs forced cutbacks in the plan, and in 1995 the freeway was dropped from the regional plans.[2]

1995–2004 edit

Maricopa County took charge of SR 303 when it was dropped from the regional freeway plans in 1995, maintaining the interim two-lane highway along the original corridor while keeping the state route designation. The county then made significant improvements to the highway, extending it from US 60 to Happy Valley Parkway in 2004 as a four-lane divided parkway.[2] SR 303 was still largely a two-lane rural road and the only sections as a four-lane divided parkway was the extension north of US 60, and the southern terminus just north of I-10 between Indian School and McDowell Roads. The segment between US 60 and Bell Road in Surprise was partially upgraded to freeway standards in 2004 with overpasses at Clearview Boulevard and Mountain View Boulevard. An interim interchange and bridge above US 60 were also built at the same time.[9] In May 2004, SR 303 was renamed the "Bob Stump Memorial Parkway" in honor of former Arizona congressman Bob Stump.[10]

2004–2011 edit

With the extension of the sales tax approved in 2004,[7] SR 303 was taken back over by the Arizona Department of Transportation (ADOT) and added back to the regional transportation plan.[2] As Maricopa County had completed much of the required study and preparation work, construction on the freeway proceeded with a planned completion date of the I-10 to I-17 segment by 2015.[11] According to an agreement between the state legislature and ADOT, Statewide Transportation Acceleration Needs (STAN) funds were used to build a partial interchange at Bell Road in summer 2010, several years before previously intended. Funds from this were also used to upgrade the crossings at Waddell and Cactus Roads to make way for the new freeway.[12]

In 2009, construction began on the 14-mile segment between Happy Valley Parkway and I-17. In May 2011, this segment opened as a four-lane freeway with interchanges at Happy Valley Parkway, Lone Mountain Parkway (not opened until 2012), and Lake Pleasant Parkway. Motorists still have to pass through signaled ramp junctions at I-17 until a full freeway-to-freeway interchange is built.[11]

2011–present edit

Beginning in mid-2011, ADOT began upgrading Loop 303 between US 60 and I-10 from a two-lane highway to a six-lane freeway with auxiliary lanes and interchanges. In August 2011, construction began on the six-mile segment between Mountain View Boulevard and Peoria Avenue. This segment was completed in fall 2013 with interchanges at Bell, Greenway, Waddell, and Cactus Roads as well as Peoria Avenue.[13][14]

In November 2011, construction began on the north half of the I-10 and Loop 303 stack interchange. Construction was completed in August 2014 with the opening of all of the north half ramps. The McDowell Road bridge was also completed during this time.[15]

In May 2012, construction began on the seven-mile segment between Peoria Avenue and Thomas Road. This segment was fully completed in August 2014 with a trumpet interchange at Northern Parkway (opened in late 2013) along with other interchanges at every arterial road except Olive Avenue.[16][17]

In August 2014, construction began on the seven-mile segment between US 60 and Happy Valley Parkway to upgrade it to freeway standards. The first part was to upgrade the roadway to three lanes in each direction; it was complete in summer 2015. The second part was to construct a parclo interchange at the US 60. This part began in December 2014 and was complete in spring 2016. The final part was to construct the El Mirage interchange. This began in February 2015 and was complete in summer 2016. This marked the first time the entire Loop 303 between I-10 and I-17 was fully upgraded to freeway standards.[5]

In February 2016, construction began on the south half of the I-10 and Loop 303 stack interchange. Construction was complete in October 2017 with the opening of all of the south half ramps along with the Van Buran Street interchange.[3]

In December 2020, construction began to widen the six-mile segment between Happy Valley Parkway and Lake Pleasant Parkway from two to three lanes in each direction. It was completed with the opening of the Jomax Parkway exit in Peoria in January 2022.[18]

 
Interchange at 43rd Avenue

In October 2022, construction began to build the interchanges at 51st Avenue and 43rd Avenue. Construction was completed with the opening of these interchanges in August 2023.[6]

Future edit

A new segment of Loop 303 is planned to begin construction in 2025. It is the three-mile segment south of Van Buren Street to MC-85. The two-mile stretch of this segment between Van Buren Street and Elwood Street will be built along the Cotton Lane alignment. It will consist of building three lanes in each direction along with interchanges at Yuma Road and Elwood Street. There will be frontage roads along this entire segment to provide access to local communities. Bridges will be built over Lilac Street/Canyon Trails Boulevard and Lower Buckeye Road, and access will be via the frontage roads. Following Elwood Street, Loop 303 will head southwest for the one-mile stretch of this segment between Elwood Street and MC-85. It will consist of building two lanes in each direction as well as an at-grade intersection with MC-85.[19]

