The following lists some of the larger power stations in Indonesia. Data are not included for a large number of small isolated plants (mostly diesel) in the Outer Islands. In total, the PLN operated over 5,000 plants across Indonesia in 2010 of which over 4,500 were small diesel plants outside of Java. For further details about existing capacity and operations of the electricity sector, see information about the state-owned Indonesian electricity company Perusahaan Listrik Negara.

Non-renewable edit

Thermal edit

Thermal power is the largest source of power in Indonesia. There are different types of thermal power plants based on the fuel used to generate the steam such as coal, gas, diesel etc. About 85% of electricity consumed in Indonesia is generated by thermal power plants.

Bituminous coal or lignite edit

Existing edit

Note: IPP means independent power producer

Power station Location District Province Region Coordinates Capacity per unit
(MW)
Installed capacity
(MW)
Operator Sector Notes Refs
Bukit Asam coal-fired Tanjung Enim Muara Enim South Sumatra Sumatra 4 x 65 260 PT. PLN Government Boiler from Stein, Turbines from Rateau and generators from GEC Alstom [1]
Paiton (PLN) coal-fired Paiton Probolinggo East Java Java-Bali 7°42′56″S 113°35′06″E / 7.7155°S 113.5849°E / -7.7155; 113.5849 (Paiton (PLN)) 2 x 400 800 PT. PLN Government Boiler from ABB Combustion Engineering, Turbines and generators from Toshiba [2]
Ombilin coal-fired Ombilin Sawahlunto West Sumatra Sumatra 2 x 100 200 PT. PLN Government Boiler from Stein, Turbines and generators from GEC Alstom [1]
Suralaya coal-fired Suralaya Cilegon Banten Java-Bali 4 x 400
3 x 600
3,400 PT. Indonesia Power Government Boiler from Babcock & Wilcox Canada, Turbines from MHI Japan; generators from Mitsubishi Electric Co.
Suralaya Baru coal-fired Suralaya Cilegon Banten Java-Bali 5°53′31″N 106°01′48″E / 5.892°N 106.03°E / 5.892; 106.03 (Suralaya Power Station) 1 x 625 625 PT. Indonesia Power Government Boiler from Shanghai Co. Ltd, Turbines and generators from Shanghai Co. Ltd [3][4]
Paiton Paiton Probolinggo East Java Java-Bali 2 x 670
2 x 610
1 x 850
2,300 PT. Paiton Energy (IPP) Private Boiler supplied by ABB, Turbines and Generators supplied by GE [4]
Tanjung Jati-B I coal-fired Bangsri Jepara East Java Java-Bali 2 x 662 1,320 PT. Central Java Power (IPP) Private Boiler supplied by Babcock & Wilcox, Turbines and Generators supplied by Toshiba [4]
Tanjung Jati-B II coal-fired Bangsri Jepara East Java Java-Bali 2 x 662 1,320 PT. Central Java Power (IPP) Private Boiler supplied by Mitsubishi Heavy Industry, Turbines and Generators supplied by Toshiba [4]
Cirebon coal-fired Kanci Kulon Cirebon West Java Java-Bali 6°46′13″S 108°36′54″E / 6.7704°S 108.6151°E / -6.7704; 108.6151 (Cirebon Steam Power Plant) 1 x 660 660 PT. Cirebon Electric Power (IPP) Private Boiler, Turbines and Generators supplied by Doosan Heavy Industries and Construction Co., Ltd. [4]
Cilacap Karangkandri Cilacap Central Java Java-Bali 07°40′31.20″S 109°05′47.40″E / 7.6753333°S 109.0965000°E / -7.6753333; 109.0965000 2 x 300 600 PT. Sumber Segara Primadaya (IPP) Government Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd
Cilacap Adipala coal-fired Adipala Cilacap Central Java Java-Bali 1 x 660 660 PT. Indonesia Power Government Boiler supplied by Shanghai Electric Corp. Ltd, Turbines and Generators supplied by Shanghai Electric Corp. Ltd [4]
Indramayu coal-fired Sumur Adem Indramayu West Java Java-Bali 3 x 330 990 PT. PLN Government Boiler supplied by Babcock & Wilcox Beijing Co., Turbines and Generators supplied by Beijing Beizhong [4]
Pacitan coal-fired Sukorejo Pacitan East Java Java-Bali 2 x 315 630 PT. PLN Government Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd [4]
Tarahan coal-fired Tarahan South Lampung Lampung Sumatra 2 x 100 200 PT. PLN Government Boiler supplied by Jinan Co. Ltd, Turbines and Generators supplied by Wuhan Co. Ltd
Labuan coal-fired Labuan Pandeglang Banten Java-Bali 2 x 300 600 PT. Indonesia Power Government Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd
Labuhan Angin coal-fired Labuhan Angin Central Tapanuli North Sumatra Sumatra 2 x 115 230 PT. PLN Government Boiler supplied by Foster Wheeler, Turbines and Generators supplied by Shanghai Turbine Co. Ltd. [5]
Lontar coal-fired Lontar, Teluk Naga Tangerang Banten Java-Bali 3 x 315 945 PT. Indonesia Power Government Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd
Pelabuhan Ratu coal-fired Pelabuhan Ratu Sukabumi West Java Java-Bali 3 x 350 1050 PT. Indonesia Power Government Boiler supplied by Shanghai Electric Corp. Ltd, Turbines and Generators supplied by Shanghai Electric Corp. Ltd [6]
Rembang coal-fired Sluke Rembang Central Java Java-Bali 06°38′18.21″S 111°28′27.41″E / 6.6383917°S 111.4742806°E / -6.6383917; 111.4742806 2 x 315 630 PT. PLN Government Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd [4]
Bangka Belitung 3 coal-fired Air Anyir Bangka Bangka Belitung Sumatera 2 x 30 60 PT. BMP (IPP) Government
Total 50 18,630
Proposed or under construction edit
Power station Location District Province Region Capacity per unit
(MW)
Installed capacity
(MW)
Operator Sector Remarks and plant coordinates
Java 4 coal-fired Tubanan, Kembang Jepara Central Java Java-Bali 2 x 1000 2,000 PT. Bhumi Jati Power Private [7]
Java 7 coal-fired Kramatwatu Serang Banten Java-Bali 2 x 1000 2,000 PT. Shenhua Guohua Pembangkitan Jawa Bali Private [8]
Central Java coal-fired (by the end of 2016) Ujungnegoro Batang Central Java Java-Bali 2 x 1000 2,000 PT. Bhimasena Power Indonesia Private [9]
Tanjung Awar-Awar coal-fired Kaliuntu Tuban East Java Java-Bali 2 x 350 700 PT. PLN Government Boiler supplied by Babcock & Wilcox Beijing Co. Turbines and generators supplied by Beijing Beizhong
Madura coal-fired Pamekasan East Java Java-Bali 2 x 100 200 PT. PLN Government
Bojonegara coal-fired Bojonegara Cilegon Banten Java-Bali 3 x 740 2,220 PT. PLN Government
Tanjung Jati-A coal-fired Cirebon Cirebon West Java Java-Bali 2 x 660 1,320 PT. Bakrie Power Private
Nusa Penida coal-fired Nusa Penida Bali Java-Bali 2 x 100 200 PT. PLN Government
Anyer coal-fired Anyer Banten Java-Bali 1 x 330 330 PT. PLN Government
Kuala Tanjung coal-fired Kuala Tanjung South Sumatra Sumatra 2 x 112 224 PT. Ranyza Energi Private
Banjarsari coal-fired Banjarsari Lahat South Sumatra Sumatra 2 x 100 200 PT. Bukit Pembangkit Innovative Private
Banyuasin coal-fired Banyuasin Banyuasin South Sumatra Sumatra 2 x 100 200 PT. Banyuasin Power Energy Private
Baturaja coal-fired Baturaja Ogan Komering Ulu South Sumatra Sumatra 2 x 100 200 PT. Priamanaya Power Energi Private
Simpang Belimbing coal-fired Gunung Raja Muara Enim South Sumatra Sumatra 2 x 150 300 PT. GH EMMI Private
Arahan coal-fired Arahan Muara Enim South Sumatra Sumatra 4 x 600 2,400 PT. PLN Government
Central Bangko coal-fired Bangko Tengah Muara Enim South Sumatra Sumatra 4 x 620 2,480 PT. BA & CHD (China)[7] Private
West Kalimantan 1 coal-fired Tanjung Gundul Bengkayang West Kalimantan Kalimantan 2 x 100 200 PT. GCL Indotenaga Government - private
Tanjung coal-fired Tanjung Tabalong South Kalimantan Kalimantan 2 x 55 110 PT. PLN Government
Total 34 17,264