A full freeway-to-freeway interchange will be built at the Loop 303 and I-17. The goal is for construction to begin sometime in 2028. Loop 303 has been built to accommodate four-general purpose lanes, one HOV lane, and one auxiliary lane in order to expand in the future.[20]

Loop 303 is planned to continue south of MC-85 and connect to the future SR 30 in Goodyear. Construction of that segment will be around the same time as that portion of SR 30, and the timeline is currently unknown.[21]

Long-term plans include the Loop 303 to continue south of SR 30 to the future I-11 Hassayampa Freeway. Most of this extension would be in Goodyear and would be built around the same time as that portion of I-11.[22]

Exit list edit

Exit numbering is arbitrary. The entire route is in Maricopa County.

Locationmi
[1]
kmExitDestinationsNotes
Goodyear0.000.00  MC 85 (Historic US 80)Planned at-grade intersection; construction planned to begin in 2025; Loop 303 may go south of MC-85 in the future[19]
1.101.77100Elwood Street / Cotton LanePlanned interchange; to be southbound exit and northbound entrance; construction planned to begin in 2025[19]
2.103.38102Yuma Road / Lower Buckeye RoadPlanned interchange; no northbound signage for Lower Buckeye Road; construction planned to begin in 2025[19]
3.205.15103Van Buren Street / McDowell RoadNorthbound exit and southbound entrance; temporary counterclockwise terminus
3.80–
3.97
6.12–
6.39
104  I-10 – Phoenix, Los AngelesStack interchange; signed as exits 104A (east) and 104B (west); exit 124 on I-10
5.198.35105Thomas Road / McDowell RoadSouthbound exit and northbound entrance
6.179.93106Indian School Road
GoodyearGlendale line7.1911.57107Camelback Road
Glendale8.1913.18108Bethany Home Road
9.2014.81109Glendale Avenue
10.1816.38110ANorthern AvenueNorthbound exit and southbound entrance
10.6817.19110BNorthern Parkway eastTrumpet interchange; west end of Northern Parkway
11.1617.96111Olive AvenuePlanned interchange; to be southbound exit and northbound entrance[23]
GlendaleSurprise line12.1819.60112Peoria Avenue
Surprise13.1821.21113Cactus Road
14.1822.82114Waddell Road
15.1824.43115Greenway Road
16.1826.04116Bell Road
19.2931.04119  US 60 (Grand Avenue)Parclo interchange
Sun City West22.5036.21122Litchfield RoadProposed interchange[24]
23.6838.11123El Mirage Road
25.6841.33125Happy Valley Parkway / Vistancia BoulevardHappy Valley Parkway was routing of Temporary Loop 303 before parkway's maintenance was turned over to Maricopa County
Peoria26.8843.26126Jomax Parkway
27.9845.03127Lone Mountain Parkway
31.7851.14131Lake Pleasant Parkway
Phoenix34.5855.6513367th AvenuePlanned interchange[6]
36.7859.1913651st Avenue
37.6860.6413743rd Avenue
39.2563.17138  I-17 / Sonoran Desert Drive – Flagstaff, PhoenixClockwise terminus; at-grade intersection with frontage roads; I-17 exit 221; continues east as Sonoran Desert Drive
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also edit