Gas or liquid fuel edit

Power station Location District Province Region Coordinates Capacity per unit
(MW)
Capacity (MW) Operator Sector Refs
Bekasi West Java 130
Betara Lampung 70
Grati CCGT Grati Pasuruan East Java Java-Bali 7°39′06″S 113°01′28″E / 7.6517°S 113.0244°E / -7.6517; 113.0244 (Grati CCGT) 3 x 100.75 GTPP; 3 x 100.75 SPP; 1 x 159.58 CCPP 764 PT. Indonesia Power Government [10][11]
Gresik CCGT Gresik Gresik East Java Java-Bali 7°09′48″S 112°39′41″E / 7.1633°S 112.6615°E / -7.1633; 112.6615 (Gresik CCGT) 4 x GTPP; 4 x SPP; 3 x CCPP 2,255 PT. Pembangkitan Jawa Bali Government [12]
Muara Tawar CCGT Tarumajaya Bekasi West Java Java-Bali 06°05′09.37″S 106°59′48.15″E / 6.0859361°S 106.9967083°E / -6.0859361; 106.9967083 (Muara Tawar CCGT) 2 x GTPP; 3 x CCPP 920 PT. Pembangkitan Jawa Bali Government
Muara Karang CCGT Muara Karang North Jakarta DKI Jakarta Java-Bali 6°06′31″S 106°47′16″E / 6.1087°S 106.7877°E / -6.1087; 106.7877 (Muara Karang CCGT) 5 x STPP; 1 x CCPP 1,208 PT. Pembangkitan Jawa Bali Government [13][14]
Palembang Timur South Sumatra 150
PLTG Senipah Senipah Kutai Kartanegara East Kalimantan Kalimantan 2x 46 GTG 92 PT. Kertanegara Energi Perkasa IPP
PLTG/MG Kalbar Peaker Parit Baru Mempawah West Kalimantan Kalimantan 100 100 PT. PLN Government 2019
Sengkang South Sulawesi 150
Tambak Lorok CCGT Tambak Lorok Semarang Central Java Java-Bali 6 x 109.65 GTPP; 2 x 50 SPP; 1 x 200 SPP; 2 x 188 CCPP 1,334 PT. Indonesia Power Government
Tanjung Priok CCGT Tanjung Priok North Jakarta DKI Jakarta Java-Bali 2 x 26 GTPP; 2 x 48.8 GTPP; 2 x 50 SPP; 6 x 130 CCGT; 2 x 200 CCGT 1,430 PT. Indonesia Power Government
Senayan Diesel Senayan Jakarta DKI Jakarta Java-Bali -6.2160361, 106.7953257 6 x 2.52 15 PT. Indonesia Power Government
PLTU 400 MW Ciwandan Cilegon Banten Java-Bali 5 x 80 STG 400 MW PT. Krakatau Daya Listrik SOE
PLTGU 120 MW Ciwandan Cilegon Banten Java-Bali 2 x 39 GTG; 1 x 43 STG 120 MW PT. Krakatau Daya Listrik SOE
Total 68 8,446

Renewable edit

Geothermal edit

Note: IPP means independent power producer

Power station Location District Province Region Capacity per unit
(MW)
Installed capacity
(MW)
Operator Sector Remarks
Kamojang geothermal Kamojang Garut West Java Java-Bali Unit I = 30
Unit II = 55
Unit III = 55
Unit IV = 60
Unit V = 35
235 PT. Indonesia Power Government Unit IV 63 MW turbine capacity and 80 MVA generator capacity both from Fuji Electric, Kawasaki, Japan [15]
Darajat geothermal Kamojang Garut West Java Java-Bali Unit I = 55 55 PT. Indonesia Power Government
Darajat geothermal Kamojang Garut West Java Java-Bali Unit II = 90
Unit III = 110
200 PT. Pertamina, Chevron Geothermal Indonesia, Ltd
(IPP)
Private Turbines Unit II = 81.3 MW & Unit III = 110 MW and Generators Unit II = 101.625 MVA & Unit III = 137.5 MVA both supplied by Fuji Electric, Kawasaki, Japan [16]
Gunung Salak geothermal Parung Kuda Sukabumi West Java Java-Bali 3 x 60 180 PT. Indonesia Power Government Turbines @ 55 MW and Generators @ 55 MVA both supplied by Ansaldo Energia, Italy [17]
Gunung Salak geothermal Parung Kuda Sukabumi West Java Java-Bali 3 x 55 165 Chevron Geothermal Salak Ltd and Dayabumi Salak Pratama Ltd (IPP) Private Turbines @ 59.5 MW and Generators @ 74.375 MVA both from Fuji Electric, Kawasaki, Japan
Ulubelu Geothermal Power Station Ulubelu Tanggamus Lampung Sumatra 2 x 55 110 PT. PLN Government Turbines 2 x 55 MW and Generators 2 x 55 MVA both from Fuji Electric, Kawasaki, Japan [18]
Wayang Windu geothermal Pengalengan Bandung West Java Java-Bali 1 x 110
1 x 117
( 1 x 127 by mid-2013 )
227 PT. Pertamina and Magma Nusantara Ltd. (IPP) Private Turbines 110 MW & 117 MW and Generators 2 x 137.5 MVA both from Fuji Electric, Kawasaki, Japan [19]
Dieng geothermal Dieng Banjarnegara Central Java Java-Bali 1 x 60 60 PT. Geo Dipa Energi (IPP) Private
Lahendong geothermal Lahendong Minahasa North Sulawesi Sulawesi Unit I = 20
Unit II = 20
Unit III = 20
Unit IV = 20
80 PT. PLN Government * Unit I: turbines = 20 MW and generator = 25 MVA both from Alstom [20]
* Unit II: turbines = 20 MW and generator = 25 MVA both from Fuji Electric, Kawasaki, Japan [21]
* Unit III: turbines = 20 MW and generator = 25 MVA both from Fuji Electric, Kawasaki, Japan [22]
* Unit IV: turbines = 20 MW and generator = 25 MVA both supplied by Fuji Electric, Kawasaki, Japan [23]
Sibayak geothermal Sibayak Karo North Sumatra Sumatra 2 x 5.65 11.3 PT. Dizamatara Powerindo
(IPP)
Private Turbines @ 5.85 MW and Generators @ 6 MVA, 5.65 MW at PF 0.94 [24]
Patuha geothermal Patuha Bandung West Java Java-Bali Unit 1 = 55 55
(by-mid 2014)
PT. Geo Dipa Energi
(IPP)
Private Turbines Unit 1 = 60 MW and Generator Unit 1 = 75 MVA both supplied by Toshiba [25]
Total 19 1,344

Hydroelectric edit

Note: IPP means independent power producer

Power station Location District Province Region Capacity per unit
(MW)
Installed capacity
(MW)
Operator Sector Remarks
Agam hydro Batang Agam Agam West Sumatra Sumatra 3 x 3.5 10 PT. PLN Government Turbines @ 3.55 MW and Generators @ 3.95 MVA both supplied by Ebara
Maninjau hydro Maninjau Agam West Sumatra Sumatra 4 x 17 68 PT. PLN Government Turbines @ 17.4 MW and Generators @ 20 MVA both supplied by Toshiba
Singkarak hydro Singkarak Solok West Sumatra Sumatra 4 x 43.75 175 PT. PLN Government Turbines @ 43.75 MW supplied by VoestAlpine and Generators @ 52 MVA supplied by ELIN (now ANDRITZ Hydro)
Koto Panjang hydro Koto Panjang Kampar Riau Sumatra 3 x 38 114 PT. PLN Government Turbines @ 39.4 MW supplied by Kvaerner Boving and Generators @ 45 MVA supplied by ELIN (now ANDRITZ Hydro)
Test I hydro Tes Rejang Lebong Bengkulu Sumatra 4 x 4 16 PT. PLN Government Turbines @ 4.7 MW supplied by Ansaldo Energia
Musi hydro Ujanmas Atas Kepahiang Bengkulu Sumatra 3 x 70 210 PT. PLN Government Turbines @ 70 MW and Generators @ 86 MVA both supplied by VA Tech Hydro (now ANDRITZ Hydro)
Besai hydro Sumberjaya West Lampung Lampung Sumatra 2 x 45 90 PT. PLN Government Turbines @ 46.4 MW and Generators @ 53 MVA both supplied by VA Tech Hydro (now ANDRITZ Hydro)
Batutegi hydro Tanggamus West Lampung Lampung Sumatra 2 x 14 28 PT. PLN Government Turbines @ 14.2 MW and Generators @ 15.7 MVA both supplied by Toshiba
Lau Renun hydro Silalahi Dairi North Sumatra Sumatra 2 x 41 82 PT. PLN Government Turbines @ 41 MW and Generators @ 47.5 MVA both supplied by VA Tech Hydro (now ANDRITZ Hydro)
Sipansihaporas hydro Sipansihaporas Central Tapanuli North Sumatra Sumatra 1 x 33
1 x 17
50 PT. PLN Government Power Station 1 = Turbines 34 MW by Meiden, Japan and Generator 39 MVA by Toshiba
Power Station 2 = 17.6 MW Meiden, Japan and Generator 20 MVA by Toshiba [26]
Asahan I hydro Parmaksian Toba Samosir North Sumatra Sumatra 2 x 90 180 PT. Bajradaya Sentranusa
(IPP)
Private Turbines and Generators supplied by Dongfang Electric Corp. Ltd
Asahan III hydro Pintu Pohan Meranti Toba Samosir North Sumatra Sumatra 2 x 87 174 PT. PLN Government
Sigura-gura hydro Simorea Asahan North Sumatra Sumatra 4 x 71.50 286 PT. Inalum Private Turbines @ 71.5 MW and Generators @ 80 MVA both supplied by Toshiba
Tangga hydro Tangga Asahan North Sumatra Sumatra 4 x 79.25 317 PT. Inalum Private Turbines @ 81.1 MW supplied by Hitachi Ltd. and Generators @ 90 MVA supplied by Mitsubishi Electric
Wampu hydro Kota Buluh Karo North Sumatra Sumatra 3 x 15 45 PT. Wampu Electric Power
(IPP)
Private
Kerinci hydro Batang Merangin Kerinci Jambi Sumatra 6 x 30 180 PT. PLN Government Turbines @ 30 MW and Generators @ 33.33 MVA [27]
Saguling hydro Rajamandala Cimahi West Java Java-Bali 4 x 175.18 701 PT. Indonesia Power Government Turbines @ 175.18 MW supplied by Toshiba and Generators @ 194? MVA supplied by Mitsubishi Electric Co,.
Cirata hydro Plered Purwakarta West Java Java-Bali 8 x 126 1,008 PT. Pembangkitan Jawa Bali Government Turbines @ 129.6 MW supplied by VoestAlpine and Generators @ 140 MVA supplied by ELIN (now ANDRITZ Hydro)
Jatiluhur hydro Jatiluhur Purwakarta West Java Java-Bali 6 x 31 186 PT. Jasa Tirta II Government Turbines @ 32.3 MW supplied by NEYRPIC and Generators @ 35 MVA supplied by GEC Alsthom Jeumont
PB. Sudirman hydro Mrica Banjarnegara Central Java Java-Bali 3 x 60.3 181 PT. Indonesia Power Government Turbines supplied by Boving and Generators supplied by ASEA
Sutami hydro Karangkates Malang East Java Java-Bali 3 x 35 105 PT. Pembangkitan Jawa Bali Government
Wlingi hydro Wlingi Malang East Java Java-Bali 2 x 27 54 PT. Pembangkitan Jawa Bali Government
Tonsea Lama hydro Tondano Minahasa North Sulawesi Sulawesi 1 x 4.44
1 x 4.50
1 x 5.44
14 PT. PLN Government
Tanggari I & II hydro Tondano Minahasa North Sulawesi Sulawesi 1 x 17.20
1 x 19
36 PT. PLN Government
Bakaru I & II hydro Bakaru Pinrang South Sulawesi Sulawesi 2 x 63
1 x 65
191 PT. PLN Government
Larona hydro Soroako East Luwu South Sulawesi Sulawesi 3 x 65 195 INCO Private Turbines @ 67.3 MW supplied by Sulzer & GE and Generators @ 85 MVA supplied by Hitachi & VA Tech Hydro
Balambano hydro Soroako East Luwu South Sulawesi Sulawesi 2 x 70 140 INCO Private Turbines @ 68.5 MW and Generators @ 80.6 MVA both supplied by Canadian General Electric
Karebbe hydro Soroako East Luwu South Sulawesi Sulawesi 2 x 66 132 INCO Private Turbines @ 63.7 MW and Generators @ 78 MVA both supplied by VA Tech Hydro (now ANDRITZ Hydro)
Pamona 2 hydro Pamona Utara Poso Central Sulawesi Sulawesi 4 x 65 260 PT. Poso Energi
(IPP)
Private Turbines @ 66.66 MW and Generators @ 72.2 MVA [27]
Riam Kanan hydro Aranio Martapura South Kalimantan Kalimantan 3 x 10 30 PT. PLN Government Turbines @ 10.5 MW and Generators @ 11 MVA both supplied by Fuji Electric Co,. Ltd, Japan [28]
Total 88 4,755