References edit

  1. ^ a b Roadway Inventory Management Section, Multimodal Planning Division (December 31, 2013). "2013 State Highway System Log" (PDF). Arizona Department of Transportation. Retrieved January 16, 2016.
  2. ^ a b c d "Loop 303". AAroads. June 6, 2020. Retrieved January 30, 2022.
  3. ^ a b "ADOT opens all new ramp connections at I-10/Loop 303 interchange in Goodyear". Arizona Department of Transportation. October 10, 2017. Retrieved February 5, 2022.
  4. ^ "Northern Parkway". AAroads. June 6, 2020. Retrieved January 23, 2022.
  5. ^ a b "New Loop 303 lanes open in northwest Valley". Arizona Department of Transportation. June 24, 2016. Retrieved February 5, 2022.
  6. ^ a b c "Loop 303: Lake Pleasant Parkway to I-17 Improvements". Arizona Department of Transportation. Retrieved November 30, 2022.
  7. ^ a b "About MAG: Proposition 300 and 400". Maricopa Association of Governments. Retrieved January 30, 2022.
  8. ^ Breyer, Joe. "Right-of-Way Resolutions - Route Number: 517". Arizona Highway Data. Works Consulting LLC. Retrieved March 2, 2016.
  9. ^ "West Valley's explosive growth spawns Loop 303 construction". Biz Journals. October 5, 2003. Retrieved January 30, 2022.
  10. ^ (PDF). May 13, 2004. Archived from the original (PDF) on 30 September 2007. Retrieved September 30, 2007.
  11. ^ a b "The future of Loop 303". Arizona Department of Transportation. May 5, 2011. Retrieved February 5, 2022.
  12. ^ "FY 2009 and FY 2010 Appropriations Chairmen Budget Options" (PDF). Arizona Legislature. p. 6. Retrieved February 1, 2022.
  13. ^ "'Turnin' dirt' on the Loop 303 in Surprise". Arizona Department of Transportation. August 11, 2011. Retrieved February 1, 2022.
  14. ^ "Work continues on Loop 303". Arizona Department of Transportation. December 16, 2013. Retrieved February 1, 2022.
  15. ^ "All ramps are open at the Loop 303/I-10 traffic interchange". Arizona Department of Transportation. September 4, 2014. Retrieved February 5, 2022.
  16. ^ "Two new Loop 303 expansion projects to start soon in the West Valley". Arizona Department of Transportation. May 3, 2012. Retrieved February 4, 2022.
  17. ^ "ADOT opens two ramps connecting Loop 303, Interstate 10". Arizona Department of Transportation. August 17, 2014. Retrieved February 4, 2022.
  18. ^ "Loop 303 widening project completed in northwest Valley". Arizona Department of Transportation. January 20, 2021. Retrieved January 21, 2022.
  19. ^ a b c d "Loop 303: MC 85 to Van Buren Street Improvements". Arizona Department of Transportation. Retrieved July 29, 2022.
  20. ^ "Initial Design Concept Report SR 303L Lake Pleasant Parkway to I-17" (PDF). Arizona Department of Transportation. October 2021. pp. 77–78. Retrieved April 1, 2022.
  21. ^ "Loop 303 from Interstate 10 to Proposed State Route 30". Arizona Department of Transportation. Retrieved July 29, 2022.
  22. ^ "Loop 303: State Route 30 to Hassayampa Freeway Study". Arizona Department of Transportation. Retrieved February 5, 2022.
  23. ^ "FY 2022 FREEWAY LIFE CYCLE PROGRAM (FLCP)" (PDF). Maricopa Association of Governments. December 1, 2021. p. 39. Retrieved July 29, 2022.
  24. ^ "SR 303L, LITCHFIELD ROAD TRAFFIC INTERCHANGE FINAL PROJECT ASSESSMENT" (PDF). Maricopa Association of Governments. April 2019. Retrieved February 5, 2022.