Pumped-storage hydroelectric edit

Currently under construction or planned:[29]

Power station Location District Province Region Capacity per unit
(MW)
Installed capacity
(MW)
Operator Sector Remarks
Upper Cisokan pumped storage hydro (COD 2015) Cianjur
Cisokan river and Cirumamis river
Cianjur and
Bandung Barat
West Java Java-Bali 4 x 260 MW pump turbine or
4 x 275 MVA motor generator
1,040 MW pump turbine or
1,100 MVA motor generator
PT. PLN Government
Matenggeng pumped storage hydro (COD 2020) Majenang
Cijolang river and Cimancing river
Ciamis West Java Java-Bali 2 x 443 MW pump turbine or
2 x 460 MVA motor generator
886 MW pump turbine or
920 MVA motor generator
PT. PLN Government
Grindulu pumped storage hydro (COD 2021) Tegalombo Pacitan East Java Java 4 x 260 MW pump turbine or
4 x 75 MVA motor generator
1,040 MW pump turbine or
1,100 MVA motor generator
PT. PLN Government [30]
Kali Konto pumped storage hydro (COD 2027) Bandar Kedungmulyo Jombang East Java Java-Bali 4 x 260 MW pump turbine or
4 x 275 MVA motor generator
1,040 MW pump turbine or
1,100 MVA motor generator
PT. PLN Government
Lake Toba pumped storage hydro (COD 2020) Toba Toba Samosir North Sumatera Sumatera 4 x 110 MW pump turbine or
4 x 125 MVA motor generator
490 MW pump turbine or
500 MVA motor generator
PT. PLN Government
Total 18 Units 1364 MW pump turbine or
4,720 MVA motor generator

Wind edit

Power station Location District Province Region Capacity per unit
(MW)
Installed capacity
(MW)
Operator Sector Remarks
Sidrap Sidenreng South Sulawesi Sulawesi 75 [31]
Jeneponto Jeneponto South Sulawesi Sulawesi 72 [32]

Solar edit

Power station Location District Province Region Installed capacity
(MW)
Operator Sector Remarks
Cirata floating solar Cirata Dam Sidenreng West Java Java-Bali 192 In development[33][34]
Batam floating solar Duriangkang Reservoir Batam Riau Islands Riau Islands 2200 In development[35][36]

See also edit

References edit

  1. Large Scale Hydropower Plants in Indonesia by Indonesia Hydro Consult (http://www.arcgis.com/apps/OnePane/basicviewer/index.html?appid=65ed8bc862bd4af09c375d49f9d389d4)
  2. Small Scale Hydropower Plants in Indonesia by Indonesia Hydro Consult (http://www.arcgis.com/apps/OnePane/basicviewer/index.html?appid=2dffb753a63142b0bf7075389414daae)
  1. ^ a b "Coal-Fired Power Plants in Indonesia - other islands". Gallery. Power Plants Around The World. 25 January 2014. Archived from the original on 6 December 2012. Retrieved 9 March 2014.
  2. ^ "Paiton PLN Coal Power Plant Indonesia - GEO". Global Energy Observatory. Retrieved 9 March 2014.
  3. ^ "Suralaya Coal Power Plant". Global Energy Observatory. Retrieved 9 March 2014.
  4. ^ a b c d e f g h i "Coal-Fired Power Plants in Indonesia - Java". Gallery. Power Plants Around The World. 25 January 2014. Archived from the original on 31 January 2014. Retrieved 9 March 2014.
  5. ^ Introduction to Indonesia Labuhan Angin 2X115MW CFB Power Plant Project
  6. ^ Shanghai Electric Suppliers of power plant equipment in Indonesia
  7. ^ Java 4 Coal Power Station Will Operate In 2021
  8. ^ Java 7 Coal Power Station Will Finish Faster
  9. ^ Consortium J-Power, Ithocu and Adaro is the bid winner of PLTU Central Java 2x1000 MW [1] 2012-04-16 at the Wayback Machine
  10. ^ "CCGT Plants in Indonesia". Gallery. Power Plants Around The World. 17 October 2012. Retrieved 9 March 2014.
  11. ^ "Grati CCGT Power Plant". Global Energy Observatory. Retrieved 9 March 2014.
  12. ^ "Gresik CCGT Power Plant". Global Energy Observatory. Retrieved 9 March 2014.
  13. ^ "Muara Karang CCGT Power Plant". Global Energy Observatory. Retrieved 9 June 2014.
  14. ^ (PDF). Project Fact Sheet. Tebeton. Archived from the original (PDF) on 14 July 2015. Retrieved 9 June 2014.
  15. ^ The geothermal steam turbine generator is produced by Fuji Japan Ltd[permanent dead link]
  16. ^ Yokogawa Receives Control System Order for Geothermal Power Plant from Fuji Electric Systems [2]
  17. ^ http://www.ansaldoenergia.com/PDF/Ref-Therm.pdf [permanent dead link]
  18. ^ "Home". fujielectric.com.
  19. ^ http://www.fujielectric.com/company/tech_archives/pdf/47-04/FER-47-04-102-2001.pdf [bare URL PDF]
  20. ^ Lahendong (Indonesia) 20 MW geothermal power plant[permanent dead link]
  21. ^ Lahendong II-20 MW Geothermal Project[permanent dead link]
  22. ^ Yokogawa has won an order from Fuji Electric Systems to supply a CENTUM CS 3000 distributed control system for the Lahendong III [3]
  23. ^ Table 1 Recent geothermal power generation projects
  24. ^ PT Dizamatara Powerindo (DP) propose to set up a geothermal power project in the North Sumatera [4][permanent dead link]
  25. ^ Marubeni and Toshiba Win FTK Order for Indonesia's Patuha Unit 1 Geothermal Power Plant [5]
  26. ^ Sipansihaporas hydro (E/S) - JICA
  27. ^ a b (PDF). Archived from the original (PDF) on 2016-03-03. Retrieved 2012-03-11.{{cite web}}: CS1 maint: archived copy as title (link)
  28. ^ The description on Riam Kanan Hydro Electric Project in Kalimantan (Indonesia)[6]
  29. ^ Rencana Usaha Penyediaan Tenaga Listrik PT. PLN (Persero)2011 - 2020
  30. ^ "Acceleration and Expansion of Indonesian Economic Development 2011-2025" (PDF). Master Plan. Retrieved 22 January 2012.[permanent dead link]
  31. ^ Andi, Hajramurni (2018-07-02). "Jokowi inaugurates first Indonesian wind farm in Sulawesi". The Jakarta Post. Retrieved 2020-02-19.
  32. ^ Tampubolon, Agus Praditya (2019-07-17). Simamora, Pamela (ed.). "Wind Farm is Coming to Indonesia, and The Power Sector isn't Ready". IESR. from the original on 30 August 2021. Retrieved 2021-08-30.
  33. ^ Garanovic, Amir (2023-03-07). "Chinese company to supply floating system for Indonesia's 192MW floating solar farm". Offshore Energy. Retrieved 2023-07-15.
  34. ^ "Cirata Floating Solar Photovoltaic". masdar.ae. Retrieved 2023-07-15.
  35. ^ Correspondent, Wahyudi SoeriaatmadjaIndonesia (2023-07-07). "Work on Indonesia-Singapore floating solar farm in Batam to start next year". The Straits Times. ISSN 0585-3923. Retrieved 2023-07-15.
  36. ^ "Sunseap signs MoU to build floating solar farm in Batam". Data Centre Dynamics.

list, power, stations, indonesia, following, lists, some, larger, power, stations, indonesia, data, included, large, number, small, isolated, plants, mostly, diesel, outer, islands, total, operated, over, plants, across, indonesia, 2010, which, over, were, sma. The following lists some of the larger power stations in Indonesia Data are not included for a large number of small isolated plants mostly diesel in the Outer Islands In total the PLN operated over 5 000 plants across Indonesia in 2010 of which over 4 500 were small diesel plants outside of Java For further details about existing capacity and operations of the electricity sector see information about the state owned Indonesian electricity company Perusahaan Listrik Negara Contents 1 Non renewable 1 1 Thermal 1 1 1 Bituminous coal or lignite 1 1 1 1 Existing 1 1 1 2 Proposed or under construction 1 1 2 Gas or liquid fuel 2 Renewable 2 1 Geothermal 2 2 Hydroelectric 2 3 Pumped storage hydroelectric 2 4 Wind 2 5 Solar 3 See also 4 ReferencesNon renewable editThermal edit Thermal power is the largest source of power in Indonesia There are different types of thermal power plants based on the fuel used to generate the steam such as coal gas diesel etc About 85 of electricity consumed in Indonesia is generated by thermal power plants Bituminous coal or lignite edit Existing edit Note IPP means independent power producer Power station Location District Province Region Coordinates Capacity per unit MW Installed capacity MW Operator Sector Notes Refs Bukit Asam coal fired Tanjung Enim Muara Enim South Sumatra Sumatra 4 x 65 260 PT PLN Government Boiler from Stein Turbines from Rateau and generators from GEC Alstom 1 Paiton PLN coal fired Paiton Probolinggo East Java Java Bali 7 42 56 S 113 35 06 E 7 7155 S 113 5849 E 7 7155 113 5849 Paiton PLN 2 x 400 800 PT PLN Government Boiler from ABB Combustion Engineering Turbines and generators from Toshiba 2 Ombilin coal fired Ombilin Sawahlunto West Sumatra Sumatra 2 x 100 200 PT PLN Government Boiler from Stein Turbines and generators from GEC Alstom 1 Suralaya coal fired Suralaya Cilegon Banten Java Bali 4 x 400 3 x 600 3 400 PT Indonesia Power Government Boiler from Babcock amp Wilcox Canada Turbines from MHI Japan generators from Mitsubishi Electric Co Suralaya Baru coal fired Suralaya Cilegon Banten Java Bali 5 53 31 N 106 01 48 E 5 892 N 106 03 E 5 892 106 03 Suralaya Power Station 1 x 625 625 PT Indonesia Power Government Boiler from Shanghai Co Ltd Turbines and generators from Shanghai Co Ltd 3 4 Paiton Paiton Probolinggo East Java Java Bali 2 x 670 2 x 610 1 x 850 2 300 PT Paiton Energy IPP Private Boiler supplied by ABB Turbines and Generators supplied by GE 4 Tanjung Jati B I coal fired Bangsri Jepara East Java Java Bali 2 x 662 1 320 PT Central Java Power IPP Private Boiler supplied by Babcock amp Wilcox Turbines and Generators supplied by Toshiba 4 Tanjung Jati B II coal fired Bangsri Jepara East Java Java Bali 2 x 662 1 320 PT Central Java Power IPP Private Boiler supplied by Mitsubishi Heavy Industry Turbines and Generators supplied by Toshiba 4 Cirebon coal fired Kanci Kulon Cirebon West Java Java Bali 6 46 13 S 108 36 54 E 6 7704 S 108 6151 E 6 7704 108 6151 Cirebon Steam Power Plant 1 x 660 660 PT Cirebon Electric Power IPP Private Boiler Turbines and Generators supplied by Doosan Heavy Industries and Construction Co Ltd 4 Cilacap Karangkandri Cilacap Central Java Java Bali 07 40 31 20 S 109 05 47 40 E 7 6753333 S 109 0965000 E 7 6753333 109 0965000 2 x 300 600 PT Sumber Segara Primadaya IPP Government Boiler supplied by Dongfang Electric Corp Ltd Turbines and Generators supplied by Dongfang Electric Corp Ltd Cilacap Adipala coal fired Adipala Cilacap Central Java Java Bali 1 x 660 660 PT Indonesia Power Government Boiler supplied by Shanghai Electric Corp Ltd Turbines and Generators supplied by Shanghai Electric Corp Ltd 4 Indramayu coal fired Sumur Adem Indramayu West Java Java Bali 3 x 330 990 PT PLN Government Boiler supplied by Babcock amp Wilcox Beijing Co Turbines and Generators supplied by Beijing Beizhong 4 Pacitan coal fired Sukorejo Pacitan East Java Java Bali 2 x 315 630 PT PLN Government Boiler supplied by Dongfang Electric Corp Ltd Turbines and Generators supplied by Dongfang Electric Corp Ltd 4 Tarahan coal fired Tarahan South Lampung Lampung Sumatra 2 x 100 200 PT PLN Government Boiler supplied by Jinan Co Ltd Turbines and Generators supplied by Wuhan Co Ltd Labuan coal fired Labuan Pandeglang Banten Java Bali 2 x 300 600 PT Indonesia Power Government Boiler supplied by Dongfang Electric Corp Ltd Turbines and Generators supplied by Dongfang Electric Corp Ltd Labuhan Angin coal fired Labuhan Angin Central Tapanuli North Sumatra Sumatra 2 x 115 230 PT PLN Government Boiler supplied by Foster Wheeler Turbines and Generators supplied by Shanghai Turbine Co Ltd 5 Lontar coal fired Lontar Teluk Naga Tangerang Banten Java Bali 3 x 315 945 PT Indonesia Power Government Boiler supplied by Dongfang Electric Corp Ltd Turbines and Generators supplied by Dongfang Electric Corp Ltd Pelabuhan Ratu coal fired Pelabuhan Ratu Sukabumi West Java Java Bali 3 x 350 1050 PT Indonesia Power Government Boiler supplied by Shanghai Electric Corp Ltd Turbines and Generators supplied by Shanghai Electric Corp Ltd 6 Rembang coal fired Sluke Rembang Central Java Java Bali 06 38 18 21 S 111 28 27 41 E 6 6383917 S 111 4742806 E 6 6383917 111 4742806 2 x 315 630 PT PLN Government Boiler supplied by Dongfang Electric Corp Ltd Turbines and Generators supplied by Dongfang Electric Corp Ltd 4 Bangka Belitung 3 coal fired Air Anyir Bangka Bangka Belitung Sumatera 2 x 30 60 PT BMP IPP Government Total 50 18 630 Proposed or under construction edit Power station Location District Province