External links edit

  • "AZ 303". arizonaroads.com.
KML is from Wikidata

arizona, state, route, loop, arizona, loop, redirect, here, other, uses, list, highways, numbered, loop, also, known, stump, memorial, parkway, formerly, estrella, freeway, freeway, that, serves, west, part, phoenix, metropolitan, area, freeway, originally, la. Loop 303 and Arizona Loop 303 redirect here For other uses see List of highways numbered 303 Arizona State Route 303 SR 303 or Loop 303 also known as the Bob Stump Memorial Parkway formerly the Estrella Freeway is a freeway that serves the west part of the Phoenix metropolitan area The freeway originally a two lane rural highway was maintained by Maricopa County until 2004 when the Arizona Department of Transportation again took control of upgrading the interim road to a freeway 2 State Route 303Bob Stump Memorial ParkwayLoop 303 highlighted in redRoute informationMaintained by ADOTLength35 25 mi 1 56 73 km Existed1991 presentMajor junctionsFromMC 85 in Goodyear Planned Major intersectionsI 10 in Goodyear Northern Parkway in Glendale US 60 in SurpriseToI 17 in PhoenixLocationCountryUnited StatesStateArizonaHighway systemArizona State Highway System Interstate US State Proposed Former SR 289 SR 347 Loop 303 I 10 interchange Contents 1 Route description 2 History 2 1 1985 1995 2 2 1995 2004 2 3 2004 2011 2 4 2011 present 3 Future 4 Exit list 5 See also 6 References 7 External linksRoute description editLoop 303 currently begins at Van Buren Street one mile south of I 10 in Goodyear It becomes a six lane freeway with a stack interchange at I 10 3 South of Van Buren Street it continues as Cotton Lane but without a route number The freeway heads north under McDowell and Thomas Roads then over an interchange with Indian School Road It then proceeds through a farmland terrain and passes by the Wildlife World Zoo near the Northern Parkway trumpet interchange 4 After passing Northern Parkway the freeway continues for a few miles before entering a residential community at Greenway Road and turning northeast It passes above Grand Avenue US 60 and a BNSF railroad line at a parclo interchange 5 The freeway turns eastward north of Sun City West before turning north again at the Happy Valley Parkway interchange It turns east again south of Lake Pleasant at the Agua Fria River Following the Lake Pleasant Parkway interchange the freeway condenses down to four lanes and passes through planned arterial interchanges 6 The freeway comes to an end at a temporary at grade interchange eventually to be a freeway to freeway interchange with I 17 near Skunk Creek East of this interchange Loop 303 becomes Sonoran Desert Drive The southern portion between US 60 to I 10 is used to bypass Grand Avenue and the whole route is used to bypass the Phoenix Metropolitan Area History edit1985 1995 edit nbsp Old colored Arizona Loop 303 shield that has been phased out Loop 303 was originally a part of the 1985 Maricopa County Regional Transportation Plan that was funded by a sales tax approved by Maricopa County voters 7 The freeway designed to serve the Northwest Valley was originally designated SR 517 in 1985 the Loop 303 designation was first assigned on December 18 1987 8 The interim two lane highway was completed between US 60 and I 10 in 1991 marking the first road along the Loop 303 corridor The freeway was scheduled to be completed sometime by 2005 However funding shortfalls and increasing construction costs forced cutbacks in the plan and in 1995 the freeway was dropped from the regional plans 2 1995 2004 edit Maricopa County took charge of SR 303 when it was dropped from the regional freeway plans in 1995 maintaining the interim two lane highway along the original corridor while keeping the state route designation The county then made significant improvements to the highway extending it from US 60 to Happy Valley Parkway in 2004 as a four lane divided parkway 2 SR 303 was still largely a two lane rural road and the only sections as a four lane divided parkway was the extension north of US 60 and the southern terminus just north of I 10 between Indian School and McDowell Roads The segment between US 60 and Bell Road in Surprise was partially upgraded to freeway standards in 2004 with overpasses at Clearview Boulevard and Mountain View Boulevard An interim interchange and bridge above US 60 were also built at the same time 9 In May 2004 SR 303 was renamed the Bob Stump Memorial Parkway in honor of former Arizona congressman Bob Stump 10 2004 2011 edit With the extension of the sales tax approved in 2004 7 SR 303 was taken back over by the Arizona Department of Transportation ADOT and added back to the regional transportation plan 2 As Maricopa County had completed much of the required study and preparation work construction on the freeway proceeded with a planned completion date of the I 10 to I 17 segment by 2015 11 According to an agreement between the state legislature and ADOT Statewide Transportation