Region Capacity per unit MW Installed capacity MW Operator Sector Remarks and plant coordinates Java 4 coal fired Tubanan Kembang Jepara Central Java Java Bali 2 x 1000 2 000 PT Bhumi Jati Power Private 7 Java 7 coal fired Kramatwatu Serang Banten Java Bali 2 x 1000 2 000 PT Shenhua Guohua Pembangkitan Jawa Bali Private 8 Central Java coal fired by the end of 2016 Ujungnegoro Batang Central Java Java Bali 2 x 1000 2 000 PT Bhimasena Power Indonesia Private 9 Tanjung Awar Awar coal fired Kaliuntu Tuban East Java Java Bali 2 x 350 700 PT PLN Government Boiler supplied by Babcock amp Wilcox Beijing Co Turbines and generators supplied by Beijing Beizhong Madura coal fired Pamekasan East Java Java Bali 2 x 100 200 PT PLN Government Bojonegara coal fired Bojonegara Cilegon Banten Java Bali 3 x 740 2 220 PT PLN Government Tanjung Jati A coal fired Cirebon Cirebon West Java Java Bali 2 x 660 1 320 PT Bakrie Power Private Nusa Penida coal fired Nusa Penida Bali Java Bali 2 x 100 200 PT PLN Government Anyer coal fired Anyer Banten Java Bali 1 x 330 330 PT PLN Government Kuala Tanjung coal fired Kuala Tanjung South Sumatra Sumatra 2 x 112 224 PT Ranyza Energi Private Banjarsari coal fired Banjarsari Lahat South Sumatra Sumatra 2 x 100 200 PT Bukit Pembangkit Innovative Private Banyuasin coal fired Banyuasin Banyuasin South Sumatra Sumatra 2 x 100 200 PT Banyuasin Power Energy Private Baturaja coal fired Baturaja Ogan Komering Ulu South Sumatra Sumatra 2 x 100 200 PT Priamanaya Power Energi Private Simpang Belimbing coal fired Gunung Raja Muara Enim South Sumatra Sumatra 2 x 150 300 PT GH EMMI Private Arahan coal fired Arahan Muara Enim South Sumatra Sumatra 4 x 600 2 400 PT PLN Government Central Bangko coal fired Bangko Tengah Muara Enim South Sumatra Sumatra 4 x 620 2 480 PT BA amp CHD China 7 Private West Kalimantan 1 coal fired Tanjung Gundul Bengkayang West Kalimantan Kalimantan 2 x 100 200 PT GCL Indotenaga Government private Tanjung coal fired Tanjung Tabalong South Kalimantan Kalimantan 2 x 55 110 PT PLN Government Total 34 17 264 Gas or liquid fuel edit Power station Location District Province Region Coordinates Capacity per unit MW Capacity MW Operator Sector Refs Bekasi West Java 130 Betara Lampung 70 Grati CCGT Grati Pasuruan East Java Java Bali 7 39 06 S 113 01 28 E 7 6517 S 113 0244 E 7 6517 113 0244 Grati CCGT 3 x 100 75 GTPP 3 x 100 75 SPP 1 x 159 58 CCPP 764 PT Indonesia Power Government 10 11 Gresik CCGT Gresik Gresik East Java Java Bali 7 09 48 S 112 39 41 E 7 1633 S 112 6615 E 7 1633 112 6615 Gresik CCGT 4 x GTPP 4 x SPP 3 x CCPP 2 255 PT Pembangkitan Jawa Bali Government 12 Muara Tawar CCGT Tarumajaya Bekasi West Java Java Bali 06 05 09 37 S 106 59 48 15 E 6 0859361 S 106 9967083 E 6 0859361 106 9967083 Muara Tawar CCGT 2 x GTPP 3 x CCPP 920 PT Pembangkitan Jawa Bali Government Muara Karang CCGT Muara Karang North Jakarta DKI Jakarta Java Bali 6 06 31 S 106 47 16 E 6 1087 S 106 7877 E 6 1087 106 7877 Muara Karang CCGT 5 x STPP 1 x CCPP 1 208 PT Pembangkitan Jawa Bali Government 13 14 Palembang Timur South Sumatra 150 PLTG Senipah Senipah Kutai Kartanegara East Kalimantan Kalimantan 2x 46 GTG 92 PT Kertanegara Energi Perkasa IPP PLTG MG Kalbar Peaker Parit Baru Mempawah West Kalimantan Kalimantan 100 100 PT PLN Government 2019 Sengkang South Sulawesi 150 Tambak Lorok CCGT Tambak Lorok Semarang Central Java Java Bali 6 x 109 65 GTPP 2 x 50 SPP 1 x 200 SPP 2 x 188 CCPP 1 334 PT Indonesia Power Government Tanjung Priok CCGT Tanjung Priok North Jakarta DKI Jakarta Java Bali 2 x 26 GTPP 2 x 48 8 GTPP 2 x 50 SPP 6 x 130 CCGT 2 x 200 CCGT 1 430 PT Indonesia Power Government Senayan Diesel Senayan Jakarta DKI Jakarta Java Bali 6 2160361 106 7953257 6 x 2 52 15 PT Indonesia Power Government PLTU 400 MW Ciwandan Cilegon Banten Java Bali 5 x 80 STG 400 MW PT Krakatau Daya Listrik SOE PLTGU 120 MW Ciwandan Cilegon Banten Java Bali 2 x 39 GTG 1 x 43 STG 120 MW PT Krakatau Daya Listrik SOE Total 68 8 446Renewable editGeothermal edit Note IPP means independent power producer Power station Location District Province Region Capacity per unit MW Installed capacity MW Operator Sector Remarks Kamojang geothermal Kamojang Garut West Java Java Bali Unit I 30 Unit II 55 Unit III 55 Unit IV 60 Unit V 35 235 PT Indonesia Power Government Unit IV 63 MW turbine capacity and 80 MVA generator capacity both from Fuji Electric Kawasaki Japan 15 Darajat geothermal Kamojang Garut West Java Java Bali Unit I 55 55 PT Indonesia Power Government Darajat geothermal Kamojang Garut West Java Java Bali Unit II 90 Unit III 110 200 PT Pertamina Chevron Geothermal Indonesia Ltd IPP Private Turbines Unit II 81 3 MW amp Unit III 110 MW and Generators Unit II 101 625 MVA amp Unit III 137 5 MVA both supplied by Fuji Electric Kawasaki Japan 16 Gunung Salak geothermal Parung Kuda Sukabumi West Java Java Bali 3 x 60 180 PT Indonesia Power Government Turbines 55 MW and Generators 55 MVA both supplied by Ansaldo Energia Italy 17 Gunung Salak geothermal Parung Kuda Sukabumi West Java Java Bali 3 x 55 165 Chevron Geothermal Salak Ltd and Dayabumi Salak Pratama Ltd IPP Private Turbines 59 5 MW and Generators 74 375 MVA both from Fuji Electric Kawasaki Japan Ulubelu Geothermal Power Station Ulubelu Tanggamus Lampung Sumatra 2 x 55 110 PT PLN Government Turbines 2 x 55 MW and Generators 2 x 55 MVA both from Fuji Electric Kawasaki Japan 18 Wayang Windu geothermal Pengalengan Bandung West Java Java Bali 1 x 110 1 x 117 1 x 127 by mid 2013 227 PT Pertamina and Magma Nusantara Ltd IPP Private Turbines 110 MW amp 117 MW and Generators 2 x 137 5 MVA both from Fuji Electric Kawasaki Japan 19 Dieng geothermal Dieng Banjarnegara Central Java Java Bali 1 x 60 60 PT Geo Dipa Energi IPP Private Lahendong geothermal Lahendong Minahasa