Acceleration Needs STAN funds were used to build a partial interchange at Bell Road in summer 2010 several years before previously intended Funds from this were also used to upgrade the crossings at Waddell and Cactus Roads to make way for the new freeway 12 In 2009 construction began on the 14 mile segment between Happy Valley Parkway and I 17 In May 2011 this segment opened as a four lane freeway with interchanges at Happy Valley Parkway Lone Mountain Parkway not opened until 2012 and Lake Pleasant Parkway Motorists still have to pass through signaled ramp junctions at I 17 until a full freeway to freeway interchange is built 11 2011 present edit Beginning in mid 2011 ADOT began upgrading Loop 303 between US 60 and I 10 from a two lane highway to a six lane freeway with auxiliary lanes and interchanges In August 2011 construction began on the six mile segment between Mountain View Boulevard and Peoria Avenue This segment was completed in fall 2013 with interchanges at Bell Greenway Waddell and Cactus Roads as well as Peoria Avenue 13 14 In November 2011 construction began on the north half of the I 10 and Loop 303 stack interchange Construction was completed in August 2014 with the opening of all of the north half ramps The McDowell Road bridge was also completed during this time 15 In May 2012 construction began on the seven mile segment between Peoria Avenue and Thomas Road This segment was fully completed in August 2014 with a trumpet interchange at Northern Parkway opened in late 2013 along with other interchanges at every arterial road except Olive Avenue 16 17 In August 2014 construction began on the seven mile segment between US 60 and Happy Valley Parkway to upgrade it to freeway standards The first part was to upgrade the roadway to three lanes in each direction it was complete in summer 2015 The second part was to construct a parclo interchange at the US 60 This part began in December 2014 and was complete in spring 2016 The final part was to construct the El Mirage interchange This began in February 2015 and was complete in summer 2016 This marked the first time the entire Loop 303 between I 10 and I 17 was fully upgraded to freeway standards 5 In February 2016 construction began on the south half of the I 10 and Loop 303 stack interchange Construction was complete in October 2017 with the opening of all of the south half ramps along with the Van Buran Street interchange 3 In December 2020 construction began to widen the six mile segment between Happy Valley Parkway and Lake Pleasant Parkway from two to three lanes in each direction It was completed with the opening of the Jomax Parkway exit in Peoria in January 2022 18 nbsp Interchange at 43rd Avenue In October 2022 construction began to build the interchanges at 51st Avenue and 43rd Avenue Construction was completed with the opening of these interchanges in August 2023 6 Future editA new segment of Loop 303 is planned to begin construction in 2025 It is the three mile segment south of Van Buren Street to MC 85 The two mile stretch of this segment between Van Buren Street and Elwood Street will be built along the Cotton Lane alignment It will consist of building three lanes in each direction along with interchanges at Yuma Road and Elwood Street There will be frontage roads along this entire segment to provide access to local communities Bridges will be built over Lilac Street Canyon Trails Boulevard and Lower Buckeye Road and access will be via the frontage roads Following Elwood Street Loop 303 will head southwest for the one mile stretch of this segment between Elwood Street and MC 85 It will consist of building two lanes in each direction as well as an at grade intersection with MC 85 19 A full freeway to freeway interchange will be built at the Loop 303 and I 17 The goal is for construction to begin sometime in 2028 Loop 303 has been built to accommodate four general purpose lanes one HOV lane and one auxiliary lane in order to expand in the future 20 Loop 303 is planned to continue south of MC 85 and connect to the future SR 30 in Goodyear Construction of that segment will be around the same time as that portion of SR 30 and the timeline is currently unknown 21 Long term plans include the Loop 303 to continue south of SR 30 to the future I 11 Hassayampa Freeway Most of this extension would be in Goodyear and would be built around the same time as that portion of I 11 22 Exit list editExit numbering is arbitrary The entire route is in Maricopa County Locationmi 1 kmExitDestinationsNotes Goodyear0 000 00 nbsp MC 85 Historic US 80 Planned at grade intersection construction planned to begin in 2025 Loop 303 may go south of MC 85 in the future 19 1 101 77100Elwood Street Cotton LanePlanned interchange to be southbound exit and northbound entrance construction planned to begin in 2025 19 2 103 38102Yuma Road Lower Buckeye RoadPlanned interchange no northbound signage for Lower Buckeye Road construction planned to begin in 2025 19 3 205 15103Van Buren Street McDowell RoadNorthbound exit and southbound entrance temporary counterclockwise terminus 3 80 3 976 12 6 39104 nbsp I 10 Phoenix Los AngelesStack interchange signed as exits 104A east and 104B west exit 124 on I 10 5 198 35105Thomas Road McDowell RoadSouthbound exit and northbound entrance 6 179 93106Indian School Road Goodyear Glendale line7 1911 57107Camelback Road Glendale8 1913 18108Bethany Home Road 9 2014 81109Glendale Avenue 10 1816 38110ANorthern AvenueNorthbound exit and southbound entrance 10 6817 19110BNorthern Parkway eastTrumpet interchange west end of Northern Parkway 11 1617 96111Olive AvenuePlanned interchange to be southbound exit and northbound entrance 23 Glendale Surprise line12 1819 60112Peoria Avenue Surprise13 1821 21113Cactus Road 14 1822 82114Waddell Road 15 1824 43115Greenway Road 16 1826 04116Bell Road 19 2931 04119 nbsp US 60 Grand Avenue Parclo interchange Sun City West22 5036 21122Litchfield RoadProposed interchange 24 23 6838 11123El Mirage Road 25 6841 33125Happy Valley Parkway Vistancia BoulevardHappy Valley Parkway was routing of Temporary Loop 303 before parkway s maintenance was turned over to Maricopa County Peoria26 8843 26126Jomax Parkway 27 9845 03127Lone Mountain Parkway 31 7851 14131Lake Pleasant Parkway Phoenix34 5855 6513367th AvenuePlanned interchange 6 36 7859 1913651st Avenue 37 6860 6413743rd Avenue 39 2563 17138 nbsp I 17 Sonoran Desert Drive Flagstaff PhoenixClockwise terminus at grade intersection with frontage roads I 17 exit 221 continues east as Sonoran Desert Drive 1 000 mi 1 609 km 1 000 km 0 621 mi Incomplete access UnopenedSee also edit nbsp U S roads portal nbsp Arizona portal Roads and freeways in metropolitan Phoenix Loop 101 Loop 202References edit a b Roadway Inventory Management Section Multimodal Planning Division December 31 2013 2013 State Highway System Log PDF Arizona Department of Transportation Retrieved January 16 2016 a b c d Loop 303 AAroads June 6 2020 Retrieved January 30 2022 a b ADOT opens all new ramp connections at I 10 Loop 303 interchange in Goodyear Arizona Department of Transportation October 10 2017 Retrieved February 5 2022 Northern Parkway AAroads June 6 2020 Retrieved January 23 2022 a b New Loop 303 lanes open in northwest Valley Arizona Department of Transportation June 24 2016 Retrieved February 5 2022 a b c Loop 303 Lake Pleasant Parkway to I 17 Improvements Arizona Department of Transportation Retrieved November 30 2022 a b About MAG Proposition 300 and 400 Maricopa Association of Governments Retrieved January 30 2022 Breyer Joe Right of Way Resolutions Route Number 517 Arizona Highway Data Works Consulting LLC Retrieved March 2 2016 West Valley s explosive growth spawns Loop 303 construction Biz Journals October 5 2003 Retrieved January 30 2022 Maricopa County Board of Supervisors minute book PDF May 13 2004 Archived from the original PDF on 30 September 2007 Retrieved September 30 2007 a b The future of Loop 303 Arizona Department of Transportation May 5 2011 Retrieved February 5 2022 FY 2009 and FY 2010 Appropriations Chairmen Budget Options PDF Arizona Legislature p 6 Retrieved February 1 2022 Turnin dirt on the Loop 303 in Surprise Arizona Department of Transportation August 11 2011 Retrieved February 1 2022 Work continues on Loop 303 Arizona Department of Transportation December 16 2013 Retrieved February 1 2022 All ramps are open at the Loop 303 I 10 traffic interchange Arizona Department of Transportation September 4 2014 Retrieved February 5 2022 Two new Loop 303 expansion projects to start soon in the West Valley Arizona Department of Transportation May 3 2012 Retrieved February 4 2022 ADOT opens two ramps connecting Loop 303 Interstate 10 Arizona Department of Transportation August 17 2014 Retrieved February 4 2022 Loop 303 widening project completed in northwest Valley Arizona Department of Transportation January 20 2021 Retrieved January 21 2022 a b c d Loop 303 MC 85 to Van Buren Street Improvements Arizona Department of Transportation Retrieved July 29 2022 Initial Design Concept Report SR 303L Lake Pleasant Parkway to I 17 PDF Arizona Department of Transportation October 2021 pp 77 78 Retrieved April 1 2022 Loop 303 from Interstate 10 to Proposed State Route 30 Arizona Department of Transportation Retrieved July 29 2022 Loop 303 State Route 30 to Hassayampa Freeway Study Arizona Department of Transportation Retrieved February 5 2022 FY 2022 FREEWAY LIFE CYCLE PROGRAM FLCP PDF Maricopa Association of Governments December 1 2021 p 39 Retrieved July 29 2022 SR 303L LITCHFIELD ROAD TRAFFIC INTERCHANGE FINAL PROJECT ASSESSMENT PDF Maricopa Association of Governments April 2019 Retrieved February 5 2022 External links edit AZ 303 arizonaroads com KML file edit help Template Attached KML Arizona State Route 303KML is from Wikidata Retrieved from https en wikipedia org w index php title Arizona State Route 303 amp oldid 1220623829, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.