North Sulawesi Sulawesi Unit I 20 Unit II 20 Unit III 20 Unit IV 20 80 PT PLN Government Unit I turbines 20 MW and generator 25 MVA both from Alstom 20 Unit II turbines 20 MW and generator 25 MVA both from Fuji Electric Kawasaki Japan 21 Unit III turbines 20 MW and generator 25 MVA both from Fuji Electric Kawasaki Japan 22 Unit IV turbines 20 MW and generator 25 MVA both supplied by Fuji Electric Kawasaki Japan 23 Sibayak geothermal Sibayak Karo North Sumatra Sumatra 2 x 5 65 11 3 PT Dizamatara Powerindo IPP Private Turbines 5 85 MW and Generators 6 MVA 5 65 MW at PF 0 94 24 Patuha geothermal Patuha Bandung West Java Java Bali Unit 1 55 55 by mid 2014 PT Geo Dipa Energi IPP Private Turbines Unit 1 60 MW and Generator Unit 1 75 MVA both supplied by Toshiba 25 Total 19 1 344 Hydroelectric edit Note IPP means independent power producer Power station Location District Province Region Capacity per unit MW Installed capacity MW Operator Sector Remarks Agam hydro Batang Agam Agam West Sumatra Sumatra 3 x 3 5 10 PT PLN Government Turbines 3 55 MW and Generators 3 95 MVA both supplied by Ebara Maninjau hydro Maninjau Agam West Sumatra Sumatra 4 x 17 68 PT PLN Government Turbines 17 4 MW and Generators 20 MVA both supplied by Toshiba Singkarak hydro Singkarak Solok West Sumatra Sumatra 4 x 43 75 175 PT PLN Government Turbines 43 75 MW supplied by VoestAlpine and Generators 52 MVA supplied by ELIN now ANDRITZ Hydro Koto Panjang hydro Koto Panjang Kampar Riau Sumatra 3 x 38 114 PT PLN Government Turbines 39 4 MW supplied by Kvaerner Boving and Generators 45 MVA supplied by ELIN now ANDRITZ Hydro Test I hydro Tes Rejang Lebong Bengkulu Sumatra 4 x 4 16 PT PLN Government Turbines 4 7 MW supplied by Ansaldo Energia Musi hydro Ujanmas Atas Kepahiang Bengkulu Sumatra 3 x 70 210 PT PLN Government Turbines 70 MW and Generators 86 MVA both supplied by VA Tech Hydro now ANDRITZ Hydro Besai hydro Sumberjaya West Lampung Lampung Sumatra 2 x 45 90 PT PLN Government Turbines 46 4 MW and Generators 53 MVA both supplied by VA Tech Hydro now ANDRITZ Hydro Batutegi hydro Tanggamus West Lampung Lampung Sumatra 2 x 14 28 PT PLN Government Turbines 14 2 MW and Generators 15 7 MVA both supplied by Toshiba Lau Renun hydro Silalahi Dairi North Sumatra Sumatra 2 x 41 82 PT PLN Government Turbines 41 MW and Generators 47 5 MVA both supplied by VA Tech Hydro now ANDRITZ Hydro Sipansihaporas hydro Sipansihaporas Central Tapanuli North Sumatra Sumatra 1 x 33 1 x 17 50 PT PLN Government Power Station 1 Turbines 34 MW by Meiden Japan and Generator 39 MVA by Toshiba Power Station 2 17 6 MW Meiden Japan and Generator 20 MVA by Toshiba 26 Asahan I hydro Parmaksian Toba Samosir North Sumatra Sumatra 2 x 90 180 PT Bajradaya Sentranusa IPP Private Turbines and Generators supplied by Dongfang Electric Corp Ltd Asahan III hydro Pintu Pohan Meranti Toba Samosir North Sumatra Sumatra 2 x 87 174 PT PLN Government Sigura gura hydro Simorea Asahan North Sumatra Sumatra 4 x 71 50 286 PT Inalum Private Turbines 71 5 MW and Generators 80 MVA both supplied by Toshiba Tangga hydro Tangga Asahan North Sumatra Sumatra 4 x 79 25 317 PT Inalum Private Turbines 81 1 MW supplied by Hitachi Ltd and Generators 90 MVA supplied by Mitsubishi Electric Wampu hydro Kota Buluh Karo North Sumatra Sumatra 3 x 15 45 PT Wampu Electric Power IPP Private Kerinci hydro Batang Merangin Kerinci Jambi Sumatra 6 x 30 180 PT PLN Government Turbines 30 MW and Generators 33 33 MVA 27 Saguling hydro Rajamandala Cimahi West Java Java Bali 4 x 175 18 701 PT Indonesia Power Government Turbines 175 18 MW supplied by Toshiba and Generators 194 MVA supplied by Mitsubishi Electric Co Cirata hydro Plered Purwakarta West Java Java Bali 8 x 126 1 008 PT Pembangkitan Jawa Bali Government Turbines 129 6 MW supplied by VoestAlpine and Generators 140 MVA supplied by ELIN now ANDRITZ Hydro Jatiluhur hydro Jatiluhur Purwakarta West Java Java Bali 6 x 31 186 PT Jasa Tirta II Government Turbines 32 3 MW supplied by NEYRPIC and Generators 35 MVA supplied by GEC Alsthom Jeumont PB Sudirman hydro Mrica Banjarnegara Central Java Java Bali 3 x 60 3 181 PT Indonesia Power Government Turbines supplied by Boving and Generators supplied by ASEA Sutami hydro Karangkates Malang East Java Java Bali 3 x 35 105 PT Pembangkitan Jawa Bali Government Wlingi hydro Wlingi Malang East Java Java Bali 2 x 27 54 PT Pembangkitan Jawa Bali Government Tonsea Lama hydro Tondano Minahasa North Sulawesi Sulawesi 1 x 4 44 1 x 4 50 1 x 5 44 14 PT PLN Government Tanggari I amp II hydro Tondano Minahasa North Sulawesi Sulawesi 1 x 17 20 1 x 19 36 PT PLN Government Bakaru I amp II hydro Bakaru Pinrang South Sulawesi Sulawesi 2 x 63 1 x 65 191 PT PLN Government Larona hydro Soroako East Luwu South Sulawesi Sulawesi 3 x 65 195 INCO Private Turbines 67 3 MW supplied by Sulzer amp GE and Generators 85 MVA supplied by Hitachi amp VA Tech Hydro Balambano hydro Soroako East Luwu South Sulawesi Sulawesi 2 x 70 140 INCO Private Turbines 68 5 MW and Generators 80 6 MVA both supplied by Canadian General Electric Karebbe hydro Soroako East Luwu South Sulawesi Sulawesi 2 x 66 132 INCO Private Turbines 63 7 MW and Generators 78 MVA both supplied by VA Tech Hydro now ANDRITZ Hydro Pamona 2 hydro Pamona Utara Poso Central Sulawesi Sulawesi 4 x 65 260 PT Poso Energi IPP Private Turbines 66 66 MW and Generators 72 2 MVA 27 Riam Kanan hydro Aranio Martapura South Kalimantan Kalimantan 3 x 10 30 PT PLN Government Turbines 10 5 MW and Generators 11 MVA both supplied by Fuji Electric Co Ltd Japan 28 Total 88 4 755 Pumped storage hydroelectric edit Currently under construction or planned 29 Power station Location District Province Region Capacity per unit MW Installed capacity MW Operator Sector Remarks Upper Cisokan pumped storage hydro COD 2015 Cianjur Cisokan river and Cirumamis river Cianjur and Bandung Barat West Java Java Bali 4 x 260 MW pump turbine or 4 x 275 MVA motor generator 1 040 MW pump turbine or 1 100 MVA motor generator PT PLN Government Matenggeng pumped storage hydro COD 2020 Majenang Cijolang river and Cimancing river Ciamis West Java Java Bali 2 x 443 MW pump turbine or 2 x 460 MVA motor generator 886 MW pump turbine or 920 MVA motor generator PT PLN Government Grindulu pumped storage hydro COD 2021 Tegalombo Pacitan East Java Java 4 x 260 MW pump turbine or 4 x 75 MVA motor generator 1 040 MW pump turbine or 1 100 MVA motor generator PT PLN Government 30 Kali Konto pumped storage hydro COD 2027 Bandar Kedungmulyo Jombang East Java Java Bali 4 x 260 MW pump turbine or 4 x 275 MVA motor generator 1 040 MW pump turbine or 1 100 MVA motor generator PT PLN Government Lake Toba pumped storage hydro COD 2020 Toba Toba Samosir North Sumatera Sumatera 4 x 110 MW pump turbine or 4 x 125 MVA motor generator 490 MW pump turbine or 500 MVA motor generator PT PLN Government Total 18 Units 1364 MW pump turbine or 4 720 MVA motor generator Wind edit Power station Location District Province Region Capacity per unit MW Installed capacity MW Operator Sector Remarks Sidrap Sidenreng South Sulawesi Sulawesi 75 31 Jeneponto Jeneponto South Sulawesi Sulawesi 72 32 Solar edit Power station Location District Province Region Installed capacity MW Operator Sector Remarks Cirata floating solar Cirata Dam Sidenreng West Java Java Bali 192 In development 33 34 Batam floating solar Duriangkang Reservoir Batam Riau Islands Riau Islands 2200 In development 35 36 See also edit nbsp energy portal nbsp Indonesia portal Energy in Indonesia List of largest power stations in the worldReferences editLarge Scale Hydropower Plants in Indonesia by Indonesia Hydro Consult http www arcgis com apps OnePane basicviewer index html appid 65ed8bc862bd4af09c375d49f9d389d4 Small Scale Hydropower Plants in Indonesia by Indonesia Hydro Consult http www arcgis com apps OnePane basicviewer index html appid 2dffb753a63142b0bf7075389414daae a b Coal Fired Power Plants in Indonesia other islands Gallery Power Plants Around The World 25 January 2014 Archived from the original on 6 December 2012 Retrieved 9 March 2014 Paiton PLN Coal Power Plant Indonesia GEO Global Energy Observatory Retrieved 9 March 2014 Suralaya Coal Power Plant Global Energy Observatory Retrieved 9 March 2014 a b c d e f g h i Coal Fired Power Plants in Indonesia Java Gallery Power Plants Around The World 25 January 2014 Archived from the original on 31 January 2014 Retrieved 9 March 2014 Introduction to Indonesia Labuhan Angin 2X115MW CFB Power Plant Project Shanghai Electric Suppliers of power plant equipment in Indonesia Java 4 Coal Power Station Will Operate In 2021 Java 7 Coal Power Station Will Finish Faster Consortium J Power Ithocu and Adaro is the bid winner of PLTU Central Java 2x1000 MW 1 Archived 2012 04 16 at the Wayback Machine CCGT Plants in Indonesia Gallery Power Plants Around The World 17 October 2012 Retrieved 9 March 2014 Grati CCGT Power Plant Global Energy Observatory Retrieved 9 March 2014 Gresik CCGT Power Plant Global Energy Observatory Retrieved 9 March 2014 Muara Karang CCGT Power Plant Global Energy Observatory Retrieved 9 June 2014 Muara Karang Gas Power Plant Project PDF Project Fact Sheet Tebeton Archived from the original PDF on 14 July 2015 Retrieved 9 June 2014 The geothermal steam turbine generator is produced by Fuji Japan Ltd permanent dead link Yokogawa Receives Control System Order for Geothermal Power Plant from Fuji Electric Systems 2 http www ansaldoenergia com PDF Ref Therm pdf permanent dead link Home fujielectric com http www fujielectric com company tech archives pdf 47 04 FER 47 04 102 2001 pdf bare URL PDF Lahendong Indonesia 20 MW geothermal power plant permanent dead link Lahendong II 20 MW Geothermal Project permanent dead link Yokogawa has won an order from Fuji Electric Systems to supply a CENTUM CS 3000 distributed control system for the Lahendong III 3 Table 1 Recent geothermal power generation projects PT Dizamatara Powerindo DP propose to set up a geothermal power project in the North Sumatera 4 permanent dead link Marubeni and Toshiba Win FTK Order for Indonesia s Patuha Unit 1 Geothermal Power Plant 5 Sipansihaporas hydro E S JICA a b Archived copy PDF Archived from the original PDF on 2016 03 03 Retrieved 2012 03 11 a href Template Cite web html title Template Cite web cite web a CS1 maint archived copy as title link The description on Riam Kanan Hydro Electric Project in Kalimantan Indonesia 6 Rencana Usaha Penyediaan Tenaga Listrik PT PLN Persero 2011 2020 Acceleration and Expansion of Indonesian Economic Development 2011 2025 PDF Master Plan Retrieved 22 January 2012 permanent dead link Andi Hajramurni 2018 07 02 Jokowi inaugurates first Indonesian wind farm in Sulawesi The Jakarta Post Retrieved 2020 02 19 Tampubolon Agus Praditya 2019 07 17 Simamora Pamela ed Wind Farm is Coming to Indonesia and The Power Sector isn t Ready IESR Archived from the original on 30 August 2021 Retrieved 2021 08 30 Garanovic Amir 2023 03 07 Chinese company to supply floating system for Indonesia s 192MW floating solar farm Offshore Energy Retrieved 2023 07 15 Cirata Floating Solar Photovoltaic masdar ae Retrieved 2023 07 15 Correspondent Wahyudi SoeriaatmadjaIndonesia 2023 07 07 Work on Indonesia Singapore floating solar farm in Batam to start next year The Straits Times ISSN 0585 3923 Retrieved 2023 07 15 Sunseap signs MoU to build floating solar farm in Batam Data Centre Dynamics Retrieved from https en wikipedia org w index php title List of power stations in Indonesia amp oldid 1222944092, wikipedia, wiki, book, books, library,